Loading...
HomeMy WebLinkAbout2020-3927_Cml AltAddDocuSign Envelope ID:A1637012-OA3C-4525-948WA694ADF3C Palm Springs BUILDING PERMIT Building Address: 6000 Palm Canyon Dr E MASTER Date 12/01/2020 Case No.: Permit Jennifer Aguilera Submitted Technician Owner Address Phone El Dorado Palms Estates 6000 E Palm Canyon Dr 760 328 2815 Palm Springs CA Contractor Address Phone Lic. Number Bert Ponce Contracting 32010 Oakland Hills St 760 578 3188 Thousand Palms CA Architect Address Phone Engineer Address Phone Lot# Block# Tract Parcel Number SEENOTE + 681-320-010 Lot Size Zone Occupancy 2168417 Building Sq.Ft. Garage/Carport Roofed Patio/Porch Remodeled Area New 0 0 0 0 Use of building Permit Type Const.Type Fixture Units Commercial Commercial Add ition/aIteration Removed 33 fixture units, Fire Sprinkler Units Valuation Permit Fees Paid replaced with 27 fixtureunits. Credit of 6035000.00 2036.59 remains. Describe work in detail: Remodel (2) existing bathrooms to meet accessibility requirements. Special Conditions: DO NOT CONCEAL OR COVER ANY CONSTRUCTION UNTIL THE WORK IS INSPECTED IMPORTANT The issuance of this permit shall not be held to be an approval of the violation of any provisions of any city or county ordinance or state law. Inspections of work are subject to an approved set of plans being on the job. Changes to plans are not to be made without permission of the Building and Safety Divisions. The owner and/or contractor is responsible for establishing all property lines. All utilities must be underground. This permit will expire if work is not started in 180 days or if more than 180 days elapses between inspections. I certify that I am familiar with all requirements of the City of Palm Springs as they apply to this permit and understand that these requirements must be completed prior to final inspection and that no certification of occupancy will be issued until such time as these requirements are met. I certify that I have read this application and state that the information is true and correct. Ds DocuSigned by: 6ktt Ini 2/24/2021 a P3ER7010 FRACTOR/AGENT DATE ISSUED BY Finaled 1` 6 204— This is a building permit when properly filled out,signed and validated,and is not transferable. PERMIT NUMBER 2020-3927 INSPECTION INFORMATION n „ay No work shall be concealed without a signature by tr tat the inspector. The approved plans and this card must always be available to the inspector. Preserve this record. JOB CARD Every permit issued shall become invalid after 180 days unless a required inspection has been Project address: 6000 Palm Canyon Dr E MASTERapproved. Furthermore, permits expire when more Y than 180 days has elapsed from the date of the last approved required inspection. Permit #: 2020-3927 Inspection hours 8AM -4PM Monday-Thursday CONSTRUCTION HOURS Inspection request line(760)323-8243 Building Department(760)323-8242 Weekdays lam to 7pm Building Department Fax(760)322-8342 Saturdays 8am to 5pm Sundays & Holidays Not Permitted GENERAL BUILDING INSPECTIONS JOB NOTES: Temp Power Setbacks Pad /Location Certification Ground Plumbing Zl DO NOT COVER UNTIL THE ABOVE IS SIGNED Footings DO NOT POUR CONCRETE UNTIL ABOVE IS SIGNED Sub Floor Roof Nail Shear/OK to Wrap DO NOT COVER UNTIL THE ABOVE IS SIGNED HVAC Ducts Top-Out Plumbing Rough Electric31 Framing 3l 1 Rough Sprinklers SEWERSKETCH: DO NOT INSU ATE UNTIL THE ABOVE IS SIGNED nsu Fation k- Drywall L3 ath Shower Pan Gas Pressure Sewer & Sketch Planning Release Fire Release Eng/Grade Encroach Final Electric Final Gas Final V.. F t ce 'Z C/O Issued