HomeMy WebLinkAboutITEM 2A - EOT-2024-0003_PC Packet PLANNING COMMISSION STAFF REPORT DATE: June 10, 2025 PUBLIC HEARING SUBJECT: A REQUEST BY MSA CONSULTING INC., ON BEHALF OF FARRELL DRIVE PS, LLC, FOR APPROVAL OF A TWO-YEAR EXTENSION OF TIME APPLICATION FOR AN APPROVED MAJOR ARCHITECTURAL REVIEW APPLICATION AND A MAJOR DEVELOPMENT PERMIT APPLICATION (CASE 3.4313 MAJ) FOR THE CONSTRUCTION OF A 64,092-SQUARE-FOOT SELF-STORAGE FACILITY ON A 4.2-ACRE UNDEVELOPED PARCEL LOCATED AT 900 NORTH FARRELL DRIVE, ZONE M-1-P, SECTION 12 (CASE EOT-2024-0003). (NK) FROM: Department of Planning Services SUMMARY: This is a request for the approval of a two (2)-year Extension of Time (EOT) application for an approved Major Development Permit application and a Major Architectural Review application (Case 3.4313 MAJ) for the construction of a 64,092-square-foot self-storage facility on a 4.2-acre undeveloped parcel. Chapter 94.12.00 of the Palm Springs Zoning Code (PSZC) provides the mechanism for extending the term of a previously granted entitlement. An extension may be granted when the Planning Commissions finds that good cause exists. The burden is on the applicant to establish by clear and convincing evidence that it has proceeded in good faith and has exercised due diligence in complying with the conditions of approval in a timely manner. Specific findings, listed below, must be made to determine good faith. To date, the applicant has met all applicable deadlines. The Major Development Permit application was approved by the Planning Commission on April 27, 2022, and the Major Architectural Review application was approved by the Architectural Review Committee (ARC) on July 18, 2022, subject to conditions of approval. Excerpts of Minutes from the Planning Commission and ARC meetings are attached to this staff report (Attachments 6, 7, & 8). Pursuant to PSZC Section 94.04.00(E), the effective date of the project approval is August 2, 2022, 15 days after ARC’s approval. The time limit for commencement of construction under an architectural approval is two years from the effective date, which would be August 2, 2024 (PSZC Section 94.04.00(H)(1). Planning Commission Staff Report June 10, 2025 – Page 2 of 9 Case No. EOT-2024-0003 On April 28, 2024, more than 60 days before the entitlements were set to expire, the applicant timely filed an application for an Extension of Time; however, the application was deemed complete on April 23, 2025. As provided in PSZC Section 94.12.00(E), the Planning Commission may take such action as it deems appropriate, including without limitation: granting the extension for up to 24 months beyond the original expiration date [see PSZC Sections 94.04.00(H)(2), 94.04.01(G)(2), and 94.12.00(F)]; modifying or adding new conditions of approval; or denying the extension. A two-year extension from the original entitlement expiration date is August 2, 2026. RECOMMENDATION: Approve the two (2)-year Extension of Time through August 2, 2026 (Two years from August 2, 2024, the original entitlement expiration date). BUSINESS PRINCIPAL DISCLOSURE: The subject property is owned by Farrell Drive PS, LLC. Public Integrity Disclosure Forms are attached to this staff report (Attachment 5). PROJECT DESCRIPTION: The project is approved for the development of a 64,092-SF self-storage facility on a 4.2- acre undeveloped parcel located on the north side of East Computer Way between North Farrell Drive and East Research Drive. It is a through lot, and the site abuts California Department of Motor Vehicles on its north side. The approved project is designed with four (4) detached buildings at a maximum height of 21 feet, in addition to outdoor customer and RV parking spaces, loading spaces, and new perimeter landscape. The site is accessible via East Research Drive, which is designed with a two-way entrance and a gated one-way exit. An aerial view of the site and its vicinity is attached to this staff report (Attachment 2). The applicant seeks a two-year Extension of Time for the approved entitlements for the following reasons: 1) Unforeseen partnership issues; 2) Difficulty finding a qualified buyer who is willing to move the project forward as entitled; and 3) Financial feasibility of the project which was adversely affected by unforeseen economic challenges such as high construction and development costs. The Justification Letter is attached to this staff report (Attachment 4). No changes are proposed to the approved plans. The applicant’s request for the Extension of Time is analyzed in the analysis section of this staff report (pages 4 through 6). Planning Commission Staff Report June 10, 2025 – Page 3 of 9 Case No. EOT-2024-0003 BACKGROUND INFORMATION: Related Relevant City Actions 04/27/2022 The Planning Commission voted 6-0-1 (Absent: Roberts) to approve a Major Development Permit application (Case 3.4313 MAJ) subject to conditions of approval. 06/06/2022 The Architectural Review Committee (ARC) reviewed a Major Architectural Review application (Case 3.4313 MAJ) and voted 6-0-2 (Absent: Poehlein & Rotman) for continuation. 07/18/2022 The ARC voted 6-0-2 to approve the application subject to additional conditions of approval which included the following: 1) Add a berm within the landscaped area along North Farrell Drive; 2) Lower the parapet on Building No. 1 by at least 2 feet; 3) Chose a more subtle color for the white columns, so they blend in with the main portion of the block wall; 4) Reduce the height of the light poles along North Farrell Drive; 5) Add more desert landscaping on the north side of the project site; and 6) Move the N/W corner of the wall back towards the project site to allow the landscaped. 01/11/2023 Recordation of Parcel Merger (PM 22-07-0900) to consolidate parcels APN: 507-350-037 and 507-350-038 (Lead Department: Engineering Services). Permit History 09/19/2022 Applicant applied for a Building Permit (#2022-4322). The Permit expired on 09/19/2023. Most Recent Change of Ownership 06/25/2021 Farrell Drive PS, LLC Neighborhood Notice 05/30/2025 Notice of public hearing mailed to addresses within 500 feet of the site, notifying that the subject application would be considered by the Planning Commission at a public hearing on June 10, 2025. 05/30/2025 Notice of public hearing published in the local newspaper. 05/30/2025 Notice emailed to Neighborhood Organizations within one (1) mile of the project site. Field Check 05/21/2025 05/22/2025 Staff conducted a site visit to confirm the conditions of the site. Planning Commission Staff Report June 10, 2025 – Page 4 of 9 Case No. EOT-2024-0003 Surrounding Property Existing Land Use Per Chapter 92 Existing General Plan Designation Existing Zoning Designation Subject Property Undeveloped IND (Industrial) M-1-P (Planned Research and Development Park) North Civic (California Department of Motor Vehicles) IND M-1-P South Office/Manufacturing (Hot Purple Energy) IND M-1-P East Offices (Business Complexes)/Undeveloped IND M-1-P West Single-Family Residences/Undeveloped Parcel IND/VLDR (Very Low Density Residential) R-1-C (Single- Family Residential) Site Area Net Acres 4.2 Acres (183,122 SF) ANALYSIS: To approve an Extension of Time application, the Planning Commission must make the seven specific findings listed in PSZC Section 94.12.00(D) must be met. One of the seven findings, PSZC Section 94.12.00(D)(7), states extenuating circumstances that are out of the applicants’ control must be present to justify granting an extension of time. Extenuating circumstances expressly exclude “financial inability and market conditions.” In the Justification Letter (Attachment 4) and follow-up communication with the applicant’s representative, the applicant stated that the primary reasons for requesting Extension of Time approval and the cause of delay in submitting all necessary documents/information for the completeness of the application, EOT-2024-0003, as follows: 1) Unforeseen partnership issues (Departure of the main equity partner); 2) Difficulty finding a qualified buyer who is willing to move the project forward as entitled; and 3) Financial feasibility of the project which was adversely affected by unforeseen economic challenges such as high construction and development costs. Staff determined that the reasons explained by the applicant are internal issues and changes within an organization and difficulty finding a qualified buyer are extenuating circumstances that are out of applicant’s control, and they are not necessarily the by- product of financial inability and/or market conditions. However, negatively affected financial feasibility of the project due to high construction and development costs Planning Commission Staff Report June 10, 2025 – Page 5 of 9 Case No. EOT-2024-0003 constitutes “financial inability and market conditions”, which would not be valid justification for seeking Extension of Time approval. In search of a potential qualified buyer, the applicant partnered up with Cushman & Wakefield to catalyze the process. The applicant is not proposing any changes to the approved plans, and staff has not observed any environmental changes at the site and/or its vicinity which would require an updated environmental assessment. The site is in its natural condition with scattered low- height shrubs, and staff has not observed any visible property maintenance issues such as illegal dumping or overgrown vegetation. Up to today, the applicant has applied for a Building Permit (#2022-4322) and completed the Parcel Merger process for the project. The applicant originally applied for Building Permit #2022-4322 on September 19, 2022, following the ARC approval of the Major Architectural Review on July 18, 2022. The Building Permit plan check was approved by all City departments except for Engineering Services. The following items are recorded as pending by the Department of Engineering Services: • Outstanding invoice for the plan check process • Cost estimates for the permits (The information needs to be updated) • PM-10 (Dust Control) items & Bond • RIFA (Red Imported Fire Ants) clearance • Completion of the WQMP (Water Quality Management Plan) review • SWPPP (Stormwater Pollution Prevention Plan) submittal and review • Tribal clearance/monitoring agreement • Proof of payment of the THCP fee with the Tribe • Grading plan, sewer plan, and hydrology report may be required to be updated to the latest standards because of the amount of time that has lapsed since the last review. This requirement will be reviewed and confirmed once the applicant resubmits the documents. Building Permit #2022-4322 expired on September 19, 2023, and it cannot be reinstated. Should the applicant wish to move forward with the proposed project, they are required to apply for a new Building Permit subject to the current Building Code requirements (2022 Building Code). Additionally, amendments to the previously submitted grading plan, sewer plan, and hydrology report may be required by the Department of Engineering Services. The applicant applied for Building Permit #2022-4322 two months after the entitlements were approved. Within 6 months of permit application, the plan check was approved by all City departments except for the Engineering Services Department as detailed above. Considering the history of the previous plan check, the nature of the pending items, and the requirement of Building Permit re-application, the applicant’s request for a two-year Extension of Time through August 2, 2026 appears to be reasonable and adequate for the issuance of a Building Permit and the commencement of construction. Planning Commission Staff Report June 10, 2025 – Page 6 of 9 Case No. EOT-2024-0003 FINDINGS – EXTENSION OF TIME: Section 94.12.00(D) of the Palm Springs Zoning Code (PSZC) requires that the following conditions be met in order to justify an Extension of Time application. Staff has analyzed the findings as follows: 1. The requested extension of time is consistent with the General Plan and any applicable specific plan, and the proposed project remains consistent with those plans as they exist at the time the extension request is being considered. The site’s General Plan land use designation is Industrial (IND), which is intended for various industrial uses which include research and development parks, light manufacturing, laboratories, and industrial services (Palm Springs 2024 General Plan, page 2-16). While the General Plan does not define the term industrial, Palm Springs Zoning Code (PSZC) defines the term industry as follows: “…means the manufacture, fabrication, processing, reduction or destruction of any article, substance or commodity, or any other treatment thereof, and including storage elevators, truck storage yards, warehouses, wholesale storage and other similar types of enterprise.” (PSZC Section 91.00.10.B) Based on the definition above, a self-storage facility is identified as an industrial use and is consistent with the intended use of the IND General Plan land use designation area. The General Plan further states “…any industrial use proposed should not detract from the City’s desire to be a premier resort community” (Palm Springs 2024 General Plan, page 2-16). The approval of the Extension of Time application will allow the development of a self-storage facility which will help deter unlawful outdoor storage and allow the City to preserve its attractiveness and character as a premier resort community. The site is not located within a Specific Plan, and no changes are proposed to the previously approved plans. Therefore, the previously approved project remains consistent with the original and the criterion is met. 2. The findings made in support of the original approval remain valid and are still appropriate. The applicant is not proposing any modifications to the approved plans or the land uses intended for the site. Additionally, there have not been any changes to the physical environment of the site or its surroundings which require the reassessment of the findings that were previously made for the original entitlement approval. Therefore, the findings made for the approval of the original entitlement are still valid and appropriate. The criterion is met. 3. There have been no significant changes to the proposed project, or to areas within Planning Commission Staff Report June 10, 2025 – Page 7 of 9 Case No. EOT-2024-0003 the geographic proximity of the proposed project that negates the appropriateness of the project, or new information concerning new or substantially more severe environmental effects which would require a reevaluation of the project under the California Environmental Quality Act (CEQA). The applicant is not proposing any changes to the approved plans. The proposed self-storage use is permitted by right in the M-1-P Zone per Palm Springs Zoning Code Section 92.16.01(A)(8). The site design conforms to the M-1-P Zone development standards, and the project did not require any relief or deviations from the applicable zoning regulations (e.g. Administrative Minor Modification, Variance). The project was deemed categorically exempt from the CEQA review pursuant to Section 15332 of Tile 14, Chapter 3 of the California Code of Regulations (Class 32, In-Fill Development). Finally, staff has not observed any environmental attributes at the project site or its vicinity that would