HomeMy WebLinkAboutFY 17-18 Comprehensive Fee SchedulePER RESOLUTION 23854, ADOPTED JULY 15, 2015, SECTION 2.D. "ON JULY 1ST OF EACH YEAR,
ALL SERVICE FEES AND CHARGES SHALL BE AUTOMATICALLY ADJUSTED BY AN AMOUNT EQUAL
TO THE PERCENTAGE OF INCREASE OR DECREASE IN TOTAL EMPLOYEE COMPENSATION FOR
THE CURRENT FISCAL YEAR'S ADOPTED BUDGET VERSUS THE NEW FISCAL YEAR'S BUDGET AS
LAST COMPUTED BEFORE THE PUBLIC HEARING."
EFFECTIVE JULY 1, 2017
FISCAL YEAR 2017-2018
COMPREHENSIVE FEE SCHEDULE
CITY OF PALM SPRINGS
AIRPORT 3
BUILDING 4
CITY CLERK 16
COMMUNITY TELEVISION 18
ENGINEERING 19
FINANCE 24
FIRE 27
GOLF COURSE 36
LIBRARY 37
PARKS & RECREATION 39
PLANNING 47
POLICE 54
RENT CONTROL 58
RIGHT-OF-WAY 59
STREETS 60
TRAFFIC 61
VACATION RENTAL COMPLIANCE 62
WASTEWATER 63
CORRESPONDENCE FOOTNOTES 66
TABLE OF CONTENTS
COMPREHENSIVE FEE SCHEDULE
CITY OF PALM SPRINGS
- AIRPORT -
FEE UNIT
AIRPORT USE FEES
PUBLIC PARKING - LONG TERM LOT
EACH 20 MINUTES $1
MAXIMUM CHARGE FOR 24 HOUR PERIOD $17 DAILY MAXIMUM
DESCRIPTION
AIRPORT DEPARTMENT
COMPREHENSIVE FEE SCHEDULE
CITY OF PALM SPRINGS
3
- BUILDING DEPARTMENT -
FEE UNIT
1
2
3
4
$293.75
COPYING (MISC. DOCUMENTS, TEXTS, ETC.)
$0.10 PER PAGE
$178.00 DOUBLE THE AMT. OF FEE
GENERAL MISCELLANEOUS FEES
PERMIT PROCESSING ISSUANCE FEE ………………………………………$36.04
ALTERNATE MATERIALS / CODE RESEARCH ……………………………$232.60
FOUNDATIONS (SIGNS, SOLAR FARMS, ETC.)
1-100 SQ. FT. …………………………………………………………$89.54
EACH ADDITIONAL 100 SQ. FT. ………………………………$13.10
REINSPECTION FEES ………………………………………………………………$163.80
INVESTIGATION FEE ………………………………………………………………2X PERMIT
$1.58 PER $1,000 OF BUILDING
VALUATION
CODE COMPLIANCE INSPECTION FEE ……………………………………$158.34
UNREASONABLE HARDSHIP WAIVER (ADA) ……………………………$254.44
GREASE TRAP WAIVER ……………………………………………………………$254.44
GENERAL PLAN MAINTENANCE FEE (% OF FEE) ………………………7%OF FEE
OCCUPATIONAL LICENSING ……………………………………………………$54.60
HOURLY RATES BY FUNCTION
PLAN REVIEW …………………………………………………………………………$169.26
BUILDING INSPECTION …………………………………………………………$163.80
COUNTER SERVICE …………………………………………………………………$143.05
AFTER HOURS INSPECTION ……………………………………………………$327.60
ADMINISTRATIVE FEE AND SPECIAL PURPOSE FEE AS APPLICABLE
FEE REFUNDS
THE BUILDING OFFICIAL MAY AUTHORIZE THE REFUNDING OF NOT MORE THAN 80 PERCENT OF THE PLAN REVIEW FEE
PAID WHEN AN APPLICATION FOR A PERMIT FOR WHICH A PLAN REVIEW FEE HAS BEEN PAID IS WITHDRAWN OR
CANCELED BEFORE ANY PLAN REVIEWING IS DONE.
THE BUILDING OFFICIAL MAY AUTHORIZE THE REFUNDING OF NOT MORE THE 80 PERCENT OF THE PERMIT FEE PAID
WHEN NO WORK HAS BEEN DONE UNDER A PERMIT ISSUED IN ACCORDANCE WITH THIS CODE.
THE BUILDING OFFICIAL MAY AUTHORIZE THE REFUNDING OF ANY FEE PAID HEREUNDER WHICH WAS ERRONEOUSLY
PAID OR COLLECTED
BOARD OF APPEALS FEE ……………………………………………………………………
PAGE FEE ………………………………………………………………………………
FAST TRACK PLAN REVIEW (WHERE AVAILABLE) …………………..……
TECHNOLOGY SURCHARGE ………………………………………………….
(PERMIT SYSTEM MAINTENANCE, DIGITAL DOCUMENT
SCANNING & STORAGE, ETC.)
THE BUILDING OFFICIAL SHALL NOT AUTHORIZE THE REFUNDING OF ANY FEE PAID, EXCEPT UPON WRITTEN
APPLICATION FILED BY THE ORIGINAL PERMITTEE NOT LATER THAN 180 DAYS AFTER THE DATE OF FEE PAYMENT.
CITY OF PALM SPRINGS
DESCRIPTION
BUILDING DEPARTMENT
COMPREHENSIVE FEE SCHEDULE
4
- BUILDING DEPARTMENT -
FEE UNIT
CITY OF PALM SPRINGS
DESCRIPTION
BUILDING DEPARTMENT
COMPREHENSIVE FEE SCHEDULE
INTERNAL PLAN REVIEW (IN-HOUSE)
PLAN REVIEW SFH ADDITION …………………………………$381.11
PLAN REVIEW SFH REMODEL …………………………………$762.22
DOOR / WINDOWS PLAN REVIEW …………………………$85.18
PATIO LATTICE PLAN REVIEW …………………………………$85.18
PATIO COVERED PLAN REVIEW ………………………………$85.18
POOL / SPAS PLAN REVIEW ……………………………………$85.18
SFR PHOTOVOLTAIC PLAN REVIEW …………………………$85.18
LOCAL DEVELOPMENT MITIGATION FEE 18
(R22953 AND CPI INCREASE EFFECTIVE 7/1/2015)
$1,245 PER DWELLING UNIT
$518 PER DWELLING UNIT
$228 PER DWELLING UNIT
COMMERCIAL ………………………………………………………………………$5,529 PER ACRE
INDUSTRIAL …………………………………………………………………………$5,529 PER ACRE
MICROFILMING FEES
$2.14 FIRST PAGE
$0.36 PER PAGE
$1.52 PER SHEET
NEWSRACKS
REGISTRATION ………………………………………………………………………$36.04 PER NEWSRACK, PER YEAR
IMPOUNDMENT ……………………………………………………………………$49.14 PER IMPOUNDED NEWSRACK
$169.26 PER HOUR
$169.26 PER HOUR
$169.26 PER HOUR
OUTSIDE NORMAL BUSINESS HOURS ……………………$327.60
WHEN NO SPECIFIC FEE IS INDICATED ……………………$163.80 PER HOUR
2X FEE SEE: SPECIAL PURPOSE FEES
RESIDENTIAL, DENSITY BETWEEN 8.1 AND 14.0 DWELLING
UNITS PER ACRE ………………………………………………………………….
RESIDENTIAL, DENSITY LESS THAN 8.0 DWELLING UNITS PER
ACRE ……………………………………………………………………………………
PAGE FEE
OTHER INSPECTIONS AND FEES
ADDITIONAL PLAN REVIEW …………………………………….………….
REQUIRED BY CHANGES, ADDITIONS OR REVISIONS TO
APPROVED PLANS
EXCEEDING SECOND CHECK ……………………………………………………
MAJOR REVISION TO PLANS ……………………………………………………
INSPECTIONS
INVESTIGATIVE FEE ……………………………………………………………
(FOR ELECTRICAL WORK STARTED WITHOUT REQUIRED PERMITS)
RESIDENTIAL, DENSITY GREATER THAN 14.1 DWELLING
UNITS PER ACRE ………………………………………………………………….
LARGE PLANS (18'X24'36') ……………………………………………………
PAGE 2 AND ALL PAGES THEREAFTER ……………………………………
PAGE 1 …………………………………………………………………………………
5
- BUILDING DEPARTMENT -
FEE UNIT
CITY OF PALM SPRINGS
DESCRIPTION
BUILDING DEPARTMENT
COMPREHENSIVE FEE SCHEDULE
$169.26 PER HOUR
$163.80
PERMIT ISSUANCE ADMINISTRATIVE FEE ………………$36.04 EACH PERMIT, PLUS ANY OF
THE FOLLOWING:
MINIMUM PLUMBING FEE ……………………………………$85.18 OR THE FOLLOWING
WHICHEVER IS GREATER
$169.26
$163.80 PER HOUR
SEE: SPECIAL PURPOSE FEES
$327.60 SEE: SPECIAL PURPOSE FEES
$163.80 PER HOUR
SEE: SPECIAL PURPOSE FEES
2X FEE SEE: SPECIAL PURPOSE FEES
$169.26 PER HOUR
$163.80
PERMITS
$158.34 SEE: SPECIAL PURPOSE FEES
PERMIT ISSUANCE ADMINISTRATIVE FEE ………………$36.04 EACH PERMIT, PLUS
MINIMUM ELECTRICAL PERMIT FEE ………………………$85.18
OUTSIDE OF NORMAL BUSINESS HOURS …………….…………………….SEE: SPECIAL PURPOSE FEES
PERMIT ISSUANCE ADMINISTRATIVE FEE ………………$36.04 EACH PERMIT, PLUS ANY OF
THE FOLLOWING:
MINIMUM MECHANICAL PERMIT FEE ……………………$85.18 OR THE FOLLOWING,
WHICHEVER IS GREATER:
SUPPLEMENTAL FEE
RE-INSPECTION FEES ……………………………………………………….…
(ASSESSED UNDER PROVISIONS OF THE BUILDING ADMIN. CODE)
REINSPECTION FEE …………………………………………………………………
PLUMBING PERMIT FEES
ADDITIONAL PLAN REVIEW ……………………………………………….
REQUIRED BY CHANGES, ADDITIONS OR REVISIONS TO APPROVED PLANS
EXCEEDING SECOND CHECK INSPECTIONS ………………………………
OUTSIDE NORMAL BUSINESS HOURS ……………………………………
OTHER INSPECTIONS AND FEES
WHEN NO SPECIFIC FEE IS INDICATED ……………………………………
INVESTIGATION FEE ……………………………………………………………
(FOR ELECTRICAL WORK STARTED WITHOUT REQUIRED PERMITS)
MAJOR REVISION …………………………………………………………….…
(TO IMPROVEMENT PLANS PRIOR TO APPROVAL)
MECHANICAL PERMIT FEE
ELECTRICAL PERMIT FEES
(TO IMPROVEMENT PLANS PRIOR TO APPROVAL)
(ANY OF THE FOLLOWING SUPPLEMENTAL FEES, WHICHEVER ONE IS GREATER)
CODE COMPLIANCE INSPECTION AND REPORT ………………………
MAJOR REVISIONS …………………………………………………………….
INSPECTIONS
6
- BUILDING DEPARTMENT -
FEE UNIT
CITY OF PALM SPRINGS
DESCRIPTION
BUILDING DEPARTMENT
COMPREHENSIVE FEE SCHEDULE
$36.04 PER PERMIT,
PLUS APPLICABLE PERMIT
VALUATIONS
PLAN CHECK FEES
10%OF TOTAL PLAN CHECK FEE
10%OF TOTAL PLAN CHECK FEE
$169.26
$169.26 PER HOUR
$169.26 PER HOUR
1. HOURLY
2. OVERHEAD
3. MAILING CHARGES
4. TELEPHONE CHARGES
5. PRINTING COSTS
RESIDENTIAL
SINGLE FAMILY HOME (NEW)
$1,206.66
$110.29
SINGLE FAMILY HOME (ADDITION)
$306.85
$54.60
$10.92
SINGLE FAMILY ALT. (REMODEL)
$307.94
$96.10
$12.01
DOOR / WINDOWS
UP TO 2 OPENINGS ………………………………………………$170.35
EACH ADDITIONAL OPENING …………………………………$19.66
PATIO LATTICE
0-250 SQ. FT. …………………………………………………………$170.35 PLUS,
251 SQ. FT. AND GREATER ……………………………………$19.66 ADDITIONAL FEE
ADDITIONAL PLAN REVIEW
PROCESSING FEE ……………………………………………………………………
PUBLIC NUISANCE ADMINISTRATIVE CHARGES
THE ADMINISTRATIVE CHARGE ATTRIBUTABLE TO PUBLIC NUISANCE ABATEMENT SHALL BE THE TOTAL OF THE FOLLOWING ITEMS:
STATE HANDICAP REGULATIONS PLAN CHECK ………………………
1-200 SQ. FT. ……………………………………………………………….
EACH ADDITIONAL 100 SQ. FT. ………………………………….
1-1200 SQ. FT. ……………………………………………………………
EACH ADDITIONAL 100 SQ. FT. UP TO 1200 SQ. FT. ……
1-200 SQ. FT. ………………………………………………………………
EACH ADDITIONAL 100 SQ. FT. > 1200 SQ. FT. ……………
EACH ADDITIONAL 100 SQ. FT. UP TO 1200 SQ. FT. ……
EACH ADDITIONAL 100 SQ. FT. > 1200 SQ. FT. ……………
(SEE: PLANNING DIVISION: PLAN CHECKING FEES)
(ADD CHARGES FOR PLANNING DIVISION REVIEW WHEN APPLICABLE.)
EXCEEDING SECOND CHECK (MINIMUM ONE HOUR) …………
REQUIRED BY RE-SUBMITTAL DUE TO CHANGES,
ADDITIONS OR REVISIONS TO APPROVED PLAN ………….
STATE ENERGY REGULATIONS PLAN CHECK ……………………………
PERMIT ISSUANCE ADMINISTRATIVE FEE ………………….…..……………
(BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, &
MISCELLANEOUS)
7
- BUILDING DEPARTMENT -
FEE UNIT
CITY OF PALM SPRINGS
DESCRIPTION
BUILDING DEPARTMENT
COMPREHENSIVE FEE SCHEDULE
PATIO COVERED
0-250 SQ. FT. …………………………………………………………$170.35 PLUS,
251 SQ. FT. AND GREATER ……………………………………$19.66 ADDITIONAL FEE
POOLS / SPAS
EACH ……………………………………………………………………$334.15
MASONRY WALLS
0-100 LF …………………………………………………………………$211.85 PLUS,
EACH ADDITIONAL 25 LF ………………………………………$27.30 ADDITIONAL FEE
MISC. SINGLE INSPECTIONS ……………………………………………………$149.60
RESIDENTIAL MEP SIMPLE ……………………………………………………$85.18
RESIDENTIAL MEP COMPLEX …………………………………………………$211.85
TEMP. POWER POLE
FIRST POLE ……………………………………………………………$41.50 PLUS,
EACH ADDITIONAL SUB PANEL ………………………………$27.30 ADDITIONAL FEE
PHOTOVOLTAIC SOLAR
SINGLE FAMILY ………………………………………………………$219.49
COMMERCIAL UP TO 100 KW …………………………………$381.11
EACH ADDITIONAL KW …………………………………………$5.46
COMMERCIAL NEW CONSTRUCTION
FIRST 5000 SQ. FT. …………………………………………………$1,740.65
EACH ADDITIONAL 500 SQ. FT. ………………………………$81.90
EACH ADDITIONAL STORY OVER TWO,
ADD 1 HOUR INSPECTION TIME FOR EACH STORY
OVER 2 ……………………………………………………………..$163.80
COMMERCIAL SHELL
FIRST 5,000 SQ. FT. …………………………………………………$1,572.48
EACH ADDITIONAL 500 SQ. FT. ………………………………$62.24
EACH ADDITIONAL STORY OVER TWO,
ADD 1 HOUR INSPECTION TIME FOR EACH STORY
OVER 2 ……………………………………………………………..$163.80
COMMERCIAL TI
FIRST 1,000 SQ. FT. …………………………………………………$457.55
EACH ADDITIONAL 500 SQ. FT. ………………………………$41.50
PLAN REVIEW …………………………………………………………$677.04
COMMERCIAL MEP SIMPLE ……………………………………$158.34
COMMERCIAL MEP COMPLEX ………………………………$345.07
8
- BUILDING DEPARTMENT -
FEE UNIT
CITY OF PALM SPRINGS
DESCRIPTION
BUILDING DEPARTMENT
COMPREHENSIVE FEE SCHEDULE
TRASH ENCLOSURE ………………………………………………………………$158.34
INTERIOR PARTITIONS: 1-200 LF ……………………………………………$105.92 PLUS,
INTERIOR PARTITIONS: EACH ADDITIONAL 100 LF …………………$27.30 ADDITIONAL FEE
CEILINGS: FIRST 200 SQ. FT. ……………………………………………………$133.22 PLUS,
CEILINGS: EACH ADDITIONAL 100 SQ. FT. ………………………………$27.30 ADDITIONAL FEE
RE-ROOF < 3,000 SQ. FT. ………………………………………………………$149.60
RE-ROOF > 3,001 SQ. FT. ………………………………………………………$228.23
DEMO COMPLETE …………………………………………………………………$170.35
DEMO INTERIOR ……………………………………………………………………$211.85
$338.52 PLUS
$42.32 EACH ADDITIONAL 1/4 HOUR
$163.80 PER HOUR
$254.00 PER HOUR
2X FEE
2X FEE DOUBLE NORMAL FEE
$81.90 PAYABLE IN ADVANCE
(EXCEEDING ONE REPEAT ACCOMMODATION)
50%OF ORIGINAL FEE WITHIN
ONE YEAR
100%OF ORIGINAL FEE AFTER ONE
$149.60
$85.18
$5.46
$160.52
$1.58 PER $1,000 OF BLDG.
VALUATION
STATE REGULATED FEES
COMMERCIAL (MINIMUM OF $50.00) ………………………$0.10 PER $1,000 OF BLDG.
RESIDENTIAL (MINIMUM OF $50.00) ……………………….$0.10 PER $1,000 OF BLDG.
SPECIAL PURPOSE FEES
TECHNOLOGY ENHANCEMENT FEE ………………………………………
STREET NUMBER CHANGE ……………………………………………………
SWIMMING POOL DRAINING PERMITS ………………………………
SOLAR, WATER HEATING …………………………………………………….
CODE COMPLIANCE INSPECTION AND REPORT FEE
(MINIMUM 2 HOURS) ………………………………………………………….
STRONG - MOTION INSTRUMENTATION PROGRAM FEE ON BUILDING PERMITS
RE-ROOFING PERMIT (MINIMUM OF $50.00) ……………………………
RENEWAL OF EXPIRED PERMIT …………………………………………
(BUILDING, ELECTRICAL, PLUMBING, OR MECHANICAL)
RE-INSPECTION CALLS ………………………………………………………….
WORK STARTED WITHOUT REQUIRED PERMITS ……………………
(BUILDING, ELECTRICAL, PLUMBING OR MECHANICAL)
INVESTIGATION FEE ……………………………………………………………
OUTSIDE OF NORMAL BUSINESS HOURS (MIN. TWO HRS.) …….
