HomeMy WebLinkAboutItem 3A - Public CommentMay 28, 2025
Sarah Yoon, Associate Planner/Historic Preservation Officer sarah.yoon@palmspringsca.gov
Department of Planning Services/ City of Palm Springs, California
3200 Tahquitz Canyon Way
Palm Springs, California 92263
Re: Opposition to Certificate of Appropriateness to build a house on the
Avery Field Cabin Ruins
Dear Ms. Yoon:
This firm has the privilege of representing a group of homeowners (Dan Bridge, Julie Jorgensen
and others) who live directly adjacent to the footprint of the proposed development on the
historic Avery Field Cabin Ruins, a Class 1 historic site located at the end of Santa Rosa Drive
(APN #513-193-001) (“Project”). Because the Project is proposed at a Class 1 Historic Site, the
developer is required to obtain a Certificate of Appropriateness from the City of Palm Springs,
Historic Site Preservation Board (“HSPB”).1 This letter is written in opposition to a Certificate
of Appropriateness for this Project. We request this letter be sent to all members of the HSPB.
The Project site and affected homeowners are identified below.
1 Palm Springs Municipal Code Section 8.05.110.C.1 “A certificate of Appropriateness must be issued by the HSPB
as the approval authority for demolition or major alteration to a historic resource.”
45-025 Manitou Drive, Suite 3 - Indian Wells, CA 92210
Phone 760.360.7666 Fax 760.262.3957
Rob@RobBernheimer.com
ROBERT A. BERNHEIMER
A Professional Law Corporation
Sarah Yoon
May 28, 2025
Page 2
At its May 6, 2025 meeting, the HSPB concluded that the Developer did not build a record that
would allow the HSPB to grant a Certificate of Appropriateness.” The HSPB continued its May
hearing until June 3, 2025 to allow the Developer to submit additional information.
I. Standards for Issuance of a Certificate of Appropriateness
Palm Springs Municipal Code Section 8.05.110.E establishes “Criteria and Findings for
Alteration of Class 1 and Class 2 Historic Resources.” These include:
“1. That the proposed alteration does not significantly impact or materially impair the
character-defining features of the historic resource as listed in the resolution for
historic designation, or, where a character defining feature may be impacted, the
proposed alteration minimizes that impact as much as possible;
2. That the proposed alteration will assist in restoring the historic resource to its original
appearance where applicable, or will substantially aid its preservation or enhancement
as a historic resource;
3. That any additions to the historic resource are consistent with the massing,
proportions, materials, and finishes of the existing historic resource…”
As set forth below, none of these criteria can be established and the Project should be DENIED
because it will:
1. Significantly impact or materially impair the character-defining features of the
historic resource.
2. Will NOT assist in restoring the historic resource to its original appearance.
3. Will NOT substantially aid its preservation or enhancement as a historic resource.
4. The Project is out of proportion with the massing of the historic resource.
For these reasons and those further identified below, the HSPB should deny the Certificate of
Appropriateness because the Developer has not met its required burden to “make a major alteration
to a historic resource.”
II. Significant Grade/Grading Challenges
A key issue of contention with this Project is that the closer the proposed home gets to the actual
ruins of the Avery Field House, the less impact the Project has on adjoining neighbors.
Complicating this is the fact that the current grade level of the Project lot is 8 feet higher than the
pad level of the existing homeowners, as shown below.
ROBERT A. BERNHEIMER
A Professional Law Corporation
Sarah Yoon
May 28, 2025
Page 3
Moreover, the current pile of rocks at the base of the Project site adjacent to Santa Rosa Drive is
not the original pad elevation of the lot. The grade is artificially mounded with debris and
boulders from the construction of the Historic Tennis Club.2 The site plan appears to continue to
incorporate the artificially elevated grade, which could lead to destabilization, increased erosion,
and potential damage to the ruin and surrounding properties.