necessitate the reevaluation of the CEQA determination or question the appropriateness of the project. The criterion is met. 4. The subject site has been properly maintained in accordance with the Property Maintenance Standards of this Title: Staff confirmed at the site visits that the project site was properly maintained and was in conformance with the Property Maintenance Standards (Palm Springs Zoning Code Section 93.19.00). The criterion is met. 5. The applicant has demonstrated convincingly and clearly that the project will be substantially underway within the extended period. The applicant states difficulty finding a qualified buyer as one of the reasons for the project delay. The applicant notes in the Justification Letter that the Extension of Time will allow them to “…come to an agreement with the potential new buyer…” The previous plan check was approved by all City departments, with the exception of Engineering Services, within 6 months of the Building Permit application. While the applicant needs to apply for a new Building Permit for the continuation of the project, the applicant has demonstrated their efforts to timely exercise the entitlements through the previous plan check process. Additionally, the applicant has completed the Parcel Merger process to prepare the site for development since the original entitlement approval. Considering the history of the previous plan check, an Extension of Time until August 2, 2026 would be sufficient for the applicant to substantially move the project forward. The criterion is met. 6. The applicant has made reasonable, substantial and timely efforts to exercise the entitlement and advance the project, such as, but not limited to, the pre-payment of impact fees or submittal of permit applications. As mentioned in finding 5 above, the previous Building Permit plan check was approved by all City departments within 6 months of permit application except for Planning Commission Staff Report June 10, 2025 – Page 8 of 9 Case No. EOT-2024-0003 the Department of Engineering Services. Additionally, the applicant completed the Parcel Merger process in January 2023 to prepare the site for development. While the applicant is required to apply for a new Building Permit for the continuation of the project, the history of previous project-related activities indicates that the applicant has demonstrated their efforts to timely exercise the entitlements. The criterion is met. 7. Extenuating circumstances, not within the applicant’s control, (financial inability and market conditions excepted), have prevented the applicant from exercising the entitlement within the initial time period granted, but that such circumstances are more likely than not to be removed in time for the applicant to substantially begin the project within the extended period. The applicant states unforeseen partnership issues (Departure of the main equity partner) and difficulty finding a qualified buyer who is willing to move the project forward as entitled as the reasons for the delay in the project. The project delay caused by unforeseen internal issues of an organization and difficulty finding a qualified buyer for the continuation of the project can be caused by multiple factors, and financial inability and/or market conditions cannot be identified definitively as a sole cause of the project delay. Therefore, they can be considered extenuating circumstances that are out of the applicant’s control. The Justification Letter indicates that a prospective buyer has been identified for the continuation of the project with assistance provided by a commercial real estate firm. While the continuation of the project would require application for a new Building Permit application, the previous Building Permit review history demonstrates the applicant’s capability to move the project forward and exercise the entitlements in a timely fashion. Hence, the approval of the Extension of Time though August 2, 2026 is adequate for the applicant to obtain a Building Permit and commence construction. The criterion is met. ENVIRONMENTAL ANALYSIS: The construction of the proposed self-storage facility is categorically exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15332 of Title 14, Chapter 3 of the California Code of Regulations (Class 32, In-Fill Development Projects). The project is consistent with the intent of the IND (Industrial) General Plan land use designation area and policies, as well as the intent and zoning regulations of the M-1-P (Planned Research and Development Park) Zone. The project site is less than five (5) acres in area, and it is fully located within the city limit and surrounded by urban uses. The project site is adjacent to the Department of Motor Vhicles to the north, and there is an existing solar energy company on the south side of East Computer Way. Additionally, the site is adjacent to business/industrial complexes and a self-storage facility to the east. Abutting an active secondary thoroughfare, the site has no value as a habitat for endangered, rare, or threatened species. The implementation of the project will not result in any significant effects relating to noise, air quality, water quality, or traffic, as supported by the traffic impact assessment report the applicant previously submitted, which found Planning Commission Staff Report June 10, 2025 – Page 9 of 9 Case No. EOT-2024-0003 that the traffic impact of the project would be less than significant (Attachment 9). Finally, the site can be adequately served by all required utilities and public services. CONCLUSION: The applicant is seeking a two (2)-year Extension of Time for the construction of a previously approved 64,092-square-foot self-storage facility, which was delayed due to unforeseen partnership issues and difficulty finding a qualified buyer who is willing to move the project forward as entitled. The applicant faced unforeseen circumstances that were out of their control. The applicant is not proposing any changes to the approved plans, and the extended time until August 2, 2026 is adequate for the applicant to obtain a Building Permit and commence construction. Therefore, staff recommends that the Planning Commission approve the two (2)-year Extension of Time application, Case EOT- 2024-0003, subject to the conditions of approval included in Exhibit A of the attached draft resolution (Attachment 3). PREPARED BY: Noriko Kikuchi, AICP, Associate Planner REVIEWED BY: Edward Robertson, Principal Planner REVIEWED BY: Christopher Hadwin, AICP, Director of Planning Services ATTACHMENTS: 1. Vicinity Map 2. Aerial Map 3. Draft Resolution (Extension of Time) & Exhibit A 4. Justification Letter 5. Public Integrity Disclosure Forms 6. Excerpt of Minutes from the April 27, 2022 Planning Commission Meeting 7. Excerpt of Minutes from the June 6, 2022 ARC Meeting 8. Excerpt of Minutes from the July 18, 2022 ARC Meeting 9. Traffic Scoping Letters 10. Site Photographs 11. Plans (Final Approval by the ARC) ATTACHMENT 1 Department of Planning Services Vicinity Map CITY OF PALM SPRINGS EOT-2024-0003 900 North Farrell Drive (APN: 507-350-037 & 507-350-038) ATTACHMENT 2 Project Site E. Tamarisk Rd. E. Computer Way ATTACHMENT 3 RESOLUTION NO. ________ A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF PALM SPRINGS, CALIFORNIA, APPROVING CASE NO. EOT- 2024-0003, EXTENSION OF TIME, TO EXTEND THE APPROVAL OF CASE NO. 3.4313 MAJ, A MAJOR DEVELOPMENT PERMIT APPLICATION AND A MAJOR ARCHITECTURAL REVIEW APPLICATION, BY TWO YEARS FOR THE CONSTRUCTION OF A NEW 64,092-SQUARE-FOOT SELF-STORAGE FACILITY, AT 900 NORTH FARRELL DRIVE (APN: 507-350-037 & 507-350-038), ZONE M-1-P, SECTION 12 (CASE NO. EOT-2024-0003). THE PLANNING COMMISSION FINDS AND DETERMINES AS FOLLOWS: A. MSA Consulting, Inc., on behalf of Farrell Drive PS, LLC (“Applicant”), has filed an Extension of Time application, Case No. EOT-2024-0003, with the City of Palm Springs pursuant to Sections 94.04.00(H)(2), 94.04.01(G)(2) and 94.12.00 of the Palm Springs Zoning Code to extend the approval of Case 3.4313 MAJ, a Major Development Permit application and a Major Architectural Review application, for the construction of a new 64,092-square-foot self-storage facility on a 4.2-acre undeveloped parcel located at 900 North Farell Drive (APN: 507-350-037 & 507-350-038). B. On April 27, 2022, the Planning Commission held a public meeting on the Major Development Permit application, Case 3.4313 MAJ, in accordance with applicable law. Subsequently, the Planning Commission voted 6-0-1 (Absent: Roberts) to approve the project subject to conditions of approval. C. On June 6, 2022, the Architectural Review Committee (ARC) held a public meeting on the Major Architectural Review application, Case 3.4313 MAJ, in accordance with applicable law. Subsequently, the ARC voted 6-0-2 (Absent: Poehlein & Rotman) for continuation. D. On July 18, 2022, the Architectural Review Committee (ARC) reviewed the Major Architectural Review application, Case 3.4313 MAJ, in accordance with applicable law. Subsequently, the ARC voted 6-0-2 (Absent: Thompson & Rotman) to approve the application subject to conditions of approval which included the following: 1) Add a berm within the landscaped area along North Farrell Drive; 2) Lower the parapet on Building No. 1 by at least 2 feet; 3) Chose a more subtle color for the white columns, so they blend in with the main portion of the block wall; 4) Reduce the height of the light poles along North Farrell Drive; 5) Add more desert landscaping on the north side of the project site; and 6) Move the N/W corner of the wall back towards the project site to allow the landscaped. E. On April 18, 2024, Applicant filed an Extension of Time application, Case EOT- 2024-0003, with the Department of Planning Commission in accordance with PSZC Planning Commission Resolution No. June 10, 2025 Case EOT-2024-0003 Page 2 of 5 Sections 94.04.00(H)(2) and 94.04.01(G)(2) seeking approval of a two (2)-year extension of time. F. On June 10, 2025, the Planning Commission held a public hearing in accordance with applicable law to consider the Extension of Time application, Case No. EOT-2024- 0003. At said meeting, the Planning Commission carefully reviewed and considered all the evidence presented in connection with the Project, including, but not limited to, the staff report, and all written and oral testimony presented. G. Pursuant to Palm Springs Zoning Code (PSZC) Sections 94.04.01(G)(2), 94.04.00(H)(2), and 94.12.00(A), The Planning Commission may grant an Extension of Time request for a Major Development Permit application and a Major Architectural Review application pursuant to the requirements of PSZC Section 94.12.00. In determining that good cause exists for an extension of time, the Planning Commission is required to make the seven (7) findings stated in PSZC Section 94.12.00(D). Subsequently, the Planning Commission finds as follows: 1. The requested extension of time is consistent with the General Plan and any applicable specific plan, and the proposed project remains consistent with those plans as they exist at the time the extension request is being considered. The site’s General Plan land use designation is Industrial (IND), which is intended for various industrial uses which include research and development parks, light manufacturing, laboratories, and industrial services (Palm Springs 2024 General Plan, page 2-16). While the General Plan does not define the term industrial, Palm Springs Zoning Code (PSZC) defines the term industry as follows: “…means the manufacture, fabrication, processing, reduction or destruction of any article, substance or commodity, or any other treatment thereof, and including storage elevators, truck storage yards, warehouses, wholesale storage and other similar types of enterprise.” (PSZC Section 91.00.10.B) Based on the definition above, a self-storage facility is identified as an industrial use and is consistent with the intended use of the IND General Plan land use designation area. The General Plan further states “…any industrial use proposed should not detract from the City’s desire to be a premier resort community” (Palm Springs 2024 General Plan, page 2-16). The approval of the Extension of Time application will allow the development of a self-storage facility which will help deter unlawful outdoor storage and allow the City to preserve its attractiveness and character as a premier resort community. The site is not located within a Specific Plan, and no changes are proposed to the previously approved plans. Therefore, the previously approved project remains consistent with the original and the criterion is met. Planning Commission Resolution No. June 10, 2025 Case EOT-2024-0003 Page 3 of 5 2. The findings made in support of the original approval remain valid and are still appropriate. The applicant is not proposing any modifications to the approved plans or the land uses intended for the site. Additionally, there have not been any changes to the physical environment of the site or its surroundings which require the reassessment of the findings that were previously made for the original entitlement approval. Therefore, the findings made for the approval of the original entitlement are still valid and appropriate. The criterion is met. 3. There have been no significant changes to the proposed project, or to areas within the geographic proximity of the proposed project that negates the appropriateness of the project, or new information concerning new or substantially more severe environmental effects which would require a reevaluation of the project under the California Environmental Quality Act (CEQA). The applicant is not proposing any changes to the approved plans. The proposed self- storage use is permitted by right in the M-1-P Zone per Palm Springs Zoning Code Section 92.16.01(A)(8). The site design conforms to the M-1-P Zone development standards, and the project did not require any relief or deviations from the applicable zoning regulations (e.g. Administrative Minor Modification, Variance). The project was deemed categorically exempt from the CEQA review pursuant to Section 15332 of Tile 14, Chapter 3 of the California Code of Regulations (Class 32, In-Fill Development). Finally, there are no environmental attributes observed at the project site or its vicinity that would necessitate the reevaluation of the CEQA determination or question the appropriateness of the project. The criterion is met. 4. The subject site has been properly maintained in accordance with the Property Maintenance Standards of this Title. The project site is properly maintained and was in conformance with the Property Maintenance Standards (Palm Springs Zoning Code Section 93.19.00). The criterion is met. 5. The applicant has demonstrated convincingly and clearly that the project will be substantially underway within the extended period. The applicant states difficulty finding a qualified buyer as one of the reasons for the project delay. The applicant notes in the Justification Letter that the Extension of Time will allow them to “…come to an agreement with the potential new buyer…” The previous plan check was approved by all City departments, with the exception of Engineering Services, within 6 months of the Building Permit application. While the applicant needs to apply for a new Building