NO FEE SPECIFICALLY INDICATED (MINIMUM ONE HOUR) ………
INSPECTIONS
9
- BUILDING DEPARTMENT -
FEE UNIT
CITY OF PALM SPRINGS
DESCRIPTION
BUILDING DEPARTMENT
COMPREHENSIVE FEE SCHEDULE
$36.04 PER APPLICATION
$81.90 PER INSPECTION
$251.16 PER INSPECTION
VACANT BUILDINGS
INSPECTION FEE FOR MULTI-FAMILY, COMMERCIAL OR
INDUSTRIAL BUILDINGS ………………………………………………………
INSPECTION FEE FOR SINGLE FAMILY RESIDENCE ………………
REGISTRATION ……………………………………………………………………
10
- BUILDING: CONTRACT PLAN REVIEW - NEW CONSTRUCTION -
4%
IBC
CLASS IBC OCCUPANCY TYPE PROJECT SIZE
THRESHOLD
2017 - 2018
BASE COST @
THRESHOLD SIZE
2017 - 2018
COST FOR EACH
ADDITIONAL
100 SF*
2017 - 2018
BASE COST @
THRESHOLD SIZE
2017 - 2018
COST FOR EACH
ADDITIONAL
100 SF*
2017 - 2018
BASE COST @
THRESHOLD SIZE
2017 - 2018
COST FOR EACH
ADDITIONAL
100 SF*
B 1,000 $983 $45.94 $874 $37.56 $874 $31.29
5,000 $2,821 $33.39 $2,376 $30.49 $2,125 $28.85
10,000 $4,490 $30.95 $3,901 $25.04 $3,568 $21.70
20,000 $7,585 $30.94 $6,405 $25.04 $5,737 $21.70
50,000 $16,868 $30.94 $13,918 $25.04 $12,247 $21.70
100,000 $32,341 $30.03 $26,438 $24.02 $23,097 $20.75
B 20,000 $7,585 $30.94
100,000 $32,341 $30.94
200,000 $63,285 $30.94
400,000 $125,174 $30.94
1,000,000 $310,841 $30.94
2,000,000 $620,285 $30.03
B 1,000 $546 $10.92 $546 $10.92 $546 $10.92
5,000 $983 $12.86 $983 $12.86 $983 $12.86
10,000 $1,626 $12.00 $1,626 $12.00 $1,626 $12.00
20,000 $2,826 $8.15 $2,826 $8.15 $2,826 $8.15
50,000 $5,270 $7.75 $5,270 $7.75 $5,270 $7.75
100,000 $9,144 $7.10 $9,144 $7.10 $9,144 $7.10
E 1,000 $983 $50.34 $928 $40.57 $928 $34.64
5,000 $2,996 $34.53 $2,551 $31.65 $2,314 $30.07
10,000 $4,723 $33.27 $4,133 $27.37 $3,818 $24.21
20,000 $8,050 $33.26 $6,870 $27.37 $6,239 $24.21
50,000 $18,031 $33.26 $15,079 $27.37 $13,503 $24.14
100,000 $34,666 $32.21 $28,763 $26.75 $25,606 $23.48
E 1,000 $546 $10.92 $546 $10.92 $2,000 $10.92
5,000 $983 $12.86 $983 $12.86 $983 $12.86
10,000 $1,626 $12.00 $1,626 $12.00 $1,626 $12.00
20,000 $2,826 $8.15 $2,826 $8.15 $2,826 $8.15
50,000 $5,270 $7.75 $5,270 $7.75 $5,270 $7.75
100,000 $9,144 $7.10 $9,144 $7.10 $9,144 $7.10
F-1 4,000 $1,569 $22.17 $1,263 $18.71 $1,067 $16.45
20,000 $5,117 $18.60 $4,258 $14.31 $3,700 $11.52
40,000 $8,838 $18.60 $7,120 $14.31 $6,004 $11.52
80,000 $16,278 $18.60 $12,844 $14.31 $10,611 $11.52
200,000 $38,600 $18.60 $30,016 $14.31 $24,431 $11.52
400,000 $75,806 $17.47 $58,635 $13.65 $47,466 $10.37
CONTRACT PLAN REVIEW - NEW CONSTRUCTION
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
IA, IB
CONSTRUCTION TYPE
IIA, IIB, IIIA, IIIB, IV
E OCCUPANCY
TENANT
IMPROVEMENTS
B OCCUPANCY
TENANT
IMPROVEMENTS
EDUCATIONAL -
GROUP
OCCUPANCY 6+
PERSONS, UP TO
THE 12TH GRADE
FACTORY
INDUSTRIAL -
MODERATE
HAZARD
BUSINESS - HIGH
RISE OFFICE
BUSINESS -
PROFESSIONAL
OFFICE
CPI ADJ FY 16-17 CONSTRUCTION TYPE CONSTRUCTION TYPE
VA, VB
11
- BUILDING: CONTRACT PLAN REVIEW - NEW CONSTRUCTION -
4%
IBC
CLASS IBC OCCUPANCY TYPE PROJECT SIZE
THRESHOLD
2017 - 2018
BASE COST @
THRESHOLD SIZE
2017 - 2018
COST FOR EACH
ADDITIONAL
100 SF*
2017 - 2018
BASE COST @
THRESHOLD SIZE
2017 - 2018
COST FOR EACH
ADDITIONAL
100 SF*
2017 - 2018
BASE COST @
THRESHOLD SIZE
2017 - 2018
COST FOR EACH
ADDITIONAL
100 SF*
CONTRACT PLAN REVIEW - NEW CONSTRUCTION
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
IA, IB
CONSTRUCTION TYPE
IIA, IIB, IIIA, IIIB, IV
CPI ADJ FY 16-17 CONSTRUCTION TYPE CONSTRUCTION TYPE
VA, VB
F-2 3,000 $1,229 $24.42 $1,000 $20.97 $854 $18.32
15,000 $4,159 $18.42 $3,516 $14.13 $3,053 $11.63
30,000 $6,923 $18.42 $5,636 $14.13 $4,798 $11.33
60,000 $12,450 $18.42 $9,875 $14.13 $8,201 $11.33
150,000 $29,032 $18.42 $22,592 $14.13 $18,405 $11.33
300,000 $56,667 $17.04 $43,788 $13.10 $35,411 $10.37
H-1 1,000 $983 $20.53 $874 $13.73 $874 $9.45
5,000 $1,804 $26.54 $1,423 $21.21 $1,251 $18.76
10,000 $3,131 $17.71 $2,483 $15.60 $2,189 $14.62
20,000 $4,902 $17.53 $4,044 $13.24 $3,652 $11.27
50,000 $10,161 $17.53 $8,014 $13.24 $7,032 $11.27
100,000 $18,925 $16.38 $14,633 $12.29 $12,668 $10.10
H-2 2,000 $1,092 $25.48 $983 $18.75 $983 $13.29
H-3 10,000 $3,131 $17.71 $2,483 $15.60 $2,046 $14.15
H-4 20,000 $4,902 $17.53 $4,044 $13.24 $3,462 $10.32
40,000 $8,408 $17.53 $6,691 $13.24 $5,527 $10.32
100,000 $18,925 $17.53 $14,633 $13.24 $11,718 $10.32
200,000 $36,454 $16.38 $27,869 $12.01 $22,041 $9.01
H-5 1,000 $983 $45.94 $874 $37.56 $874 $31.29
5,000 $2,821 $33.39 $2,376 $30.49 $2,125 $28.85
10,000 $4,490 $30.95 $3,901 $25.04 $3,568 $21.70
20,000 $7,585 $30.94 $6,405 $25.04 $5,737 $21.70
50,000 $16,868 $30.94 $13,918 $25.04 $12,247 $21.70
100,000 $32,341 $29.48 $26,438 $23.48 $23,097 $20.20
I-1 2,000 $1,346 $39.29 $1,155 $34.98 $1,054 $32.62
10,000 $4,490 $30.95 $3,954 $25.57 $3,664 $22.67
20,000 $7,585 $30.95 $6,512 $25.57 $5,931 $22.66
40,000 $13,774 $30.94 $11,628 $25.57 $10,464 $22.67
100,000 $32,341 $30.94 $26,975 $25.57 $24,062 $22.66
200,000 $63,285 $29.48 $52,553 $24.02 $46,729 $21.57
I-2 2,000 $2,090 $57.73 $1,933 $53.20 $1,833 $50.23
10,000 $6,708 $53.13 $6,189 $47.94 $5,852 $44.55
20,000 $12,021 $53.13 $10,983 $47.94 $10,307 $44.55
40,000 $22,646 $53.11 $20,571 $47.93 $19,219 $44.55
100,000 $54,520 $53.11 $49,332 $47.93 $45,950 $44.55
200,000 $107,645 $51.87 $97,270 $46.41 $90,505 $42.59
INSTITUTIONAL
HIGH HAZARD
GROUP 1-5
FACTORY
INDUSTRIAL -
LOW HAZARD
HIGH HAZARD
GROUP H-1 POSE
A DETONATION
HAZARD
INSTITUTIONAL
HIGH HAZARD
GROUP
12
- BUILDING: CONTRACT PLAN REVIEW - NEW CONSTRUCTION -
4%
IBC
CLASS IBC OCCUPANCY TYPE PROJECT SIZE
THRESHOLD
2017 - 2018
BASE COST @
THRESHOLD SIZE
2017 - 2018
COST FOR EACH
ADDITIONAL
100 SF*
2017 - 2018
BASE COST @
THRESHOLD SIZE
2017 - 2018
COST FOR EACH
ADDITIONAL
100 SF*
2017 - 2018
BASE COST @
THRESHOLD SIZE
2017 - 2018
COST FOR EACH
ADDITIONAL
100 SF*
CONTRACT PLAN REVIEW - NEW CONSTRUCTION
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
IA, IB
CONSTRUCTION TYPE
IIA, IIB, IIIA, IIIB, IV
CPI ADJ FY 16-17 CONSTRUCTION TYPE CONSTRUCTION TYPE
VA, VB
I-3 2,000 $1,512 $43.04 $1,302 $38.31 $1,175 $35.36
10,000 $4,955 $35.60 $4,366 $29.69 $4,004 $26.08
20,000 $8,515 $35.59 $7,335 $29.69 $6,612 $26.08
40,000 $15,634 $35.59 $13,273 $29.69 $11,827 $26.08
100,000 $36,992 $35.59 $31,088 $29.69 $27,476 $26.08
200,000 $72,586 $34.40 $60,782 $28.39 $53,554 $24.84
I-4 1,000 $928 $46.98 $874 $38.57 $874 $33.11
5,000 $2,808 $33.31 $2,417 $30.75 $2,198 $29.33
10,000 $4,473 $30.76 $3,954 $25.57 $3,665 $22.66
20,000 $7,549 $30.76 $6,512 $25.57 $5,931 $22.66
50,000 $16,779 $30.76 $14,185 $25.57 $12,729 $22.66
100,000 $32,162 $29.48 $26,975 $24.57 $24,062 $21.57
M 1,000 $819 $34.86 $764 $27.81 $764 $22.28
5,000 $2,213 $29.44 $1,877 $27.23 $1,655 $24.40
10,000 $3,686 $22.90 $3,239 $18.42 $2,875 $16.85
20,000 $5,975 $22.89 $5,081 $18.42 $4,560 $15.82
50,000 $12,844 $22.89 $10,608 $18.42 $9,307 $15.81
100,000 $24,292 $21.57 $19,820 $17.20 $17,218 $14.74
M 1,000 $546 $10.92 $546 $10.92 $546 $10.92
5,000 $983 $12.86 $983 $12.86 $983 $12.86
10,000 $1,626 $12.00 $1,626 $12.00 $1,626 $12.00
20,000 $2,826 $8.15 $2,826 $8.15 $2,826 $8.15
50,000 $5,270 $7.75 $5,270 $7.75 $5,270 $7.75
100,000 $9,144 $7.10 $9,144 $7.10 $9,144 $7.10
R-1 2,000 $1,353 $39.44 $1,168 $35.27 $1,064 $32.87
10,000 $4,509 $31.12 $3,990 $25.94 $3,693 $22.96
20,000 $7,621 $31.12 $6,584 $25.94 $5,990 $22.95
40,000 $13,845 $31.12 $11,771 $25.94 $10,581 $22.95
100,000 $32,520 $31.12 $27,333 $25.94 $24,356 $22.95
200,000 $63,643 $30.03 $53,269 $24.57 $47,315 $21.84
R-2 1,500 $939 $40.05 $819 $33.94 $764 $29.19
7,500 $3,343 $25.91 $2,856 $22.39 $2,516 $20.92
15,000 $5,286 $25.94 $4,535 $20.92 $4,085 $17.91
30,000 $9,177 $25.94 $7,675 $20.92 $6,773 $17.91
75,000 $20,848 $25.94 $17,092 $20.92 $14,836 $17.91
150,000 $40,300 $24.84 $32,787 $4,441.40 $28,275 $16.93
INSTITUTIONAL
RESIDENTIAL -
PERMANENT, 2+
DWELLINGS
APARTMENT,
DORMITORY,
TIMESHARE
M OCCUPANCY
TENANT
IMPROVEMENTS
MERCANTILE
INSTITUTIONAL
RESIDENTIAL-
TRANSIENT
BOARDING
HOUSES, HOTELS,
MOTELS
13
- BUILDING: CONTRACT PLAN REVIEW - NEW CONSTRUCTION -
4%
IBC
CLASS IBC OCCUPANCY TYPE PROJECT SIZE
THRESHOLD
2017 - 2018
BASE COST @
THRESHOLD SIZE
2017 - 2018
COST FOR EACH
ADDITIONAL
100 SF*
2017 - 2018
BASE COST @
THRESHOLD SIZE
2017 - 2018
COST FOR EACH
ADDITIONAL
100 SF*
2017 - 2018
BASE COST @
THRESHOLD SIZE
2017 - 2018
COST FOR EACH
ADDITIONAL
100 SF*
CONTRACT PLAN REVIEW - NEW CONSTRUCTION
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
IA, IB
CONSTRUCTION TYPE
IIA, IIB, IIIA, IIIB, IV
CPI ADJ FY 16-17 CONSTRUCTION TYPE CONSTRUCTION TYPE
VA, VB
R-3 1,500 $1,201 $13.54 $1,092 $14.96 $983 $14.09
2,500 $1,337 $43.57 $1,242 $39.75 $1,124 $35.27
3,500 $1,772 $38.00 $1,639 $36.69 $1,476 $35.05
4,500 $2,152 $36.91 $2,006 $33.74 $1,827 $29.76
6,500 $2,891 $27.32 $2,681 $27.17 $2,422 $27.05
10,000 $3,847 $25.12 $3,632 $24.02 $3,369 $24.02
R-3 1,500 $1,201 $13.54 $1,092 $14.96 $983 $14.09
2,500 $1,337 $43.57 $1,242 $39.75 $1,124 $35.27
3,500 $1,772 $38.00 $1,639 $36.69 $1,476 $35.05
4,500 $2,152 $36.91 $2,006 $33.74 $1,827 $29.76
6,500 $2,891 $27.32 $2,681 $27.17 $2,422 $27.05
10,000 $3,847 $25.12 $3,632 $24.02 $3,369 $24.02
R-3 1,500 $149 $6.77 $149 $6.77 $149 $6.77
2,500 $216 $6.77 $216 $6.77 $216 $6.77
3,500 $284 $6.77 $284 $6.77 $284 $6.77
4,500 $352 $5.68 $352 $5.68 $352 $5.68
6,500 $465 $5.21 $465 $5.21 $465 $5.21
10,000 $648 $4.91 $648 $4.91 $648 $4.91
R-4 1,500 $1,067 $43.95 $930 $39.75 $854 $36.65
7,500 $3,704 $30.76 $3,315 $25.56 $3,053 $23.24
15,000 $6,011 $30.76 $5,233 $25.57 $4,796 $22.67
30,000 $10,626 $30.76 $9,070 $25.57 $8,197 $22.66
75,000 $24,471 $30.76 $20,580 $25.57 $18,396 $22.66
150,000 $47,545 $29.76 $39,764 $24.57 $35,396 $21.57
RESIDENTIAL -
ASSISTED LIVING
(6-16 PERSONS)
DWELLINGS -
PRODUCTION
PHASE OF
MASTER PLAN
(REPEATS)
DWELLINGS -
CUSTOM HOMES
DWELLINGS -
MODELS, FIRST
MASTER PLAN
14
- BUILDING: MISCELLANEOUS FEES -
ITEM FEE
MISCELLANEOUS
ARBOR / TRELLIS $218
AWNING / CANOPY (SUPPORTED BY BUILDING)$218
BALCONY ADDITION $218
CARPORT $218
DECK (WOOD)$218
FIREPLACE $164
FOUNDATION
FOUNDDATION REPAIR $218
PATIO COVER
WOOD FRAME $218
METAL FRAME $218
OTHER FRAME $218
ENCLOSED, WOOD FRAME $246
ENCLOSED, METAL FRAME $246
ENCLOSED, OTHER FRAME $246
PHOTOVOLTAIC SYSTEM
RESIDENTIAL $191
COMMERCIAL, UP TO 4 KILOWATTS (NOTE 1)$273
COMMERCIAL, EACH ADDITIONAL 1 KILOWATT $55
REMODEL - RESIDENTIAL
LESS THAN 300 SF $164
KITCHEN $164
BATH $164
RETAINING WALL (CONCRETE OR MASONRY)
STANDARD (UP TO 50 LF)$164
ADDITIONAL RETAINING WALL (PER 50')$55
STORAGE RACKS
0-8' HIGH (UP TO 100 LF)$164
EACH ADDITIONAL 100 LF $55
OVER 8' HIGH (UP TO 100 LF)$218
EACH ADDITIONAL 100 LF $55
SWIMMING POOL/SPA
GUNITE (UP TO 800 SF)$328
ADDITIONAL POOL (OVER 800 SF)$109
SPA OR HOT TUB (PRE-FABRICATED)$218
CITY OF PALM SPRINGS - COMPREHENSIVE FEE SCHEDULE
BUILDING - MISCELLANEOUS ITEMS
15
- CITY CLERK -
FEE UNIT
ADMINISTRATIVE APPEALS BOARD
$164
APPEAL TO CITY COUNCIL
$568
CERTIFICATION ………………………………………………………………………………….$14 PER DOCUMENT
CITY COUNCIL AGENDAS AND MINUTES
$66 ANNUALLY
$142 ANNUALLY
COPIES AND PUBLICATIONS
NO CHARGE
$0.10 PER PAGE
DOMESTIC PARTNERSHIP REGISTRATION ……………………………………..$44 FOR REGISTRATION
$22 FOR TERMINATION
GENERAL PLAN
$13 EACH
$262 EACH
INITIATIVE FILING FEE ……………………………………………………………………..$200 STATE REGULATED FEE
MAILING DOCUMENTS
$7
$15
$42
MUNICIPAL CODE ……………………………………………………………………………..$103
$0.10 PER PAGE
$35 BASED ON ACTUAL VENDOR
COST - PER YEAR
ROOM RATES 13&14
$27
HALF DAY RENTAL ………………………………………………………$109
FULL DAY RENTAL ……………………………………………………….$218
HALF DAY (4 HOURS OR LESS) …………………………………………………$55 HALF DAY
FULL DAY (OVER 4 HOURS) ……………………………………………………..$109 FULL DAY
HALF DAY (4 HOURS OR LESS) ………………………………………………….$27 HALF DAY
FULL DAY (OVER 4 HOURS) ………………………………………………………$55 FULL DAY
SUPPLEMENT …………………………………………………………………………..
AGENDA …………………………………………………………………………………..
AGENDA & MINUTES ……………………………………………………………….
1-10 PAGES ………………………………………………………………………………
OVER 10 PAGES ……………………………………………………………………….
CD ……………………………………………………………………………………………
LARGE BOX ………………………………………………………………………………
MANILA ENVELOPES ………………………………………………………………..
#10 ENVELOPES ……………………………………………………………………….
COMPREHENSIVE FEE SCHEDULE
CITY OF PALM SPRINGS
APPEAL, MINIMUM DEPOSIT FOR HEARING ……………………………
GENERAL ADMINISTRATIVE APPEALS ………………………………………
DESCRIPTION
CONTRACT PROCESSING ………………………………………………………….
SMALL CONFERENCE ROOM
LARGE CONFERENCE ROOM
COUNCIL CHAMBER
CITY CLERK
PAPER COPY …………………………………………………………………………….
PER PAGE …………………………………………………………………………………
16
- CITY CLERK -
FEE UNIT
COMPREHENSIVE FEE SCHEDULE
CITY OF PALM SPRINGS
DESCRIPTION
CITY CLERK
ZONING MAPS (AVAILABLE ON OUR WEBSITE)
$11
ZONING ORDINANCE FULL DOCUMENT ………………………………………..$12
$0.10 PER PAGE BASED ON ACTUAL
VENDOR COST
$16 PER YEAR
CD (ELECTRONIC COPY) …………………………………………………………………………….
ZONING CODE SUPPLEMENTS ………………………………………………….
PER PAGE ………………………………………………………………………………..
17
- COMMUNITY TELEVISION -
FEE UNIT
$11
$107 PER HOUR
$61
$61
MINI DIGITAL / VIDEO CAMERA ………………………….$48 PER HOUR (MIN. 2 HRS.)
ADDITIONAL MONITORS, MICROPHONES, ETC. ..$5 PER HOUR (MIN. 2 HRS.)
$11 EACH
$27 EACH
NOTE:1
2 THIS PRICING DOES NOT INCLUDE RENTAL OF THE COUNCIL
CHAMBER OR THE LARGE CONFERENCE ROOM, WHICH MUST BE
DONE SEPARATELY. SEE: CITY CLERK
COUNCIL CHAMBER ……………………………………………………………..
ON-SCREEN TITLES ……………………………………………………………………………
WHILE IN PRODUCTION FROM THE COUNCIL CHAMBER OR
THE LARGE CONFERENCE ROOM OR IN POST PRODUCTION,
PHONE NUMBERS, PEOPLES NAMES AND TITLES, ETC., CAN
BE SUPERIMPOSED ON SCREEN
POST PRODUCTION EDITING
TRIMMING FOR CONTENT AND/OR LENGTH TO COMPLETE A
VIDEO PROJECT FOR CABLECAST …………………………………………
ALL EQUIPMENT WILL BE OPERATED BY PSCTV PERSONNEL ONLY.
PRODUCTION RATES
PER HOUR
(MINIMUM 2 HOURS)
TAPES SHIPPED BY UPS ………………………………………………………..
PROGRAMMING TAPES
COPIES OF PROGRAMS PRODUCED BY PSCTV ON DVD ………
SHIPPING OF TAPES
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
COMMUNITY TELEVISION
DESCRIPTION
ADDITIONAL EQUIPMENT
INCLUDES 3 REMOTE CONTROL CAMERAS, 10 FIXED
MICROPHONES, 1 HAND HELD MICROPHONE WIRELESS, 1
MONITOR
LARGE CONFERENCE ROOM ………………………………………………..