One of my clients, Julie Jorgensen, spoke at the HSPB’s May meeting. She expressed concern
that siting the Project as far as possible from the cabin ruins has the effect of exacerbating the
considerable impacts such a large development would cause to her and her neighbors’ homes.
The Tennis Club homes of the neighbors are low-rise and are situated at street grade. The Project
is set at a much higher, mounded grade than the neighboring homes. Its proposed retaining wall
alone would rise 10 feet from the closest home, and its overall design rises more than 30 feet at
these neighboring homes’ fence lines.
The currently proposed grading will require extensive removal of natural vegetation, further
exacerbating erosion risks and destroying wildlife habitat. The plans do not adequately
2 See City of Palm Springs, Initial Study, TPM 36922, “The eastern side of the property appears to be disturbed and
can be attributed to the construction of the buildings in the tennis club property, from which large piles of boulders
may have been pushed into the project area. A dirt road runs along the eastern and southern project boundaries.”
ROBERT A. BERNHEIMER
A Professional Law Corporation
Sarah Yoon
May 28, 2025
Page 4
demonstrate how the development will incorporate and screen retaining walls, which are visually
intrusive and could disrupt the natural drainage patterns that protect the ruins.
It is likely that restoring the natural grade to this portion of the site, where the construction of the
house is proposed, would uncover a portion of the Historic Tahquitz Ditch, which was
constructed in the 1830s to bring water from Tahquitz Canyon to Palm Springs Village and the
original location of the tribal spa.3 If the development is to proceed, archaeological work should
be completed before initiating construction to ensure that the Tahquitz Ditch resource is
understood and given adequate historic protection.
The very minimal proposed setback exacerbates the massive visual impact to the neighboring
homes to the south. The extremely large footprint of the home, nearly 5000 square feet, together
with its proposed 24-foot height, atop a grade that is 6-8’ feet above the street and the neighbors’
grade, results in the neighbors’ homes being completely engulfed by the development.
These impacts affect the Avery Field Cabin Ruins, in addition to the neighboring, currently
occupied homes.
III. Drainage and Erosion Control, Geology and Soils.
The Project site also involves significant drainage challenges, even without further development,
given its unique place in the mountainside runoff drainage plan of the City of Palm Springs.
The historic Baristo Wash cuts through the site, offering an historic, beautiful, and sensitive habitat
for endangered species, and providing a critical, practical component of the entire City’s water
management plan, as water flows from the mountainside into the village.
The proposed drainage and erosion control measures are insufficient to handle the unique
challenges of this hillside site. Adding more than 5000 square feet of new hardscape, including
what appears to be a large driveway over the wash, will increase the water flow and speed through
the Baristo Wash, and will likely require engineered canals and reinforcements that will affect the
scenic, species habitat, and hydrologic roles of the wash.
Even at present, without the construction of the Project, the Baristo Wash is insufficient to control
existing storm runoff. Two adjacent homes located at 555 West Baristo Road Nos. 30 & 31, have
3 Explore Palm Springs: Water Ditches: Tahquitz Ditch, Whitewater Ditch brought water to Palm Springs in early
1900s, Palm Springs Life, April 30, 2015
ROBERT A. BERNHEIMER
A Professional Law Corporation
Sarah Yoon
May 28, 2025
Page 5
experienced runoff directly from the mounded portion of the site, onto the neighboring lawn and
to the home’s foundation, causing significant water damage and reconstruction expense.
Recently, a French ditch was constructed at the homeowner association’s expense, to ensure that
current runoff is safely directed offsite. Other neighbors experience flooding of their patios from
the wash during heavy rain.
The potential for increased runoff, erosion, and sedimentation from covering the bulk of the
buildable area of the site with hardscape poses a significant risk to abutting properties and the
natural environment. The development will increase the amount of impervious surfaces, leading
to a greater volume of stormwater runoff that is likely to overwhelm existing drainage systems and
cause flooding. The proposed erosion control measures do not adequately address the long -term
stability of the slope.