Permit for the continuation of the project, the applicant has demonstrated their efforts to timely exercise the entitlements through the previous plan check process. Additionally, the applicant has completed the Parcel Merger process to prepare the site Planning Commission Resolution No. June 10, 2025 Case EOT-2024-0003 Page 4 of 5 for development since the original entitlement approval. Considering the history of the previous plan check, an Extension of Time until August 2, 2026 would be sufficient for the applicant to substantially move the project forward. The criterion is met. 6. The applicant has made reasonable, substantial and timely efforts to exercise the entitlement and advance the project, such as, but not limited to, the pre-payment of impact fees or submittal of permit applications. As mentioned in finding 5 above, the previous Building Permit plan check was approved by all City departments within 6 months of permit application except for the Department of Engineering Services. Additionally, the applicant completed the Parcel Merger process in January 2023 to prepare the site for development. While the applicant is required to apply for a new Building Permit for the continuation of the project, the history of previous project-related activities indicates that the applicant has demonstrated their efforts to timely exercise the entitlements. The criterion is met. 7. Extenuating circumstances, not within the applicant's control, (financial inability and market conditions excepted), have prevented the applicant from exercising the entitlement within the initial time period granted, but that such circumstances are more likely than not to be removed in time for the applicant to substantially begin the project within the extended period. The applicant states unforeseen partnership issues (Departure of the main equity partner) and difficulty finding a qualified buyer who is willing to move the project forward as entitled as the reasons for the delay in the project. The project delay caused by unforeseen internal issues of an organization and difficulty finding a qualified buyer for the continuation of the project can be caused by multiple factors, and financial inability and/or market conditions cannot be identified definitively as a sole cause of the project delay. Therefore, they can be considered extenuating circumstances that are out of the applicant’s control. The Justification Letter indicates that a prospective buyer has been identified for the continuation of the project with assistance provided by a commercial real estate firm. While the continuation of the project would require application for a new Building Permit application, the previous Building Permit review history demonstrates the applicant’s capability to move the project forward and exercise the entitlements in a timely fashion. Hence, the approval of the Extension of Time though August 2, 2026 is adequate for the applicant to obtain a Building Permit and commence construction. The criterion is met. NOW, THEREFORE, THE PLANNING COMMISSION OF THE CITY OF PALM SPRINGS DOES HEREBY RESOLVE AS FOLLOWS: SECTION 1. That the findings and determinations reflected above are true and correct, and are incorporated by this reference herein as the cause and foundation for the action taken by and through this Resolution. Planning Commission Resolution No. June 10, 2025 Case EOT-2024-0003 Page 5 of 5 SECTION 2. That the construction of the proposed self-storage facility is categorically exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15332 of Title 14, Chapter 3 of the California Code of Regulations (Class 32, In- Fill Development Projects). The project is consistent with the intent of the IND (Industrial) General Plan land use designation area and policies, as well as the intent and zoning regulations of the M-1-P (Planned Research and Development Park) Zone. The project site is less than five (5) acres in area, and it is fully located within the city limit and surrounded by urban uses. The project site is adjacent to the Department of Motor Vhicles to the north, and there is an existing solar energy company on the south side of East Computer Way. Additionally, the site is adjacent to business/industrial complexes and a self-storage facility to the east. Abutting an active secondary thoroughfare, the site has no value as a habitat for endangered, rare, or threatened species. The implementation of the project will not result in any significant effects relating to noise, air quality, water quality, or traffic, as supported by the traffic impact assessment report the applicant previously submitted, which found that the traffic impact of the project would be less than significant. Finally, the site can be adequately served by all required utilities and public services. SECTION 3. That the Planning Commission hereby approves Case No. EOT- 2024-0003, Extension of Time, to extend the approval of Case No. 3.4313 MAJ by two years until August 2, 2026 for the construction of a new 64,092-SF self-storage facility on a 4.20-acre undeveloped parcel located at 900 North Farrell Drive (APN: 507-350-037 & 507-350-038), subject to subject to the conditions of approval stated in Exhibit A of this resolution. ADOPTED this 10th day of June, 2025. AYES: EXCUSED: ATTEST: CITY OF PALM SPRINGS, CALIFORNIA ___________________ Christopher Hadwin, AICP Director of Planning Services RESOLUTION NO. EXHIBIT A Farrell Drive PS Self-Storage Facility 900 North Farrell Drive Case EOT-2024-0003 June 10, 2025 CONDITIONS OF APPROVAL Before final acceptance of the project, all conditions listed below shall be completed to the satisfaction of the City Engineer, the Director of Planning Services, the Director of Building and Safety, the Chief of Police, the Fire Chief or their designee, depending on which department recommended the condition. Any agreements, easements or covenants required to be entered into shall be in a form approved by the City Attorney. ADMINISTRATIVE CONDITIONS ADM 1. Project Description. This approval is for the project described per Case EOT- 2024-0003; except as modified with the conditions below. ADM 2. Reference Documents. The site shall be developed and maintained in accordance with the plans that were conditionally approved by the ARC on July 18, 2022 for Case 3.4313 MAJ, including the site plan, architectural elevations, exterior materials and colors, landscaping, and grading that are on file with the Department of Planning Services except as modified by the conditions below. ADM 3. Conform to all Codes and Regulations. The project shall conform to the conditions contained herein, all applicable regulations of the Palm Springs Zoning Ordinance, Municipal Code, and any other City County, State and Federal Codes, ordinances, resolutions and laws that may apply. ADM 4. Minor Deviations. The Director of Planning Services or designee may approve minor deviations to the project description and approved plans in accordance with the provisions of the Palm Springs Zoning Code. ADM 5. Indemnification. The owner shall defend, indemnify, and hold harmless the City of Palm Springs, its agents, officers, and employees from any claim, action, or proceeding against the City of Palm Springs or its agents, officers or employees to attach, set aside, void or annul, an approval of the City of Palm Springs, its legislative body, advisory agencies, or administrative officers concerning Case EOT-2024-0003. The City of Palm Springs will Planning Commission Meeting June 10, 2025 Case EOT-2024-0003 Page 2 promptly notify the applicant of any such claim, action, or proceeding against the City of Palm Springs and the applicant will either undertake defense of the matter and pay the City's associated legal costs or will advance funds to pay for defense of the matter by the City Attorney. If the City of Palm Springs fails to promptly notify the applicant of any such claim, action or proceeding or fails to cooperate fully in the defense, the applicant shall not, thereafter, be responsible to defend, indemnify, or hold harmless the City of Palm Springs. Notwithstanding the foregoing, the City retains the right to settle or abandon the matter without the applicant's consent but should it do so, the City shall waive the indemnification herein, except, the City's decision to settle or abandon a matter following an adverse judgment or failure to appeal, shall not cause a waiver of the indemnification rights herein. ADM 6. Maintenance and Repair. The property owner(s) and successors and assignees in interest shall maintain and repair the improvements including and without limitation all structures, sidewalks, bikeways, parking areas, landscape, irrigation, lighting, signs, walls, and fences between the curb and property line, including sidewalk or bikeway easement areas that extend onto private property, in a first class condition, free from waste and debris, and in accordance with all applicable law, rules, ordinances and regulations of all federal, state, and local bodies and agencies having jurisdiction at the property owner’s sole expense. This condition shall be included in the recorded covenant agreement for the property if required by the City. ADM 7. Time Limit on Approval. The approval of this application, Case EOT-2024- 0003, extends the approval of Case 3.3413 MAJ until August 2, 2026. Above-ground (vertical) construction shall commence no later than August 2, 2026. ADM 8. Right to Appeal. Decisions of an administrative officer or agency of the City of Palm Springs may be appealed in accordance with Municipal Code Chapter 2.05. Permits will not be issued until the appeal period has concluded. ADM 9. Public Art Fees. This project shall be subject to Chapters 2.24 and 3.37 of the Municipal Code regarding public art. The project shall either provide public art or payment of an in-lieu fee. In the case of the in-lieu fee, the fee shall be based upon the total building permit valuation as calculated pursuant to the valuation table in the Uniform Building Code, the fee being 1/2% for commercial projects or 1/4% for residential projects with first $100,000 of total building permit valuation for individual single-family units exempt. Should the public art be located on the project site, said location shall be reviewed and approved by the Director of Planning and Zoning and the Public Arts Commission, and the property owner shall enter into a recorded agreement to maintain the art work and protect the public rights of access and viewing. ADM 10. Comply with City Noise Ordinance. All activities which take place on-site shall comply with the provisions of Section 11.74 Noise Ordinance of the Planning Commission Meeting June 10, 2025 Case EOT-2024-0003 Page 3 Palm Springs Municipal Code. Violations may result in revocation of this Conditional Use Permit. ENVIRONMENTAL ASSESSMENT CONDITIONS ENV 1. Coachella Valley Multiple-Species Habitat Conservation Plan (CVMSHCP) Local Development Mitigation Fee (LDMF) required. All projects within the City of Palm Springs, not within the Agua Caliente Band of Cahuilla Indians reservation are subject to payment of the CVMSHCP LDMF prior to the issuance of certificate of occupancy. ENV 2. California Fish & Game Fees Required. The project is required to file a Notice of Determination (NOD). Required filing fee shall be submitted by the City to the County Clerk with the Notice of Determination. Action on this application shall not be final until such a filing and fee is paid. ENV 3. Cultural Resource Site Monitoring. There is a possibility of buried cultural or Native American tribal resources on the site. A Native American Monitor shall be present during all ground-disturbing activities. (check for duplication in engineering conditions) a. The presence of an approved Agua Caliente Native American Cultural Resource Monitor(s) during any ground disturbing activities (including archaeological testing and surveys). Should buried cultural deposits be encountered, the Monitor may request that destructive construction halt and the Monitor shall notify a Qualified Archaeologist (Secretary of the Interior’s Standards and Guidelines) to investigate and, if necessary, prepare a mitigation plan for submission to the State Historic Preservation Officer and the Agua Caliente Tribal Historic Preservation Office. b. Two copies of any cultural resource documentation generated in connection with this project, including reports of investigations, record search results and site records/updates shall be forwarded to the Tribal Planning, Building, and Engineering Department and one copy to the City Planning Department prior to final inspection. PLANNING DEPARTMENT CONDITIONS PLN 1. Outdoor Lighting Conformance. Outdoor lighting shall fully conform to the requirements of Palm Springs Zoning Code and shall not produce disability glare, discomfort glare, light trespass, and/or light pollution as defined in Palm Springs Zoning Cod Sections 93.21.00(A)(7), (8), (9), and (10). Additionally, the outdoor lighting shall conform to the requirement by the Riverside County Airport Land Use Commission (ALUC). Also see Condition ALUC 1. Planning Commission Meeting June 10, 2025 Case EOT-2024-0003 Page 4 PLN 2. Water Efficient Landscaping Conformance. The project is subject to the Water Efficient Landscape Ordinance (Chapter 8.60.00) of the Palm Springs Municipal Code and all other water efficient landscape ordinances. The applicant shall submit a landscape and irrigation plan to the Director of Planning Services for review and approval prior to the issuance of a building permit. Landscape plans shall be wet stamped and approved by the Riverside County Agricultural Commissioner's Office prior to submittal. Prior to submittal to the City, landscape plans shall also be certified by the local water agency that they are in conformance with the water agency’s and the State’s Water Efficient Landscape Ordinances. PLN 3. Sign Applications Required. No signs are approved by this action. Separate approval and permits shall be required for all signs in accordance with Zoning Ordinance Section 93.20.00. The applicant shall submit a sign program to the Department of Planning Services prior to the issuance of building permits. PLN 4. Screen Roof-mounted Equipment. All roof-mounted mechanical equipment shall be screened per the requirements of Section 93.03.00 of the Zoning Ordinance. PLN 5. Surface Mounted Downspouts Prohibited. No exterior downspouts shall be permitted on any facade on the proposed building(s) that are visible from adjacent streets or residential and commercial areas. PLN 6. Exterior Alarms & Audio Systems. No sirens, outside paging or any type of signalization will be permitted, except approved alarm systems. PLN 7. Outside Storage Prohibited. No outside storage of any kind shall be permitted except as approved as a part of the proposed plan. PLN 8. Landscape Screening. Install additional planting materials in the perimeter planting bed along the south and west property lines to ensure adequate screening of the RVs from Farrell and Research Drive. A landscape berm between 1’-3’ in height will be located in the landscape area along North Farrell Drive. The plant materials and installation shall be satisfactory to the Riverside County Airport Land Use Commission and Palm Springs International Airport