INCLUDES 4 REMOTE CONTROL CAMERAS, 15 FIXED
MICROPHONES, 1 HAND HELD MICROPHONE WIRELESS, TWO
MONITORS
PER HOUR
(MINIMUM 2 HOURS)
PER HOUR
(MINIMUM 2 HOURS)
18
- ENGINEERING DEPARTMENT -
FEE UNIT
ARCHITECTURAL REVIEW
MAJOR ARCHITECTURAL APPROVAL
COMMERCIAL / INDUSTRIAL / MULTIPLE SF / MF ………………..$2,812.99
HILLSIDE SF ………………………………………………………………………….$2,812.99
SINGLE-FAMILY HOUSE - MAJOR THOROUGHFARE ……………..$904.18
CODES, COVENANTS & RESTRICTIONS (CC & Rs) ………………………..$535.08
CONDITIONAL USE PERMIT
CUP (P.C. & C.C.) ………………………………………………………………………...$1,675.13
CUP (P.C. ONLY) …………………………………………………………………………$1,505.87
CONSTRUCTION PERMITS
ADMINISTRATION PERMIT (MICROFILMING FEE) ……………………….$34.94 EACH PERMIT
$505.60
PUBLIC OR PRIVATE IMPROVEMENTS (ENCHROACHMENT PERMIT) -
CURRENT VALUATION
$1 - $2,000 …………………………………………………………………..$324.32 BASE FEE THEN…
$2,001 - $50,000 ……………………………………………………………$324.32 PLUS 4.2% BALANCE OVER
$2,000
$50,001 - $200,000 ………………………………………………………$2,525.80 PLUS 3.4% BALANCE OVER
$50,000
OVER $200,000 ……………………………………………………………$8,095.00 PLUS 2.5% BALANCE OVER
$200,000
2X FEE DOUBLE FEE PER OFFENSE
$743.65 PER COVENANT
NORTH ………………………………………………………………………………..$7,110.01 PER ACRE
CENTRAL ………………………………………………………………………………$10,059.50 PER ACRE
SOUTH ………………………………………………………………………………..$7,939.93 PER ACRE
EAST ……………………………………………………………………………………$4,495.76 PER ACRE
SOUTHEAST …………………………………………………………………………$8,214.02 PER ACRE
EAGLE CANYON ……………………………………………………………………$7,665.84 PER ACRE
THE FOLLOWING FEES ARE DIRECTLY RELATED TO & IN ADDITION TO THE ASSOCIATED PLANNING FEES
(ARCHITECTURAL REVIEW / CC&Rs / CONDITIONAL USE PERMIT / ENVIROMENTAL DOCUMENTS / PLANNED DEVELOPMENT
DISTRICT (P.C. & C.C.) / SUBDIVISION MAPS)
(ALSO: SEE PLANNING - ARCHITECTURAL REVIEW)
(ALSO: SEE PLANNING - CONDITIONAL USE PERMIT)
DRAINAGE FEE 7, 8
MINOR (DRIVEWAY, DUMPSTER, ETC.) ……………………………………….
PENALTY FEE (WORKING WITHOUT PERMIT) ……………………………………..
STREET IMPROVEMENT / UTILITY UNDER GROUNDING
COVENANT ………………………………………………………………………………….
COMPREHENSIVE FEE SCHEDULE
CITY OF PALM SPRINGS
DESCRIPTION
ENGINEERING DEPARTMENT
19
- ENGINEERING DEPARTMENT -
FEE UNIT
COMPREHENSIVE FEE SCHEDULE
CITY OF PALM SPRINGS
DESCRIPTION
ENGINEERING DEPARTMENT
ENCROACHMENTS
……………………..SET INDIVIDUALLY
ENCROACHMENT AGREEMENT ……………………………………………………$1,334.42 PER AGREEMENT PROCESSED
ENCROACHMENT LICENSE ………………………………………………………….$2,673.22 PER AGREEMENT PROCESSED
ENGINEERING SPECIAL PURPOSE FEES
$153.97 PER HOUR (MIN. 1 HR)
$230.96 PER HOUR (MIN. 2 HRS.)
$153.97 PER HOUR (MIN. 1 HR.)
ENVIROMENTAL DOCUMENTS
EIR OR MITIGATED NEGATIVE DECLARATION ……………………………..$6,031.12 DEPOSIT TO COVER ALL
DIRECT INTERNAL AND
EXTERNAL TECHNICAL
REVIEW COSTS.
$1,675.13
GRADING PERMIT
50 CUBIC YARDS OR LESS …………………………………………………...$28.51
51 TO 100 CUBIC YARDS ……………………………………………………$43.68
$43.68 PLUS
$21.23
FIRST 1,000 CUBIC YARDS, PLUS …………………………………………$235.94 PLUS
$17.58
$394.23 PLUS
$80.67
GRADING PERMIT FEES (3.1.)
101 TO 1,000 CUBIC YARDS
FIRST 100 CUBIC YARDS ……………………………………………………
DEPOSITS & BONDS …………………………………………………………………….
RE-INSPECTION CALLS ………………………………………………………………..
INSPECTIONS AND STAFF TIME …………………………………………………..
INSPECTIONS ……………………………………………………………………………….
(ANNUAL DEPOSITS, BOND FOR CONTINUING USE & ADDITIONAL BOND)
INITIAL STUDY …………………………………………………………………………….
EACH ADDITIONAL 10,000 CUBIC YARDS, OR FRACTION
THEREOF ……………………………………………………………………………..
(EXCEEDING ONE REPEAT ACCOMMODATION)
(OUTSIDE NORMAL BUSINESS HOURS)
(FOR WHICH NO FEE IS SPECIFICALLY INDICATED)
EACH ADDITIONAL 100 CUBIC YARDS, OR FRACTION
THEREOF ……………………………………………………………………………..
1,001 TO 10,000 CUBIC YARDS
EACH ADDITIONAL 1,000 CUBIC YARDS, OR FRACTION
THEREOF ……………………………………………………………………………..
10,001 TO 100,000 CUBIC YARDS
FIRST 10,000 CUBIC YARDS, PLUS ………………………………………
(ALSO: SEE PLANNING - ENVIROMENTAL DOCUMENTS)
20
- ENGINEERING DEPARTMENT -
FEE UNIT
COMPREHENSIVE FEE SCHEDULE
CITY OF PALM SPRINGS
DESCRIPTION
ENGINEERING DEPARTMENT
$1,114.79 PLUS
$44.28
GRADING PLAN - CHECK
PARCEL SIZE:
LESS THAN 15,000 S.F. ………………………………………………………….$584.22 PER SHEET *
15,000 S.F. TO 4 ACRES ………………………………………………………..$896.53 PER SHEET *
4 + ACRES …………………………………………………………………………….$1,577.94 PER SHEET *
82%PLUS 82% PER PROJECT
50%
PLUS 50 % OF THE ABOVE
AMOUNTS
FAST TRACK PERFORMANCE ………………………………………………………150%TIMES THE ABOVE AMOUNTS
LOT LINE ADJUSTMENT, PARCEL MERGER, AND CERTIFICATE OF COMPLIANCE
STAFF APPROVAL ………………………………………………………………………..$3,503.14 EACH - PLAN CHECK FEE IS
$920 DIRECT COST / PASS
THROUGH PLUS ADMIN FEE
COORD. OF $2288
PLAN CHECK FEES FOR IMPROVEMENTS (STREET, SEWER, DRAINAGE)
TRAFFIC SIGNAL PLANS ……………………………………………………………….$584.22 PER SHEET *
STREET PLANS ……………………………………………………………………………..$584.22 PER SHEET *
SEWER PLANS ……………………………………………………………………………..$478.30 PER SHEET *
STORM DRAIN …………………………………………………………………………….$584.22 PER SHEET *
SIGNING & STRIPING PLANS ………………………………………………………$478.30 PER SHEET *
* CONSULTANT DIRECT COST / PASS-THROUGH (SUBJECT TO CHANGE BASED UPON CURRENT CONTRACT)
72.5%PLUS 72.5% PER PROJECT
50%OF THE ABOVE AMOUNTS
STREET PLANS 4TH RESUBMITTAL …………………………………………………$404.48
SEWER PLANS 4TH RESUBMITTAL …………………………………………………$341.28
STORM DRAIN 4TH RESUBMITTAL …………………………………………………$404.48
SIGNING & STRIPING 4TH RESUBMITTAL ………………………………………$353.92
EACH ADDITIONAL 10,000 CUBIC YARDS, OR FRACTION
THEREOF ………………………………………………………………………
* CONSULTANT DIRECT COST / PASS-THROUGH (SUBJECT TO CHANGE BASED UPON CURRENT CONTRACT)
ADMINISTRATIVE/COORDINATION FEE ……………………………………..
PROJECT ADMINISTRATIVE FEE/COORDINATION ………………………
100,001 CUBIC YARDS OR MORE
FIRST 100,000 CUBIC YARDS ………………………………………………..
ADDITIONAL PER SHEET CHARGE ON THE FOURTH (4TH)
RESUBMITTAL ……………………………………………………………………………..
ADDITIONAL PER SHEET CHARGE ON THE FOURTH (4TH)
RESUBMITTAL ADDED …………………………………………………………………
21
- ENGINEERING DEPARTMENT -
FEE UNIT
COMPREHENSIVE FEE SCHEDULE
CITY OF PALM SPRINGS
DESCRIPTION
ENGINEERING DEPARTMENT
FAST TRACK PERFORMANCE ………………………………………………………150%TIMES THE ABOVE AMOUNTS
PLAN CHECK / REVIEW
……………………CONSULTANT COST
PLUS
$336.89 PER HOUR - FULLY
BURDENED HOURLY RATE -
DIR. OF PUBLIC WORKS
FAST TRACK PERFORMANCE ……………………………………………………….150%TIMES THE ABOVE AMOUNTS
PLANNED DEVELOPMENT DISTRICT 3 (P.C. & C.C.)
PRELIMINARY DEVELOPMENT PLAN - 5 ACRES OR UNDER …………$1,807.26
PRELIMINARY DEVELOPMENT PLAN - > 5 ACRES …………………………$1,807.26
PRELIMINARY DEVELOPMENT PLAN - MINOR AMENDMENT ……..$0
PRELIMINARY DEVELOPMENT PLAN - MAJOR AMENDMENT ………$1,406.50
PRODUCTIVE HOURLY RATES BY POSITION
DIRECTOR OF PUBLIC WORKS ……………………………………………………..$336.89
ASSISTANT DIRECTOR OF PUBLIC WORKS ……………………………………$268.14
ASSOCIATE CIVIL ENGINEER ………………………………………………………..$220.10
ENGINEERING ASSOCIATE …………………………………………………………..$200.36
SR. PUBLIC WORKS INSPECTOR …………………………………………………..$181.48
PUBLIC WORKS ADMINISTRATOR ……………………………………………….$183.00
ENGINEERING ASSIST. …………………………………………………………………$174.75
ENGINEERING FIELD TECHS ………………………………………………………….$139.69
ENGINEERING SECRETARY / COUNTER TECH ……………………………….$140.65
SENIOR SECRETARY ……………………………………………………………………..$100.65
FIELD TECH / DUST CONTROL ………………………………………………………$140.52
REPROGRAPHIC SERVICES
SET-UP FEE …………………………………………………………………………………..$10.50 PER JOB
BLUEPRINTING OR OVERSIZED COPIER ………………………………..$10.50
BLUEPRINTING …………………………………………………………………………….$10.50
AERIALS (INCLUDING STRIP PHOTOS) ………………………………………..$10.50 PER MAP,OR PER SERIAL
PHOTO SHEET
$10.50 PER ADDITIONAL DUPLICATE
MAPS
TRACT, PARCEL & RECORD MAPS (18' X 28') ……………………….$10.50
CITY STAFF TIME ………………………………………………………………………….
(ALSO: SEE PLANNING - PLANNED DEVELOPMENT DISTRICT)
ADDITIONAL DUPLICATE COPY …………………………………………….
PROFESSIONAL REPORTS OR PLANS …………………………………………..
(NOT SPECIFICALLY COVERED BY THIS SCHEDULE)
22
- ENGINEERING DEPARTMENT -
FEE UNIT
COMPREHENSIVE FEE SCHEDULE
CITY OF PALM SPRINGS
DESCRIPTION
ENGINEERING DEPARTMENT
STREET MAPS
1000 SCALE ………………………………………………………………….$10.50 EACH
1/3 OF 600 SCALE …………………………………………………………$10.50 EACH
600 SCALE ……………………………………………………………………$10.50 EACH
PLANS:
STREET & SEWER IMPROVEMENT PLANS (24' X 36') ……………$10.50 EACH
COPYING:
ENGINEERING COPIER - OVERSIZED ……………………………………$0.10 PER PAGE
STANDARD XEROX COPIER (LEDGER OR SMALL COPIES) ……………$0.10 PER PAGE
SUBDIVISION MAPS
PARCEL MAPS ………………………………………………………………………………$689.05 PER SHEET *
FINAL MAPS (OR PARCEL MAPS 5 LOTS OR MORE) ……………………..$911.82 PER SHEET *
REVISION OF FINAL AND PARCEL MAPS ……………………………………..50%OF ORIGINAL FEE
50%OF ABOVE AMOUNTS
* CONSULTANT DIRECT COST / PASS-THROUGH (SUBJECT TO CHANGE BASED UPON CURRENT CONTRACT)
FAST TRACK PERFORMANCE ……………………………………………………….150%TIMES ABOVE AMOUNTS
SUBDIVISION MAPS FLAT FEE ……………………………………………………..$4,778.59 PER PROJECT
SUBDIVISION MAPS
PETITION FOR REVERSION TO ACREAGE ……………………………………$738.19
TENTATIVE TRACT MAPS (P.C. & C.C.) …………………………………………$7,093.63
TENTATIVE PARCEL MAPS (P.C. & C.C.) ………………………………………$5,754.84
VESTING MAPS ……………………………………………………………………………$9,969.96
IMAGING FEES (TRACT, PARCEL & VESTING MAPS) ………………………………$73.16
PARCEL MAP WAIVER …………………………………………………………………$2,877.42
TECHNOLOGY SURCHARGE …………………………………………………………….$0.92 /$1,000.00 NEW
CONSTRUCTION VALUE
TRAFFIC SURVEY FEE ……………………………………………………………………….$372.37
TRANSPORTATION PERMIT FEE (OVERSIZE / OVERWEIGHT VEHICLES)
STATE REGULATED FEES / SPECIALIZED CARRIES & RIGGING ASSOCIATION
ANNUAL PERMIT …………………………………………………………………$90 PER YEAR
SINGLE TRIP PERMIT …………………………………………………………….$16 EACH TRIP
(ALSO: SEE PLANNING - SUBDIVISIONS MAPS)
ADDITIONAL PER SHEET CHARGE ON THE FOURTH (4TH)
RESUBMITTAL
23
- FINANCE -
FEE UNIT
ACCOUNTS RECEIVABLE - LATE CHARGE
(A)$11 PER MONTH
(B)20%MONTHLY ON UNPAID
RECEIVABLE BALANCE
*
ASSESSMENT DISTRICT BONDS (PER REQUEST) ……………………………………$33 PER PARCEL
BINGO PERMIT FEE (INITIAL ISSUANCE OR RENEWAL) ………………………………$61 6 MONTH PERIOD OR LESS
BUSINESS LICENSE ADMINISTRATIVE FEE
NEW BUSINESS LICENSE …………………………………………………………………$31
RENEWED BUSINESS LICENSE …………………………………………………………$20 PER YEAR
BUSINESS LICENSE STATE FEE (SB 1186) 19 ………………………………………$1 STATE REGULATED FEE
CITY COUNCIL CHAMBER 13
SEE: CITY CLERK
COLLECTION FEE …………………………………………………………………………………$55 ONE TIME FEE
DANCE APPLICATION FEE ……………………………………………………………………$92 PER DANCE
CASUAL DANCES ……………………………………………………………………………NO FEE
DOG LICENSE
SEE: POLICE DEPARTMENT
ESCORT ESTABLISHMENT ……………………………………………………………………$607 PER YEAR, PLUS
BUSINESS LICENSE, PLUS
FINGERPRINTING
INDIVIDUAL ……………………………………………………………………………………$122 PER YEAR, PLUS
BUSINESS LICENSE, PLUS
FINGERPRINTING
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
FINANCE DEPARTMENT
DESCRIPTION
FEE TO BE WAIVED FOR REAL ESTATE BROKERS AND AGENTS
WITH VALID CITY OF PALM SPRINGS BUSINESS LICENSES, AND
FOR INQUIRIES DIRECTLY FROM THE OWNER OF THE PROPERTY
IN QUESTION.
UNPAID BALANCES OF $300 OR LESS ………………………………….
(EXCEPT GOVERNMENTAL AGENCIES WHICH ARE EXEMPT, ON
RECEIVABLES OVER 30 DAYS OLD. *)
UNPAID BALANCES OF MORE THAN $300 ………………………...
(OTHER THAN THOSE OF GOVERNMENTAL AGENCIES, DUE THE
CITY OVER 30 DAYS OLD. *)
(INFORMATION PER PARCEL EFFECTIVE 4/1/92)
NOTE: FINANCE DIRECTOR TO HAVE THE AUTHORITY TO
WAIVE CHARGES DEEMED UNECONOMICAL TO COLLECT.
(NOTE: INCLUDES LICENSES FOR THE EXEMPT AND NON-PROFIT
24
- FINANCE -
FEE UNIT
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
FINANCE DEPARTMENT
DESCRIPTION
FOOD HANDLERS CERTIFICATION FEE ………………………………………………$5
HORSE DRAWN CARRIAGES
APPLICATION FEE ……………………………………………………………………………$20
PERMIT FEE ……………………………………………………………………………………$41
SPECIAL PERMIT FEE ………………………………………………………………………$31
MASSAGE PERMIT FEE
ESTABLISHMENT ……………………………………………………………………………$164 BACKGROUND CHECK, PLUS
BUSINESS LICENSE, PLUS
FINGERPRINTING
INDIVIDUAL ……………………………………………………………………………………$164 BACKGROUND CHECK, PLUS
BUSINESS LICENSE, PLUS
FINGERPRINTING
PEDICABS
VEHICLE PERMIT FEE ………………………………………………………………………$414 PER VEHICLE
DRIVER PERMIT FEE ………………………………………………………………………$541 PER DRIVER
PSYCHIC ACTIVITIES PERMIT FEE ………………………………………………………$122
……...……………COLLECTED BY RIVERSIDE
COUNTY HEALTH OFFICER
RETURNED CHECKS (INSUFFICIENT FUNDS, ETC.) ……………………………………$25 FIRST OFFENSE
STATE REGULATED FEE $35 EACH ADDITIONAL ITEM
RETURNED
SALES PERMITS (NOT REFUNDABLE)
AUCTION SALES PERMITS ………………………………………………………………$103 APPLICATION FEE
CLOSING OUT SALES ………………………………………………………………………$103 FILING OR RENEWAL FEE
JEWELRY SALES INVESTIGATION FEE ……………………………………………………...……………SEE: POLICE - HAND DEALER /
PAWNBROKER LICENSE
TEMPORARY EVENT PERMITS
$35 PER EVENT, PER DAY (IF LESS
THAN 4 VENDORS)
-OR-
$8.75 PER VENDOR, PER DAY (FOR
4 OR MORE VENDORS)
RESTAURANT SANITARY GRADE POSTING FEE ……………………………
(COLLECTED BY RIVERSIDE COUNTY HEALTH OFFICER FOR A TWO
YEAR FOOD HANDLERS CERTIFICATE.)
TEMPORARY EVENT PERMIT (IF LESS THAN 4 VENDORS) …………………
TEMPORARY EVENT PERMIT (FOR 4 VENDORS OR MORE) ………………
25
- FINANCE -
FEE UNIT
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
FINANCE DEPARTMENT
DESCRIPTION
VALET PARKING PERMIT FEE
SPECIAL EVENT VALET PARKING PERMIT FEE …………………………………$152 PER YEAR
TEMPORARY VALET PARKING FEE …………………………………………………$92 PER APPLICATION
VACATION RENTALS
ALSO SEE: VACATION RENTAL COMPLIANCE
VACATION RENTAL
NEW REGISTRATION ………………………………………………………………$900 PER APPLICATION
RENEWAL ………………………………………………………………………………$900 PER RENEWAL
HOMESHARE
NEW REGISTRATION ………………………………………………………………$225 PER APPLICATION
RENEWAL ………………………………………………………………………………$225 PER RENEWAL
$764
APPEAL, VACATION RENTAL SUSPENSION / REVOCATION /
OTHER ACTION THAN ADMINISTRATIVE CITATION ……………………
26
- FIRE DEPARTMENT -
FEE UNIT
ADMINISTRATIVE
BLUEPRINT COPY FEE
COPYING - 18X24
COPYING - 24X36
COPYING - LEGAL SIZE
COPYING - LETTER SIZE
DUPLICATE ID CARDS ……………………………………………………………………$49
CPR CARD ………………………………………………………………………………………$49
DUPLICATE CPR CARDS ………………………………………..…………………………$49
INCIDENT REPORTS ……………………………….………………………………………$38 CITY SET
FIRE / CODE RESEARCH FEE ………………………….…………………………………$228 FBR @ FIRE MARSHAL
LATE PERMIT SUBMITTALS ……………………………………..………………………………….….…...…2X OF REGULAR FEE
SERVICES NOT SPECIFICALLY LISTED ………………………………………………………….….…...…FBR / HOURLY
$300 DEPOSIT (HOURLY)
FALSE ALARMS (FIRE / SMOKE / SPRINKLER)
SEE MASTER BAIL SCHEDULE (ORD. 1678)
FIRE & EMERGENCY ……………………………………………………………………………………....…...…
GROUP R OCCUPANCY INSPECTIONS
$185
$247
$228
$342
$312
FULLY BURDENED HOURLY
RATES; PLUS MATERIALS
APARTMENTS & CONDOMINIUMNS (R - OCCUPANCY)
INSPECTIONS - UNITS: 51-75 ……………………………………………………….
