RRRCITY OF PALM SPRINGS MEASURE J COMMUNITY INITIATED PROJECTS APPLICATION FORM Name of Applicant: Michael Hinkle Date Submitted: 9/26/2024 Applicant Type: Non-Profit Organization Name of Organization: Palm Springs Art Museum If yes, provide IRS ID# Tell us about your project: 1.Project Name: PSAM Elevator Replacement 2.Project Address: 101 Museum Drive, Palm Springs 3.Project Type: Grant 4.This project improves: Business Community, Downtown Enhancements, Historic Preservation, Sustainability/Conservation, Tourism 5. What demographic(s) does this project serve? Children/Students, Entire PS Community, Individuals with Disabilities,LGBTQ+ and Seniors 6. Estimated project cost: $366,300.00 7. Short description of proposed project. The Palm Springs Art Museum seeks to replace its aging elevator with a modern, eco-friendly, and universally accessible system. This upgrade will enhance visitor comfort, particularly for individuals with disabilities and mobility challenges, while supporting the museum's commitment to sustainability. The new elevator will feature advanced accessibility, energy-efficient technology, and a design that complements the museum’s architecture. It will incorporate eco-friendly materials and low-emission components, ensuring environmental goals are met. This necessary upgrade will improve functionality, accessibility, and infrastructure, supporting the museum’s long-term plan and growing, diverse audience by providing reliable access to all floors. Applicant’s information: Name of Contact Person: Michael Hinkle Contact Person’s Phone Number:(760) 322-4897 Contact Person’s Email Address: mhinkle@psmuseum.org From:Michael Hinkle To:Melissa Sanchez Subject:Supplemental Documentation for Measure J Application - PSAM Elevator Replacement Date:Monday, December 23, 2024 10:08:27 AM Attachments:Palm Springs Art Museum Passenger Elevator FRB MOD.pdf NOTICE: This message originated outside of The City of Palm Springs -- DO NOT CLICK on links or open attachments unless you are sure the content is safe. Dear Melissa and the Measure J Oversight Commission, Thank you for the opportunity to provide the detailed proposal for the PSAM Elevator Replacement project at Palm Springs Art Museum. Please see attached. We are grateful for your consideration of support for this critical infrastructure project. Wishing you safe and happy holidays. All my best, Michael Michael Hinkle Associate Director of Development 760-332-4897 Office 760-989-2212 Mobile KONE Internal Proposal for Palm Springs Art Museum Pass FRB KONE People Flow Solution Proposal 03/12/2024 2(19) www.kone.us Palm Springs Art Museum Pass FRB KONE Internal KONE Inc. Orange Cty / Riverside Office 1540 Scenic Avenue, Suite 100 Costa Mesa, California, 92626 Mobile +1 17146996030 Work +17148907080 don.sterling@kone.com www.kone.us 1. Proposal We are pleased to enclose, for your review and consideration, KONE's proposal to fully replace your equipment located at the following address: 101 Museum Drive, Palm Springs, California. ● This proposal is based on 2025 installation. ● This proposal is valid for (30) days. ● Anticipated downtime: 11 weeks per unit for full replacement. The existing equipment, as outlined below, will be replaced in accordance with the explanation provided herein. Where additional items are made a part of this Proposal, a complete description is provided. Where existing equipment and/or systems are not mentioned, the intent of this Proposal is to reuse said item(s) "as is". The KONE solution includes design, manufacturing, supply and installation of the following: Elevator Equipment name Solution Capacity/Speed Landings/Entrances Price MKOF FRB MonoSpace 500 23.2-1 1 x KONE MonoSpace 500 DX 4000 lbs / 150 fpm Landings: 5 Entrances: 3 front / 2 rear $ 366,300.00 Building 1 Total $ 366,300.00 Total Sales Price, net including TAX $ 366,300.00 2. Validity of proposal If provided, our proposal is based on the architectural drawings and specification (Division 14) and meets the general intent of the project. In case of any differences or contradictions between the contents of the documents contained in KONE's Tender Document, the Project Drawings or the Project Specifications, the KONE Tender Document shall prevail. Pricing is based on the contents specified in this Proposal and the appendices and Bid Attachments, which are incorporated into this Proposal (the “Proposal”). Contract terms shall be in accordance with Bid Attachment “A” / KONE Inc. General Terms and Conditions and Bid Attachment “B” / Site Safety Requirements / Work by Others, which are incorporated by reference. The pricing included in this Proposal is submitted with the understanding that all documents referenced and incorporated will be signed without modification. In the event of conflicts or inconsistencies between this Proposal and any other contract document, this Proposal shall supersede and