Loading...
HomeMy WebLinkAbout2019-3753F PALM SA City of Palm Springs Community Development Department U cn Building & Safety Division CORPORMto * 3200 East Tahquitz Canyon Way, Palm Springs CA 92262 IFORN\ P PO Box 2743, Palm Springs CA 92263 Tel 760.323-8242 • Fax 760.322.8342 • TDD 760.864.9527 www.palmspringsca.gov May 18, 2021 Re: Change of Street Name from Avalon Way to Miralon Way within the Miralon Development in the City of Palm Springs To Whom it May Concern: Per Resolution No. 24366 (copy attached), the City of Palm Springs approved changing the street name of Avalon Way to Miralon Way within the Miralon Development. All street numbers remain the same. Please change your records accordingly. The following agencies are being notified of the change: Address Management Systems; Chamber of Commerce; County Assessor's Office; Desert Water Agency; Registrar of Voters; Riverside County 911 Coordinator; Southern California Edison; Southern California Gas Co; US Postal Service; Verizon; Waste Disposal Services; Waste Water Treatment Plant and affected City Departments (Police, Fire, Finance). Sincer, ly, AlbpOfficial O Bui Building & Safety Division AG:sd Enclosure RESOLUTION NO. 24366 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PALM SPRINGS, CALIFORNIA, APPROVING A REQUEST OF A STREET NAME CHANGE FROM AVALON WAY TO MIRALON WAY WITHIN THE MIRALON DEVELOPMENT LOCATED AT 801 SUNRISE PARKWAY. THE CITY COUNCIL FINDS AND DETERMINES AS FOLLOWS: A. On November 1, 2017, developers of Miralon project submitted a Street Name Change application to the Department of Planning Services, requesting that the name of Avalon Way be changed to Miralon Way. B. On December 13, 2017, the Planning Commission received a report from the Department of Planning Services regarding the proposed street name change pursuant to the requirements of the City Palm Springs Municipal Code (PSMC) Chapter 14.08. C. On December 13, 2017, the Planning Commission conducted a noticed public hearing, and considered the proposal to change the name of Avalon Way to Miralon Way within the Miralon development. D. The Planning Commission carefully reviewed and considered all of the evidence presented at its meeting of December 13, 2017, including but not limited to the staff report and all written and oral testimony presented. E. On December 13, 2017, at the public hearing for said street name change, the Planning Commission voted 5-0 to recommend approval to the City Council. F. On February 7, 2018, a public hearing on the proposed street name change was held by the City Council in accordance with applicable law. The City Council carefully reviewed and considered all of the evidence presented in connection with the hearing on the project, including, but not limited to, the staff report, and all written and oral testimony presented. G. Pursuant to the California Environmental Quality Act (CEQA) Guidelines, a Mitigated Negative Declaration (MND) was previously adopted by City Council on May 5, 2004 and a Notice of Determination (NOD) was filed. An Addendum to the MND was prepared in 2016 and determined that the Amended Project will not result in any new significant environmental impacts or substantially increase the severity of previously identified significant impacts as compared to the previously approved project. Furthermore, the Addendum concludes that none of the conditions described in Section 15162 of the CEQA Guidelines calling for preparation of a subsequent MND have occurred and therefore the Addendum to the MND is appropriate to satisfy CEQA requirements for the Amended Project. The proposed street name change request Resolution No.24366 Page 2 would not result in any new environmental impacts beyond those already assessed in the previously adopted MND. THE CITY COUNCIL OF THE CITY OF PALM SPRINGS, CALIFORNIA, RESOLVES: Based upon the foregoing, the City Council hereby approves changing of Avalon Way to Miralon Way within the Miralon development Case No. 5.09821 TM 31848 SNC. ADOPTED THIS 7T" DAY OF FEBRUARY, 2018. David H. Ready, E D. City Manager ATTEST: A-ntfivony J. City Clerk Resolution No. 24366 Page 3 CERTIFICATION STATE OF CALIFORNIA ) COUNTY OF RIVERSIDE ) SS. CITY OF PALM SPRINGS ) I, Anthony J. Mejia, MMC, City Clerk of the City of Palm Springs, hereby certify that Resolution No. 24366 is a full, true and correct copy, and was duly adopted at a regular meeting of the City Council of the City of Palm Springs on the 7 day of February, 2018, by the following vote: AYES: Councilmembers Holstege, Kors, Middleton, Mayor Pro Tern Roberts, and Mayor Moon NOES: None ABSENT: None ABSTAIN: None IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of Palm Springs, California, this 4- day of 0, t bny lei C City Clerk teaL aA City of Palm Springs BUILDING PERMIT I1470 Building Address: 4097 Avalon Way Date 09/24/2019 Case No. Permit Kim Floyd Submitted Technician Owner Address Phone Avalon 1150,LLC 500 Boylston St Ste 2010 961 892 7769 Boston MA Contractor Address Phone Lic.Number Lindly'sPools 30766 Desert Palm, 1-000 Palms 760)343-0600 833313 Architect Address Phone Engineer Address Phone Lot# Block# Tract Parcel Number 31848 669-330-016 Lot Size Zone Occupancy Building Sq.Ft. Garage/Carport Roofed Patio/Porch Remodeled Area Addition Use of building Permit Type Const.Type Fixture Units commercial New Pool/Spa Fire Sprinkler Units Valuation Permit Fees Paid 120000.00 889.44 Describe work in detail: Spa, Miralon Amenity Center.