HOTELS & MOTELS (R - OCCUPANCY) INSPECTIONS -
UNITS: 11-50 ……………………………………………………………………………….
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
FIRE DEPARTMENT
FBR = Fully Burdened Hourly Rates
DESCRIPTION
FIRE DEPARTMENT RESPONSES TO FLOODING, HAZARDOUS
MATERIALS, STRUCTURE FIRES, REFUSE FIRES AND VEGETATION
FIRES.
SUBPOENAS (CIVIL) - ……………………………………………………………………
DEPOSIT ONLY - ACTUAL CHARGE IS EMPLOYEE OVERTIME RATE TIMES
THE NUMBER OF HOURS PLUS FRINGE BENEFITS PLUS THE
ADMINISTRATIVE CHARGE PLUS MILEAGE (HOURS CALCULATED PORTAL
TO PORTAL)
APARTMENTS & CONDOMINIUMNS (R - OCCUPANCY)
INSPECTIONS - UNITS: 3-10 ………………………………………………………….
HOTELS & MOTELS (R - OCCUPANCY) INSPECTIONS -
UNITS: 3-10 ………………………………………………………………………………..
APARTMENTS & CONDOMINIUMNS (R - OCCUPANCY)
INSPECTIONS - UNITS: 11-50 ……………………………………………………….
27
- FIRE DEPARTMENT -
FEE UNIT
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
FIRE DEPARTMENT
FBR = Fully Burdened Hourly Rates
DESCRIPTION
$461
$474
$557
$688
$982
INSPECTIONS
SMOKE DETECTOR INSPECTION FEE ………………………………………………$111 PER INSPECTION
$186 PER INSPECTION
$434 PER INSPECTION
KNOX TM BOX/SWITCH INSPECTIONS ………………………………………………$193 PER INSPECTION
ARSON INVESTIGATION FEE (PER HOUR) ……………………………………………$177 PER HOUR
MULTI-RESIDENTIAL FIRE INSPECTION FEE (3 OR MORE UNITS)
(SEE: GROUP R OCCUPANCY INSPECTIONS)
$288 PER INSPECTION
………….….…...…FULLY BURDENED HOURLY
PRE-ENGINEERED FIRE SUPPRESSION SYSTEMS ………………………………$357 PER INSPECTION
AIRCRAFT HANGARS < 40,000 SQ. FT. ……………………………………………$357 PER INSPECTION
AIRCRAFT HANGARS > 40,001 - 150,000 SQ. FT. ……………………………$446 PER INSPECTION
AIRCRAFT HANGARS > 150,000 SQ. FT. …………………………………………$534 PER INSPECTION
HAZARDOUS MATERIALS FACILITIES ………………………………………………$177 HOURLY @ DFM
HIGH-PILED STORAGE FACILITIES ……………………………………………………$177 HOURLY @ DFM
FAILED RE-INSPECTION / ADDITIONAL FIELD INSPECTION ………………$177 PER INSPECTION
ANNUAL HIGH-RISE > 75' ………………………………………………………………$177 HOURLY @ DFM
ANNUAL NON-HIGH-RISE 30'-74' ……………………………………………………$177 HOURLY @ DFM
WEED ABATEMENT / FIRE HAZARD …………………………………………………$282 PER INSPECTION
SPECIAL EVENTS (4 HOUR MINIMUM PER PERSON) …………………………………$177 PER HOUR
HOTELS & MOTELS (R - OCCUPANCY) INSPECTIONS -
UNITS: 51-75 ……………………………………………………………………………….
APARTMENTS & CONDOMINIUMNS (R - OCCUPANCY)
INSPECTIONS - UNITS: 76-100 …………………………………………………….
HOTELS & MOTELS (R - OCCUPANCY) INSPECTIONS -
UNITS: 76-100 ……………………………………………………………………………..
APARTMENTS & CONDOMINIUMNS (R - OCCUPANCY)
INSPECTIONS - UNITS: 101 + UNITS …………………………………………….
HOTELS & MOTELS (R - OCCUPANCY) INSPECTIONS -
UNITS: 101 + UNITS ……………………………………………………………………..
FIRE & LIFE SAFETY STANDBY FEE / SPECIAL SERVICES (4 HR. MIN.)
(FOR ALL OTHER SERVICES AND SPECIAL PURPOSES NOT
SPECIFICALLY LISTED) (SEE: POSITION RATES)
ENGINE COMPANY INSPECTIONS (PER CREW HOUR) …………………………
NEW BUSINESS LICENSE INSPECTION (DEPUTY FIRE MARSHAL)
SMOKE DETECTOR INSPECTION FEE - IMMEDIATE NEED ……………
(IF AVAILABLE)
28
- FIRE DEPARTMENT -
FEE UNIT
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
FIRE DEPARTMENT
FBR = Fully Burdened Hourly Rates
DESCRIPTION
FILM PERMIT STANDBY (4 HOUR MINIMUM PER PERSON) ………………………$177 PER HOUR
NEW CONSTRUCTION FIRE INSPECTIONS
NEW SINGLE FAMILY DWELLING ………………………………………………….………….….…...BLDG INSP
$308
NEW COMMERCIAL / INDUSTRIAL ……………………………………………….$308
RESIDENTIAL ADDITION / REMODELS ………………………………………….……………………BLDG INSP
COMMERCIAL / TENNANT IMPROVEMENT ………………………………….$308
$308
$308
$308
$219
$308
………….….…...BLDG INSP
$308
$750
$1,105
$1,459
$1,459
$263
$396
$396
$219
$396
$396
$219
$219
$219
FIRE FINAL ………………………………………………………………………………...
(USED TO FINAL A PROJECT)
FIRE RELEASE ……………………………………………………………………………….
(USED FOR FD RELEASE TO BUILDING DEPT.)
NEW MULTI-RESIDENTIAL (HOTEL, MOTEL, APT., CONDO. PROJECTS) ….….
FIRE PUMPS …………………………………………………………………………………
FIRE STANDPIPE SYSTEMS ……………………………………………………………
FIRE SPRINKLER SYSTEM SUPERVISION & ALARMS ………………………
SMOKE CONTROLS ……………………………………………………………………..
(SMOKE & HEAT VENTS, BARRIERS, ENCLOSURES, ETC.)
FIRE WATER TANKS ……………………………………………………………………
FIRE MISCELLANEOUS ………………………………………………………………….
FIRE SPRINKLER SYSTEMS (SINGLE FAMILY DETACHED) ……………….
FIRE SPRINKLER SYSTEMS (MULTI-FAMILY 3 OR MORE UNITS) …..
FIRE SPRINKLER SYSTEMS (COMMERCIAL / INDUSTRIAL)
> 120, 000 SQ. FT. ………………………………………………………………………
FIRE SPRINKLER TENANT IMPROVEMENT (>10 HEADS) …………….
FIRE SPRINKLER SYSTEMS (COMMERCIAL / INDUSTRIAL)
0 - 35,000 SQ. FT. ……………………………………………………………………….
FIRE SPRINKLER SYSTEMS (COMMERCIAL / INDUSTRIAL)
35,001 - 75,000 SQ. FT. ………………………………………………………………
FIRE SPRINKLER SYSTEMS (COMMERCIAL / INDUSTRIAL)
75,001 - 120,000 SQ. FT. …………………………………………………………….
COMMERCIAL / INDUSTRIAL ADDITION OR REMODEL …………………
COMMERCIAL COOKING HOOD AND DUCT SYSTEMS ………………….
WATER SYSTEMS …………………………………………………………………………
(FIRE HYDRANTS, WATER MAINS, SPRINKLER RISERS)
PRE-ENGINEERED FIRE SUPPRESSION SYSTEMS ……………………………
(HALON, DRY-CHEM. SYSTEM)
FIRE ALARM SYSTEMS ………...……………………………………………………….
29
- FIRE DEPARTMENT -
FEE UNIT
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
FIRE DEPARTMENT
FBR = Fully Burdened Hourly Rates
DESCRIPTION
FIRE DEPARTMENT ONLY - MISC.
MISC. - FAILED / ADDITIONAL FIELD INSPECTIONS …………………………$290
MISC. - EXIT ANALYSIS PLANS …………………………………………………………$219
MISC. - OCCUPANT LOAD DETERMINATIONS …………………………………$270
MISC. - PLAN RESUBMITTALS …………………………………………………………$219
MISC. - PLAN REVIEWS, OTHER ………………………………………………………$219
$396
NEW CONSTRUCTION FIRE PLAN REVIEW
NEW SINGLE FAMILY DWELLING ……………………………………………………$290 PER APPLICATION
$290 PER APPLICATION
NEW COMMERCIAL / INDUSTRIAL …………………………………………………$290 PER APPLICATION
RESIDENTIAL ADDITION / REMODELS ……………………………………………$166 PER APPLICATION
COMMERCIAL / TENNANT IMPROVEMENT ……………………………………$290 PER APPLICATION
$290 PER APPLICATION
$290 PER APPLICATION
$290 PER APPLICATION
$357 PER APPLICATION
$290 PER APPLICATION
$166 PER APPLICATION
$290 PER APPLICATION
$290 PER APPLICATION
$414 PER APPLICATION
$414 PER APPLICATION
$414 PER APPLICATION
$166 PER APPLICATION
$290 PER APPLICATION
$290 PER APPLICATION
$166 PER APPLICATION
PLAN CHECK DEPOSIT (FOR SERVICES NOT LISTED ABOVE) ……………………
FIRE SPRINKLER SYSTEMS (COMMERCIAL / INDUSTRIAL)
0 - 35,000 SQ.FT. ………………………………………………………………………….
FIRE SPRINKLER SYSTEMS (COMMERCIAL / INDUSTRIAL)
35,001 - 75,000 SQ. FT. ………………………………………………………………..
FIRE SPRINKLER SYSTEMS (COMMERCIAL / INDUSTRIAL)
75,001 - 120,000 SQ. FT. ………………………………………………………………
FIRE SPRINKLER SYSTEMS (COMMERCIAL / INDUSTRIAL)
> 120, 000 SQ.FT. …………………………………………………………………………
FIRE SPRINKLER TENANT IMPROVEMENT (>10 HEADS) ……………….
FIRE PUMPS …………………………………………………………………………………
FIRE STANDPIPE SYSTEMS ……………………………………………………………
FIRE SPRINKLER SYSTEM SUPERVISION & ALARMS ………………………
COMMERCIAL COOKING HOOD AND DUCT SYSTEMS ………………….
WATER SYSTEMS ……………………………………………………………………….
(FIRE HYDRANTS, WATER MAINS, SPRINKLER RISERS)
PRE-ENGINEERED FIRE SUPPRESSION SYSTEMS …………………………...
(HALON, DRY-CHEM SYSTEM)
FIRE ALARM SYSTEMS …………………………………………………………………
FIRE SPRINKLER SYSTEMS (SINGLE FAMILY DETACHED) ……………….
FIRE SPRINKLER SYSTEMS (MULTI-FAMILY 3 OR MORE UNITS) ……
NEW MULTI-RESIDENTIAL ………………………………………………………….
(HOTEL, MOTEL, APT., CONDO. PROJECTS)
COMMERCIAL / INDUSTRIAL ADDITION OR REMODEL …………………
30
- FIRE DEPARTMENT -
FEE UNIT
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
FIRE DEPARTMENT
FBR = Fully Burdened Hourly Rates
DESCRIPTION
$290 PER APPLICATION
$290 PER APPLICATION
$166 * + INSPECTION AT FBR
$166 * + INSPECTION AT FBR
$166 * + INSPECTION AT FBR
$166 * + INSPECTION AT FBR
FIRE DEPARTMENT ONLY - MISC.
MISC. - FAILED / ADDITIONAL FIELD INSPECTIONS …………………………$124
MISC. - EXIT ANALYSIS PLANS …………………………………………………………$270
MISC. - OCCUPANT LOAD DETERMINATIONS …………………………………$271
MISC. - PLAN RESUBMITTALS …………………………………………………………$124
MISC. - PLAN REVIEWS, OTHER ………………………………………………………$124
%NOTE: LEAVE BLANK
FIRE PLAN REVIEW AND INSPECTION FEE
NEW SINGLE FAMILY DWELLING ……………………………………………………$290 * + INSPECTION AT FBR
$290 * + INSPECTION AT FBR
NEW COMMERCIAL / INDUSTRIAL …………………………………………………$290 * + INSPECTION AT FBR
RESIDENTIAL ADDITION / REMODELS ……………………………………………$166 * + INSPECTION AT FBR
COMMERCIAL / TENNANT IMPROVEMENT ……………………………………$290 * + INSPECTION AT FBR
$290 * + INSPECTION AT FBR
$290 * + INSPECTION AT FBR
$290 * + INSPECTION AT FBR
$290 * + INSPECTION AT FBR
$290 * + INSPECTION AT FBR
$166 * + INSPECTION AT FBRFIRE SPRINKLER SYSTEMS …………………………………………………………..
(SINGLE FAMILY DETACHED)
FIRE ALARM SYSTEMS ………………………………………………………………..
PRE-ENGINEERED FIRE SUPPRESSION SYSTEMS …………………………...
(HALON, DRY-CHEM. SYSTEM)
NEW MULTI-RESIDENTIAL ………………………………………………………….
(HOTEL, MOTEL, APT., CONDO. PROJECTS)
WATER SYSTEMS ……………………………………………………………………….
(FIRE HYDRANTS, WATER MAINS, SPRINKLER RISERS)
CONTRACT PLAN CHECK FEE (ADMINISTRATIVE SURCHARGE 15%) ……….
COMMERCIAL COOKING HOOD AND DUCT SYSTEMS ………………….
COMMERCIAL / INDUSTRIAL ADDITION OR REMODEL …………………
FIRE RELEASE ……………………………………………………………………………….
(USED FOR FD RELEASE TO BUILDING DEPT.)
SMOKE CONTROLS ……………………………………………………………………...
(SMOKE & HEAT VENTS, BARRIERS, ENCLOSURES, ETC.)
UNDERGROUND WATER SUPPLY TO SPRINKLER RISER ……………….
(PER RISER)
FIRE WATER TANKS ……………………………………………………………………..
FIRE MISCELLANEOUS ………………………………………………………………….
FIRE FINAL …………………………………………………………………………………
(USED TO FINAL A PROJECT)
31
- FIRE DEPARTMENT -
FEE UNIT
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
FIRE DEPARTMENT
FBR = Fully Burdened Hourly Rates
DESCRIPTION
$290 * + INSPECTION AT FBR
$290 * + INSPECTION AT FBR
$166 * + INSPECTION AT FBR
*
OPERATIONAL PERMITS (* DENOTES A RENEWAL PERMIT)
FIRST TIME PLAN REVIEW ………………………………………………………………$190
AEROSOL PRODUCTS * ……………………………………………………………………$420
AIRCRAFT REFUELING VEHICLE * ……………………………………………………$244
AIRCRAFT REPAIR HANGER * …………………………………………………………$420
AMUSEMENT BUILDINGS ………………………………………………………………$244
AUTO WRECKING YARD * ………………………………………………………………$244
AVIATION FACILITIES * ……………………………………………………………………$420
BATTERY SYSTEMS * ………………………………………………………………………$244
CANDLES AND OPEN FLAMES IN ASSEMBLY AREAS * ………………………$244
CARNIVALS / FAIRS / CIRCUS …………………………………………………………$244
CELLULOSE NITRATE FILM STORAGE * ……………………………………………$244
COMBUSTIBLE DUST OPERATIONS …………………………………………………$244
COMBUSTIBLE MATERIALS STORAGE * …………………………………………$244
COMMERCIAL RUBBISH HANDLING OPERATION * …………………………$420
COMPRESSED GASSES * …………………………………………………………………$244
CRYOGENIC FLUIDS * ……………………………………………………………………$244
CUTTING & WELDING * …………………………………………………………………$420
DRY CLEANING PLANTS * ………………………………………………………………$244
DUST PRODUCING OPERATION * ……………………………………………………$244
EXHIBITS & TRADE SHOWS ……………………………………………………………$244
EXPLOSIVES OR BLASTING AGENTS * ………………………………………………$244
FIRE HYDRANTS & VALVES (FLOW TESTS) ……………………………………………$244
FIREWORKS (MANUFACTURE, COMPOUND, STORE) * ………………………………$420
STATED FEE FOR THE ABOVE PROJECTS IS FOR PLAN REVIEW. INSPECTION FEES WILL BE ADDED AT THE FULLY-
BURDENED RATE OF THE EMPLOYEE CONDUCTING THE INSPECTION. THE APPLICANT WILL BE REQUIRED TO
PLACE A DEPOSIT FEE FOR THE ANTICIPATED INSPECTION FEE AT THE TIME THE PERMIT IS ISSUED AT THE
DESCRETION OF THE FIRE CHIEF.
FIRE SPRINKLER SYSTEMS …………………………………………………………..
(COMMERCIAL / INDUSTRIAL)
FIRE SPRINKLER SYSTEMS …………………………………………………………..
(MULTI-FAMILY 3 OR MORE UNITS)
UNDERGROUND WATER SUPPLY TO SPRINKLER RISER ……………..
(PER RISER)
32
- FIRE DEPARTMENT -
FEE UNIT
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
FIRE DEPARTMENT
FBR = Fully Burdened Hourly Rates
DESCRIPTION
$190
$190
$244
$244 FBR
$244
FLAMMABLE & COMBUSTIBLE LIQUIDS * ………………………………………$244
FUMIGATION OR THERMAL INSECTICIDE FOGGING ………………………$367
HAZARDOUS MATERIALS (STORAGE / USE) * ………………………………………$244 FBR
HIGH-PILED STORAGE * …………………………………………………………………$244 FBR
HOT WORK, CUTTING & GRINDING OPERATIONS ……………………………$367
IMPAIRMENTS (PLANNED) - FIRE PROTECTION SYSTEMS ……………………$545
KNOX BOX - RESIDENTIAL * ……………………………………………………………$244
$491
LIQUID / GAS-FUELED VEHICLES IN AN ASSEMBLY …………………………$244 PER EVENT
LUMBER YARDS * ……………………………………………………………………………$244 FBR
MISC. COMBUSTIBLE STORAGE > 2,500 CF * …………………………………$244
MOTOR VEHICLE FUEL DISPENSING STATION * ………………………………$244
OPEN FIRES (INCLUDES RECREATIONAL & BONFIRES) …………………………………$244
ORGANIC COATINGS * ……………………………………………………………………$244 FBR
PARADE FLOATS ……………………………………………………………………………$155
PLACES OF ASSEMBLY (50-100 OCCUPANTS) * ………………………………………$244
PLACES OF ASSEMBLY (101-300 OCCUPANTS) * ……………………………………$332
PLACES OF ASSEMBLY (OVER 300 OCCUPANTS) * …………………………………$420
PRIVATE FIRE HYDRANTS * ……………………………………………………………$244 PER SYSTEM
RADIOACTIVE MATERIALS * ……………………………………………………………$244 FBR
REFRIGERATION EQUIPMENT * ………………………………………………………$244 FBR
REPAIR GARAGES * …………………………………………………………………………$244
SPRAYING OR DIPPING * …………………………………………………………………$244 FBR
TENTS, CANOPIES OR MEMBRANE STRUCTURES < 400 SQ FT …………$306
TENTS, CANOPIES OR MEMBRANE STRUCTURES > 400 SQ FT …………$367
TIRE STORAGE * ……………………………………………………………………………$244 FBR
WASTE HANDLING FACILITIES * ………………………………………………………$244 FBR
FIREWORKS PYROTECHNIC SPECIAL EFFECTS (THEATRICAL /
MOVIES) (4 HOUR MINIMUM) …………………………………………………..
FIREWORKS PYROTECHNIC DISPLAYS (INDOOR / OUTDOOR)
(4 HOUR MINIMUM) ………………………………………………...……………….
FLAMMABLE & COMBUSTIBLE LIQUIDS -CONTAINERS / TANKS * ..