requirements. PLN 9. West Elevation. Enhance perimeter wall design along Farrell Drive, such as alternating recesses, raised planters, and/or other similar enhancements. PLN 10. Riverside County Airport Land Use Commission (ALUC) Review. Applicant shall contact the ALUC to ensure that the proposed use is permitted and the project meets all the requirements imposed by the ALUC. PLN 11. Conformance with Conditions of Approval Required. The project shall be subject to conditions of approval that were imposed by the Planning Planning Commission Meeting June 10, 2025 Case EOT-2024-0003 Page 5 Commission and Architectural Review Committee for the approval of the Major Development Permit and Major Architectural Review applications, Case 3.4313 MAJ, on April 27 and July 18, 2022, respectively. These conditions include, but are not limited to, the following: Planning Commission (April 27, 2022): a. Install additional planting materials in the perimeter planting bed along North Farrell Drive to ensure adequate screening of the RVs from the public right-of-way. The plant materials and installation shall be satisfactory to the Riverside County Airport Land Use Commission and Palm Springs International Airport requirements. b. Enhance perimeter wall design along Farrell Drive, such as alternating recesses, raised planters and/or other similar enhancements. The proposed wall along Farrell Drive should undulate along the street with a hedge alternating on both sides to provide a continuous screen of the RV parking areas. Said hedge shall be planted to grow to, and be maintained at, a height of 14 feet. Architectural Review Committee (July 18, 2022): a. Addition of berm along Farrell Drive. b. Lower the parapet by at least two feet. c. Eliminate the white block (vertical columns). d. Lower light standards below 20 feet. e. Incorporate light shields. f. Add desert landscape on north side and move wall at NW corner of site to provide larger landscape buffer on street side of project. PLN 12. Additional Screening: Provide additional screening on the north and south property lines by continuing the landscape screening and wall along North Farrell Drive to Building #2 and Building #4. RIVERSIDE COUNTY AIRPORT LAND USE COMMISSION (ALUC) CONDITIONS ALUC 1. Any new outdoor lighting installed shall be hooded or shielded to prevent either the spillage of lumens or reflection into the sky. Outdoor lighting shall be downward facing. ALUC 2. The following uses shall be prohibited: (a) Any use which would direct a steady light or flashing light of red, white, green, or amber colors associated with airport operations toward an aircraft engaged in an initial straight climb following takeoff or toward an aircraft engaged in a straight final approach toward a landing at an airport, Planning Commission Meeting June 10, 2025 Case EOT-2024-0003 Page 6 other than an FAA-approved navigational signal light or visual approach slope indicator. (b) Any use which would cause sunlight to be reflected towards an aircraft engaged in an initial straight climb following takeoff or towards an aircraft engaged in a straight final approach towards a landing at an airport. (c) Any use which would generate smoke or water vapor or which would attract large concentrations of birds, or which may otherwise affect safe air navigation within the area. (Such uses include landscaping utilizing water features, aquaculture, outdoor production of cereal grains, sunflower, and row crops, composting operations, wastewater management facilities, artificial marshes, trash transfer stations that are open on one or more sides, recycling centers containing putrescible wastes, construction and demolition debris facilities, fly ash disposal, and incinerators.) (d) Any use which would generate electrical interference that may be detrimental to the operation of aircraft and/or aircraft instrumentation. (e) Children’s schools, day care centers, libraries, hospitals, nursing homes, places of worship, buildings with more than two aboveground habitable floors, critical community infrastructure facilities, and aboveground bulk storage of 6,000 gallons or more of flammable or hazardous materials. (f) Highly noise-sensitive outdoor nonresidential uses. (g) Any use which results in a hazard to flight, including physical (e.g. tall objects), visual, and electronic forms of interference with the safety of aircraft operations. ALUC 3. The attached “Notice of Airport in Vicinity” shall be provided to all prospective purchasers and occupants of the property. ALUC 4. Prior to issuance of a building permit, the property owner shall convey an avigation easement to Palm Springs International Airport. Copies of the recorded avigation easement shall be forwarded to the Airport Land Use Commission and to the City of Palm Springs. ALUC 5. Any proposed stormwater basins or facilities shall be designed and maintained to provide for a maximum 48-hour detention period following the design storm, and remain totally dry between rainfalls. Vegetation in and around the basins that would provide food or cover for birds would be incompatible with airport operations and shall not be utilized in project landscaping. Trees shall be spaced so as to prevent large expanses of contiguous canopy, when mature. Landscaping in and around the basin(s) shall not include trees or shrubs that produce seeds, fruits, or berries. Planning Commission Meeting June 10, 2025 Case EOT-2024-0003 Page 7 Landscaping in the stormwater basin, if not rip-rap, should be in accordance with the guidance provided in ALUC “LANDSCAPING NEAR AIRPORTS” brochure, and the “AIRPORTS, WILDLIFE AND STORMWATER MANAGEMENT” brochure available at RCALUC.ORG which list acceptable plants from Riverside County Landscaping Guide or other alternative landscaping as may be recommended by a qualified wildlife hazard biologist. A notice sign, in a form similar to that attached hereto, shall be permanently affixed to the stormwater basin with the following language: “There is an airport nearby. This stormwater basin is designed to hold stormwater for only 48 hours and not attract birds. Proper maintenance is necessary to avoid bird strikes”. The sign will also include the name, telephone number or other contact information of the person or entity responsible to monitor the stormwater basin. ALUC 6. This project has been evaluated as a self-storage facility totaling 64,583 square feet, including 64,337 square feet of storage area, 112 square feet office area, 50 square feet of break room area, and 84 square feet of lobby area. Any increase in building area, change in use to any higher intensity use, change in building location, or modification of the project’s proposed single parcel area will require an amended review to evaluate consistency with the ALUCP compatibility criteria, at the discretion of the ALUC Director. ALUC 7. Noise attenuation measures shall be incorporated into the design of the office areas, to the extent such measures are necessary to ensure that interior noise levels from aircraft operations are at or below 45 CNEL. ALUC 8. The project does not propose rooftop solar panels at this time. However, if the project were to propose solar rooftop panels in the future, the applicant/developer shall prepare a solar glare study that analyzes glare impacts, and this study shall be reviewed by the Airport Land Use Commission and Palm Springs Airport Manager. BUILDING DIVISION CONDITIONS The Following Standard Building & Safety Conditions of Approval Are Applicable to This Project: BLDG 1. Separate permits are required for Site Walls, Trash Enclosures, Signs, PV (Photovoltaic), Construction Trailers. BLDG 2. Grading & ROW permits are to be issued by our Engineering Division. BLDG 3. Utilities on the utility side of any meter are to be arranged with the respective Utility Company. Any utilities after a meter will be included in the Building Departments scope of work for inspections. Planning Commission Meeting June 10, 2025 Case EOT-2024-0003 Page 8 The Following Standard Building & Safety Conditions of Approval Are Applicable to This Project: General Conditions 1. Shall comply with the latest adopted edition of the following codes as applicable: A. 2022 California Building Code B. 2022 California Electrical Code C. 2022 California Mechanical Code D. 2022 California Plumbing Code E. 2022 California Energy Code F. 2022 California Fire Code G. 2022 California Green Building Standards Code 2. Any temporary building, trailer, commercial coach, etc. installed and/or used in connection with a construction project shall comply with City Code. 3. All exterior lighting shall be oriented, directed, and/or shielded as much as possible so that direct illumination does not infringe onto adjoining properties. 4. All development impact fees including but not limited to TUMF, CVMSHCP, Sewer Connection and Public Arts shall be paid at time of permit issuance. ENGINEERING DIVISION CONDITIONS: The Engineering Services Department recommends that if this application is approved, such approval is subject to the following conditions being completed in compliance with City standards and ordinances. Before final acceptance of the project, all conditions listed below shall be completed to the satisfaction of the City Engineer. All Grading Plans, Improvement Plans, Required Studies and Documents listed below, must be submitted to Engineering Services Department for review and approval. STREETS ENG 1. Any improvements within the public right-of-way require a City of Palm Springs Encroachment Permit. All improvements are subject to inspection and a 48-hour inspection notification is required. ENG 2. Provide proposed finish floor elevations of all proposed structures, existing structures on site, and all adjacent off-site structures. Planning Commission Meeting June 10, 2025 Case EOT-2024-0003 Page 9 Provide proposed on-site drainage flow designs. This information required prior to site plan approval. FARRELL DRIVE ENG 3. Access to Farrell Drive shall be prohibited. ENG 4. All broken or off grade street improvements along the project frontage shall be repaired or replaced. COMPUTER WAY ENG 5. All broken or off grade street improvements along the project frontage shall be repaired or replaced. RESEARCH DRIVE ENG 6. Construct 30 feet wide driveway approaches in accordance with City of Palm Springs Standard Drawing No. 205. ENG 7. Construct a Type C curb ramp meeting current California State Accessibility standards on each side of the driveway approach in accordance with City of Palm Springs Standard Drawing No. 214. The applicant shall ensure that an appropriate path of travel, meeting ADA guidelines, is provided across the driveway, and shall adjust the location of the access ramps, if necessary, to meet ADA guidelines, subject to the approval of the City Engineer. If necessary, additional pedestrian and sidewalk easements shall be provided on-site to construct a path of travel meeting ADA guidelines. ENG 8. Remove and replace existing asphalt concrete pavement where required, in accordance with applicable City standards. ENG 9. All broken or off grade street improvements along the project frontage shall be repaired or replaced. ON-SITE ENG 10. The on-site layout of drive aisles and parking spaces is subject to further review and approval by the City Engineer. Adjustment of proposed street alignments, and deletion or relocation of proposed parking spaces may be required during review and approval of construction plans for on-site improvements, as required by the City Engineer. Approval of the preliminary site plan does not constitute approval of the on-site layout of streets and parking spaces as proposed. Planning Commission Meeting June 10, 2025 Case EOT-2024-0003 Page 10 ENG 11. The minimum pavement section for all on-site pavement drive aisles, parking spaces, etc. shall be 2-1/2 inches asphalt concrete pavement over 4 inches crushed miscellaneous base with a minimum subgrade of 24 inches at 95% relative compaction, or equal. If an alternative pavement section is proposed, the proposed pavement section shall be designed by a California registered Geotechnical Engineer using "R" values from the project site and submitted to the City Engineer for approval. ENG 12. All on-site drive aisles shall be two-way with a minimum 24 feet wide travelway (as measured from face of curb) where no on-street parking is proposed. ENG 13. On-site drive aisles shall be constructed with curbs, gutters, and cross- gutters, as necessary to accept and convey surface drainage of the on- site drive aisles to the on-site drainage system, in accordance with applicable City standards. SANITARY SEWER ENG 14. All sanitary facilities shall be connected to the public sewer system. New laterals shall not be connected at manholes. GRADING ENG 15. Submit a Precise Grading Plan prepared by a California registered Civil engineer to the Engineering Services Department for review and approval. The Precise Grading Plan shall be approved by the City Engineer prior to issuance of grading permit. a. A Fugitive Dust Control Plan shall be prepared by the applicant and/or its grading contractor and submitted to the Engineering Services Department for review and approval. The applicant and/or its grading contractor shall be required to comply with Chapter 8.50 of the City of Palm Springs Municipal Code, and shall be required to utilize one or more “Coachella Valley Best Available Control Measures” as identified in the Coachella Valley Fugitive Dust Control Handbook for each fugitive dust source such that the applicable performance standards are met. The applicant’s or its contractor’s Fugitive Dust Control Plan shall be prepared by staff that has completed the South Coast Air Quality Management District (AQMD) Coachella Valley Fugitive Dust Control Class. The applicant and/or its grading contractor shall provide the Engineering Services Department with current and valid Certificate(s) of Completion from AQMD for staff that have completed the required training. For information on attending a Fugitive Dust Control Class and information on the Coachella Valley Fugitive Dust Control Handbook and related “PM10” Dust Control issues, please contact AQMD at (909) 396-3752, or at Planning Commission Meeting June 10, 2025 Case EOT-2024-0003 Page 11 http://www.AQMD.gov. A Fugitive Dust Control Plan, in conformance with the Coachella Valley Fugitive Dust Control Handbook, shall be submitted to and approved by the Engineering Services Department prior to approval of the Grading plan. b. The first submittal of the Grading Plan shall include the following information: a copy of final approved conformed copy of Conditions of Approval; a copy of a final approved conformed copy of the Site Plan; a copy of current Title Report; a copy of Soils Report; and a copy of the associated Hydrology Study/Report; a copy of the project-specific Final Water Quality Management Plan. ENG 16. Prior to approval of a Grading Plan (or issuance of a Grading Permit), the applicant shall obtain written approval to proceed with construction from the Agua Caliente Band of Cahuilla Indians, Tribal Historic Preservation Officer or Tribal Archaeologist (a copy of the written approval must be provided to the City). The applicant shall contact the Tribal Historic Preservation Officer or the Tribal