prevail. This Proposal is valid for 30 days. Please know that we are available to assist you in coordinating the work by others as further described in our “Bid Attachment B“. Should you have any questions or require additional information, please feel free to contact me directly. We look forward to hearing from you and working together on this project. Yours sincerely, 3(19) www.kone.us Palm Springs Art Museum Pass FRB KONE Internal 4(19) www.kone.us Palm Springs Art Museum Pass FRB KONE Internal 3. Your Solution Elevator Technical Specification MKOF FRB MonoSpace 500 23.2-1 Base solution KONE Solution KONE MonoSpace 500 DX Machinery location Guiderail-mounted in overhead of hoistway Capacity (lb) 4000 Speed (fpm) 150 Travel height (ft) 46 ft 0 in Stops 5 Front entrances 3 Rear entrances 2 Control system Full collective Simplex IBC seismic design Category D Design Spectral Response (SDS) 1.2 Value (IP) (SDS) 1.8 Regulations ASME A17.1-2004 KONE Environmental Product Declarations https://www.kone.com/en/products-and-services/green-building/lifecycle-impact-assessments/ Shaft construction Shaft size (W x D) (ft) 9 ft 5 in x 8 ft 7 in Pit depth (ft) 4 ft 0 in Clear Height under Ceiling (ft) 16 ft 1 in Headroom Bracket attach type B side Welded to vertical steel (13) Headroom Bracket attach type D side Welded to vertical steel (13) Mechanical components & machinery Power supply, machinery (V / Hz) 480 / 60 Car and doors Car size (WxDxH) (in) 6 ft 7.9213 in wide x 6 ft 6.7402 in deep x 8 ft 0 in high Door opening dimensions (WxH) (ft) 4 ft 0 in x 7 ft 0 in Controller location Adjacent Right 5th floor, front opening 5(19) www.kone.us Palm Springs Art Museum Pass FRB KONE Internal Design Group 1 - MKOF FRB MonoSpace 500 23.2-1 Do you want to see the design in 3D view? Click below Rear and Side walls Front and Side walls https://cardesigner.kone.us/#/doc/4a97c2cd-fd58-445b-83b4-3315293498f6 Materials and design Please note that all images are for illustration purposes only. Some differences to actual product delivered may exist. Elevator MKOF FRB MonoSpace 500 23.2-1 Car walls Macchiato Walnut (6932-NT Formica) or other KONE standard laminate Front wall #4 Brushed Stainless Steel, pan type door Ceiling Round, LED spotlights (CL88) #4 Brushed Stainless Steel Flooring by others Maximum floor thickness: 1 in Maximum floor weight: 3 lb/ft2 Handrail Round, straight ends (HR61) #4 Brushed Stainless Steel Handrail on side walls Skirting #4 Brushed Stainless Steel Car Fan Fan Required Protection pads KONE standard pads and hooks included 6(19) www.kone.us Palm Springs Art Museum Pass FRB KONE Internal Door type Single-speed, center-opening Entrance equipment The existing hoistway entrances and hoistway door panels shall be retained and reused in place. Door material #4 Brushed Stainless Steel Sill material Aluminum Number of car operating panels (COP) 1 COP details Dot matrix Flush #4 Brushed Stainless Steel Vertical (VER) Media screen all in 1 (CM3) Jamb mounted destination indicator Car Lantern (jamb-mounted) included Signalization Series KSS570 series signalization Additional Options 24/7 Emergency Communications Yes Hall/Lobby panel included No Hazard Avoidance Emergency battery drive Emergency battery drive included Operation of car ventilation KONE Standard Fan Regenerative drive Yes Landing Floor Marking Landing Sill Material Finish Entrance Frame type Hall Lantern / Position Indicator 5 Rear 3 Retained Retained None 4 Rear M Retained Retained None 3 Front 2 Retained Retained Lantern / Position Indicator 2 Front M1 Retained Retained Lantern / Position Indicator 1 Front *1 Retained Retained Lantern / Position Indicator 7(19) www.kone.us Palm Springs Art Museum Pass FRB KONE Internal 4. Project-Specific Clarifications This proposal includes provisions for KONE 24/7 Emergency Video Communications, which fully meets the intent of IBC 2018 and ASME A17.1 2019 code. In addition to the two-way audio communication, it allows for text-based two-way communication between the elevator cab and the KONE Customer Care Center as well as means to visually verify if the cab is occupied when an emergency call is placed. This solution is turn-key and code compliant, and includes the following: ● Hardware that enables audio and text-based two-way communication and video into the elevator cab, including touchscreen mounted in the car operating panel, camera, and all related wiring ● Wireless communication to KONE Customer Care Center is provided by KONE. No additional data and voice network or phone line is required to be provided by others ● 4-hour battery backup of both of in-car communication devices, wireless data, and voice network ● 24 hour-a-day, 7-day-a-week monitoring of elevator by KONE Customer Care Center A valid service contract with KONE, including KONE 24/7 Emergency Video Communications and KONE 24/7 Connected Services, must be active. These services are included in the proposal for the duration of the warranty maintenance period. The KONE 24/7 Emergency Video Communications contract addendum and General Terms and Conditions for KONE Digital Services, , which define the fees for the audio, video, and data connections, must be signed by the Building Owner. The payment obligation, among other provisions, survives termination of any maintenance agreement. Sufficient AT&T or Verizon cellular in the United States, or Rogers Roaming in Canada, connectivity in the control space and a dedicated 110V disconnect are required to be provided by others to enable KONE 24/7 Emergency Video Communications. 