FLAMMABLE & COMBUSTIBLE LIQUIDS-TANK REMOVAL*
(4 HOUR MINIMUM) …………………………………………………………………
FLAMMABLE & COMBUSTIBLE LIQUIDS -UNDERGROUND TANKS *
LIQUEFIED PETROLEUM GASES (STORE, USE, HANDLE, DISPENSE) * ………
33
- FIRE DEPARTMENT -
FEE UNIT
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
FIRE DEPARTMENT
FBR = Fully Burdened Hourly Rates
DESCRIPTION
WELDING / CUTTING OPERATIONS * ………………………………………………$244
WOOD PRODUCTS * ………………………………………………………………………$244
OPERATING WITHOUT REQUIRED PERMIT (2X PERMIT FEE)* ………………PERMIT FEE;PLUS 2X PERMIT FEE*
POSITION RATES (FBR)
DEPUTY FIRE CHIEF (40 HOUR) …………………………………………………………$228 PER HOUR
FIRE BATTALION CHIEF ……………………………………………………………………$213 PER HOUR
FIRE CAPTAIN …………………………………………………………………………………$177 PER HOUR
PREVENTION CAPTAIN (40 HOUR) ……………………………………………………$177 PER HOUR
SUPPRESSION CAPTAIN / PARAMEDIC (CAPT. PLUS 5%) ………………………$186 PER HOUR
DEPUTY FIRE MARSHAL …………………………………………………………………$177 PER HOUR
FIRE ENGINEER ………………………………………………………………………………$147 PER HOUR
FIRE ENGINEER / PARAMEDIC …………………………………………………………$178 PER HOUR
FIREFIGHTER / PARAMEDIC ……………………………………………………………$138 PER HOUR
FIREFIGHTER …………………………………………………………………………………$109 PER HOUR
EMERGENCY SERVICES COORDINATOR …………………………………………$102 PER HOUR
PLANS EXAMINER II (40 HOUR) …………………………………………………………$124 PER HOUR
FIRE PREVENTION SPECIALIST (40 HOUR) …………………………………………$99 PER HOUR
RENEWABLE PERMIT FEES (SEE: OPERATIONAL PERMITS)
SAFETY TRAINING
$96 PER STUDENT (CLASS OF 6)
$126 PER STUDENT (CLASS OF 6)
$155 PER STUDENT (CLASS OF 6)
$185 PER STUDENT (CLASS OF 6)
$245 PER STUDENT (CLASS OF 6)
$189 PER STUDENT
FIRE EXTINGUISHER TRAINING (DEPUTY FIRE MARSHAL FBR) …………………$177 PER HOUR, 20 STUDENT
CLASS
SPECIAL EVENTS STANDBY (I.E. PARADES, ETC.)
ENGINE (PER HOUR) ……………………………………………………………………………………$434 PER HOUR
LADDER TRUCK (PER HOUR) ………………………………………………………………$434 PER HOUR
WATER TENDER (PER HOUR) ………………………………………………………………$295 PER HOUR
COMMAND (PER HOUR) ……………………………………………………………………$213 PER HOUR
SAFETY TRAINING TO INCLUDE, BUT NOT BE LIMITED TO CARDIOPULMONARY RESUSCITATION (CPR), & C.A.R.E.S.
(COMMUNITY ASSISTANCE AND RESPONSE TO EMERGENCY SITUATIONS) TRAINING; MEDICAL AID DURING
EMERGENCY/DISASTER, EMERGENCY PREPAREDNESS/RESPONSE AND BASICS OF FIRE EXTINGUISHMENT, LIGHT SEARCH AND
RESCUE, AND INTRODUCTION TO DISASTER PSYCHOLOGY AND COMMUNITY EMERGENCY RESPONSE TEAMS (CERT).
4 HOUR CLASS / MINIMUM CLASS SIZE - 4 (PLUS COURSE MATERIALS)
8 HOUR CLASS / MINIMUM CLASS SIZE - 6 (PLUS COURSE MATERIALS)
6 HOUR CLASS / MINIMUM CLASS SIZE - 6 (PLUS COURSE MATERIALS)
5 HOUR CLASS / MINIMUM CLASS SIZE - 6 (PLUS COURSE MATERIALS)
4 HOUR CLASS / MINIMUM CLASS SIZE - 6 (PLUS COURSE MATERIALS)
3 HOUR CLASS / MINIMUM CLASS SIZE - 6 (PLUS COURSE MATERIALS)
34
- FIRE DEPARTMENT -
FEE UNIT
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
FIRE DEPARTMENT
FBR = Fully Burdened Hourly Rates
DESCRIPTION
FIRE ATTACK …………………………………………………………………………………$257 PER HOUR
STATE 850 INSPECTIONS
………………….FEE ESTABLISHED BY STATE
………………….FEE ESTABLISHED BY STATE
………………….FEE ESTABLISHED BY STATE
$451
$665
$886
$451
$669
$886
$451
UNDERGROUND STORAGE TANKS (SEE: OPERATIONAL PERMITS)
STATE LICENSING & PRIVATE SCHOOL LIFE SAFETY INSPECTION -
ANNUAL LICENSED CARE INSPECTION 26-50 BEDS …………………….…
STATE LICENSING & PRIVATE SCHOOL LIFE SAFETY INSPECTION -
ANNUAL LICENSED CARE INSPECTION > 50 BEDS …………………………
STATE LICENSING & PRIVATE SCHOOL LIFE SAFETY INSPECTION -
FIRE CLEARANCE INSPECTION - ALL OTHER REVIEWS …………………
STATE LICENSING & PRIVATE SCHOOL LIFE SAFETY INSPECTION -
LICENSED CARE PRE - INSPECTION < 25 ………………………………………
STATE LICENSING & PRIVATE SCHOOL LIFE SAFETY INSPECTION -
LICENSED CARE PRE - INSPECTION > 26 ………………………………………
STATE LICENSING & PRIVATE SCHOOL LIFE SAFETY INSPECTION -
FIRE CLEARANCE INSPECTION 1-6 ……………………………………………….
STATE LICENSING & PRIVATE SCHOOL LIFE SAFETY INSPECTION -
FIRE CLEARANCE INSPECTION 7-25 …..…………………………………………
STATE LICENSING & PRIVATE SCHOOL LIFE SAFETY INSPECTION -
FIRE CLEARANCE INSPECTION 26-50 ……………………………………………
STATE LICENSING & PRIVATE SCHOOL LIFE SAFETY INSPECTION -
FIRE CLEARANCE INSPECTION > 50 ………………………………………………
STATE LICENSING & PRIVATE SCHOOL LIFE SAFETY INSPECTION -
ANNUAL LICENSED CARE INSPECTION 7-25 BEDS …………………………
35
- GOLF COURSE -
FEE UNIT
DISCOUNTS
RESIDENT DISCOUNT CARDS …………………………………………………………..$33 ANNUAL FEE
GREEN FEES (INCLUDES CART)
RESORT COURSE
OCTOBER THRU DECEMBER 23 …………………………………………….$49 MON - THUR
$57 FRI - SUN & HOLIDAYS
DECEMBER 24 THRU MAY …………………………………………………….$54 MON - THURS
$59 FRI - SUN & HOLIDAYS
JUNE THRU SEPTEMBER ……………………………………………………….$24 MON - THURS
$33 FRI - SUN & HOLIDAYS
LEGEND COURSE
OCTOBER THRU DECEMBER 23 …………………………………………….$29 MON - THUR
$35 FRI - SUN & HOLIDAYS
DECEMBER 24 THRU MAY …………………………………………………….$35 MON - THUR
$40 FRI - SUN & HOLIDAYS
JUNE THRU SEPTEMBER ……………………………………………………….$11 MON - THURS
$22 FRI - SUN & HOLIDAYS
FOR REGULATIONS CONCERNING; DISCOUNT CARDS, ANNUAL RENEWAL OF DISCOUNT CARD, JR. GOLF,
PSHS GOLF TEAM, RESERVATIONS, HOLIDAYS, PROMOTIONAL / TOURNAMENT RATES, PRIVATE CARTS,
PRIME TIME, RESIDENCE DEFINED
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
GOLF COURSE
DESCRIPTION
36
- LIBRARY -
FEE UNIT
BARCODE OR RFID TAGS REPLACEMENT FEE …………………………………$1
CHARGES - PRINTERS / COPIERS
COPIERS ………………………………………………………………………………………. $0.25 PER COPY
MICROFILM ………………………………………………………………………………….$0.25 PER COPY
MICROFICHE ………………………………………………………………………………..$0.25 PER COPY
DAMAGE & CLEANING FEES FOR CASINGS
$8
CD & DVD CASE …………………………………………………………………………….$2
DAMAGE CHARGES …………………………………………………………………………...
DAMAGED BEYOND REPAIR ………………………………………………….…………
FEES AND CHARGES
RESEARCH (GREATER THAN 20 MINUTES) …….…………………………….$53 PER HOUR
COPIES FOR RESEARCH ……………………………………………………………..…$5
INTERLIBRARY LOAN REQUEST ………………………………………………………..$3 PER REQUEST
INTERNET PRINTING ………………………………………………………………………….$0.25 PER PAGE
LOST (BOOKS, DVDS, CD, AUDIO BOOKS) ………………………………………………………
LOST / DAMAGED ITEM IN SET …………………………………………………………$11 PER ITEM
NON-PICKUP OF INTERLIBRARY LOANS (WITHIN 5 DAYS) …………………..$3 EACH
OVERDUE MATERIALS (PER ITEM):
BOOKS, MAGAZINES, CDS & AUDIO BOOKS ………………………………….$0.25 PER DAY
ALL DVDS ………………………………………………………………………………………$0.25 PER DAY
YOUTH BOOKS, MAGAZINES, CDS & AUDIO BOOKS …………………….$0.10 PER DAY
GRAB N' GO BAGS & OTHER ITEMS AS NOTED …………………………….$1 PER DAY
MAXIMUM FINE …………………………………………………………………………..$5 PER ITEM
REGISTRATION
RESIDENT BORROWERS ……………………………………………………………….FREE
NON-RESIDENT BORROWERS
ONE CARD FOR 1 MONTH …………………………………………………...$11 MONTHLY
ONE CARD FOR 3 MONTHS …………………………………………………..$21
ONE CARD FOR 1 YEAR …………………………………………………………$32
TWO CARDS FOR 1 YEAR * …………………………………………………..$42
*FOR 2 ADULTS AT THE SAME ADDRESS
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
LIBRARY
DESCRIPTION
AUDIO BOOK CASE
REPLACEMENT COST PLUS
$10.00 PROCESSING FEE
REPLACEMENT COST PLUS
$10.00 PROCESSING FEE
REPLACEMENT COST PLUS
$10.00 PROCESSING FEE
37
- LIBRARY -
FEE UNIT
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
LIBRARY
DESCRIPTION
$1 PER CARD
SLIGHT DAMAGE OR DEFACEMENT …………………………………………………$5 PER ITEM
THE LEARNING CENTER RENTAL**
ROOM RENTAL (HALF DAY) ……………………………………………………………$105 UP TO 4 HOURS / HALF DAY
ROOM RENTAL (FULL DAY) ……………………………………………………………$210 UP TO 8 HOURS / FULL DAY
NON-PROFIT RATE ……………………………………………………………………….50%OF THE ABOVE FEE
SET-UP ………………………………………………………………………………………….$26
WELWOOD / CORNELIA WHITE COMMUNITY ROOM / WELWOOD RENTAL**
ROOM RENTAL ……………………………………………………………………………$210 UP TO 4 HOURS
ROOM RATE ……………………………………………………………………………….$630 UP TO 8 HOURS
NON-PROFIT RATES ……………………………………………………………………50%OF THE ABOVE FEE
SET-UP ……………………………………………………………………………………….$26
**CANCELLATION POLICY:
REFUNDABLE WITHIN 72 HOURS BEFORE SCHEDULED RENTAL OTHERWISE FEE IS FORFEITED AND DUE UPON
RECEIPT OF INVOICE.
REPLACEMENT CARD ……………………………………………………………………
38
- PARKS / RECREATION -
FEE UNIT
ASSOCIATION FEE (PER YEAR)
FAMILY …………………………………………………………………………………………$52
ADULT ………………………………………………………………………………………….$35
YOUTH (AGES 4-12) ……………………………………………………………………..$19
BANNERS
CASTLE
FIRST WEEK ………………………………………………………………..……….$20
ADDITIONAL WEEKS ……………………………………………………..……$5
STREET
INSTALL, DISPLAY AND REMOVE ………………………………………..$225
COMMERCIAL FILMING / PHOTOGRAPHY PERMITS 11
PRODUCTION PERMIT (FILMING MOTION PICTURE)
APPLICATION FEE ………………………………………………………………..$164 PER PRODUCTION
LOCATION FEE
PER DAY ………………………………………………………………………$44 PER DAY -OR-
PER WEEK (7 DAY PERIOD) ……………………………………………..$218 PER WEEK (7 DAY PERIOD)
STILL PHOTOGRAPHY*
APPLICATION FEE ………………………………………………………………..$82 PER PRODUCTION
LOCATION FEE ……………………………………………………………………..$16 PER DAY
*
*
*
DESERT HIGHLAND CENTER 11
$328 NO ALCOHOL -
DEPOSIT ONLY
$546 WITH ALCOHOL -
DEPOSIT ONLY
SERVICE FEE: FEES WILL BE CHANGED TO COVER EXPENSES TO THE CITY FOR
PERSONNEL, EQUIPMENT, AND VEHICLE EXPENSES INCURRED BY THE CITY TO ASSIST A
FILM PROJECT. THIS WILL REFLECT ACTUAL COST TO THE CITY AND ARE APPLIED, IN
ADDITION TO APPLICATION AND LOCATION FEES.
PROJECTS WITH LESS THAN FIVE (5) CREW MEMBERS, TWO (2) VEHICLES,
AND LASTING LESS THAN EIGHT (8) HOURS, QUALIFY.
APPLICANTS MUST FILE ANNUALLY
EXCEPTION: PROJECTS USING CITY OF PALM SPRINGS PROPERTY OR RIGHTS-
OF-WAY.
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
PARKS & RECREATION
DESCRIPTION
FACILITIES FEE: FACILITIES MANAGED BY VARIOUS CITY DEPARTMENTS HAVE FEE
SCHEDULES ESTABLISHED FOR THEIR USE.
USE FEES APPROPRIATE TO THESE FACILITIES WILL BE APPLIED IN ADDITION TO
APPLICATION AND LOCATION FEES.
APPLICATION DEPOSIT ………………………………………………………………..
39
- PARKS / RECREATION -
FEE UNIT
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
PARKS & RECREATION
DESCRIPTION
$37 PER HOUR
$49 PER MEETING
$164 FIRST 4 HOURS
$33 PER HOUR - OVER 4 HOURS
$37
LEISURE CENTER
CASHIER ………………………………………………………………………………………$1 PER TRANSACTION
COMMUNITY ROOM 11
APPLICATION DEPOSIT ………………………………………………………..$61
ATTENDANT …………………………………………………………………………$37 PER HOUR
BASE RENT
COMMERCIAL
MEETINGS (UP TO 3 HOURS) ……………………………………$181 PER MEETING
EVENTS (DAILY) …………………………………………………….$206 PER EVENT
RESIDENTS
MEETINGS (3 HOURS) ……………………………………………$72 PER MEETING
EVENTS (DAILY) …………………………………………………….$122 PER EVENT
TAX-EXEMPT / NON-PROFIT 4
MEETINGS (3 HOURS) ……………………………………………$103 PER MEETING
EVENTS (DAILY) …………………………………………………….$103 PER EVENT
125%OF CURRENT BASE EVENT
$37
DANCE STUDIO 11
APPLICATION DEPOSIT ……………………………………………………….$31
ATTENDANT …………………………………………………………………………$37
BASE RENT (3 HOURS)
COMMERCIAL ……………………………………………………………..$122
RESIDENTS ……………………………………………………………………$72
TAX-EXEMPT / NON - PROFIT 4 …………………………………….$36
125%OF CURRENT BASE RENT
MUNICIPAL ALCOHOL BEVERAGE FEE
COMMERCIAL, RESIDENTS, TAX-EXEMPT / NON-PROFIT 4 ………….$37
PALM SPRINGS STADIUM 11
APPLICATION DEPOSIT ………………………………………………………………..$1,092 DEPOSIT ONLY
EXTENDED USE (EACH HOUR OVER 4 HOURS) ……………………………
BASE RENT ……………………………………………………………………………
NON-RESIDENT FACILITY RENTAL
BASE RENT - MEETINGS (DAILY) …………………………………………….
RESIDENT FACILITY RENTAL
FACILITY ATTENDANT …………………………………………………………………
NON-RESIDENT STANDARD, NON-PROFIT & COMMERCIAL FEES
MUNICIPAL ALCOHOLIC BEVERAGE FEE ……………………………………..
NON-RESIDENT STANDARD, NON-PROFIT & COMMERCIAL FEES
MUNICIPAL ALCOHOLIC BEVERAGE FEE ……………………………………..
40
- PARKS / RECREATION -
FEE UNIT
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
PARKS & RECREATION
DESCRIPTION
BASE RENT-DAILY
COMMERCIAL ………………………………………………………………………$1,820
RESIDENT …………………………………………………………………………….$879
TAX-EXEMPT / NON-PROFIT 4 ……………………………………………$424
LIGHTS …………………………………………………………………………………………$31 PER HOUR,
MINIMUM 2 HOURS
MUNICIPAL ALCOHOLIC BEVERAGE FEE ……………………………………..$37
FIELD PREPARATION ……………………………………………………………………$49
125%OF CURRENT BASE RENT
PARK & PLAYFIELD RESERVATIONS AND USE 11
125%OF CURRENT BASE RENT
PICNIC AREA RESERVATION - ALL PARKS
APPLICATION DEPOSIT ………………………………………………………..$109 DEPOSIT ONLY
BASE RENT (3 HOURS)
COMMERCIAL ………………………………………………………………$158
RESIDENTS ……………………………………………………………………$92
TAX-EXEMPT / NON-PROFIT 4 ………………………………………$92
PLAYING FIELDS - SOCCER (MINIMUM 2 HOURS)
FIELD RENTAL
LEAGUES ………………………………………………………………………$48 PER FIELD, PLUS
$48 PER DAY FOR PREPARATION
TOURNAMENT …………………………………………………………….$48 PER FIELD, PLUS
$48 PER DAY FOR PREPARATION
LIGHTS
DEMUTH PARK …………………………………………………………….$31 PER HOUR,
MINIMUM 2 HOURS
RESERVATIONS …………………………………………………………………..$10
PLAYFIELDS - SOFTBALL & BASEBALL (MINIMUM 2 HOURS)
FIELD RENTAL
LEAGUES ………………………………………………………………………$48 PER FIELD, PLUS
$48 PER DAY FOR PREPARATION
RESIDENTS …………………………………………………………………..$25 PER HOUR
TAX-EXEMPT / NON - PROFIT 4 …………………………………….$25 PER HOUR
TOURNAMENT …………………………………………………………….$48 PER TEAM
NON-RESIDENT STANDARD, NON-PROFIT & COMMERCIAL FEES
NON-RESIDENT STANDARD, NON-PROFIT & COMMERCIAL FEES
41
- PARKS / RECREATION -
FEE UNIT
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
PARKS & RECREATION
DESCRIPTION
LIGHTS
DEMUTH PARK …………………………………………………………….$31 PER HOUR,
MINIMUM 2 HOURS
PAVILION WAY (CERRITOS RD) PRACTICE FIELD ……………..$31 PER HOUR,
MINIMUM 2 HOURS
RESERVATIONS …………………………………………………………………….$10
PAVILION 2, 11
EVENTS (8 HOURS), WITHOUT ALCOHOL ……………………………………….$609
EVENTS (8 HOURS), WITH ALCOHOL ………………………………………………$846
MEETINGS (UP TO 3 HOURS) ……………………………………………………………$122
ATTENDANT ………………………………………………………………………………..$37 PER HOUR
BASE RENT
COMMERCIAL
EVENTS (8 HOURS) …………………………………………………………………$1,212
MEETINGS (UP TO 3 HOURS) ……………………………………………………$515
RESIDENTS
EVENTS (8 HOURS) …………………………………………………………………$1,030 PER EVENT
MEETINGS (UP TO 3 HOURS) …………………………………………………$305 PER EVENT
TAX-EXEMPT / NON-PROFIT 4
EVENTS (8 HOURS) …………………………………………………………………$515 PER EVENT
MEETINGS (UP TO 3 HOURS) …………………………………………………$152 PER MEETING
……………………OF CUURENT BASE RENT
KITCHEN USE FEE (RESIDENT & NON - RESIDENT) ………………………………$226 PER RENTAL
MUNICIPAL ALCOHOLIC BEVERAGE FEES ……………………………………$37
PROGRAM
AEROBICS / SOO BAHK DO …………………………………………………………..$64 PER MONTH
AEROBICS, YOGA ………………………………………………………………………….$13 PER PERSON DROP IN FEE
MARTIAL ARTS (PER MONTH)
AIKIDO …………………………………………………………………………………$70 PER MONTH
TAE KWON DO MOO DUK KWON ………………………………………..$83 PER MONTH
DROP IN FEE (PER PERSON, PER CLASS) ………………………………………$11 PER PERSON, PER CLASS
CAMP
$70 - $88 PER WEEK
$82 - $126 PER WEEK
$38 PER WEEK
BASKETBALL LEAGUE FEES …………………………………………………………..$395 - $564 PER TEAM, PER SEASON
SUMMER CAMP** ……………………………………………………………….
TINY TOT CAMP*** ……………………………………………………………..
NON-RESIDENT STANDARD, NON-PROFIT & COMMERCIAL
FEES ………………………………………………………………………………….
PERFORMING ARTS CAMP / DANCE GROUP** ……………………………
42
- PARKS / RECREATION -
FEE UNIT
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
PARKS & RECREATION
DESCRIPTION
$11
$5 PER PERSON DROP-IN FEE
DANCERCIZE / YOGA ……………………………………………………………………$54 PER MONTH
FOR KIDS ONLY ……………………………………………………………………………$117 PER MONTH
JAZZ / JAZZNATICS ………………………………………………………………………$54 PER MONTH
PARENT & ME
PARENT & ME ………………………………………………………………………$27 PER MONTH
PARENT & ME ……………………………………………………………………..$7 PER PERSON DROP-IN FEE
TINY TOTS (4 DAYS PER WEEK) ………………………………………………..$109 PER MONTH
SOFTBALL LEAGUES * …………………………………………………………………..$439 - $585 PER TEAM
SOFTBALL TOURNAMENTS * ……………………………………………………….$351 - $585 PER TEAM
SWIMMING
$47 PER MONTH
PRIVATE SWIM LESSONS / ADULT GROUP …………………………..$63 PER MONTH
SWIM TEAM …………………………………………………………………………$36 PER MONTH
WATER POLO ……………………………………………………………………………….$38 PER MONTH
*
**
***
RECREATIONAL VEHICLE PARKING FEEDS
$20 PER NIGHT,
INCLUDES TRANSIENT
OCCUPANCY TAX
SHOWMOBILE 11
APPLICATION DEPOSIT ………………………………………………………………..$97 DEPOSIT ONLY
RENTAL 1ST 3 HOURS ……………………………………………………………………$1,016
EACH ADDITIONAL HOUR ……………………………………………………………$347
TOWING CHARGES (REFLECT ACTUAL COST TO CITY) ………………………….$57
TRANSPORTATION / LABOR …………………………………………………………$57
MULTIPLE-DAY EVENTS* ...................................................