Archaeologist at ACBCI- THPO@aguacaliente.net to determine their requirements, if any, associated with grading or other construction. The applicant is advised to contact the Tribal Historic Preservation Officer or Tribal Archaeologist as early as possible. If required, it is the responsibility of the applicant to coordinate scheduling of Tribal monitors during grading or other construction, and to arrange payment of any required fees associated with Tribal monitoring. ENG 17. In accordance with an approved PM-10 Dust Control Plan, temporary dust control perimeter fencing shall be installed. Fencing shall have screening that is tan in color; green screening will not be allowed. Temporary dust control perimeter fencing shall be installed prior to issuance of Grading Permit and commencement of grading operations. ENG 18. Temporary dust control perimeter fence screening shall be appropriately maintained, as required by the City Engineer. Cuts (vents) made into the perimeter fence screening shall not be allowed. Perimeter fencing shall be adequately anchored into the ground to resist wind loading. ENG 19. Within 10 days of ceasing all construction activity and when construction activities are not scheduled to occur for at least 30 days, the disturbed areas on-site shall be permanently stabilized, in accordance with Palm Springs Municipal Code Section 8.50.022. Following stabilization of all disturbed areas, perimeter fencing shall be removed, as required by the City Engineer. ENG 20. Prior to issuance of grading permit, the applicant shall provide verification to the City that the Tribal Habitat Conservation Plan (THCP) fee has been Planning Commission Meeting June 10, 2025 Case EOT-2024-0003 Page 12 paid to the Agua Caliente Band of Cahuilla Indians in accordance with the THCP. ENG 21. Drainage swales shall be provided adjacent to all curbs and sidewalks to keep nuisance water from entering the public streets, roadways, or gutters. ENG 22. A Notice of Intent (NOI) to comply with the California General Construction Stormwater Permit (Water Quality Order 2009-0009-DWQ as modified September 2, 2009) is required for the proposed development via the California Regional Water Quality Control Board online SMARTS system. A copy of the executed letter issuing a Waste Discharge Identification (WDID) number shall be provided to the City Engineer prior to issuance of a grading or building permit. ENG 23. This project requires preparation and implementation of a stormwater pollution prevention plan (SWPPP). As of September 4, 2012, all SWPPPs shall include a post-construction management plan (including Best Management Practices) in accordance with the current Construction General Permit. Where applicable, the approved final project-specific Water Quality Management Plan shall be incorporated by reference or attached to the SWPPP as the Post-Construction Management Plan. A copy of the up-to-date SWPPP shall be kept at the project site and be available for review upon request. ENG 24. In accordance with City of Palm Springs Municipal Code, Section 8.50.022 (h), the applicant shall post with the City a cash bond of two thousand dollars ($2,000.00) per disturbed acre at the time of issuance of grading permit for mitigation measures for erosion/blowsand relating to this property and development. ENG 25. A Geotechnical/Soils Report prepared by a California registered Geotechnical Engineer shall be required for and incorporated as an integral part of the grading plan for the proposed development. A copy of the Geotechnical/Soils Report shall be submitted to the Engineering Services Department with the first submittal of a grading plan. (if required) ENG 26. The applicant shall provide all necessary geotechnical/soils inspections and testing in accordance with the Geotechnical/Soils Report prepared for the project. All backfill, compaction, and other earthwork shown on the approved grading plan shall be certified by a California registered geotechnical or civil engineer, certifying that all grading was performed in accordance with the Geotechnical/Soils Report prepared for the project. Documentation of all compaction and other soils testing are to be provided even though there may not be a grading plan for the project. Prior to issuance of Building Permits. Planning Commission Meeting June 10, 2025 Case EOT-2024-0003 Page 13 ENG 27. The applicant shall provide Grading Certification for all building (or structure) pads in conformance with the approved grading plan (if required), to the Engineering Services Department for review and approval. ENG 28. In cooperation with the California Agricultural Commissioner and the California Department of Food and Agriculture Red Imported Fire Ant Project, applicants for grading permits involving a grading plan and involving the export of soil will be required to present a clearance document from a Department of Food and Agriculture representative in the form of an approved “Notification of Intent To Move Soil From or Within Quarantined Areas of Orange, Riverside, and Los Angeles Counties” (Revised - RIFA Form CA-1) prior to approval of the Grading Plan (if required). The California Department of Food and Agriculture office is located at 6819 East Gage Avenue, Commerce, CA 90040 (Phone (760) 782-3271, (562) 505-6415), Sonia.Oran@cdfa.ca.gov. WATER QUALITY MANAGEMENT PLAN ENG 29. This project shall be required to install measures in accordance with applicable National Pollution Discharge Elimination System (NPDES) Best Management Practices (BMP’s) included as part of the NPDES Permit issued for the Whitewater River Region from the Colorado River Basin Regional Water Quality Control Board (RWQCB). The applicant is advised that installation of BMP’s, including mechanical or other means for pre-treating contaminated stormwater and non-stormwater runoff, shall be required by regulations imposed by the RWQCB. It shall be the applicant’s responsibility to design and install appropriate BMP’s, in accordance with the NPDES Permit, that effectively intercept and pre-treat contaminated stormwater and non-stormwater runoff from the project site, prior to release to the City’s municipal separate storm sewer system (“MS4”), to the satisfaction of the City Engineer and the RWQCB. Such measures shall be designed and installed on-site; and provisions for perpetual maintenance of the measures shall be provided to the satisfaction of the City Engineer, including provisions in Covenants, Conditions, and Restrictions (CC&R’s) required for the development (if any). ENG 30. A Final Project-Specific Water Quality Management Plan (WQMP) shall be submitted to and approved by the City Engineer prior to issuance of a grading or building permit. The WQMP shall address the implementation of operational Best Management Practices (BMP’s) necessary to accommodate nuisance water and storm water runoff from the site. Direct release of nuisance water to the adjacent property (or public streets) is prohibited. Construction of operational BMP’s shall be incorporated into the Precise Grading and Paving Plan. Planning Commission Meeting June 10, 2025 Case EOT-2024-0003 Page 14 ENG 31. Prior to issuance of any grading or building permits, the property owner shall record a “Covenant and Agreement” with the County-Clerk Recorder or other instrument on a standardized form to inform future property owners of the requirement to implement the approved Final Project- Specific Water Quality Management Plan (WQMP). Other alternative instruments for requiring implementation of the approved Final Project- Specific WQMP include: requiring the implementation of the Final Project- Specific WQMP in Home Owners Association or Property Owner Association Covenants, Conditions, and Restrictions (CC&Rs); formation of Landscape, Lighting and Maintenance Districts, Assessment Districts or Community Service Areas responsible for implementing the Final Project- Specific WQMP; or equivalent. Alternative instruments must be approved by the City Engineer prior to issuance of any grading or building permits. ENG 32. Prior to issuance of certificate of occupancy or final City approvals (OR of “final” approval by City), the applicant shall: (a) demonstrate that all structural BMP’s have been constructed and installed in conformance with approved plans and specifications; (b) demonstrate that applicant is prepared to implement all non-structural BMP’s included in the approved Final Project-Specific WQMP, conditions of approval, or grading/building permit conditions; and (c) demonstrate that an adequate number of copies of the approved Final Project-Specific WQMP are available for the future owners (where applicable). a. Prior to issuance of certificate of occupancy or final City approvals (OR of “final” approval by City), the applicant shall: b. Demonstrate that all structural BMPs have been constructed and installed in conformance with approved plans and specifications; c. Demonstrate that applicant is prepared to implement all non- structural BMPs included in the approved Final Project-Specific Water Quality Management Plan (WQMP), conditions of approval, or grading/building permit conditions; and d. Demonstrate that an adequate number of copies of the approved Final Project-Specific WQMP are available for the future owners (where applicable). DRAINAGE ENG 33. All stormwater runoff passing through the site shall be accepted and conveyed across the property in a manner acceptable to the City Engineer. For all stormwater runoff falling on the site, on-site retention or Planning Commission Meeting June 10, 2025 Case EOT-2024-0003 Page 15 other facilities approved by the City Engineer shall be required to contain the increased stormwater runoff generated by the development of the property. Provide a hydrology study to determine the volume of increased stormwater runoff due to development of the site, and to determine required stormwater runoff mitigation measures for the proposed development. Final retention basin sizing and other stormwater runoff mitigation measures shall be determined upon review and approval of the hydrology study by the City Engineer and may require redesign or changes to site configuration or layout consistent with the findings of the final hydrology study. No more than 40-50% of the street frontage parkway/setback areas should be designed as retention basins. On-site open space, in conjunction with dry wells and other subsurface solutions should be considered as alternatives to using landscaped parkways for on-site retention. ENG 34. This project shall be required to install measures in accordance with applicable National Pollution Discharge Elimination System (NPDES) Best Management Practices (BMP’s) included as part of the NPDES Permit issued for the Whitewater River Region from the Colorado River Basin Regional Water Quality Control Board (RWQCB). The applicant is advised that installation of BMP’s, including mechanical or other means for pre-treating contaminated stormwater and non-stormwater runoff, shall be required by regulations imposed by the RWQCB. It shall be the applicant’s responsibility to design and install appropriate BMP’s, in accordance with the NPDES Permit, that effectively intercept and pre-treat contaminated stormwater and non-stormwater runoff from the project site, prior to release to the City’s municipal separate storm sewer system (“MS4”), to the satisfaction of the City Engineer and the RWQCB. Such measures shall be designed and installed on-site; and provisions for perpetual maintenance of the measures shall be provided to the satisfaction of the City Engineer, including provisions in Covenants, Conditions, and Restrictions (CC&R’s) required for the development. ENG 35. The project is subject to flood control and drainage implementation fees. The acreage drainage fee at the present time is $10,311.99 per acre in accordance with Resolution No. 15189. Fees shall be paid prior to issuance of a building permit. GENERAL ENG 36. Any utility trenches or other excavations within existing asphalt concrete pavement of off-site streets required by the proposed development shall be backfilled and repaired in accordance with City of Palm Springs Standard Drawing No. 115. ENG 37. All proposed utility lines shall be installed underground. Planning Commission Meeting June 10, 2025 Case EOT-2024-0003 Page 16 ENG 38. All existing utilities shall be shown on the improvement plans if required for the project. The existing and proposed service laterals shall be shown from the main line to the property line. ENG 39. Upon approval of any improvement plan (if required) by the City Engineer, the improvement plan shall be provided to the City in digital format, consisting of a DWG (AutoCAD drawing filetype), DXF (AutoCAD ASCII drawing exchange filetype), and PDF (Adobe Acrobat document filetype) formats. Variation of the type and format of the digital data to be submitted to the City may be authorized, upon prior approval by the City Engineer. ENG 40. The original improvement plans prepared for the proposed development and approved by the City Engineer (if required) shall be documented with record drawing “as-built” information and returned to the Engineering Services Department prior to issuance of a final certificate of occupancy. Any modifications or changes to approved improvement plans shall be submitted to the City Engineer for approval prior to construction. ENG 41. Nothing shall be constructed or planted in the corner cut-off area of any intersection or driveway which does or will exceed the height required to maintain an appropriate sight distance per City of Palm Springs Zoning Code Section 93.02.00, D. ENG 42. All proposed trees within the public right-of-way and within 10 feet of the public sidewalk and/or curb shall have City approved deep root barriers installed in accordance with City of Palm Springs Standard Drawing No. 904. MAP ENG 43. The existing parcels identified as Parcel 1 of Parcel Map 8779, Map Book 58, Page 89, and Parcel 1 of Parcel Map 15814, Map Book 83, Page 62, shall be merged. An application for a parcel merger shall be submitted to the Engineering Services Department for review and approval. A copy of a current title report and copies of record documents shall be submitted with the application for the parcel merger. The application shall be submitted to and approved by the City Engineer prior to issuance of building permit. TRAFFIC ENG 44. A minimum of 48 inches of clearance for accessibility shall be provided on public sidewalks. Minimum clearance on public sidewalks shall be provided by either an additional dedication of a sidewalk easement if necessary and widening of the sidewalk, or by the relocation of any obstructions within the public sidewalk along the frontage of the subject property. Planning Commission Meeting June 10, 2025 Case EOT-2024-0003 Page 17 ENG 45. All damaged, destroyed, or modified pavement legends, traffic control devices, signing, striping, and streetlights, associated with the proposed development shall be replaced as required by the City Engineer prior to issuance of a Certificate of Occupancy. ENG 46. Construction signing, lighting and barricading shall be provided during all phases of construction as required by City Standards or as directed by the City Engineer. As a minimum, all construction