8(19) www.kone.us Palm Springs Art Museum Pass FRB KONE Internal 5. Why KONE? KONE in brief KONE is a global leader in the elevator and escalator industry. Our versatile product portfolio features a wide range of innovative products including elevators, escalators, and autowalks. You are supported by our broad district and branch network across North America. KONE MonoSpace® Replacement of in-ground hydraulic elevator system(s) or geared traction elevators systems(s) with a flexible machine room-less traction elevator solution offers many benefits: ● Excellent eco-efficiency – oil-free hoisting technology, lighting and standby solutions for energy efficient operation. ● Superb ride comfort – smooth and quiet operation in compliance with our strict ride-comfort standards. ● Versatile design - a broad set of attractive materials and accessories to create the perfect interior for your elevator adds to your building's value. KONE 24/7 Connected Services – improved safety, full transparency, and peace of mind KONE elevators can be equipped with KONE 24/7 Connected Services. This solution allows our teams to predict issues and act before a shutdown occurs. For our customer and building tenants, it means improved reporting and communication on maintenance work with full transparency and ease of mind. Read more at kone.us/connected 9(19) www.kone.us Palm Springs Art Museum Pass FRB KONE Internal 6. Ensuring Project Success Project Schedule Overview This Proposal is conditioned upon KONE's standard installation methodology and all work performed during normal business hours, excluding IUEC (International Union of Elevator Constructors) holidays. The following schedule is proposed: Preparation of Submittals 2 weeks From receipt of contract and first payment. Contract Review 6 weeks From receipt of full contract package. All referenced documents required. Approval of Submittals TBD Mutually agreeable time to incorporate changes to the layout and approve the submittals. Approval of Submittals means notification in writing, by the Customer or Customer's Agent, that all submittals are approved, and manufacturing may commence. All finishes and features are to be confirmed at the time of submittal approval. Manufacturing and Delivery 15 weeks From receipt of submittal approval and an executed contract. KONE’s policy is to release equipment to Manufacturing after the contract is fully executed by both parties. Note: KONE's factory has two-week shutdown over the months of July and December. Any manufacturing duration that falls during these months shall add two weeks to the manufacturing time. Delivery times may be extended due to delays caused by measures undertaken to stop the spreading of the Coronavirus (2019-nCoV) epidemic, availability of personnel, logistics providers, and supply chains. Notice to commence on site and site check 2 weeks Prior to starting the installation, KONE requires a two-week notice to inspect the site to ensure it fulfils the requirements set by KONE for commencing installation. Site Check will be performed in the two weeks before installation begins. Installation 10 weeks Only after the site has passed the Site Check inspection, the installation can start. Duration is per unit. If multiple units need to be installed at the same time, a Foreman will be required at additional cost - based on availability. Testing and Commissioning 1-2 weeks Clean 3-phase power, active phone line to the controller, and all life safety provided by others is required prior to testing / commissioning. 