SURCHARGE FOR PAYMENT RECEIVED AFTER THE 15TH OF THE
MONTH (PER CLASS) ……………………………………………………………………..
DANCERCIZE / FOLK DANCING / SQUARE DANCING / CLOGGING
PARENT & ME, SWIM / PRESCHOOL BEGINNER SWIM /
BEGINNER SWIM ……………………………………………………………….
$5.00 DISCOUNT IF PAID BY THURSDAY WEEK PRIOR
$25.00 DISCOUNT IF PAID THURSDAY WEEK PRIOR; $15.00 DISCOUNT IF PAID
FRIDAY WEEK PRIOR.
FEES COULD CHANGE BASED ON OFFICIALS CONTRACTS AND MAXIMUM LIMITS
SET ON ENTRY FEES FOR NATIONAL TOURNAMENTS
CITY CONTRACTED
THERE MUST BE A GUARANTEED MINIMUM OF 25 RV'S IN
ORDER TO PARK IN CITY FACILITIES
43
- PARKS / RECREATION -
FEE UNIT
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
PARKS & RECREATION
DESCRIPTION
SKATE PARK FEES
PRIVATE PARTY RENTALS
HALF DAY (3 HOUR MINIMUM) …………………………………………………$351
FULL DAY ………………………………………………………………………………$703 PER DAY
SPECIAL EVENTS - ALL PARKS
APPLICATION DEPOSIT
REVIEW FEE …………………………………………………………………………………$59
BASE RENT (50 PEOPLE OR MORE) ……………………………………………………$181
COMMERCIAL ……………………………………………………………………………..$244 PER DAY
RESIDENTS …………………………………………………………………………………..$244 PER DAY
TAX-EXEMPT / NON-PROFIT 4 ……………………………………………………..$122 PER DAY
SPECIAL EVENTS-APPLICATION DEPOSIT ……………………………………$60
SPECIAL EVENTS INSURANCE PROCESSING FEE …………………………$20
SPECIAL EVENTS REVIEW FEE ………………………………………………………..$190
SWIM CENTER
DAILY ADMISSIONS
RESIDENTS:
ADULT (13 & OVER) ………………………………………………………..$4 PER VISIT
YOUTH (4 - 12) ……………………………………………………………….$3 PER VISIT
NON-RESIDENTS:
ADULTS (13 & OVER) ……………………………………………………….$5 PER VISIT
POOL PASS (PUNCH CARD - 25 SWIMS)
RESIDENT ADULT (AGES 13 & UP) ……………………………………………$66
NON RESIDENT ADULT (AGES 13 & UP) …………………………………..$82
NON - PROFIT (501C3) SWIM TEAMS (IE. PIRANHAS)
NON-EXCLUSIVE USAGE
1-25 SWIMMERS ………………………………………………………….$272 PER MONTH
26-50 SWIMMERS …………………………………………………………$545 PER MONTH
51-75 SWIMMERS …………………………………………………………$817 PER MONTH
76-100 SWIMMERS ………………………………………………………$1,090 PER MONTH
101-125 SWIMMERS ……………………………………………………$1,363 PER MONTH
125-150 SWIMMERS ……………………………………………………$1,636 PER MONTH
151-175 SWIMMERS ……………………………………………………$1,909 PER MONTH
176-200 SWIMMERS ……………………………………………………$2,182 PER MONTH
ABOVE 200 SWIMMERS ………………………………………………$8 /SWIMMER PER MONTH
EXCLUSIVE USAGE ……………………………………………………………….$1.37 /SWIMMER PER MEET
44
- PARKS / RECREATION -
FEE UNIT
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
PARKS & RECREATION
DESCRIPTION
SCHOOLS / SCHOOL DISTRICT (IE. PSUSD)
NON-EXCLUSIVE USAGE ………………………………………………………$38 PER HOUR
EXCLUSIVE USAGE ……………………………………………………………….$76 PER HOUR
RESIDENT RESERVATION
NON-EXCLUSIVE USAGE ………………………………………………………$11 PER HOUR
EXCLUSIVE USAGE ……………………………………………………………….$55 PER HOUR
NON-RESIDENT RESERVATION
NON-EXCLUSIVE USAGE ………………………………………………………$22 PER HOUR
EXCLUSIVE USAGE ………………………………………………………………..$76 PER HOUR
TENNIS COURTS
RENTAL …………………………………………………………………………………………$11 PER HOUR
VILLAGE FEST
USER FEES (FOR ALL VILLAGE FEST FEES)
APPLICATION FEE ……………………………………………………………….$33
GENERAL VENDOR
ANNUAL (JAN.-DEC.) …………………………………………………$2,102
SEASON 1 (OCT. - MAY) ………………………………………………$300 MONTH
SEASON 2 (JUN. - SEPT.) ……………………………………………$180 MONTH
FOOD SERVICE VENDOR
ANNUAL (JAN.-DEC.) …………………………………………………$2,894
SEASON 1 (OCT. - MAY) ………………………………………………$371 MONTH
SEASON 2 (JUN. - SEPT.) ……………………………………………$229 MONTH
SEASON 1 (OCT. - MAY) ………………………………………………$153 MONTH
SEASON 2 (JUN. - SEPT.) ………………………………………………$93 MONTH
SEASON 1 (OCT. - MAY) PALM SPRINGS …………………….$300 MONTH
SEASON 2 (JUN. - SEPT.) PALM SPRINGS ……………………$180 MONTH
SEASON 1 (OCT. - MAY) ………………………………………………$360 MONTH
SEASON 2 (JUN. - SEPT.) ………………………………………………$218 MONTH
NON-PROFIT VENDOR (4-WEEK MAXIMUM - PAID IN ADVANCE)
ANNUAL (JAN.-DEC.) …………………………………………………$49 WEEK
SEASON 1 (OCT. - MAY) ………………………………………………$49 WEEK
SEASON 2 (JUN. - SEPT.) ……………………………………………$49 WEEK
POLITICAL VENDOR (8-WEEK MAXIMUM - PAID IN ADVANCE)
ANNUAL (JAN.-DEC.) …………………………………………………$60 WEEK
SEASON 1 (OCT. - MAY) ………………………………………………$60 WEEK
SEASON 2 (JUN. - SEPT.) ……………………………………………$60 WEEK
RETAIL MERCHANT VENDOR (MAXIMUM 1 - MONTH PER VENDOR)
ATTRACTIONS VENDOR
45
- PARKS / RECREATION -
FEE UNIT
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
PARKS & RECREATION
DESCRIPTION
CORPORATE SPONSORSHIP
ANNUAL (JAN.-DEC.) …………………………………………………
SEASON 1 (OCT. - MAY) ………………………………………………
SEASON 2 (JUN. - SEPT.) ……………………………………………
COMMERCIAL VENDOR
ANNUAL (JAN.-DEC.) …………………………………………………$240 WEEK
SEASON 1 (OCT. - MAY) ………………………………………………$240 WEEK
SEASON 2 (JUN. - SEPT.) ……………………………………………$240 WEEK
STANDBY VENDOR
ANNUAL (JAN.-DEC.) …………………………………………………N/A
SEASON 1 (OCT. - MAY) ………………………………………………$104 WEEK
SEASON 2 (JUN. - SEPT.) ……………………………………………$104 WEEK
ENTERTAINERS R23549 ……………………………………………………………………$22
LATE PAYMENT FEE ……………………………………………………………………..$27
NEGOTIATED BY CONTRACT
NEGOTIATED BY CONTRACT
NEGOTIATED BY CONTRACT
46
- PLANNING DEPARTMENT -
FEE UNIT
PLANNING
1
2
3
ADMINISTRATIVE MINOR MODIFICATIONS ………………………$10.92 $1,094.18
ADULT ORIENTED BUSINESS PERMITS
PROCESSING AND ISSUING …………………………………………………………………………$2,332.51
ANNEXATION TO PALM SPRINGS
ACTUAL CONSULTANT / ATTORNEY / STAFF COSTS ………………………………………………$5,460 DEPOSIT
ANTENNA PERMITS
HOMEOWNER ……………………..………………………………………………$10.92 $75.35
COMMERCIAL ……………………..………………………………………………$10.92 $455.36
APPEALS
$28.39 $933.66 PLUS NOTIFICATION
$28.39 $437 PLUS NOTIFICATION
ARCHITECTURAL REVIEW
SEE: "PLAN CHECKING FEE - PLANNING" FOR ADDITIONAL CHARGES
SEE: BUILDING DIVISION "PERMITS" AND "PLAN CHECK"
MAJOR ARCHITECTURAL APPROVAL
(SEE NOTE RE: DISCOUNTED FEES)
COMMERCIAL / INDUSTRIAL / MULTIPLE SF / MF ……………………………………$5,741.74
HILLSIDE SF ………………………………………………………………………………………………$3,354.62
SINGLE-FAMILY HOUSE - MAJOR THOROUGHFARE …………………………………$1,956.86
MINOR ARCHITECTURAL REVIEW
STAFF APPROVAL ……………………………………………………………………………………$395.30
PLANNING COMMISSION APPROVAL ……………………………..………………………$1,100.74
INCIDENTAL PERMITS ………………………………………………………………………………$55
CEQA - SEE ENVIRONMENTAL DOCUMENT SECTION
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
PLANNING DEPARTMENT
DESCRIPTION IMAGING FEE
A PLANNING APPLICATION THAT INCLUDES MULTIPLE ASSOCIATED APPLICATIONS BEING PROCESSED
SIMULTANEOUSLY AS ONE PROJECT SUBJECT TO THE REVIEW AND APPROVAL BY THE PLANNING COMMISSION
AND/OR CITY COUNCIL, ARE SUBJECT TO A 50% FEE DISCOUNT ON THE ASSOCIATED APPLICATIONS, WITH THE
HIGHER APPLICATION FEE APPLIED AT 100% AND ALL OTHER ASSOCIATED APPLICATION FEES APPLIED AT 50%.
PROJECTS INCLUDING MULTIPLE APPLICATIONS REQUIRING SEPARATE ACTIONS BY THE PLANNING
COMMISSION AND/OR CITY COUNCIL ARE NOT SUBJECT TO A 50% FEE DISCOUNT.
PLANNING COMMISSION DECISION TO CITY COUNCIL ……….
PLANNING DIRECTOR DECISION TO PLANNING
COMMISSION …………………………………………………………………….
MAJOR PROJECT REVISIONS DURING APPLICATION REVIEW/PLAN CHECK MAY RESULT IN 50% ADDITIONAL FEE.
WORK DONE WITHOUT PERMITS WILL BE ASSESSED THE BASE FEE PLUS A FINE OF THE SAME AMOUNT.
47
- PLANNING DEPARTMENT -
FEE UNIT
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
PLANNING DEPARTMENT
DESCRIPTION IMAGING FEE
………………………$50.23 EACH
$124.49 $8,536.16 PLUS NOTIFICATION
………………………$3,822 DEPOSIT
$17.47 $719.63 PLUS CITY
ATTORNEY COST
$3,822 DEPOSIT
CONDITIONAL USE PERMIT
CUP (P.C. & C.C.) ……………………………………………………………………………………$4,532.89 PLUS NOTIFICATION
CUP (P.C. ONLY) …………………………………………………………….………………………$4,046.95 PLUS NOTIFICATION
$5 $36.04
HILLSIDE, ARCHITECTURAL REVIEW AREAS …………………………..$5 $36.04
$11 $1,302.76
$197 $5,019.92
SEE NOTE RE: DISCOUNTED FEES
………………………$3,822 DEPOSIT
ENVIRONMENTAL DOCUMENTS
$57 $4,252.25
$85.18 $7,326.23
$283.92
$283.92 $5,460 DEPOSIT
(PEER REVIEW)
$17.47 DEPOSIT
$17.47 DEPOSIT
PLUS CITY ATTORNEY DEPOSIT REQUIRED ………………………….
WILL BE BILLED ON ACTUAL COST
ENVIRONMENTAL DOCUMENTS ……………………………………….
(MND/EIR) (CITY CONSULTANT PREPARED)
MITIGATION MONITORING -
FIELD REVIEW (PER SITE VISIT) ………………………………………….
MITIGATION MONITORING -
SUBMITTED REVIEW (PER SITE VISIT) ………………………………..
ENVIRONMENTAL DOCUMENTS ……………………………………….
(MND/EIR) (DEVELOPER CONSULTANT PREPARED)
NOTES:
CERTIFICATION OF RESOLUTIONS (P. C. OR HSPB)
(AAC FEES INCLUDED FOR NEW CONSTRUCTION TYPE I & II)
(SEE NOTE BELOW - AMENDMENTS AT 50%)
C.U.P. AMENDMENTS MAY QUALIFY FOR 50% DISCOUNT, BUT ONLY IF ORIGINAL CUP IS 5 OR LESS YEARS
OLD – SEE PLANNING DIRECTOR - IMAGING FOR AMENDMENTS - FULL FEES.
CITY ATTORNEY REVIEW OF DEVELOPMENT PROJECTS
ACTUAL COST AT CURRENT HOURLY RATE - DEPOSIT
REQUIRED (SUBJECT TO CHANGE) ………………………………………
CODES, COVENANTS & RESTRICTIONS (CC&Rs) - PLNNG
WILL BE BILLED ON ACTUAL COST - DEPOSIT REQUIRED
CHANGE OF ZONE (COZ) (P. C. & C. C.)
CONSULTANT FEE + 12.5%
DETERMINATIONS BY PLANNING COMMISSION ……………
DEMOLITIONS, MODIFICATIONS, IMPROVEMENTS, ETC.
DEVELOPMENT AGREEMENTS (DA) - PLANNING ………….
INITIAL STUDY / MINOR PROJECT (CITY PREPARED) ………………
INITIAL STUDY / MAJOR PROJECT (CITY PREPARED) ………………
48
- PLANNING DEPARTMENT -
FEE UNIT
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
PLANNING DEPARTMENT
DESCRIPTION IMAGING FEE
EVENT HOUSE REGISTRATION (R22418)
EVENT HOUSE FEE ……………………………………………………………….………………………$382
EVENT HOUSE APPEAL (R22418) ……………………………………………..………………………$141.96 PER APPEAL
FILES RETRIEVED FROM STORAGE - PRA …………………………..………………………NO COST
………………………CITY COST
FINAL PLANNING INSPECTION
………………………$203.11
………………………$491
………………………$235.87
………………………$42.59
$283.92 12.5%OF CONSULTANT
COST
………………………12.5%OF CONSULTANT
COST
………………………12.5%OF CONSULTANT
COST
GARAGE SALE PERMITS
SINGLE GARAGE SALE PERMIT ………………………………………………………………………$20
MULTIPLE GARAGE SALE PERMIT …………………………………………………………………$40
$39.31 $8,683.58 PLUS NOTIFICATION
GENERAL PLAN & ZONING LETTER
VERIFICATION OF ZONING ……………………………………………………………………………$244.61
INVESTIGATION OF ZONING CONFORMANCE ………………………………………………$777.50
$22.93 $0.73 /$1,000.00 NEW
CONST.
GENERAL PLAN & GENERAL PLAN MAP
SEE CITY CLERK
………………………$1,425.06
ENVIRONMENTAL DOCUMENTS - DEPT. FISH & GAME
FINAL PLANNING INSPECTION - MINOR ARCHITECTURAL ….
FINAL PLANNING INSPECTION - MAJOR ARCHITECTURAL …
OUTSIDE AGENCY ENTITLEMENT & PLANNING SERVICES ...
(IN HOUSE)
OUTSIDE AGENCY ENTITLEMENT & PLANNING SERVICES …
(CONSULTANT)
FOCUSED ENTITLEMENT & PLANNING SERVICES ……………
GENERAL PLAN AMENDMENT (GPA) (P.C. & C.C.) ……..
SUBDIVISION - FINAL PLANNING INSPECTION - FIRST SFR …
SUBDIVISION - FINAL PLANNING INSPECTION - EACH
ADDITIONAL SFR …………………………………………………………………
(SB1535:ADJUSTED ANNUALLY BY FISH & GAME SECTION 713)
SEE DEPARTMENT OF FISH & WILDLIFE / FEES COLLECTED BY FISH & WILDLIFE
HISTORIC SITE PRESERVATION - MILLS ACT - CLASS I ……
GENERAL PLAN MAINTENANCE SURCHARGE …………………
FILES RETRIEVED - OPTIONAL EXPEDITED SERVICE ………………
49
- PLANNING DEPARTMENT -
FEE UNIT
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
PLANNING DEPARTMENT
DESCRIPTION IMAGING FEE
$17.47 $312.31
HSPB - DEMOLITIONS OF CLASS 3 SITES …………………………..………………………$609.34
HSPB - SURVEY (COST + TAX) ……………………………………………………………………………$33.85
$21.84 $636.64
(PLUS ARCHITECTURAL / NOTIFICATION FEES)
IN-LIEU PARKING FEES (ESTABLISHED BY RESOLUTION 21578)
………………………$14,050.76
………………………$4,683.59
EXISTING CONSTRUCTION - PER SPACE …………………………………………………$2,342.34
AGREEMENT PREPARATION ……………………………………………$28.39 $620.26
LAND USE PERMITS (L.U.P)
MINOR LAND USE PERMITS …………………………………………………$10.92 $122.30
(POSTCARD RACKS, OWNERSHIP TRANSFERS, ETC.)
MAJOR LAND USE PERMITS …………………………………………………………………………$940.21
LOT TIE AGREEMENT ……………………………………………………………………………………$638.82
LANDSCAPE & IRRIGATION PLAN
SINGLE FAMILY RESIDENCE ………………………………………………….………………………$405.13
MF / SF SUBDIVISION …………………………………………………………..………………………$1,764.67
COMMERCIAL / INDUSTRIAL < 5 ACRES ……………….………………………………………$915.10
COMMERCIAL / INDUSTRIAL > 5 ACRES ……………………….………………………………$1,425.06
MEDICAL CANNABIS COOPERATIVES OR COLLECTIVES
………………………$8,190 DEPOSIT
………………………$819 DEPOSIT
MURAL PERMIT ……………………………………………………………………..………………………$2,044.22
NOTIFICATION CHARGES
PLANNING COMMISSION ONLY …………………………………………..………………………$476.31
PLANNING COMMISSION AND CITY COUNCIL ……………………..………………………$952.62
PARK FEES IN-LIEU OF DEDICATION 15
QUIMBY PARK ACT
(SEE NOTE RE: DISCOUNTED FEES)
APPLICATION FEE (FULL REIMBURSEMENT OF COSTS TO
ADMINISTER) ………………………………………………………………………
APPEAL FEE (FULL REIMBURSEMENT OF COSTS TO ADMINISTER) …
HSPB-APPLICATION FOR CERTIFICATE OF APPROVAL FOR
EXTERIOR MODIFICATIONS TO A CLASS 1 HISTORIC SITE
……………………………………………………….………………………………..
AREAS BOUNDED BY AMADO & BELARDO ROAD, MUSEUM
WAY, RAMON ROAD & INDIAN CANYON DRIVE ………………… ,
ROAD
……………………………………………………………………………..
HOUSE MOVING APPLICATION …………………………………..……….
50
- PLANNING DEPARTMENT -
FEE UNIT
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
PLANNING DEPARTMENT
DESCRIPTION IMAGING FEE
PLAN CHECKING FEES - PLANNING
THE FOLLOWING FEE MAY BE ADDED TO ANY PLAN REQUIRING PLANNING DIVISION REVIEWS.
SINGLE - FAMILY RESIDENTIAL (TOTAL BUILDING AREA:)
ANY SIZE: ……………………………………………………………………………………………$192.19
………………………$246
………………………$585.31
………………………$1,434.89
………………………$874
………………………$533.99
………………………$1,229.59
………………………$619.16
PLANNED DEVELOPMENT DISTRICT (P.C. & C.C.)
………………………$4,962.05 PLUS NOTIFICATION
………………………$10,198.19 PLUS NOTIFICATION
FINAL P.D.D. - FOR 5 ACRES ……………………………………………….$196.56 $3,135.13
FINAL P.D.D. - OVER 5 ACRES …………………………………………….$196.56 $3,856.94
………………………$1,783.24
………………………$4,452.08
NOTE: 50% OF FEES ARE FOR AMENDMENTS TO ORIGINAL APPLICATIONS 5 OR LESS YEARS OLD.