signing, lighting and barricading shall be in accordance with Part 6 “Temporary Traffic Control” of the California Manual on Uniform Traffic Control Devices (CAMUTCD), dated November 7, 2014, or subsequent editions in force at the time of construction. ENG 47. This property is subject to the Transportation Uniform Mitigation Fee which shall be paid prior to issuance of building permit. FIRE DEPARTMENT CONDITIONS: FID 1. These Fire Department conditions may not provide all requirements. Owner/developer is responsible for all applicable state and locally adopted fire codes. Detailed plans are still required for review. Conditions are subject to final plan check and review. FID 2. Fire Department Conditions were based on the 2022 California Fire Code as adopted by City of Palm Springs, Palm Springs Municipal Code, PSFD Appendix “T” Development Requirements. This building will require fire sprinklers and a fire alarm system. FID 3. Conditions of Approval – “Conditions of Approval” received from the Palm Springs Planning Department must be submitted with each plan set. Failure to submit will result in a delay of plan approval. FID 4. Required access (CFC 504.1): Exterior doors and openings required by this code or the California Building Code shall be maintained readily accessible for emergency access by the fire department. An approved access walkway leading from fire apparatus access roads to exterior openings shall be provided when required by the fire code official. FID 5. NFPA Fire Sprinklers: An automatic fire sprinkler system is required. Only a C-16 licensed fire sprinkler contractor shall perform system design and installation. System to be designed and installed in accordance with NFPA standard 13, 2016 Edition, as modified by local ordinance Planning Commission Meeting June 10, 2025 Case EOT-2024-0003 Page 18 FID 6. Private Fire Hydrants: Additional private hydrants may be required. FID 7. Security Gates: A Knox Key operated switch shall be installed at every automatic gate. Secured automated vehicle gates or entries shall utilize a combination of a Tomar Strobeswitch™, or approved equal, and an approved Knox Key switch when required by the fire code official. Secured non-automated vehicle gates or entries shall utilize an approve padlock or chain (maximum link or lock shackle size of 1/4 inch) when required by the fire code official. FID 8. Key Box Required to be Installed (CFC 506.1): Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be flush mount type and shall contain keys to gain necessary access as required by the fire code official. Secured emergency access gates serving apartment, town home or condominium complex courtyards must provide a key box in addition to association or facility locks. The nominal height of Knox lock box installations shall be 5 feet above grade. Location and installation of Knox key boxes must be approved by the fire code official. FID 9. Key Box Contents (CFC 506.1): The Knox key box shall contain keys to all areas of ingress/egress, alarm rooms, fire sprinkler riser/equipment rooms, mechanical rooms, elevator rooms, elevator controls, plus a card containing the emergency contact people and phone numbers for the building/complex. FID 10. Turning Radius: Fire access road turns and corners shall be designed with a minimum inner radius of 25 feet and an outer radius of 43 feet. FID 11. Dead Ends: Dead-end fire apparatus roads in excess of 150 feet in length shall be provided with an approved area for turning around a fire apparatus. FID 12. Designated Fire Lanes: In private developments fire lanes shall not be less than 24 feet in width (curb to curb) with no parking on either side and shall be identified. Planning Commission Meeting June 10, 2025 Case EOT-2024-0003 Page 19 FID 13. Address: Shall provide 12” addresses for this structure and show location on plans. FID 14. Fire Extinguishers: Shall install 2A10BC fire extinguishers every 75’ inside the office space. FID 15. Fire Inspection: Shall call fire for a fire inspection prior to opening business at 760-323-8181. END OF CONDITIONS ATTACHMENT 4 ATTACHMENT 5 CITY OF PALM SPRINGS – PUBLIC INTEGRITY DISCLOSURE APPLICANT DISCLOSURE FORM Page 1 of 2 (Revised 05/16/19) PUBLIC INTEGRITY DISCLOSURE APPLICANT DISCLOSURE FORM 1.Name of Entity 2.Address of Entity (Principle Place of Business) 3.Local or California Address (if different than #2) 4.State where Entity is Registered with Secretary of State If other than California, is the Entity also registered in California? F Yes F No 5.Type of Entity F Corporation F Limited Liability Company F Partnership F Trust F Other (please specify) 6.Officers, Directors, Members, Managers, Trustees, Other Fiduciaries (please specify) Note: If any response is not a natural person, please identify all officers, directors, members, managers and other fiduciaries for the member, manager, trust or other entity _________________________________________________ F Officer F Director F Member F Manager [name] F General Partner F Limited Partner F Other ____________________________________ _________________________________________________ F Officer F Director F Member F Manager [name] F General Partner F Limited Partner F Other ____________________________________ _________________________________________________ F Officer F Director F Member F Manager [name] F General Partner F Limited Partner F Other ____________________________________ Farrell Drive PS, LLC 3121 Michelson Drive, Suite 200, Irvine, CA 92612 Same As Above California ■ John Chen ■ ■ Eric Higuchi ■ CITY OF PALM SPRINGS – PUBLIC INTEGRITY DISCLOSURE APPLICANT DISCLOSURE FORM Page 2 of 2 (Revised 05/16/19) 7. Owners/Investors with a 5% beneficial interest in the Applicant Entity or a related entity EXAMPLE JANE DOE [name of owner/investor] 50%, ABC COMPANY, Inc. [percentage of beneficial interest in entity and name of entity] A. [name of owner/investor] [percentage of beneficial interest in entity and name of entity] B. [name of owner/investor] [percentage of beneficial interest in entity and name of entity] C. [name of owner/investor] [percentage of beneficial interest in entity and name of entity] D. [name of owner/investor] [percentage of beneficial interest in entity and name of entity] E. [name of owner/investor] [percentage of beneficial interest in entity and name of entity] I DECLARE UNDER PENALTY OF PERJURY UNDER THE LAWS OF THE STATE OF CALIFORNIA THAT THE FOREGOING IS TRUE AND CORRECT. Signature of Disclosing Party, Printed Name, Title Date PENALTIES Falsification of information or failure to report information required to be reported may subject you to administrative action by the City. Daoqing Zheng 64%, Farrell Drive PS LLC Emily Chen 9%, Farrell Drive PS LLC Chen Family Trust dated June 30, 2008 9%, Farrell Drive PS LLC Chung Living Trust, dated 09/30/2013 9%, Farrell Drive PS LLC Kyung Min Kim 9% Farrel Drive PS LLC John Chen, Manager 03/10/2022 CITY OF PALM SPRINGS – PUBLIC INTEGRITY DISCLOSURE APPLICANT DISCLOSURE FORM Page 1 of 2 (Revised 05/16/19) PUBLIC INTEGRITY DISCLOSURE APPLICANT DISCLOSURE FORM 1. Name of Entity 2. Address of Entity (Principle Place of Business) 3. Local or California Address (if different than #2) 4. State where Entity is Registered with Secretary of State If other than California, is the Entity also registered in California?  Yes  No 5. Type of Entity  Corporation  Limited Liability Company  Partnership  Trust  Other (please specify) 6. Officers, Directors, Members, Managers, Trustees, Other Fiduciaries (please specify) Note: If any response is not a natural person, please identify all officers, directors, members, managers and other fiduciaries for the member, manager, trust or other entity _________________________________________________  Officer  Director  Member  Manager [name]  General Partner  Limited Partner  Other ____________________________________ _________________________________________________  Officer  Director  Member  Manager [name]  General Partner  Limited Partner  Other ____________________________________ _________________________________________________  Officer  Director  Member  Manager [name]  General Partner  Limited Partner  Other ____________________________________ CITY OF PALM SPRINGS – PUBLIC INTEGRITY DISCLOSURE APPLICANT DISCLOSURE FORM Page 1 of 2 (Revised 05/16/19) 7. Owners/Investors with a 5% beneficial interest in the Applicant Entity or a related entity EXAMPLE JANE DOE [name of owner/investor] 50%, ABC COMPANY, Inc. [percentage of beneficial interest in entity and name of entity] A. [name of owner/investor] [percentage of beneficial interest in entity and name of entity] B. [name of owner/investor] [percentage of beneficial interest in entity and name of entity] C. [name of owner/investor] [percentage of beneficial interest in entity and name of entity] D. [name of owner/investor] [percentage of beneficial interest in entity and name of entity] E. [name of owner/investor] [percentage of beneficial interest in entity and name of entity] I DECLARE UNDER PENALTY OF PERJURY UNDER THE LAWS OF THE STATE OF CALIFORNIA THAT THE FOREGOING IS TRUE AND CORRECT. Signature of Disclosing Party, Printed Name, Title Date PENALTIES Falsification of information or failure to report information required to be reported may subject you to administrative action by the City. ATTACHMENT 6 ATTACHMENT 7 ATTACHMENT 8 ATTACHMENT 9 14782-02 TG Letter March 18, 2022 Mr. Eric Higuchi Red Rock Realty Investment, LLC 3121 Michelson Drive, Suite 200 Irvine, CA 92612 950 N. FARRELL DRIVE TRIP GENERATION ASSESSMENT Mr. Eric Higuchi, Urban Crossroads, Inc. is pleased to provide the following Trip Generation Assessment for 950 N. Farrell Drive development which is located in the City of Palm Springs. The purpose of this work effort is to determine whether additional traffic analysis is necessary for the proposed Project based on the City of Palm Springs’s Traffic Impact Analysis Guidelines (dated July 2020) (City Guidelines). PROPOSED PROJECT The Project is proposed to consist of an approximately 65,284 square foot mini-warehouse facility (storage facility) and ancillary office space on 4.20-acres of vacant land. TRIP GENERATION The trip generation rates used for this analysis are based upon information collected by the Institute of Transportation Engineers (ITE) as provided in their Trip Generation Manual (11th Edition, 2021) for the proposed mini-warehouse use (ITE Land Use Code 151) (see Table 1). The trip generation summary illustrating daily, and peak hour trip generation estimates for the proposed Project is also shown in Table 1. As shown in Table 1, the proposed Project is anticipated to generate a total of 96 trip-ends per day with 5 AM peak hour trips and 10 PM peak hour trips. Mr. Eric Higuchi Red Rock Realty Investment, LLC March 18, 2022 Page 2 of 2 14782-02 TG Letter TABLE 1: PROPOSED PROJECT TRIP GENERATION SUMMARY CONCLUSION According to the City’s Guidelines, a level of service (LOS) traffic study may not be required if the AM or PM peak hour trip generation is less than 100 vehicle trips. Based on the City’s Guidelines and the anticipated trip generation for the site, additional traffic analysis beyond this trip generation assessment is not necessary. If you have any questions or comments, I can be reached at (949) 861-0177. Respectfully submitted, URBAN CROSSROADS, INC. Charlene So, PE Principal ITE LU AM Peak Hour PM Peak Hour Land Use 1 Units2 Code In Out Total In Out Total Mini-Warehouse TSF 151 0.05 0.04 0.09 0.07 0.08 0.15 1.45 1 Trip Generation Source: Institute of Transportation Engineers (ITE), Trip Generation Manual, Eleventh Edition (2021). 2 TSF = thousand square feet Land Use Quantity Units1 In Out Total In Out Total Daily Mini Warehouse 65.284 TSF 3 2 5 5 5 10 96 1 TSF = thousand square feet AM Peak Hour PM Peak Hour Daily 14782-01 VMT March 21, 2022 Mr. Eric Higuchi Red Rock Realty Investment, LLC 3121 Michelson Drive, Suite 200 Irvine, CA 92612 950 N. FARRELL DRIVE VEHICLE MILES TRAVELED (VMT) SCREENING EVALUATION Mr. Eric Higuchi, Urban Crossroads, Inc. is pleased to provide the following Vehicle Miles Traveled (VMT) Screening Evaluation for the 950 N. Farrell Drive development (Project) located at 950 N. Farrell Drive in the City of Palm Springs (See Attachment A). PROJECT OVERVIEW It is our understanding that the Project is proposed to consist of the development of an approximately 65,284 square foot mini-warehouse facility and ancillary office space on a 4.20- acres of vacant land (See Attachment A). BACKGROUND Changes to California Environmental Quality Act (CEQA) Guidelines were adopted in December 2018, which require all lead agencies to adopt VMT as a replacement for automobile delay-based level of service (LOS) as the measure for identifying transportation impacts for land use projects. This statewide mandate went into effect July 1, 2020. To aid in this transition, the Governor’s Office of Planning and Research (OPR) released a Technical Advisory on Evaluating Transportation Impacts in CEQA (December of 2018) (Technical Advisory) (1). Based on the Technical Advisory, the City of Palm Springs has developed and adopted the City of Palm Springs Traffic Impact Analysis Guidelines (July 2020) (City Guidelines) (2). This VMT analysis has been developed based on the adopted City Guidelines. VMT SCREENING City Guidelines identify Projects that meet certain VMT screening criteria may be presumed to result in a less than significant transportation impact. The City Guidelines lists the following VMT screening steps: • Step 1: Transit Priority Area (TPA) Screening Mr. Eric Higuchi Red Rock Realty Investment, LLC March 21, 2022 Page 2 of 4 14782-01 VMT • Step 2: Low VMT Area Screening • Step 3: Project Type Screening A land use project need only meet one of the above screening criteria to result in a less than significant impact. STEP 1: TPA SCREENING Consistent with guidance identified in the City Guidelines, projects located within a Transit Priority Area (TPA) (i.e., within ½ mile of an existing “major transit stop”1 or an existing stop along a “high- quality transit corridor”2) may be presumed to have a less than significant impact absent substantial evidence to the contrary. However, the presumption may not be appropriate if a project: • Has a Floor Area Ratio (FAR) of less than 0.75; • Includes more parking for use by residents, customers, or employees of the project than required by the jurisdiction (if the jurisdiction requires the project to supply parking); • Is inconsistent with the applicable Sustainable Communities Strategy (as determined by the lead agency, with input from the Metropolitan Planning Organization); or • Replaces affordable residential units with a smaller number of moderate or high-income residential units. Southern California Councils of Governments (SCAG) provides TPA data through their graphical information system (GIS). This data was utilized to locate if the Project site and its proximity to a TPA. Results as shown in Attachment B, identify the Project Site is not located within ½ mile of an existing major transit stop, or along a high-quality transit corridor. TPA screening criteria is not met. STEP 2: LOW VMT AREA SCREENING As noted in the Technical Advisory, “Residential and office projects that locate in areas with low VMT and that incorporate similar features (density, mix of uses, and transit accessibility) will tend to exhibit similarly low VMT.” City Guidelines state that projects may be presumed to have a less than significant VMT impact if located in an already low VMT generating traffic analysis zones (TAZs) that generates a VMT per service population (SP) that is below the City of Palm Springs General Plan Buildout VMT per SP. As noted in the City Guidelines the Riverside County Model (RIVCOM) once available, may be the appropriate tool to use for screening in the City related to low VMT areas. The Western Riverside Council of Governments (WRCOG) is the developer/owner of RIVCOM and recently launched the 1 Pub. Resources Code, § 21064.3 (“‘Major transit stop’ means a site containing an existing rail transit station, a ferry terminal served by either a bus or rail transit service, or the intersection of two or more major bus routes with a frequency of service interval of 15 minutes or less during the morning and afternoon peak commute periods.”). 