10(19) www.kone.us Palm Springs Art Museum Pass FRB KONE Internal Site Preparation KONE requires the following conditions fulfilled two weeks prior to commencement on site. Please see Bid Attachment “B” / Site Safety Requirements / Work by Others for more detailed site requirements. These conditions will be verified during the site readiness visit. Adequate access for delivery of elevator material + clean/dry 21’ x 56’ storage space per elevator. The hoistway, pit, and machine room must be clean, dry, and constructed per the approved KONE final layout drawings. Any required support for guide rail brackets, divider beams and divider screens from pit floor to the top of the hoistway will be provided by others. Note: bracket support points may be required between floors. The hoistway must be plumb according to tolerances listed on KONE Final approved layout drawings. Removable, OSHA approved barricades must be provided around all hoistway openings. Provide and install full entrance protection, made of nylon mesh or reinforced plastic at all hoistway openings per OSHA 1346 1926.502(j). Design and install entrance protection in such a way as to allow quick accessibility in and out of the hoistway. Permanent or temporary three-phase and single-phase power of permanent characteristics with disconnect switches. A hoist beam and safety beam (furnished by KONE) must be cut to size and installed in the elevator overhead per the approved KONE final layout drawings (hoistbeam capable of supporting the load requirement noted in our shop drawings). Applicable work areas must have adequate lighting. Finished floor marks must be visible from the hoistway openings at all landings. Warranty / maintenance Our Proposal includes 12 months of KONE standard maintenance with KONE 24/7 Connected Services, including regular time callback service. Under no circumstances shall indicators or predictions from KONE 24/7 Connected Services be cause for immediate services. They shall be addressed upon the next scheduled maintenance visit, or otherwise at the sole discretion of KONE. The remote monitoring devices are provided to the Customer as part of the Services. Customer gives KONE the right to utilize 24/7 Connected Services to collect, export and use data generated by the use and operation of the equipment. Customer has no ownership or proprietary rights to such data, nor the device or software that monitors, analyzes, translates, reports or compiles such data. KONE 24/7 Connected Services, including any data collected, the device(s) to perform the service, and any software related thereto shall be the exclusive property of KONE. KONE MAKES NO WARRANTY THAT SERVICES WILL BE UNINTERRUPTED OR ERROR-FREE. KONE IS NOT LIABLE FOR ANY DAMAGES RELATING TO LACK OF NETWORK COVERAGE AT THE SITE OF THE EQUIPMENT, DUE TO TAMPERING WITH THE REMOTE MONITORING DEVICE, INTEROPERABILITY, SERVICE DEFECTS, SERVICE LEVELS, DELAYS, SERVICE ERRORS, INTERRUPTIONS OR ANY OTHER REASON OUTSIDE OF KONE’S REASONABLE CONTROL. KONE DISCLAIMS ANY LIABILITY FOR DAMAGES OR INJURIES (INCLUDING DEATH) ARISING FROM OR IN CONNECTION WITH THE OPERATION OR USE OF THE SERVICES SET FORTH HEREIN. The Product Warranty is specified in Bid Attachment A. Installation by KONE of any parts covered under the Product Warranty on parts will only occur while KONE maintains an active maintenance contract. The Product Warranty and Warranty Maintenance commences on the date of acceptance set forth in the Uniform Final Acceptance Form. For long-term reliability, a continuing maintenance agreement is necessary. This Proposal is conditioned upon KONE receiving a ten (10) year KONE Extended Warranty maintenance contract from ownership prior to the date of acceptance set forth in the Uniform Final Acceptance Form. 11(19) www.kone.us Palm Springs Art Museum Pass FRB KONE Internal Price Adjustment KONE shall be entitled to an equitable adjustment in the Price, including but not limited to, any increased costs between the time the Contract is signed and the date of manufacture for materials, labor, or shipping, as well as increased costs resulting from any change in law or tariffs. Payment terms Proposal price is valid with the following payment terms (Payment due date is 30 days net, from the date of KONE's invoices): 30% Engineering & Site Management 50% Material 20% Installation KONE reserves the right to delay and/or suspend the work, including manufacturing, delivery, installation and/or final turnover of the equipment for non-payment. Prior to equipment turnover, KONE must be paid in full including all change orders, less retention. Additionally, prior to turnover KONE requires a signed Final Acceptance and receipt of a Final Punchlist from all parties. Should you have a requirement other than that shown above; we will be pleased to discuss it with you. Sourcing This Proposal is made without regard to compliance with any special purchasing and/or manufacturing requirements including, but not limited to, Buy America, Buy American, U.S. Steel, FAR clauses, minority/disadvantaged supplier requirements or similar state procurement laws. Should such requirements be applicable to this project, KONE reserves the right to modify and/or withdraw our Proposal. Confidentiality Any pictures or images included in this Proposal are for information purposes only. This proposal and all attachments are intended for the exclusive use of the addressee-recipient. This proposal and attachments are proprietary, confidential, and protected by copyright laws of the United States of America and international