$56.78 $568.93
FORMERLY USE / STANDARDS AMENDMENT
$20.75 $395.30
PLANNING COMMISSION ITEMS
AGENDA ONLY - YEARLY ………………………………………………………………………………$66.61
AGENDA & MINUTES - YEARLY …………………………………………….………………………$145.24
$85.18 $914.00
PRODUCTIVE HOURLY RATES BY CATEGORY
DIRECTOR OF PLANNING ……………………………………………………..………………………$293.75
PRINCIPAL PLANNER ……………………………………………………………………………………$256.62
ASSOCIATE / ASSISTANT PLANNER ………………………………………………………………$170.35
FINAL LANDSCAPE / EXT. LIGHTING (NEW) …………………
COMMERCIAL / PLANNED DEVELOPMENTS, ETC. -
1 TO 5 ACRES ……………………………………………………………....
COMMERCIAL / MULTI - RESIDENTIAL FAMILY -
LESS THAN 1 ACRE ……………………………………………………....
COMMERCIAL TENANT IMPROVEMENT …………………….
COMMERCIAL / PLANNED DEVELOPMENTS, ETC. -
OVER 5 ACRES ………………………………………………………………
PRE-APPLICATION - 50% APPLIED TO FEE FOR REGULAR
APPLICATION ……………………………………………………………………..
FINAL DEV. AMEND. - MINOR CHANGE (P.C.) ………………
INCIDENTAL CHANGE TO APPROVED PD (STAFF) …………
PRELIMINARY DEVELOPMENT PLAN - > 5 ACRES ……………….
PRELIMINARY DEVELOPMENT PLAN - 5 ACRES OR UNDER …
PRELIMINARY DEVELOPMENT PLAN - MAJOR AMENDMENT
PRELIMINARY DEVELOPMENT PLAN - MINOR AMENDMENT
MULTI - FAMILY RESIDENTS - OVER 5 ACRES ……………….
MULTI - FAMILY RESIDENTS - 1 TO 5 ACRES ……………….
(SEE PLAN CHECK FEES - PLANNING FOR ADDITIONAL CHARGES)
51
- PLANNING DEPARTMENT -
FEE UNIT
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
PLANNING DEPARTMENT
DESCRIPTION IMAGING FEE
PLANNING ADMIN COORDINATOR ………………………………………………………………$148.51
CLERICAL (SR. SECRETARY) …………………………………………………..………………………$133.22
PLANNING TECH ………………………………………………………………….………………………$132.13
………………………$680.32
REFUNDS
NET OF ESTIMATED STAFF TIME EXPENDED …………………………………………………$170.35
RESOLUTION CERTIFICATION ……………………………………………….………………………$100.46
(SAME AS CERTIFICATION)
$22.93 $934.75
SEARCHLIGHT PERMITS …………………………….………………………….$10.92 $425.88
SIGN PERMITS
REVIEW AND APPROVAL
BY PLANNING COMMISSION …………………………………………..$28.39 $1,651.10
BY CITY COUNCIL …………………………………………………………….$56.78 $1,651.10
BY STAFF …………………………………………………………………………$10.92 $127.76
TEMPORARY SIGNS …………………………………………………………$5.46 $31.67 PER SIGN
$10.92 $255.53
$33.85 $1,858.58
$33.85 $1,858.58
………………………$3,939.94
$197.65 $5,460 DEPOSIT, PLUS
NOTIFICATION
$197.65 $2,730
……………………………
DEPOSIT, PLUS
NOTIFICATION
STREET NAME CHANGE …………………………………………………………$28.39 $2,762 PLUS
PLUS COST OF CHANGING STREET SIGNS)
SUBDIVISION MAPS
PETITION FOR REVERSION TO ACREAGE ………………………………………………………$2,580.40
REVISED MAPS
APPLICATION FEE - MINOR ………………………………………………$17.47 $1,023.20 PLUS NOTIFICATION
APPLICATION FEE - MAJOR ………………………………………………$17.47 $1,541.90 PLUS NOTIFICATION
TENTATIVE TRACT MAPS (P.C. & C.C.) ………………………………….$73.16 $3,089.27 PLUS NOTIFICATION
(SEE NOTE RE: DISCOUNTED FEES)
SIGN DISTRICTS (PLUS NOTIFICATIN FEE C.C.) …………….
SPECIFIC PLAN - AMENDMENT - INITIAL DEPOSIT - TEXT
AMENDMENT ……………………………………………………………………..
SIGN PROGRAM - MULTI-TENANT - / AMENDMENT ……
SIGN VARIANCE - INCLUDES NOTIFICATION ………………..
RESOLUTION OF CONVENIENCE & NECESSITY …………………
SEE NOTE RE: DISCOUNTED FEES
TEMPORARY CONSTRUCTION FENCE GRAPHICS ……………
RECREATIONAL VEHICLE PARKING PERMIT ……………………
SPECIFIC PLAN - INITIAL DEPOSIT ……………………………………..
(RATE CHARGED AT PRINCIPAL PLANNER'S FULL HOURLY RATE.)
52
- PLANNING DEPARTMENT -
FEE UNIT
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
PLANNING DEPARTMENT
DESCRIPTION IMAGING FEE
TENTATIVE PARCEL MAPS (P.C. & C.C.) ………………………………..$73.16 $2,580.40 PLUS NOTIFICATION
(SEE NOTE RE: DISCOUNTED FEES)
VESTING MAPS …………………………………………………………………….$73.16 $4,549.27 PLUS NOTIFICATION
PARCEL MAP WAIVER ………………………………………………………….………………………$2,157
TECHNOLOGY SURCHARGE …………………………………………………..………………………$0.92 /$1,000.00 NEW
CONSTRUCTION
VALUE
TIME EXTENSIONS …………………………………………………………………$28.39 $1,536.44 PLUS NOTIFICATION
VARIANCE ……………………………………………………………………………..$28.39 $2,861.04 PLUS NOTIFICATION
(FROM TYPE I C.U.P. AMENDMENT 1 TO 5 ACRES)
ZONING / CODE COMPLIANCE INSPECTION & LETTER
(SEE GPA VERIFICATION OF ZONING / INVESTIGATION OF ZONING COMFORMANCE)
ZONING MAPS
SEE CITY CLERK
53
- POLICE DEPARTMENT -
FEE UNIT ADDT'L FEES UNIT
ADMINISTRATIVE HEARING FEE
DANGEROUS AND VICIOUS DOG HEARING ………………$122
ALARM ORDINANCE FEES
USER'S ALARM PERMITS
ANNUAL ALARM PERMIT ……………………...……………$35
REISSUED ALARM PERMIT ………………………...…………$35
RENEWAL FEE (YEARLY) ……………………...…………………$31
FALSE ALARMS
SEE: MASTER BAIL SCHEDULE (ORD. 1678)
DEAD ANIMALS FEES (ANIMAL CONTROL)
DELIVERED DEAD ANIMALS
……………………
$16
$29
DISPOSAL ONLY (OF DEAD ANIMALS)
SMALL / MEDIUM ANIMAL …………………..……………$11
LARGE ANIMAL ……………..……………...……………………$31
PICK-UP & DISPOSAL
SMALL / MEDIUM ANIMAL ………………..………………$36
LARGE ANIMAL …………………………...……...………………$61 PLUS COST
TRAP RENTAL FEES
INITIAL FEE PER WEEK ……………...……………...…………$31
EXTRA DAY
WITH PERMISSION ……………...…………………………$5 PER DAY
WITHOUT PERMISSION ……………………...…………$31 PER DAY
$122 PER ATTEMPT
LATE FEE PER DAY …………………………...…..……………$31
SERVICES, SPECIAL:
ANIMAL REMOVALS
FROM CHIMNEYS
$66
$33
DESCRIPTION
PER ANIMAL, PLUS COST
WITHOUT ASSISTANCE (FROM DELIVERER) (R22239)
PER 5 ANIMALS, PLUS DISPOSAL FEE
NO CHARGE, PLUS DISPOSAL FEEBY DELIVERER (NO ASSISTANCE RECEIVED) ………………
WITH ASSISTANCE (FROM DELIVERER) (R22239) ………
PER 5 ANIMALS, PLUS DISPOSAL FEE
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
POLICE DEPARTMENT
FBR = Fully Burdened Hourly Rates
UNLOADING & ADMINISTRATIVE PROCESSING FEE
PER STAFF, PER HOUR
PER STAFF, PER 1/2 HOUR
PLUS COST
ANIMAL CONTROL TO PICK UP OR RECLAIM ……
EACH 1/2 HOUR AFTER FIRST HOUR ………
INITIAL CALL RESPONSE, DOOR TO DOOR,
MINIMUM 2 STAFF REQUIRED ……………….
54
- POLICE DEPARTMENT -
FEE UNIT ADDT'L FEES UNITDESCRIPTION
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
POLICE DEPARTMENT
FBR = Fully Burdened Hourly Rates
BILLING SURCHARGE …………..………………...……………$31
RELOCATION OF NON-DOMESTIC ANIMALS
FROM CITY OWNED TRAPS
$122 /SET-UP CALL
CLEARING
NON-SKUNK TRAPS ……………………………..$31 PLUS COSTS
SKUNKS
FROM SKUNK TRAP ……………………..………$31 PLUS COSTS
FROM NON-SKUNK TRAP ………………..……$64 PLUS COSTS
NOT CONTAINED IN CITY TRAPS
$62
EACH 1/2 HOUR ……………..………………………………$33
$122
MICROCHIPPING FEE
DANGEROUS OR VICIOUS ANIMALS …………….…$20
$20
CREMATION HOLD -DELIVERED ……………………………$3
PICK-UP / CREMATION HOLD ………………………………$32
BICYCLE LICENSE FEES
ISSUANCE OR REPLACEMENT OF LICENSE …………………$1 PER LICENSE
CONCEALED CARRY WEAPON PERMIT STATE REGULATED FEES
TWO-YEAR STANDARD …………………………………………$245 PLUS $93 D.O.J. FEE
THREE-YEAR JUDGE …………………………………………… $245 PLUS $115 D.O.J. FEE
$245 PLUS $137 D.O.J. FEE
RENEWAL FEES STATE REGULATED FEES
TWO-YEAR STANDARD …………………………………………$81 PLUS $52 D.O.J. FEE
THREE-YEAR JUDGE …………………………………………… $81 PLUS $74 D.O.J. FEE
$81 PLUS $96 D.O.J. FEE
MODIFICATION / AMENDMENT FEE …………………………$37
(I.E.) CHANGE OF NAME, GUNS, ADDRESS)
APPLICABLE UNTIL STATE LAW AND/OR LOCAL ORDINANCES MANDATE OTHERWISE
EMERGENCY SERVICES FEE - "AFTER HOURS"
CALL OUTS …..……………………………………………………
OWNERS REQUEST, RECLAIMED ANIMALS,
WHEN OBTAINING CITY DOG LICENSE ……..…
PLUS ANY ADDT'L FEES THAT MAY APPLY
FOUR-YEAR RESERVE POLICE OFFICER ………………
FOUR-YEAR RESERVE POLICE OFFICER ………………
PER STAFF, PER 1/2 HOUR
PER STAFF, PER HOUR
SET-UP, CHECKING AND CLEARING ………
INITIAL CALL RESPONSE, 2 HOUR MINIMUM
55
- POLICE DEPARTMENT -
FEE UNIT ADDT'L FEES UNITDESCRIPTION
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
POLICE DEPARTMENT
FBR = Fully Burdened Hourly Rates
$75
INDIVIDUAL FEE (NON-CITY EMPLOYEE) ……………………$75
NON-PSPD CITY EMPLOYEE …………………………………$75
STATE MANDATED FIREARMS TRAINING
$75
$181
$99
CRIME AND ACCIDENT REPORT FEES ………………………$0.11 PER PAGE
FINGERPRINT FEE
NON-CRIMINAL AND NON-STATE MANDATED …………$38
$202 PER PERSON
POSITION RATES (FBR)
COMMUNITY SERVICE OFFICER …………………………...$98 PER HOUR
DISPATCHER ……….………………………………………………….$95 PER HOUR
LIEUTENANT ………….………………………………………………$228 PER HOUR
SERGEANT …………………..…………………………………………$195 PER HOUR
SWORN OFFICER …….…………………………..…………………$140 PER HOUR
PRESS PASS …………………………………………………………………$33 EACH
RANGE USE
$75
INCLUDING TRIBAL POLICE
RETIRED PSPD CONCEALED WEAPONS ………………………$50
ANNUAL QUALIFICATIONS
PALM SPRINGS CITY EMPLOYEE USE PER HOUR ………$75
NON-POLICE OFFICER
BASIC RANGE USE OUT OF STATE HR 218
QUALIFICATIONS ………………………………………
INITIAL APPLICANT ………………………………………
(14 HRS OF CLASSROOM OF 6 T0 20 STUDENTS
AND 2 HRS RANGE INSTRUCTION)
RENEWALS …………………………………………………
(4 HOURS OF CLASSROOM OF 4 TO 17 AND RANGE
INSTRUCTION)
ANNUAL RANGE QUALIFICATION FEES ………………….
(CHANGE OF NAME, GUNS, ADDRESS)
OUTSIDE LAW ENFORCEMENT AGENCIES
PER HOUR ………………………………………………………………
INITIAL CANNABIS RELATED BUSINESS AND
ACTIVITY APPLICATION FILING FEE20 ……………………
(INCLUDES: BACKGROUND CHECK AND FINGERPRINTING)
56
- POLICE DEPARTMENT -
FEE UNIT ADDT'L FEES UNITDESCRIPTION
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
POLICE DEPARTMENT
FBR = Fully Burdened Hourly Rates
ROOM RATES
POLICE TRAINING CENTER ROOMS (101 A, B & C)
HALF DAY (4 HOURS OR LESS) ……………………………………$49 PER ROOM
FULL DAY (OVER 4 HOURS) ………………………………………$82 PER ROOM
POLICE LIBRARY
HALF DAY (4 HOURS OR LESS) …………………………………$49 PER ROOM
FULL DAY (OVER 4 HOURS) ……………………………………$82 PER ROOM
$213 PLUS $319 CPS APP. FEE
SOUND TRUCK PERMITS ……………………………………………$19
STATISTICAL DATA REPORTS ……………………………………$112 PER HOUR
VEHICLE TOW CHARGE ………………………………………………$164 PER TOW
VEHICLE TOW STORAGE CHARGE ……………………………$55 PER DAY
VIDEO TAPE COPYING FEES ………………………………………$31
VOLUNTARY GUN REGISTRATION ……………………………$25
$109,200
PER PHONE LINE PER MONTH OR ……………………………$1.25
$72
PER 911 EMERGENCY CALL FOR THOSE WHO CHOSE
TO SELECT THE PAY-PER-CALL OPTION …………………
911 EMERGENCY COMMUNICATIONS SYSTEM RESPONSE FEE
SECOND HAND DEALER/PAWNBROKER LICENSE …
VEHICLE TOWING ADMINISTRATIVE COST
RECOVERY FEE (VTACR) ………………………………………….
PLUS BLANK VIDEO TAPE COST
DIVIDED EQUALLY AMONG ALL APPROVED ROTATIONAL TOW CONTRACTORS
57
- RENT CONTROL -
FEE UNIT
$60 PER RENTAL UNIT
LATE FEE - ANNUAL REGISTRATION
30 DAYS PAST DUE ……………………………………………………………………...10%
60 DAYS PAST DUE ………………………………………………………………………30%
90 DAYS PAST DUE ………………………………………………………………………50%
RENT REVIEW REQUEST …………………………………………………………………$1,815
SUBJECT TO RENT CONTROL, WITH FEE DUE AND PAYABLE
ANNUALLY ON OR BEFORE SEPTEMBER 1
ANNUAL REGISTRATION RENEWAL FEE ……………………………………..
($12.00 PER UNIT REGISTRATION FEE INCLUDED)
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
RENT CONTROL
DESCRIPTION
58
- RIGHT OF WAY -
FEE UNIT
$1,630.36 PER APPLICATION
DOCUMENT PREPARATION
LEASES ………………………………………………………………………………………..$724.00 PER APPLICATION
NOTES & DEED OF TRUST …………………………………………………………..$724.00 PER APPLICATION
CONVEYANCE DOCUMENTS ………………………………………………………$858.31 PER APPLICATION
PLAN CHECK FOR RIGHT-OF-WAY ……………………………………………$1,908.82 PER APPLICATION
STREET & EASEMENT VACATION ……………………………………………$1,964.51 PER APPLICATION
DESCRIPTION PREPARATION ………………………………………………………..
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
RIGHT-OF-WAY
DESCRIPTION
59
- STREETS -
FEE UNIT
DOWNTOWN
PARKING
EMPLOYEE PARKING PERMIT (2-HOUR ZONES)
SEPTEMBER - AUGUST, NO PRORATING ……………………………..$34.94
METERED LOTS (NO DAILY MAXIMUM)
UP TO 2 HOURS ……………………………………………………………$1.09
ADDITIONAL HOUR ……………………………………………………..$1.09 EACH
MONTHLY SPACE RENTAL ……………………………………………$46.96 PER MONTH, PER SPACE
VALET
PARKING PERMIT …………………………………………………………$175.81
PARKING PRIVILEDGE FEE ……………………………………………$0.57 PER CAR PARKED
MANAGED PARKING PROGRAM FEES AND PROCEDURES
PUBLIC WORKS - STREET
DOWNTOWN PARKING
ADJUDICATION
ADMINISTRATIVE HEARING FEE …………………………………$29.48 REFUND IF DECISION IN
FAVOR OF APPLICANT
DOCUMENT FEES ……………………………………………………….$18.56
DMV ABSTRACT …………………………………………………………$10.92
DESCRIPTION
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
STREETS
60
- TRAFFIC -
FEE UNIT
WARRANT ANALYSIS
STOP SIGNS ………………………………………………………………………………..$958.78 FLAT FEE
TRAFFIC SIGNALS ………………………………………………………………………$958.78 FLAT FEE
IF CONSULTANT IS REQUIRED, ACTUAL COST PLUS 15% ADMINISTRATIVE FEE
IN THOSE CASES WHERE THE RESULT OF THE WARRANT ANALYSIS SHOWS THAT ADDITIONAL INTERSECTION
CONTROL IMPROVEMENTS ARE JUSTIFIED, THE REQUESTER'S FEE SHALL BE RETURNED.
DESCRIPTION
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
TRAFFIC
61
- VACATION RENTAL -
FEE UNIT
VACATION RENTALS
VACATION RENTAL
NEW REGISTRATION ………………………………………………………………$900 PER APPLICATION
RENEWAL ………………………………………………………………………………$900 PER RENEWAL
HOMESHARE
NEW REGISTRATION ………………………………………………………………$225 PER APPLICATION
RENEWAL ………………………………………………………………………………$225 PER RENEWAL
$764
APPEAL, VACATION RENTAL SUSPENSION / REVOCATION / OTHER
ACTION THAN ADMINISTRATIVE CITATION
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
VACATION RENTAL COMPLIANCE
DESCRIPTION
62
- WASTEWATER -
FEE UNIT
SEWER FACILITY FEE
EXCLUSIVE OF STREET MAIN CHARGES OR STREET LATERAL FEE
A.RESIDENTIAL UNITS * ……………………………………………………….$3,000 /EDU (EQUIVALENT
DWELLING UNIT)
1)
2)
B.COMMERCIAL AND INDUSTRIAL UNITS * …………….……………$306 FIXTURE UNIT
C.
WITHOUT KITCHENS * ……………………………………….$1,290 UNIT
WITH KITCHENS * ………………………………………………$1,500 UNIT
D.RECREATIONAL VEHICLE SPACE * ……………………………………..$2,340 SPACE
(FOR BUILDING PERMITS)
E.ASSESSMENT DISTRICTS
F.PROPERTIES ADJACENT TO CITY * …………………………………….$6,000 UNIT
*
PROPERTIES OUTSIDE OF THE CITY SHALL PAY A SEWER FACILITY FEE EQUAL TO TWICE THE RATE ESTABLISHED FOR PROPERTIES
WITHIN THE CITY LIMITS.
NOTE: ALL BUILDING PERMIT APPLICATIONS THAT WERE RECEIVED BY THE CITY’S BUILDING DIVISION ON OR BEFORE JULY 1,
2006, AND BASED UPON THE SUBMISSIONS MADE BY THAT DATE HAVE BEEN DEEMED BY THE CITY TO BE ACCEPTED FOR
REVIEW TO DETERMINE THEIR COMPLIANCE WITH CITY’S REQUIREMENTS, SHALL BE PROCESSED ON A FIRST-COME, FIRST
SERVED BASIS, IN ACCORDANCE WITH THE CITY’S STANDARD POLICIES AND PRACTICES, AND THOSE PERMITS THAT ARE
ISSUED ON OR BEFORE AUGUST 21, 2006, SHALL BE SUBJECT TO THE FEES THAT APPLIED PRIOR TO ADOPTION OF
RESOLUTION 21622.
THE SEWER FACILITY FEE TO BE PAID FOR PREMISES WITH SERVICE MADE AVAILABLE BY AN ASSESSMENT DISTRICT
SHALL BE THE FEE IN EFFECT AT THE TIME A PETITION REPRESENTING 60% SUFFICIENCY IS FILED WITH THE CITY,
PROVIDED SAID CONNECTION OCCURS DURING THE COURSE OF CONSTRUCTION BUT IN NO EVENT LATER THAN 30
DAYS AFTER FILING OF NOTICE OF COMPLETION OF THE ASSESSMENT DISTRICT. SHOULD A PERMIT NOT BE SECURED
WITHIN THE TIME FRAME SET FORTH HEREIN, THE FACILITY FEE TO BE PAID SHALL BE THAT FEE IN EFFECT AT THE TIME
THE PERMIT FOR CONNECTION IS SECURED.