& Pursuant to whenever a building permit is issued for the remodel or modification of a single family home with an existing swimming pool or spa, the permit shall require that the suction outlet be upgraded so as to be equipped with all approved anti-entrapment cover. Overhead conductor clearances SHALL comply with NEC Table 680 Special Conditions: Compliance with Swimming Pool Safety Article 7 required at encapsulation inspection. DO NOT CONCEAL OR COVER ANY CONSTRUCTION UNTIL THE WORK IS INSPECTED IMPORTANT The issuance of this permit shall not be held to be an approval of the violation of any provisions of any city or county ordinance or state law. Inspections of work are subject to an approved set of plans being on the job. Changes to plans are not to be made without permission of the Building and Safety Divisions. The owner and/or contractor is responsible for establishing all property lines. All utilities must be underground. This permit will expire if work is not started in 180 days or if more than 180 days elapses between inspections. I certify that I am familiar with all requirements of the City of Palm Springs as they apply to this permit and understand that these requirements must be completed prior to fina.P%pection and that no certification of occupancy will be issued until such time as these requirements are met. I certify that I have read this application a d s to that the information is true and correct. O ER/CONTRAC bR/AGENT DATE ISSUE BY Finaled This a building permit when properly filled out,signed and validated,and is not transferable. PERMITNUMBER 20ly-3753 PALM S, INSPECTION INFORMATION No work shall be concealed without a signature by the fir 0IR ' p inspector. The approved plans and this card must always be available to the inspector. Preserve this record. permit issued shall become invalid after 180 days JOB CARD Every pe t y unless a required inspection has been approved. Furthermore, permits expire when more than 180 days Project address:4097 Avalon Way has elapsed from the date of the last approved required inspection. Permit#: 2019-3753 Inspection hours 8AM-4PM Monday-Thursday Inspection request line(760)323-8243 CONSTRUCTION HOURS Building Department(760)323-8242 Weekdays 7am to 7pm Building Department Fax(760)322-8342 Saturdays 8am to 5pm Sundays & Holidays Not Permitted SWIMMING POOLS INSPECTIONS !I )) 9 Steel, Bonding, Setbacks: azz/Q d l4 JOB NOTES: pdv(" 0- Underground Piping&Electric: p uL Ci /21 coE" 1 6414A p lG 7 v Gas Pressure Test: DO NOT GUNITE UNTIL THE ABOVE IS SIGNED Equipotential Bonding:V arriers/Alarms/Encap: G 1 44,mw-t1GZOOLy! DONOTP STERUNTILABOVEISSIGNED GleDf w/4PI R LAL S NL'( !y ..s'1a TU-a- f PLt Final: Compliance with Swimming c1 Pool Safety Standard required zltrzl %, at encapsulation inspection. tfti `ti9-ut6f Pursuant to Health & Safety's 115920-115929,whenevera building permit is issued for the remodel or modification of a single family home with an existing swimming pool or spa, the permit shall require that the suction outlet be upgraded so as to be equipped with an approved anti-entrapment cover. Overhead conductor clearances shall comply with NEC Table 680-8 o+ „ LM fw BUILDING PERMIT APPLICATION zc FOR BLOCK WALLS, POOLS, REROOFS, & REPIPES DATE: Project Address Owner's Name 1kr1)Q `-`. Phone# Owner's Address Contractor's Name OW CP (A i1<01 Phone# Contractor's Address O Lic.# Engineer's Name Phone# Engineer's Address Lic# CONTACT PERSON Address Phone# Walls-Height of Wail Length of Wall Front Set Back Re-roofs-S.F. of Roofs t. of ateDrial ES (ICBO) Report/UL Listing Project Description ''`^' 4 A Total Value of Work$ Opme WHERE INDICATED BY A CHECK, SUBMIT 3 SETS Minimum size of pool plans 11"X 17" Minimum scale '/" =1') Plot Plan with lot square footage. Waste, Drain & Vent Isometric. Planning/Eng. Department Approval. Water Piping Isometric, dimensioned. Structural Calculations, if applicable. Gas Piping Isometric: Show BTU ratings of Roof or Truss Eng., if applicable. each appliance on all branches, distance Plan for Pool with Wet Stamp from Engineer. and placement of longest run &total BTU for entire system. SITE PLAN FOR POOLS MUST BE COMPLETE: MUST SHOW ENTIRE SITE, PROPERTY LINES, BUILDING FOOTPRINT, NORTH ARROW, LEGAL DESCRIPTION AND PROPER ADDRESS. County of Riverside DEPARTMENT OF ENVIRONMENTAL HEALTH Supplemental Report to SAN. frm # Date 11-19-19 Subject Miralon/Ambassador Drive, Palm Springs Service Request# 40507 Inspector J. Dubin REMARKS Spa pre-gunite inspection: All piping observed as per plan at this stage. Main drain and skimmer equalizer line "T" splits observed. 1. Provide a drywell sizing approval prior to the final. Le. City stamp, etc. Spa is approved to backfill/gunite. Not approved to plaster or operate. Emailed to: lindly1 @hotmail.com 11-19-19 JD DEH-SAN-118(Rev 2/16)