2 Pub. Resources Code, § 21155 (“For purposes of this section, a high-quality transit corridor means a corridor with fixed route bus service with service intervals no longer than 15 minutes during peak commute hours.”). Mr. Eric Higuchi Red Rock Realty Investment, LLC March 21, 2022 Page 3 of 4 14782-01 VMT new modeling tool for use by its member agencies in August 2021. At the time this analysis was prepared the RIVCOM tool was in its 4th update (also referred to as version 3.0). As screening maps have not been created utilizing the RIVCOM model, an easy-to-use map is not available for screening purposes. For the purposes of this analysis, the RIVCOM model was used to calculate the cumulative year 2045 City of Palms Springs’ citywide average VMT per SP of 36.65, as seen in Table 1. TABLE 1: CITY OF PALM SPRINGS AVERAGE VMT PER SP Cumulative VMT 3,790,685 Service Population 103,440 VMT per SP 36.65 The proposed Project site was then located within the RIVCOM model. The Project site was found to be located in TAZ 1171. The Project’s TAZ was then calculated for VMT per SP. As shown in Table 2, TAZ 1171 has a VMT per SP of 28.14. TABLE 2: TAZ 1711 VMT PER SP Baseline VMT 121,274 Service Population 4,310 VMT per SP 28.14 Based on the data contained in the RIVCOM traffic model, the Project is found to be located within a low VMT generating zone. Low VMT Area screening criteria is met. STEP 3: PROJECT TYPE SCREENING The City Guidelines state that small projects generating fewer than 110 daily vehicle trips or less may be presumed to have a less than significant impact, subject to discretionary approval by the City. Trips generated by the Project’s proposed land uses have been estimated based on trip generation rates collected by the Institute of Transportation Engineers (ITE) Trip Generation Manual, 11th Edition, 2021 (3). The Project is anticipated to generate 96 daily vehicle trips, which does not exceed the City’s 110 daily vehicle trip threshold. Additionally, the City Guidelines identify that local serving retail less than 50,000 square feet or other local serving essential services (e.g., day care centers, public schools, medical/dental office buildings, etc.) are presumed to have a less than significant impact absent substantial evidence to the contrary. The Project is proposing a mini storage facility as a means of an overflow location to store belongings to support nearby residents and businesses. It is reasonable to assume that the residents and businesses will select this location, at least in part, as to how it effects their proximity to their belongings. As a result, the trips are expected to be local serving. The Project Type screening threshold is met. Mr. Eric Higuchi Red Rock Realty Investment, LLC March 21, 2022 Page 4 of 4 14782-01 VMT CONCLUSION Based on our review of applicable VMT screening thresholds, the Project meets the Low VMT Area and the Project Type screening criteria. The Project would therefore result in a less than significant VMT impact finding. No additional VMT analysis is required. If you have any questions, please contact me directly at aso@urbanxroads.com. Respectfully submitted, URBAN CROSSROADS, INC. Alexander So Senior Associate REFERENCES 1. Office of Planning and Research. Technical Advisory on Evaluating Transportation Impacts in CEQA. State of California : s.n., December 2018. 2. City of Palm Springs. City of Palm Springs Traffic Impact Analysis Guidelines. July 2020. 3. Institute of Transportation Engineers. Trip Generation Manual. 11th Edition. 2021. ATTACHMENT 10 PROJECT SITERESEARCH DRIVE1FARRELL DRIVECOMPUTER WAY243EXISTING SITE PHOTOGRAPHSDATA TABLEASSESSOR'S PARCEL NUMBER:EXHIBIT DATE: JANUARY 6, 2022APPLICANT /ADDRESS:CONTACT:3121 MICHELSON DRIVE, SUITE 200IRVINE, CALIFORNIA 92612ERIC HIGUCHIEXHIBIT PREPARER:ADDRESS:MSA CONSULTING, INC.34200 BOB HOPE DRIVERANCHO MIRAGE, CALIFORNIA 92270CONTACT:PAUL DEPALATIS, AICPIN THE CITY OF PALM SPRINGS, COUNTY OF RIVERSIDE, STATE OF CALIFORNIALAND OWNER:RICHFIELD VENTURES, INC.507-350-037 & 507-350-038TELEPHONE:(760) 320-9811MSA CONSULTING, INC.> PLANNING > C IVIL ENG INEER ING > LAND SURVEYING34200 Bob Hope Drive, Rancho Mirage, CA 92270760.320.9811 msaconsultinginc.comSHEETSHEETS1OF1PHOTOGRAPH NO. 1PHOTOGRAPH LOCATION LEGEND:PHOTOGRAPH LOCATION & DIRECTIONXNORTHWEST CORNER OF PROJECTC/O ERIC HIGUCHIN.T.S.VICINITY MAPTACHEVAH DRIVESITEVISTA CHINOTAMARISK ROADAVENIDA CABALLEROS SUNRISE WAYALEJO ROADRESEARCHDRIVECOMPUTERWAYFARRELL DRIVE FARRELL DRIVE PALM SPRINGSINTERNATIONALAIRPORTPHOTOGRAPH NO. 2NORTHEAST CORNER OF PROJECTPHOTOGRAPH NO. 3SOUTHEAST CORNER OF PROJECTPHOTOGRAPH NO. 4SOUTHWEST CORNER OF PROJECTR:\2713\Acad\Planning\Exhibits\2713 Existing Site Photos.dwg, 1/6/2022 11:15:49 AM, dgallerani, MSA Consulting, Inc. ATTACHMENT 11 MAJOR ARCHITECTURAL SUBMITTAL PACKAGE950 N. FARRELL DRIVESELF-STORAGE / MINI-WAREHOUSE DEVELOPMENT950 N. FARRELL DRIVEPALM SPRINGS, CACOVER SHEETSHEET 105.31.22NOT TO SCALEPALM SPRINGSINTERNATIONALAIRPORTCOMPUTER WAYN. FARRELL DRSITE LOCATIONRESEARCH DR SE C U R ITY RACK30X48CLR .SPACECC E CCE TRASH3OFFICE26'-4"28'-4"41'-4"20'SETBACK25'SETBACK25'SETBACK100'SETBACK100'SETBACKLOBB Y PROPOSEDSELF STORAGEBUILDING 1 1-STORYPROPERTY LINEPROPERTY LINEPROP E R T Y LI N E PROP E R T Y LI N E 12'X3 0' R V P A R KI N G 12'X30'3RV12'X40'LOADING12'X40'LOADINGBUILDING 3 DRIVE-UPSBUILDING 4 DRIVE-UPS25'LANDSCAPESETBACKR/W DEDICATION15' SIDEWALK EASEMENTSTOPSTOP 20'T21'-4"30'31'-6"61'-4"BUILDING 2DRIVE-UPS25'-8"STOP 20'EXIT ONLYGATEMONUMENT SIGNSEE LANDSCAPE8' HIGH SPLIT-FACE CMUWALL (ON EXTERIORFACING SIDE) WITHALTERNATING RECESSESFOR HEDGES ON BOTHSIDES. HEDGE SHALL BEMAINTAINED AT A HEIGHTOF 14 FT.FACP141'-4"4EVCHARGING10'LSSETBACK10'LSSETBACK18' TYP 9'TYP18'9'8'9'30' DRIVE W A Y 30'DRIVEWAY24'FIRE ACCESSRETENTION BASINRETE N TI O N BASIN LS5'10' CORNERVISIBILITY TRIANGLE10'10'4'-4"TR12'X40'LOADINGALTERNATING PLANTERSWHERE WALL IS RECESSED,TYP1'-6"48'-1"48'-2"47'-8"1'-10"1'-8"26'-2"LSLOBBYLOADI N G 32135'950 N. FARRELL DRIVEPALM SPRINGS, CASHEET 2NORTHCONCEPTUAL SITE PLAN06.20.22030'15' 60'scale: 1" = 30'-0" SHEET 2.1 12345678910111213CDEFGAB12345678910111213CDEFGAB14141515161617171818191920202121222223232425262728242526272829303132333435362930313233343536HJKLMNPQHJKLMNPQOFFICELOBBYSECURITY RACK 30X48 CLR. SPACE CCE351'-4"141'-4"BREAKRMUNISEX10'-8"10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'-8"25'52'-8"10'-8"10'10'10'10'10'10'10'10'10'10'10'10'10'-8"71'-4"70'311'-4"40'75'66'-4"10x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x710x710x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x2010x2010x2010x2010x2010x2010x2010x2010x2010x2010x2010x2010x2010x2010x2010x2010x2010x2010x2010x2010x2010x2010x2010x205x105x105x105x105x105x105x105x105x105x105x105x105x105x105x55x55x55x55x55x55x55x55x55x55x510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x2010x2010x2010x2010x205x105x105x105x105x105x105x105x105x1010x105x55x55x55x55x55x55x55x55x55x55x55x55x55x55x55x55x55x55x55x55x55x55x55x55x55x55x55x55x5DISPLAYLOBBYCCE25'-8"9'10x2010x20JANUNISEX10x105x1010x1010x1010x105x105x710x1510x1510x1510x1510x155x105x105x105x105x105x105x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x1010x105x105x105x105x105x105x105x105x105x105x105x105x105x105x105x105x105x105x105x105x105x105x105x105x105x105x105x105x105x105x510x105x55x57'9'LOADING5'950 N. FARRELL DRIVEPALM SPRINGS, CASHEET 3NORTHCONCEPT FLOOR PLAN - BUILDING 107.01.22016'8' 32'4'scale: 1/16" = 1'-0" 12345678910111213CDEFGAB12345678910111213CDEFGAB14141515161617171818191920202121222223232425262728242526272829303132333435362930313233343536HJKLMNPQHJKLMNPQ351'-4"141'-4"10'-8"10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'-8"25'25'10'-8"10'10'10'10'10'10'10'10'10'10'10'10'10'-8"71'-4"70'311'-4"DRIVE-UPS40'75'66'-4"+5'-0"FROM T.O. ROOF ROOFTOP UNIT, TYPROOF SCREEN, TYPWALKPADS, TYPSLOPE DOWN1/4" PER FT16'-0"T.O. PARAPET17'-0"T.O. PARAPET16'-0"T.O. PARAPET16'-0"T.O. PARAPET16'-0"T.O. PARAPET17'-0"T.O. PARAPET21'-0"T.O. METALROOF16'-0"T.O. PARAPET16'-0"T.O. PARAPET17'-0"T.O. PARAPET17'-0"T.O. PARAPETRIDGESLOPE DOWN1/4" PER FTSLOPE DOWN1/4" PER FTSLOPE DOWN1/4" PER FTMETAL CANOPYBELOW950 N. FARRELL DRIVEPALM SPRINGS, CASHEET 3.1NORTHCONCEPT ROOF PLAN - BUILDING 107.01.22016'8' 32'4'scale: 1/16" = 1'-0" 10x2012345678910111213AB12345678910111213AB14141515161617171818CC1919BUILDING 2 DRIVE-UPS181'-4"10'-8"10'10'10'10'10'10'10'10'10'10'10'10x2010x2010x2010x2010x2010x2010x2010x2010x2010x2010x2010x2010x2010x2010x2010x2010x2010'10'10'10'10'10'-8"12345678910111213AB12345678910111213AB14141515161617171818CC19202122232425262728293031322021222324252627282930313219DEFGDEFGBUILDING 3 DRIVE-UPS311'-4"10'-8"10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'-8"61'-4"10'-8"10'10'10'10'10'-8"36'-4"10'15'51'-4"80'180'10x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x1510x2010x2010x2010x2010x2010x2010x2010x2010x2010x2010x2010x2010x2010x2010x2010x2010x2010x2010x3010x3010x3010x3010x3010x3010x3010x3010x3010x3010x3010x3010x3010x3010x3010x3010x3010x3012345678910111213AB12345678910111213AB14141515161617171818CC191920212219202122DDBUILDING 4 DRIVE-UPS211'-4"10'-8"10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'-8"26'-4"10'-8"10x2510'5'-8"10x2510x2510x2510x2510x2510x2510x2510x2510x2510x2510x2510x2510x2510x2510x2510x2510x2510x2510x2510x25950 N. FARRELL DRIVEPALM SPRINGS, CASHEET 4NORTHCONCEPT FLOOR PLANS - DRIVE-UP BUILDINGS 2, 3, 402.07.22016'8' 32'4'scale: 1/16" = 1'-0"NORTHNORTH 12345678910111213AB12345678910111213AB14141515161617171818CC1919181'-4"10'-8"10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'-8"SLOPE DN.1/4" PER FT. MIN.±12'-8"T.O. PARAPET±13'-8"T.O. PARAPET±12'-8"T.O. PARAPET±13'-8"T.O. PARAPET12345678910111213AB12345678910111213AB14141515161617171818CC19202122232425262728293031322021222324252627282930313219DEFGDEFGBUILDING 3 DRIVE-UPS311'-4"10'-8"10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'-8"61'-4"10'-8"10'10'10'10'10'-8"36'-4"10'15'51'-4"80'180'SLOPE DN.1/4" PER FT. MIN.±13'-4"T.O. PARAPET±14'-4"T.O. PARAPET±13'-4"T.O. PARAPETSLOPE DN.1/4" PER FT. MIN.12345678910111213AB12345678910111213AB14141515161617171818CC191920212219202122DDBUILDING 4 DRIVE-UPS211'-4"10'-8"10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'10'-8"26'-4"10'-8"10'5'-8"SLOPE DN.1/4" PER FT. MIN.±12'-8"T.O. PARAPET±13'-8"T.O. PARAPET±12'-8"T.O. PARAPET±13'-8"T.O. PARAPETSLOPE DN.1/4" PER FT. MIN.950 N. FARRELL DRIVEPALM SPRINGS, CASHEET 4.1NORTHCONCEPT ROOF PLANS - DRIVE-UP BUILDINGS 2, 3, 402.07.22016'8' 32'4'scale: 1/16" = 1'-0"NORTHNORTH OFFICE LOBBY BREAK RM UNISE X DISPLA Y LOBB Y JAN UNISE X LOADI N G TRASH3OFFICE26'-4"28'-4"41'-4"20'SETBACK25'SETBACK25'SETBACK100'SETBACK100'SETBACKLOBB Y PROPOSEDSELF STORAGEBUILDING 1 1-STORYPROPERTY LINEPROPERTY LINEPROP E R T Y LI N E PROP E R T Y LI N E 12'X3 0' R V P A R KI N G 12'X30'3RV12'X40'LOADING12'X40'LOADINGBUILDING 3 DRIVE-UPSBUILDING 4 DRIVE-UPS25'LANDSCAPESETBACKR/W DEDICATION15' SIDEWALK EASEMENTSTOPSTOP 20'T21'-4"30'31'-6"61'-4"BUILDING 2DRIVE-UPS25'-8"STOP 20'EXIT ONLYGATEMONUMENT SIGNSEE LANDSCAPE8' HIGH SPLIT-FACE CMUWALL (ON EXTERIORFACING SIDE) WITHALTERNATING RECESSESFOR HEDGES ON BOTHSIDES. HEDGE SHALL BEMAINTAINED AT A HEIGHTOF 14 FT.FACP141'-4"4EVCHARGING10'LSSETBACK10'LSSETBACK18' TYP 9'TYP18'9'8'9'30' DRIVE W A Y 30'24'FIRE ACCESSRETENTION BASINRETE N TI O N BASIN LS5'10' CORNERVISIBILITY TRIANGLE10'10'4'-4"TR12'X40'LOADINGALTERNATING PLANTERSWHERE WALL IS RECESSED,TYP1'-6"48'-1"48'-2"47'-8"1'-10"1'-8"26'-2"LSLOBBYLOADI N G 32135'1111111111111LLLLL1010'1010101010000010101010'10000'00'0'0'00'00'0'0'000'0'0'000'00'10101KKKKKKKKCKCKKKCKCKKCKCKKKKKKKKKKKKKKKKCKCCK0000A00000CCKKKKKKKKKKKKKKKKKKKKAAAAAACAAACAACCAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA5'5'5'5'5'5'5'5'5'555555'555555'55555'5'5555555555555555555555555555555555555'5'55'5'5'55'5'5'55'5'5'5555'5'55'5'55555555'5'5'5'5'5'5'5'5'5'5'555555555555555555555555555555555555555555555555555555555555555555555555555555555555'5'5'5'5'5'55555555555555555555'5'5'5'55'5'55'55'5'55'5'5'5'5'5555555555ASASASASASASASASASASASASASASASASASASASASASASASASASASASASASASASASASASASASASASASASASASASAAAAAAAAAAAAAAAAAAAAAASASASASASASASASASASSASASASASASASASASASASASASASASASASAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAASASASASASASASASASASASASASASAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAASSSSSASASASASASASASASASASASASASASASASASSASASAAASASASASASAAAAAAASASAASAAASAASAAAAASASAAAAASASAAAASASASASASASASASASASASASASASASASASAAAAASASASASASASASASASASASASASASAAAAAAAAAAAAAAAAASAASASASASASASASASASASAAAAAAAAAAAAAAAASASASASAAASASASASAASASASASAAAASASAAAAAAAASASASASASASASASAASASASASASASASASASASASAAAASASAAAAAAASASASASASASASASASASASASASASASASASASASASASASASASASAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAASASASA BBBBBBBBBBBBBBBBBBBBBAAABABBBBBBBBBBBBBBBBBBB10'11010100111111100101101011101101110101010101010100101010101010100'00000000'0000'8' PERIMETER WALL8' PERIMETER WALLBBBAAAAAAAAAAABBBBBBAAAAAABBBBBAAAAABBBBBAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAABBBBBBBBBBBAAAAAAAAAAABBBBAAAABBAAAAAABBBBAAAABBBBBAAAAABBBAAAKKKKKKKKKKKKKKKKK2525252525'2525'55""""22555LSLSLSLSL22222222222222222222252222222222222""8"8""""5'-5'--55----8888888888888888888888888885'-5'-5-5--5'5''5'-5'55'55'-88888--88888855555558888888888888"8888"8"888""8"8"8888"8"8"""-----88888888888888------888888888888888888888888--00'0'00ETBETASEES0000000000000000000000000000000000000000000000000000000000000000010010000000000000000TBT111110100101000010101001010001010101001010101010101010TBTBBBBBBAAAAABBBBBBBBBBBBTBTBBBBBBBBBBBBBBBBBBBBBBBBBBBBAAAAAAABBBBBBBBBBBBBAAAAAAAAAAABBBBBBBBBBAAAAAAAAAAABBBBBBBBBBBBBBBBBBBAAAAAAAAAAAABBBBBBBAABBBBAAAAAA11011011011011111111111111111111111111111111111111111110110111111111111111010101010101010111111111111111111011010101101010111111111111111SETETETSESEESSINNNNNNSISISNNININNNSSIINNSSIINNNNNNNNNNNNNNNNNNSNNNNNEEENTNTTTTTTTTTTTENNNNNNNNNNNNNNNNNNTNNTNTNTTTTITTITTITTITIOOIOONTTNNEOOIIOOOOOTITITITITITTITITITIITTTTTTNNNNNNNNNNNNNNNNNNNTNTTTTNNNNNNNNIIIOOENIIETTTTTTTTTTTTTTNNNNNTTTITNNNIIIIOOONNNNNNNOONNONNNOOTNNTTTTNIITTIINNNNTTTTNNNNONNNNNNNONNNNNNNNNNNNNNNNNNNNTTNNNNTTTTTTTOTTTNNTTTTTNNNIINTTTTTTTTTTTTTTNNNTTEEEENTNNTTTTTOOOOONNNNNO BBBBBBBBAAAAAAAAAAAASSSSSSSSOOOOOOOOOOON BNNNNNNN BNNBNN