Loading...
HomeMy WebLinkAbout2025-04-23 Item 2CFrom:Joy Brown Meredith To:City Clerk Subject:April 23, 2025 City Council Meeting Comment 2C Date:Tuesday, April 22, 2025 9:14:16 AM NOTICE: This message originated outside of The City of Palm Springs -- DO NOT CLICK on links or open attachments unless you are sure the content is safe. Re: Public Hearing 2C On behalf of many businesses in Downtown Palm Springs, I'd like to add our comments regarding the discussion of the Fee Schedule. When temporary free-standing signs were finally allowed, after over 2 years of discussions, it was a big win for the small businesses of Palm Springs - especially retailers who were previously not allowed any outdoor signage. But some of the rules still needed to be ironed out. One thing that was added later on was the need for a LUP to be able to place the sign on public property in front of businesses. The LUP in itself was not a problem. We all want everyone to be safe by not creating any hazards with the signs. However, at some point the fee increased greatly to over $500 because it was decided a City Engineer would be required to make a site visit to the business rather than allowing a photograph and diagram to be submitted at a much lower rate. This fee is very hard on small businesses. Please consider a smaller fee for this LUP. Thank you. Joy Brown Meredith Founder, Crystal Fantasy since 1987 268 N Palm Canyon Drive Downtown Palm Springs CA 92262 760-322-7799 www.CrystalFantasy.com President, Main Street Palm Springs 760-333-6820 www.PalmCanyonDrive.org 04/23/2025 Public Comment Item 2C