NEW CONSTRUCTION SHALL PAY THE SEWER FACILITY FEE IN EFFECT AT THE TIME A BUILDING PERMIT IS ISSUED
BY THE CITY, AND SAID FACILITY FEE SHALL BE PAID PRIOR TO THE GRANTING OF A BUILDING PERMIT. SAID
FACILITY FEES SHALL BE DEPOSITED IN THE SEWER FUND
IF THE COST OF ON-SITE SEWER CONSTRUCTION AND CONNECTION, EXCLUSIVE OF SEWER FACILITY FEE, SHALL
EXCEED THE SUM OF $4,776 PER DWELLING UNIT, OR SUCH GREATER SUM AS SHALL HEREAFTER BE DETERMINED
BY RESOLUTION OF THE CITY COUNCIL, AMOUNTS SHALL BE ADJUSTED ANNUALLY IN ACCORDANCE WITH THE
ENGINEERING NEWS RECORD CONSTRUCTION COST INDEX.
IF THE COST OF SEWER MAIN CONSTRUCTION, IN THE EVENT NO SEWER MAIN EXISTS IN PROXIMITY TO SAID
PROPERTY SHALL EXCEED $7,960 PER DWELLING UNIT, OR SUCH GREATER SUM AS SHALL HEREAFTER BE
DETERMINED BY RESOLUTION OF THE CITY COUNCIL, AMOUNTS SHALL BE ADJUSTED ANNUALLY IN ACCORDANCE
WITH THE ENGINEERING NEWS RECORD CONSTRUCTION COST INDEX.
(INCLUDING SINGLE-FAMILY DWELLINGS, APARTMENTS, CO-OP APARTMENTS, CONDOMINIUMS, AND MOBILE HOME PARK SPACES)
DESCRIPTION
HOTEL ROOMS (AS DEFINED BY THE ZONING ORDINANCE)
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
WASTEWATER
63
- WASTEWATER -
FEE UNITDESCRIPTION
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
WASTEWATER
SEWER MAIN SURCHARGE FEE
SEWER STREET MAIN CHARGES
1)……………………
$16
………………………………………..
PER FOOT
2)
3)
SEWER SURCHARGE LIFT STATION NO. 1 AREA FEE 9, 10
NEW RESIDENTIAL UNITS * ……………………………………………………….$365 PER UNIT
COMMERCIAL AND INDUSTRIAL UNITS * …………………………………$32 PER FIXTURE UNIT
HOTEL ROOMS *
WITHOUT KITCHENS ………………………………………………………….$161 PER UNIT
WITH KITCHENS …………………………………………………………………$182 PER UNIT
*NOTE: FOR WHICH A BUILDING PERMIT IS ISSUED ON OR AFTER MAY 18, 1983
SUB-SURFACE SEWAGE DISPOSAL REVIEW FEE ………………………..$17 PER UNIT
SIXTEEN DOLLARS ($16) PER LOT FRONT FOOT ALONG SAID
SEWER, OR ………………………………………...…………………….
SAID STREET MAIN CHARGES SHALL BE DEPOSITED IN THE SEWER FUND, EXCEPT FOR THOSE CHARGES COLLECTED THROUGH
A SEWER REIMBURSEMENT AGREEMENT WHEREIN THE ORIGINAL COSTS PLUS INTEREST ARE REIMBURSED TO THE SECOND
PARTY OF SAID AGREEMENT.
NEW DEVELOPMENT, NATURALLY CONTRIBUTORY OF SEWAGE FLOWS TO LIFT STATION NO. 1 FOR SECTIONS 20, 29, 20 AND PALM
HILLS
IN ADDITION TO SEWER STREET MAIN CHARGE, INSPECTION FEE AND ANY OTHER APPLICABLE FEES, WHEN A SEWER
REIMBURSEMENT AGREEMENT REQUIRES THE COLLECTION OF A SEWER MAIN SURCHARGE FEE, THE BUILDING DIVISION
SHALL COLLECT AND REMIT THE AMOUNT PRESCRIBED BY SUCH AGREEMENT, (INCLUDING INTEREST, IF REQUIRED BY THE
SUBJECT AGREEMENT).
AT THE RATE ESTABLISHED BY RESOLUTION OF THE CITY COUNCIL FOR
SEWERS AND/OR SEWAGE COLLECTION SYSTEM CONSTRUCTED BY THE CITY
IN A SPECIFIED APPLICABLE AREA.
AT THE RATE ESTABLISHED IN A SEWER REIMBURSEMENT AGREEMENT
ADOPTED BY RESOLUTION OF THE CITY COUNCIL FOR SEWERS CONSTRUCTED
BY A DEVELOPER, OR
IN ADDITION TO THE INSPECTION FEE AND ANY OTHER APPLICABLE FEES, WHEN A PROPERTY CONNECTING TO A CITY SEWER
HAS NOT PAID ITS SHARE OF THE COST OF SAID SEWER, THERE SHALL BE PAID A STREET MAIN CHARGE. SAID STREET MAIN
CHARGE SHALL BE DETERMINED BY THE BUILDING DIVISION, BASED UPON ONE OF THE FOLLOWING FORMULA, WHICHEVER
IS THE GREATER:
64
- WASTEWATER -
FEE UNITDESCRIPTION
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
WASTEWATER
SEWER SERVICE CHARGES 5
(MONTHLY RATES) (EFFECTIVE 7/1/12 IN ACCORDANCE TO R23120)
A)RESIDENTIAL USES ……………………………………………………………..$20 MONTHLY PER UNIT
B)$20 MINIMUM CHARGE, PLUS
$1.98 MONTHLY PER FIXTURE UNIT
C)$20 PER MONTH, PLUS
$6.81 MONTHLY PER UNIT
D)$13.17 MONTHLY PER UNIT
E)$20 MONTHLY PER UNIT, PLUS
$1.98 PER FIXTURE UNIT
F)150%OF ESTABLISHED CITY RATE
G)RECREATIONAL VEHICLE PARKS ………………………………………..$4.90 MONTHLY PER SPACE, PLUS
FOR COMMUNITY FACILITIES ……………………………………………$1.98 PER FIXTURE UNIT
H)
$67.58 EACH LOAD *
$135.16 EACH LOAD *
I)$1,930.50 PER APPLICATION
J)SAID SEWER SERVICE CHARGES SHALL BE DEPOSITED IN THE WASTEWATER TREATMENT PLANT FUND.
EFF. JULY 1, 2017
PROPERTIES WITHIN CITY LIMITS (ANY PART THEREOF) ………….
PROPERTIES OUTSIDE CITY LIMITS (ANY PART THEREOF) …………
SEPTAGE PERMIT FEE ………………………………………………………...
(FOR DISCHARGING SEPTAGE AT THE CITY'S WASTEWATER
TREATMENT PLANT)
HOTELS (AS DEFINED IN THE ZONING ORDINANCE) ………………………...
ROOMS WITHOUT KITCHENS
HOTELS (AS DEFINED IN THE ZONING ORDINANCE) ………………………..
ROOMS WITH KITCHENS
PROPERTIES ADJACENT TO CITY ……………………………………....
(PROPERTIES OUTSIDE OF THE CITY SHALL PAY A SEWER SERVICE
CHARGE EQUAL TO 150% OF THE ESTABLISHED RATES FOR
PROPERTIES WITHIN THE CITY LIMITS.)
SEPTAGE DUMPING FEE
(*LOADS NOT IN EXCESS OF 1,000 GALLONS)
MOBILE HOME PARKS (AS DEFINED IN THE ZONING ORDINANCE) -
ONE BILL TO PARK OPERATOR FOR COMMUNITY FACILITIES
COMMERCIAL AND INDUSTRIAL USES ………………………………
(INCLUDING COMMERCIAL FACILITIES IN HOTELS)
65
- CORRESPONDING FOOTNOTES -
CORRESPONDING FOOTNOTES
1)NOT USED
2)
3)NOT USED
4)
1)THE GROUP IS A NONPROFIT TAX EXEMPT CORPORATION BY A STATE;
2)
3)
5)
FIXTURE TYPE EQUIVALENT
BATHTUB 2
LAVATORY 1
TOILET 6
LAUNDRY TRAYS 2
SHOWER 2
DISHWASHER
RESIDENTIAL 2
COMMERCIAL 25
AUTOMATIC WASHERS
COMMUNITY FACILITIES 2 EACH 10 LB. CAPACITY
LAUNDRY OR COMMERCIAL LAUNDRY 7 EACH 10 LB. CAPACITY
DRINKING FOUNTAINS 1
URINAL 2
GARBAGE DISPOSAL
RESIDENTIAL 6
COMMERCIAL 28
6)ANIMAL PLACEMENT FEES: ANY OF THE ANIMAL PLACEMENT FEES MAY BE WAIVED IN WHOLE OR IN PART
BY THE CITY MANAGER, OR HIS DESIGNEE, UNDER SPECIAL CIRCUMSTANCES AS HE MAY DETERMINE
WHERE THE PUBLIC AND CITY'S INTEREST MAY BE SERVED THEREBY.
ITS ACTIVITIES QUALIFY CONTRIBUTORS FOR INCOME TAX DEDUCTIONS UNDER SECTION 501(C) 3 OF
THE U.S. INTERNAL REVENUE CODE OR EQUIVALENT STATE LAW;
IT EXTENDS MEMBERSHIP PRIVILEGES TO ANY PERSON REGARDLESS OF RACE, COLOR, OR PLACE OF
NATIONAL ORIGIN.
(FIXTURE UNIT EQUIVALENTS) FIXTURE UNIT EQUIVALENTS TO BE USED IN CONJUNCTION WITH THE SEWER
SERVICE CHARGE RATE SCHEDULE ARE DETERMINED AS FOLLOWS, BASED ON THE AMOUNT AND TYPE OF
FLOW THROUGH THE GIVEN FIXTURES:
DISCOUNT RENTAL RATES ARE AVAILABLE TO THOSE GROUPS WHICH MEET ALL OF THE FOLLOWING
CRITERIA:
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
CORRESPONDING FOOTNOTES
FEE EXEMPT GROUPS: THE FOLLOWING GROUPS WILL BE EXEMPT FROM PAYMENT OR RENTAL FEES IN
ACCORDANCE WITH R12742 SECTION 1: CITY SPONSORED AND CO-SPONSORED ACTIVITIES. EXEMPTION
DOES NOT APPLY TO PSUSD PER FACILITIES JOINT USE AGREEMENT 04119 ENTERED JUNE 1, 1999.
66
- CORRESPONDING FOOTNOTES -
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
CORRESPONDING FOOTNOTES
7)
8)
9)
10)
11)
1)
2)
DRAINAGE FEES SHALL APPLY TO ALL EXISTING VACANT PROPERTIES WHICH ARE NOT PART OF AN EXISTING
SUBDIVISION OR THAT ARE LEGAL LOTS OF RECORD HAVING BEEN PART OF A SUBDIVISION RECORDED
PRIOR TO THE EFFECTIVE DATE OF THIS RESOLUTION. FOR PROPERTIES SMALLER THAN ONE (1) ACRE, A PER-
SQUARE-FOOT FEE SHALL BE ESTABLISHED BASED ON THE ACREAGE FEE FOR A GIVEN SUBDRAINAGE AREA.
A DRAINAGE FEE SHALL BE REQUIRED FOR ALL DEVELOPED PROPERTIES WHEN AN ADDITION OF HARD
SURFACED AREA EXCEED 50% OF THE EXISTING HARD SURFACED AREA.
IF IT IS FOUND UPON REVIEW AND REVISION OF THE MASTER DRAINAGE PLAN, THAT THE REVISED PLAN
CAN BE IMPLEMENTED AT LESSER COST THAN THE ORIGINAL PLAN, THEN THE BASE FEE WILL BE LOWERED.
IN CASES WHERE DEVELOPMENTS HAVE PREVIOUSLY BEEN ASSESSED THE HIGHER FEE, THE DIFFERENCE
BETWEEN THE FEE PAID AND SUCH REVISED FEE WILL BE REFUNDED.
IN THOSE CASES WHERE THE DEVELOPER ELECTS TO CONSTRUCT THE IMPROVEMENTS, ACTUAL COSTS
WHICH CITY VALIDATES DEVELOPER HAS INCURRED FOR DESIGN AND/OR CONSTRUCTION OF STORM
AND/OR DRAINAGE IMPROVEMENTS AS SHOWN IN THE MASTER DRAINAGE PLAN, SHALL BE CREDITED
TOWARDS THE DRAINAGE FEE OTHERWISE DUE. IN THE EVENT SUCH COSTS EXCEED THE FEE OTHERWISE
DUE, THE CITY WILL ENTER INTO AN AGREEMENT TO REIMBURSE THE DEVELOPER FOR THE EXCESS COST.
SUCH REIMBURSEMENT SHALL BE MADE FROM DRAINAGE FEES WHEN COLLECTED FROM OTHER PROJECTS
WITHIN THE BASIN AREA WITHIN WHICH THE DEVELOPMENT OCCURRED.
THE DEVELOPER WILL BE GRANTED CREDIT TOWARDS DRAINAGE FEES FOR ACTUAL COSTS WHICH CITY
VALIDATES DEVELOPER HAS INCURRED FOR ASSOCIATED DESIGN AND/OR CONSTRUCTION OF ON-SITE
AND/OR OFF-SITE I0-YEAR RETENTION/DETENTION, OR OTHER MEASURES WHICH DIRECTLY REDUCE THE
DESIGN AND/OR CONSTRUCTION COSTS OF THE MASTER STORM DRAINAGE SYSTEM OF THE CITY OF PALM
SPRINGS.
WHEN ANY PROPERTY OWNER NOT WITHIN THE CITY LIMITS REQUESTS APPROVAL FOR SEWER
CONNECTION, WHETHER EXISTING PRIOR TO MAY 18, 1983 OR CONSTRUCTED THEREAFTER, THIS WILL
RESULT IN THE CONTRIBUTION OF SEWAGE FLOWS TO LIFT STATION NO. 1, THAT SEWER SURCHARGE LIFT
STATION NO. 1 FEES BE DETERMINED BY THE CITY MANAGER, AND THAT SUCH FEE BE APPROVED BY THE
CITY COUNCIL IN CONJUNCTION WITH THE ISSUANCE OF AUTHORIZATION TO CONNECT TO THE CITY'S
SEWER SYSTEM; AND
SUCH FEES SHALL BE COLLECTED AT THE TIME OF ISSUANCE OF A BUILDING PERMIT FOR CONSTRUCTION
OR IN THE CASE OF DEVELOPMENT AT THE TIME SUCH CONNECTION IS AUTHORIZED. SUCH FEE SHALL BE
IN ADDITION TO THE INSPECTION FEE, SEWER FACILITY FEE, STREET MAIN CHARGE, AND ANY OTHER
APPLICABLE FEES, AND SHALL BE DEPOSITED INTO THE SEWER FUND.
FACILITY RENTAL NOTES:
EXTENDED, MULTIPLE DAY, AND MULTIPLE FACILITY USE FEES WILL BE SET BY THE SPECIAL EVENTS
MANAGER.
RENTAL FEES AS DETERMINED BY THE SPECIAL EVENTS MANAGER WILL VARY ACCORDING TO SERVICE
LEVELS REQUIRED BY THE PROPOSED USE.
67
- CORRESPONDING FOOTNOTES -
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
CORRESPONDING FOOTNOTES
3)
12)
13)
14)
15)
NUMBER OF BEDROOMS AMOUNT OF FEE
STUDIO / ONE BEDROOM UNIT $750
TWO BEDROOM UNIT $1,000
THREE OR MORE BEDROOM UNIT $1,500
16)
17)
18)
ADDITONAL PARKS & RECREATION DEPARTMENT FACILITIES ARE AVAILABLE FOR RENT WITH FEES
ESTABLISHED BY THE DEPARTMENTS BASED ON ACTIVITY AND SERVICE LEVELS REQUIRED
PURSUANT TO RESOLUTION NO. 22953 SHOULD AN AMENDMENT TO THE MSHCP BE APPROVED AND
IMPLEMENTED, THAT PROVIDES FOR THE CITY OF DESERT HOT SPRINGS AS A PERMITTEE; ON THE
EFFECTIVE DATE OF SUCH AMENDMENT, THE LOCAL DEVELOPMENT MITIGATION FEES SHALL
AUTOMATICALLY BE ADJUSTED AS FOLLOWS:
FEES AND CHARGES FLUCTUATE BASED ON ACTIVITY, SUPPLIES AND LEVEL OF SUPERVISION. ALL FEES AND
CHARGES ARE IN ACCORDANCE WITH THE RESOLUTION ADOPTED BY COUNCIL MAY 7, 1986
USE OF THE FACILITY SHALL BE LIMITED TO NON-PROFIT ORGANIZATIONS FOR MEETINGS WHICH ARE OPEN
TO THE GENERAL PUBLIC, AND AVAILABLE ONLY AS AN ALTERNATIVE TO OTHER CITY FACILITIES.
THE CITY CLERK IS AUTHORIZED TO WAIVE THE FEE FOR STATE, FEDERAL OR COUNTY AGENCIES
REQUESTING USE OF THE FACILITY FOR THE PURPOSE OF CONDUCTING A PUBLIC MEETING TO INFORM, OR
RECEIVE INPUT FROM THE GENERAL PUBLIC AT-LARGE. CITY HALL CONFERENCE ROOMS MAY BE RENTED
NO MORE THAN 10 DAYS IN ADVANCE, WHICH SHOULD ACCOMMODATE STAFF, COUNCIL AND
COMMISSION NEEDS. EXCEPTION TO FEE: SCHOOL.
THE DEVELOPER MAY BE REQUIRED TO PAY TO THE CITY A FEE IN-LIEU OF MAKING A DEDICATION OF LAND.
UNDER SUCH CIRCUMSTANCES, THE DEVELOPER WILL BE REQUIRED TO PAY A FEE IN AN AMOUNT AS
PRESCRIBED IN ORDINANCE 1632, AS AMENDED. FOR DEVELOPMENT IN THE CITY’S CENTRAL BUSINESS
DISTRICT, THE DEVELOPER MAY ELECT TO PAY A PER RESIDENTIAL DWELLING UNIT FEE IN-LIEU OF THE
DEDICATION AND/OR FEE FORMULA PROVIDED IN SECTION VII AND SUBSECTIONS A THROUGH F OF
SECTION VI OF ORDINANCE 1632, AS AMENDED, PURSUANT TO THE FOLLOWING SCHEDULE (AMENDED BY
ORD1718/R22021 EFFECTIVE 11/5/07):
ON JULY 1ST OF EACH YEAR, ALL SERVICE FEES AND CHARGES SHALL BE AUTOMATICALLY ADJUSTED BY AN
AMOUNT EQUAL TO THE PERCENTAGE OF INCREASE OR DECREASE IN TOTAL EMPLOYEE COMPENSATION
FOR THE CURRENT FISCAL YEAR'S ADOPTED BUDGET VERSUS THE NEW FISCAL YEAR'S BUDGET AS LAST
COMPUTED BEFORE THE PUBLIC HEARING - PURSUANT RESOLUTION NO. 23854 SECTION 2.D.
A PERSON SUBJECT TO THE FEE IMPOSED BY THE RESOLUTION MAY APPLY TO THE CITY COUNCIL FOR
ADJUSTMENT TO THAT FEE, OR A WAIVER OF THAT FEE, OR REIMBURSEMENT OF PART OR ALL OF THE FEE,
SOLELY BY FOLLOWING THE WRITTEN PROTEST PROCEDURE IN THE TIME AND MANNER PRESCRIBED BY
GOVERNMENT CODE SECTION 66020 AND DETAILING THE REASONS FOR THE ADJUSTMENT, WAIVER OR
REIMBURSEMENT PURSUANT TO RESOLUTION NO. 20849 SECTION 3.
68
- CORRESPONDING FOOTNOTES -
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
CORRESPONDING FOOTNOTES
RESIDENTIAL, DENSITY LESS THAN 8.0 DWELLING UNITS PER ACRE $1,245 PER DWELLING
UNIT
$518 PER DWELLING
UNIT
RESIDENTIAL, DENSITY GREATER THAN 14.1 DWELLING UNITS PER ACRE $228 PER DWELLING
UNIT
COMMERCIAL $5,529 PER ACRE
INDUSTRIAL $5,529 PER ACRE
19)
20)PER ORDINANCE 1909, EACH PERSON WHO IS AN OWNER, SUPERVISOR OR EMPLOYEE OWNING A 20%
INTEREST IN THE APPLICANT BUSINESS WILL BE SUBJECT TO BACKGROUND CHECK AND FINGERPRINTING.
BACKGROUND CHECKS FOR ALL CANNABIS RELATED BUSINESSES AND ACTIVITIES TAKE PLACE PER SECTION
5.45.080 (E)(8) AND 5.55.080 (E)(8) AS CODIFIED IN THE NEWLY ADOPTED ORDINANCES.
RESIDENTIAL, DENSITY BETWEEN 8.1 AND 14.0 DWELLING UNITS PER
ACRE
EFFECTIVE JANUARY 1, 2013, SENATE BILL 1186 IMPOSES A $1 FEE ON ANY APPLICANT FOR A LOCAL
BUSINESS LICENSE OR A RENEWAL AND IS TO BE COLLECTED BY CITIES.
69