BNNBBBBAABAAAAAAAAAAAAAAAAAAASSSSSSSSSSNSSSAAASSAAAAAAAAAABABBBBBBABABBBABBBABABAAAABBNNNNNNNNNNNNOOOOOOOOONNNNNOOOONNANNNAAAOONNBBBBBOBBBBSSSSBBOOOOSSBBBBNNOSBBBBNNNAAAANNNAAANAAAAANNAANNAAAAAANNNAAAANNAANNNAAAAAANNNNNNNAAAAAOOOOAAAOONOAAAAAANNOOOOAABBBOOOOOBBAAANNNOOOAABBOOSSOAAONNOAAASOOOOSSSSNAAAAASBABBANNNBBNBBBNNSSSSSSBBBNNSBBABBNNNSBBBBBOOONOOOBBBBBAAAAAAOO BAAAAAAOOAAASSPROPPPPEEROEROPPPPPEPPPPROPPPPPPTTTTTTT4444 "4 "44 "4 "''LLL ININLLIILLLINININLLLLIILLLLLININILLIIININININ ROPEOPEOPEPPPPPPPOPOPOPPEOPOPOPOPOPEOPOPEPOPOEOPEPOPOOOEOPEEEPEPEPEPEEEEEEEE Y YYYRTYYRTYRTYRTYYRRYRTYRTYRTYRTYRTYYRRTYRTYRRRRRYYYYYY P ROEEEERR Y OOOO EE RRR YYYEEERTTTRTRTRRTRTRTRTRRTRTRTRTRTRTRTRTRTRTTRTRTRTRTRTRRRTRTRRRRTYYYYYYYTYTYTYTYYYLYYYTYTYLYYLYTYLYYYTTTTTTLLLLLLL9T PPPPPPEECAEEEEEEEEEEEEEEEEEEEPPPPPPPPPPEEEEEEEEEEEEEEEEEEEEEEEEEEEECACTBTBTTTTTTTBTTTBTBTBTBTBBBBBTBTBBBBBBBBAAAAAAAACACAPPPPPPAPPAPPPPPPPPPPPPPPPPPPEEEEEEEEEEEPPPAAPCABBBBBBBBBBBAAAAAAAAAAABBBBBBBBBBBBBAAAAAAAAAAAAEEEEEEEEEEEEEEEPPPPPPPPPPPPPPPPPPPPPPPPPPPEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEPEEPPPPEEEEPPPPPPPPPPPPEEEEEKKKKKKKKKKKCKCKKKKKKKKKKKKKKAAACABBACKAACACACAAAACACACACACACACACACACACCCCCCCKCKCCKKACKACACACACACCCCCCCCCCCCCAACACACACACACACBACCCKCKCKCACCKCACACACCKCACACACACACCKACKCKACKACACCCKCKAACACCACACACACACACCKACACCCCCKCKCKCKCKKCKCKCKKKCKCKCKCKCKCKCKKCKCKCKCKCKCKCKCKCKCKCKCKCKCKKKKKKKKKKCKCKCKCKCKCKCKKCKCKCKCKCKCKCKKKKKCKCKCKCKCKCKCKKKKKKKKKCKCKKCKCKKCKCKCKCKCKCKCKCKCKCKCKCKCKCKCKCKCKCKKKKKCKCKCKCKCKCKCKCKCKCKCKCKCKCKCKKKKKKKKKKKCKKKCKKCKCKCKCKCKCKCKCKCKCKCKCKCKCK1111111118LOWWATER USESIZEQUANTITYSYMBOLPROSOPIS GLANDULOSA CHILEAN MESQUITEBOTANICAL NAME COMMON NAMEPLANT LEGEND624" BOX LOWACACIA GREGGII CATCLAW ACACIA8MODCHILOPSIS LINEARIS DESERT WILLOW 48" BOX74 LOWHESPERALOE PARVIFLORA RED YUCCA5 GAL76 LOWCALLIANDRA CALIFORNICA BAJA FAIRY DUSTER5 GALANGULAR GRANITE BOULDER - COLOR: GOLD6LOWLEUCOPHYLLUM FRUTESCENS TEXAS RANGER5 GAL32 LOWPEDILANTHUS BRACTEATUS TALL SLIPPER PLANT5 GAL@ 48" OC LOWACACIA REDOLENS 'DESERT CARPET' PROSTRATE ACACIA 1 GALEXISTING NATIVE LANDSCAPE TO REMAIN115 LOWBULBINE FRUTESCENS STALKED BULBINE5 GALANGULAR 4-6" COBBLE - COLOR: GOLDCITY OF PALM SPRINGS DESIGN GUIDELINE: 93.06.00 OFF-STREET PARKINGParking Lot Shading - 30% minimum shade (5-24 spaces)PARKING AREA = 1,836 SQ. FT. (11 spaces)SHADE REQUIRED = 551 SQ. FT.SHADE PROVIDED = 708 SQ. FT = 77%LANDSCAPE NOTESxALL LANDSCAPE AREAS TO BE IRRIGATED WITH AN AUTOMATIC IRRIGATION SYSTEM.xLANDSCAPING IS TO CONFORM TO ALL APPLICABLE CODES & ORDINANCES.xPROPERTY OWNER SHALL BE RESPONSIBLE FOR ALL ON-SITE LANDSCAPING AS SHOWN.xALL TREES WITHIN 5' OF HARDSCAPE TO HAVE A 12" DEEP LINEAR ROOT BARRIER.xALL PLANTER AREAS TO RECEIVE A 3" LAYER OF IN-ORGANIC ROCK MULCH. SEE LEGEND.xSOIL COMPACTION TO BE NO GREATER THAN 85% ON LANDSCAPE AREAS.xALL FINISH GRADES TO BE 1-1/2" BELOW FINISH SURFACE PAVING.2LOWOLEA EUROPAEA 'WILSONII' FRUITLESS OLIVE24" BOX36" BOX200 LOWDASYLIRION LONGISSIMUM MEXICAN GRASS TREE5 GAL32 LOWECHINOCACTUS GRUSONII GOLDEN BARREL CACTUS5 GAL1/2-1" GRAVEL MULCH - COLOR: GOLD* ALL PLANTS SELECTED USING THE "LUSH AND EFFICIENT LANDSCAPE GUIDELINES PUBLISHED BY THECOACHELLA VALLEY WATER DISTRICT.37 LOWYUCCA WHIPPLEI OUR LORD'S CANDLE 5 GALLANDSCAPE PERCENTAGEPROJECT AREA = 188,594 SQ. FT.LANDSCAPE AREA = 46,785 SQ. FT.PERCENTAGE = 24.8%SHADE CALCULATIONChilopsis linearis, 30' canopy @ 15 yrs. = 708 sq. ft. shade2 @ 50% shade = 708 sq. ft.- MULTI-TRUNK- MULTI-TRUNK- LOW BRANCHING- STANDARD TRUNK8LOWPINK DAWN CHITALPA 48" BOX- MULTI-TRUNKX CHITALPA TASHKENTENSIS'PINK DAWN'PRUNUS CAROLINIANA CAROLINA LAUREL CHERRY 165 MOD5 GAL1215' BTH MODWASHINGTONIA FILIFERA CALIFORNIA FAN PALM950 N. FARRELL DRIVEPALM SPRINGS, CASHEET 9NORTHCONCEPTUAL LANDSCAPE PLAN06.27.22030'15' 60'scale: 1" = 30'-0"LEGENDPRECISION BLOCK CAP (GRAY).116" TALL x 16" x 8" SPLIT FACE BLOCK (GRAY).2395018"6"4'-6"16'-0"12"3'-4"12"22'-0"12"2'-6"BEIGE STUCCO3RAISED METAL LETTERING44GRAY STUCCO556FINISHED GRADE6FRONT ELEVATION SIDE ELEVATION6231518"4'-6"6"SELF STORAGE ACACIA GREGGIIOLEA EUROPAEA PROSOPIS GLANDULOSACHILOPSIS LINEARISBULBINE FRUTESCENS CALLIANDRA CALIFORNICA DASYLIRION LONGISSIMUMLEUCOPHYLLUM FRUTESCENSECHINOCACTUS GRUSONIIHESPERALOE PARVIFLORAYUCCA WHIPPLEI950 N. FARRELL DRIVEPALM SPRINGS, CASHEET 10LANDSCAPE IMAGE BOARD06.27.22ACACIA REDOLENS 'PROSTRATA'PEDIANTHUS BRACTEATUSWASHINGTONIA FILIFERAPRUNUS CAROLINIANA ESL-1950 N. FARRELL DRIVEPALM SPRINGS, CAmjrichpe@gmail.com(208) 255-1600ELECT. ENGINEERSENGINEERING345 JACOBSON ROADSANDPOINT, ID 83864RICHARDSONRDS O NTSLECCIAOETAROFILACFTRLAERIERExp. 6-30-2023MICHEGISTREE12417CHALREDPJOFESSIONALAIENNGINEE R.REVIEWED 02/07/2022SITE LIGHTING PHOTOMETRIC PLAN07-16-2022SHEET 11GENERAL NOTES - SITE PHOTOMETRICS:SPECIAL NOTES:SITE LIGHTING PHOTOMETRIC PLANSCALE: 1"=30'-0"NORTH3.82.63.44.22.34.13.42.73.43.52.33.72.52.52.13.21.91.95.32.32.52.21.82.42.52.22.02.32.22.32.41.91.92.12.41.91.61.61.82.02.02.02.01.91.61.51.61.71.92.02.22.62.32.31.81.51.51.61.81.81.82.12.42.62.01.61.41.41.51.61.71.52.02.62.31.61.41.41.51.51.71.61.62.32.72.42.01.61.61.72.01.62.32.72.42.02.02.22.62.12.63.02.52.32.82.83.43.13.11.33.60.20.10.10.40.40.40.20.10.10.50.60.80.80.60.30.10.10.70.91.11.31.21.10.90.40.20.10.91.51.91.81.71.71.41.20.50.30.20.50.91.92.72.52.32.22.11.81.50.80.40.40.61.01.41.92.52.72.62.52.62.42.11.10.70.61.01.21.31.51.92.22.32.42.62.93.13.01.51.20.81.41.41.41.41.61.71.92.02.12.43.03.43.62.01.71.21.42.21.91.71.61.41.41.51.71.71.92.22.93.53.62.41.91.51.01.82.12.11.91.61.41.31.31.41.41.61.92.73.63.52.61.71.10.71.11.51.91.91.61.41.31.31.21.11.11.21.72.42.92.60.30.61.11.31.51.71.51.41.21.11.11.11.01.01.01.42.12.93.40.71.11.21.31.31.41.51.41.31.11.01.31.41.41.21.11.42.02.62.41.52.01.61.41.41.21.31.41.41.31.21.41.92.22.21.61.41.41.72.01.61.42.22.22.01.71.51.31.31.51.41.31.52.12.33.12.82.41.61.41.41.51.20.71.01.42.02.12.01.81.61.51.61.81.61.61.82.02.83.02.31.81.51.51.61.20.60.91.21.51.81.71.61.71.81.92.12.52.01.61.41.42.32.62.31.91.91.91.40.71.11.11.21.41.41.51.41.61.92.43.03.32.01.41.03.02.92.82.32.22.22.21.41.31.31.21.11.21.31.31.31.62.12.83.43.82.12.12.92.62.42.31.91.12.22.11.71.51.41.21.21.31.21.21.62.13.03.22.12.02.42.72.32.01.41.01.52.02.21.91.61.41.21.21.41.41.51.92.62.92.52.31.32.32.62.41.91.40.51.01.21.51.91.91.71.51.41.41.41.71.92.32.22.52.11.92.12.22.32.11.40.81.11.11.31.51.61.51.41.41.51.61.72.22.52.42.62.42.02.72.31.51.41.51.31.21.11.21.31.41.31.21.21.51.82.22.52.31.92.22.32.72.52.21.02.02.41.81.61.41.21.11.21.31.31.21.11.62.22.32.32.11.41.92.42.22.42.42.31.11.41.82.32.01.81.41.21.11.11.31.31.31.41.92.22.11.51.61.92.12.22.02.02.01.41.01.21.31.41.81.91.71.61.51.31.11.21.31.41.61.82.11.91.02.62.22.22.42.42.11.91.71.71.71.31.51.41.31.31.31.51.61.51.51.41.41.41.31.31.71.81.91.61.72.01.41.72.73.03.02.82.12.12.11.71.71.51.11.52.32.11.71.51.41.31.31.41.41.31.31.41.41.61.82.01.71.51.41.41.61.82.32.62.62.72.72.01.41.92.22.01.91.40.71.21.72.12.21.91.61.41.31.31.41.41.31.31.61.81.81.92.31.82.52.22.42.42.31.91.81.52.12.52.62.52.10.81.11.31.61.91.91.71.61.41.31.31.41.51.61.71.91.71.61.31.62.32.93.02.82.61.71.52.72.72.92.92.80.91.11.31.51.61.61.61.51.41.31.51.61.81.82.12.21.41.51.72.12.42.72.52.92.52.02.72.82.11.01.11.21.31.41.51.51.41.41.51.81.81.91.51.62.82.32.32.52.42.11.91.61.72.62.62.11.21.21.21.31.41.41.51.51.71.92.11.91.41.31.41.72.72.93.02.82.11.61.21.41.41.31.41.41.51.71.91.91.71.91.91.41.61.82.32.62.62.62.62.01.71.81.71.51.41.51.72.02.01.71.61.32.22.42.32.52.42.31.91.71.52.42.31.91.61.51.72.02.42.41.71.62.32.93.02.82.61.71.52.42.42.21.81.81.92.12.21.11.51.72.12.42.72.42.82.61.92.32.62.42.32.32.42.01.42.82.42.32.52.42.01.81.62.62.82.62.82.52.42.42.51.51.72.72.93.02.82.11.61.12.02.62.22.62.72.42.42.21.51.71.82.32.52.52.62.52.02.02.32.32.22.23.22.52.42.62.42.31.81.71.52.22.12.22.32.72.83.13.12.92.61.71.41.62.12.12.32.62.72.82.42.72.61.62.22.22.42.52.11.81.61.72.42.92.62.01.62.13.13.33.32.02.23.33.42.02.82.92.82.62.31.92.42.52.41.71.31.92.12.21.91.51.11.61.82.12.31.71.31.81.82.12.42.42.31.52.12.12.22.82.92.72.32.52.42.52.72.82.21.32.22.72.92.63.12.41.72.72.92.01.62.52.82.01.62.32.62.81.52.22.52.41.42.02.32.31.91.32.12.21.91.61.21.01.31.81.71.51.51.21.01.11.51.51.41.61.81.91.11.41.51.51.72.02.31.61.42.01.91.81.82.32.32.42.82.62.42.43.53.43.33.70.00.00.00.0 0.00.00.03.93.73.83.53.63.53.73.33.03.43.43.32.62.11.81.81.84.00.1 0.1 0.1 0.1 0.10.10.10.10.20.30.30.40.4 0.40.30.20.10.10.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.52.42.62.52.42.62.11.61.71.51.31.32.7 2.70.10.10.10.10.10.10.30.10.10.10.10.10.20.10.10.30.10.10.10.10.10.10.10.10.20.10.10.10.10.10.10.10.10.10.10.10.10.10.10.20.30.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.0 0.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.4WA @ 12'WA @ 12'WA @ 12'WA @ 12'PC @ 10'PA @ 18'PD @ 10'PA @ 18'WA @ 12'WA @ 12'WA @ 12' WA @ 12' WA @ 12'WA @ 12'WA @ 12'WA @ 12'WA @ 12'WA @ 12'WA @ 12'WA @ 12'WA @ 12' WA @ 12' WA @ 12' WA @ 12' WA @ 12'WA @ 12'WA @ 12'WA @ 12'WA @ 12'WA @ 12'PC @ 10'WA @ 12'WA @ 12'PB @ 20'PC @ 10'PB @ 20'WA @ 12'WA @ 12'WA @ 12'WA @ 12'WA @ 12'WB @ 12'WB @ 12'WB @ 12'WB @ 12'WA @ 12'WA @ 12'WA @ 12'WA @ 12'WA @ 12'WA @ 12'WA @ 12'WA @ 12'WA @ 12'WA @ 12'WA @ 12'WA @ 12'PA @ 18'WA @ 12'PE @ 20'PE @ 20'PE @ 20'PE @ 20'PE @ 20'PE @ 20'Plan ViewScale - 1" = 30ftStatisticsDescription Symbol Avg Max Min Max/Min Avg/MinCalc Zone #1-Entrance 3.1 fc 5.3 fc 1.9 fc 2.8:1 1.6:1Calc Zone #2-Parking public front of Gate2.1 fc 3.6 fc 1.3 fc 2.8:1 1.6:1Calc Zone #3-Parking, Drive, Storage area1.8 fc 3.9 fc 0.0 fc N/A N/ACalc Zone #4-Exit Only Gate 3.1 fc 4.0 fc 1.8 fc 2.2:1 1.7:1Calc Zone #5 0.1 fc 0.5 fc 0.0 fc N/A N/ACalc Zone #6-Sidewalk, SE 2.1 fc 2.7 fc 1.3 fc 2.1:1 1.6:1Calc Zone #7-Past Prop Line, Farrel Drive Side0.0 fc 0.4 fc 0.0 fc N/A N/AScheduleSymbol Label Quantity Manufacturer Catalog Number DescriptionNumber LampsLumens Per LampLight Loss FactorTotal Lamp LumensWattageWA46 Lithonia Lighting WDGE2 LED P3 40K 80CRI TFTMWDGE2 LED WITH P3 - PERFORMANCE PACKAGE, 4000K, 80CRI, TYPE FORWARD THROW MEDIUM OPTIC1 3166 0.79 3166 32.1375WB4 Lithonia Lighting WDGE2 LED P4 40K 80CRI TFTMWDGE2 LED WITH P4 - PERFORMANCE PACKAGE, 4000K, 80CRI, TYPE FORWARD THROW MEDIUM OPTIC1 4202 0.79 4202 46.6589PA3 Lithonia Lighting DSX0 LED P1 40K T4M MVOLTDSX0 LED P1 40K T4M MVOLT 1 4611 0.79 4611 38PB2 Lithonia Lighting DSX0 LED P3 40K T4M MVOLTDSX0 LED P3 40K T4M MVOLT 1 8268 0.79 8268 71PC3 Lithonia Lighting DSX0 LED P1 40K T5M MVOLTDSX0 LED P1 40K T5M MVOLT 1 4891 0.79 4891 38PD1 Lithonia Lighting DSX0 LED P1 40K T4M MVOLT HSDSX0 LED P1 40K T4M MVOLT with houseside shield1 3579 0.79 3579 38PE6 Lithonia Lighting DSX0 LED P3 40K T4M MVOLT HSDSX0 LED P3 40K T4M MVOLT with houseside shield1 6417 0.79 6417 71Luminaire LocationsNo. Label X Y ZLocationMH Orientation Tilt X YAimZ1 PA 412.21 489.58 18.00 18.00 180.00 0.00 412.21 489.58 0.003 PA 368.24 455.14 18.00 18.00 180.00 0.00 368.24 455.14 0.001 PB 378.35 60.26 20.00 20.00 0.00 0.00 378.35 60.26 0.008 PB 139.13 448.34 20.00 20.00 180.00 0.00 139.13 448.34 0.002 PC 461.47 447.79 10.00 10.00 338.00 0.00 461.47 447.79 0.003 PC 639.35 97.72 10.00 10.00 0.00 0.00 639.35 97.72 0.004 PC 628.98 134.11 10.00 10.00 0.00 0.00 628.98 134.11 0.001 PD 440.61 480.53 10.00 10.00 147.76 0.00 440.61 480.53 0.001 WA 353.26 412.63 12.00 12.00 58.02 0.00 353.26 412.63 0.002 WA 453.67 425.11 12.00 12.00 332.93 0.00 453.67 425.11 0.003 WA 400.09 396.26 12.00 12.00 332.93 0.00 400.09 396.26 0.004 WA 427.25 410.86 12.00 12.00 332.93 0.00 427.25 410.86 0.005 WA 327.73 413.97 12.00 12.00 330.00 0.00 327.73 413.97 0.0011 WA 251.72 413.84 12.00 12.00 330.00 0.00 251.72 413.84 0.0012 WA 225.52 453.13 12.00 12.00 180.00 0.00 225.52 453.13 0.0013 WA 275.52 453.13 12.00 12.00 180.00 0.00 275.52 453.13 0.0014 WA 325.52 453.13 12.00 12.00 180.00 0.00 325.52 453.13 0.0017 WA 252.71 344.91 12.00 12.00 240.00 0.00 252.71 344.91 0.0018 WA 281.22 292.12 12.00 12.00 240.00 0.00 281.22 292.12 0.0019 WA 304.28 270.48 12.00 12.00 240.00 0.00 304.28 270.48 0.0020 WA 323.29 235.28 12.00 12.00 240.00 0.00 323.29 235.28 0.0022 WA 361.31 164.89 12.00 12.00 240.00 0.00 361.31 164.89 0.0023 WA 380.16 130.00 12.00 12.00 240.00 0.00 380.16 130.00 0.0024 WA 398.27 138.35 12.00 12.00 150.00 0.00 398.27 138.35 0.0025 WA 421.85 98.71 12.00 12.00 0.00 0.00 421.85 98.71 0.0026 WA 471.85 98.71 12.00 12.00 0.00 0.00 471.85 98.71 0.0027 WA 521.85 98.71 12.00 12.00 0.00 0.00 521.85 98.71 0.0028 WA 571.85 98.71 12.00 12.00 0.00 0.00 571.85 98.71 0.0029 WA 621.85 98.71 12.00 12.00 0.00 0.00 621.85 98.71 0.0030 WA 469.15 135.73 12.00 12.00 150.00 0.00 469.15 135.73 0.0031 WA 505.79 155.38 12.00 12.00 150.00 0.00 505.79 155.38 0.0032 WA 533.39 137.90 12.00 12.00 240.00 0.00 533.39 137.90 0.0033 WA 592.54 156.82 12.00 12.00 150.00 0.00 592.54 156.82 0.0034 WA 548.44 133.08 12.00 12.00 150.00 0.00 548.44 133.08 0.0035 WA 586.39 192.03 12.00 12.00 60.00 0.00 586.39 192.03 0.0036 WA 596.97 171.68 12.00 12.00 60.00 0.00 596.97 171.68 0.0038 WA 315.16 394.54 12.00 12.00 240.00 0.00 315.16 394.54 0.0045 WA 270.18 411.27 12.00 12.00 60.00 0.00 270.18 411.27 0.0056 WA 410.74 89.29 12.00 12.00 270.00 0.00 410.74 89.29 0.0057 WA 342.30 200.09 12.00 12.00 240.00 0.00 342.30 200.09 0.0060 WA 164.34 456.71 12.00 12.00 270.00 0.00 164.34 456.71 0.0061 WA 338.92 350.55 12.00 12.00 240.00 0.00 338.92 350.55 0.0062 WA 293.95 367.28 12.00 12.00 60.00 0.00 293.95 367.28 0.0063 WA 362.68 306.56 12.00 12.00 240.00 0.00 362.68 306.56 0.0064 WA 317.71 323.29 12.00 12.00 60.00 0.00 317.71 323.29 0.0065 WA 386.44 262.56 12.00 12.00 240.00 0.00 386.44 262.56 0.0066 WA 341.47 279.29 12.00 12.00 60.00 0.00 341.47 279.29 0.0067 WA 410.21 218.57 12.00 12.00 240.00 0.00 410.21 218.57 0.0068 WA 365.23 235.30 12.00 12.00 60.00 0.00 365.23 235.30 0.0069 WA 433.97 174.58 12.00 12.00 240.00 0.00 433.97 174.58 0.0070 WA 389.00 191.31 12.00 12.00 60.00 0.00 389.00 191.31 0.0071 WA 457.66 130.70 12.00 12.00 240.00 0.00 457.66 130.70 0.0072 WA 412.68 147.43 12.00 12.00 60.00 0.00 412.68 147.43 0.001 WB 175.52 453.13 12.00 12.00 180.00 0.00 175.52 453.13 0.002 WB 222.61 398.15 12.00 12.00 330.00 0.00 222.61 398.15 0.003 WB 211.05 390.41 12.00 12.00 240.00 0.00 211.05 390.41 0.004 WB 234.70 346.71 12.00 12.00 240.00 0.00 234.70 346.71 0.004 PA 385.35 475.81 18.00 18.00 180.00 0.00 385.35 475.81 0.0073 WA 266.96 318.52 12.00 12.00 240.00 0.00 266.96 318.52 0.001 PE 309.97 112.35 20.00 20.00 61.91 0.00 309.97 112.35 0.002 PE 277.11 172.84 20.00 20.00 61.91 0.00 277.11 172.84 0.003 PE 238.02 232.64 20.00 20.00 57.00 0.00 238.02 232.64 0.004 PE 194.08 290.58 20.00 20.00 61.91 0.00 194.08 290.58 0.005 PE 151.52 341.48 20.00 20.00 50.00 0.00 151.52 341.48 0.006 PE 117.20 399.41 20.00 20.00 59.00 0.00 117.20 399.41 0.00 ESL-1950 N. FARRELL DRIVEPALM SPRINGS, CAmjrichpe@gmail.com(208) 255-1600ELECT. ENGINEERSENGINEERING345 JACOBSON ROADSANDPOINT, ID 83864RICHARDSONRDS O NTSLECCIAOETAROFILACFTRLAERIERExp. 6-30-2023MICHEGISTREE12417CHALREDPJOFESSIONALAIENNGINEE R.REVIEWED 02/07/2022SITE LIGHTING - LUMINAIRE CUT SHEETS7/06/2022SHEET 12TYPES PA, PB, PC, PD & PE POLE TOP LUMINAIRESTYPES WA, WB WALL MTD. LUMINAIRES ESL-1950 N. FARRELL DRIVEPALM SPRINGS, CAmjrichpe@gmail.com(208) 255-1600ELECT. ENGINEERSENGINEERING345 JACOBSON ROADSANDPOINT, ID 83864RICHARDSONRDS O NTSLECCIAOETAROFILACFTRLAERIERExp. 6-30-2023MICHEGISTREE12417CHALREDPJOFESSIONALAIENNGINEE R.REVIEWED 02/07/2022SITE LIGHTING - TITLE 24 & GREEN CODE COMPLIANCE7/06/2022SHEET 13& PE