Additionally, it appears the site is within a rockfall hazard area. This requires the preparation of
a geotechnical investigation to determine the areas of potential rockfall, and whether any walls
will be required to protect the ruins and neighboring houses from rockfall.
New channels and significant walling are likely to be required in order to fortify the Baristo Wash.
These preventive measures could have impacts on the ruins. In order to protect the Historic
Resource from the development’s impacts on the dramatic mountainside hydrology, at a minimum,
the HSPB should confirm that the project will be required to comply with NPDES stormwater
regulations during construction, and it should confirm that Riverside County Flood Control and
Water Conservation District and the City of Palm Springs will assert flood control jurisdiction and
will require and oversee a detailed hydrology report to consider on and offsite impacts.
IV. Visual Impacts.
The Project’s size and placement on the lot will create a visually obtrusive structure that dominates
the site, rather than blending harmoniously with the neighboring development. The mass of the
building is not in keeping with the setting of the ruins and will negatively impact views from
surrounding properties. The sheer size of the proposed structure will block sunlight and mountain
views for the neighboring properties and the sightline of the ruins. The building’s proposed height
exceeds the allowable limits for hillside development if natural street grade is not restored prior to
construction, creating an unwelcome precedent for future projects.
ROBERT A. BERNHEIMER
A Professional Law Corporation
Sarah Yoon
May 28, 2025
Page 6
V. Adverse Impact on Biological Resources.
The Project will detract from the Historic Resource by creating significant impacts on sensitive
species, riparian habitat and wetlands, and it conflicts with established conservation plans.4 These
natural components are what drew Avery Field and the artists’ community to settle in this unique
setting and are relevant to the protection of the resource.
There are 16 special-status plant species that occur onsite. The Baristo Wash is “Desert Dry Wash
Woodland Habitat,” which is protected by both state and Federal standards. A 2018 study (the
“City Study”) conducted on the site by the City concluded that the Wash is protected by both State
and federal standards, and impacts to it would be significant.5 The City has concluded that
consultation and permitting processes with the California Department of Fish and Wildlife, the
U.S. Army Corps of Engineers, and the US Department of Fish and Wildlife Services would be
required, and the Developer must provide signed permits or confirmation that no permitting is
required.
A portion of the site falls within the Santa Rosa and San Jacinto Mountains Conservation
Agreement, which is preserved for Peninsular Bighorn Sheep, as shown in the Coachella Valley
Multiple Species Habitat Conservation Plan. The City Study concluded that the Developer would
also need to show that the quantity and quality of runoff discharged to the adjacent conservation
area is not altered in an adverse way, when compared to existing conditions, and that noise not
exceed 75 dba by setbacks, berms, and walls to minimize the effect on the adjacent conservation
area. It also specified that a biological monitor for Big Horn Sheep should be present during ground
disturbing activities.
VI. Fire Safety.
Development on this hillside lot raises serious fire safety concerns. Increased density, limited
access, and the potential for fire spread necessitate careful consideration, and the current proposal
does not adequately address these risks. The proposed development does not provide adequate
emergency vehicle access to the hillside, where the meeting of natural mountainside with intense
development creates new fire hazards. The lack of sufficient defensible space around the proposed
structure increases the risk of fire damage to both the new development and surrounding properties.
4 City of Palm Springs, Draft Initial Study/ Mitigated Negative Declaration, TPM 36922 / 7.1482AMM
5 Initial Study / Mitigated Negative Declaration, City Project No. TPM 36922 / 7.1482 AMM, April 2018
ROBERT A. BERNHEIMER
A Professional Law Corporation
Sarah Yoon
May 28, 2025
Page 7
VII. Conclusion
For all of the above reasons, a Certificate of Appropriateness should be denied for this Project.
Cordially,
Robert A. Bernheimer
Cc: Historic Site Preservation Board Members:
Jade Nelson, Chair
Erik Rosenow, Vice Chair
Kurt Bachman
Janet Hansen
Jeffrey Herr
Peter Moruzzi
Katherine Maschka-Hitchcock