treaties. Reproducing, copying, disclosing, adapting, publishing, or distributing this proposal or the attachments, in whole or part, is prohibited. Copyright © 2020 KONE Inc. All rights reserved. Completion The price is based on KONE completing its work by December 31, 2025, and a material manufacturing start, no later than six months from the date of this Proposal. The standard wage rate is assumed. If KONE's on-site work is not completed in the above calendar year (due to delays by others), you will be responsible for the labor rate increase that occurs on January 1st of each following year. Storage/delivery/remobilization This Proposal is based on the site being handed over to KONE in accordance with KONE Site Safety Requirements, per Bid Attachment “B,” on the agreed dates. Any changes to such dates are considered a change to the schedule and KONE shall be entitled to an extension of time and to recover all costs related to such changes and an extension of time. If the Site Requirements are not complete, KONE will not deliver the unit equipment to the job site. If KONE is unable to unload at the jobsite on the scheduled date and commence installation immediately, additional costs for off-site storage ($1,600 / month per unit) and labor for double handling of the materials ($4,000) shall be paid to KONE via a Change Order. Should KONE be required to demobilize, through no fault of its own, due to any suspension or work stoppage, and after material is delivered to the jobsite a charge of $4,000 per crew shall be paid to KONE via a Change Order for each remobilization. Customer shall also store and protect the materials and equipment onsite or at a storage facility reasonably acceptable to KONE at Customer’s sole risk and cost. If KONE is not able to commence installation on the agreed upon material delivery date or if KONE’s work cannot be performed in an uninterrupted manner, labor may be reallocated to other projects and may not be available to reallocate to this project for several weeks. KONE is not responsible for any delay to the project resulting from labor reallocation because of Site Requirements not being complete by the material delivery date. 12(19) www.kone.us Palm Springs Art Museum Pass FRB KONE Internal Operator time No operator time is included in this proposal. If the General Contractor or another subcontractor requires access to the shaft or the use of the elevator platform for any reason prior to Final Acceptance, KONE will provide an operator per the standard hourly rate of $250/hour for straight time or $500/hour for overtime. Availability of an operator will be determined at the time of the request. KONE’s installation schedule shall be extended by the time needed by other trades for access to the shaft. Hoistway cleaning KONE is unable to estimate the cleanliness of an elevator hoistway on a construction site, as the amount of debris/dust is dependent on work completed by other trades within the building. As such, KONE has not included any costs for clean down of the elevator shaft but can provide a price if conditions warrant. Other trade work No additional time or costs (outside of the equipment installation and inspection time) have been included in this proposal for coordination with the life safety system, security system, or any other trades. KONE shall be entitled to an extension of time and / or additional costs incurred by additional time expended for coordination with other trades. Phone This proposal includes one standard, hands-free ADA compliant speakerphone per cab. It will automatically dial to a determined location. A KONE Care – Emergency Phone Monitoring or Wireless Phone service agreement must be completed, (either accepting or denying KONE’s monitoring service) two weeks prior to final inspection. Inspections This Proposal includes one final inspection by the elevator code authority, per elevator, during normal working hours. Prior to scheduling the elevator final inspection with the Authority Having Jurisdiction (AHJ), building life safety including fire alarm and dedicated phone lines for each elevator must be fully operational. If the final inspection fails due to KONE’s sole responsibility, KONE shall pay for the cost of re-inspection(s). Should re-inspection be required due to deficiencies by others, you will be responsible for the cost of re-inspection(s). All other testing will be provided for additional cost at normal KONE billing rates. During the final testing, a representative of the fire-life-safety contractors will be required (at no cost to KONE) while testing the elevators. No overtime has been included in this Proposal. Changes to the work KONE shall not be required to proceed with any Customer requested change to its Work (“Extra Work”) until such Extra Work is evidenced in a mutually acceptable Change Order and signed by both parties. This includes, but is not limited to, any changes or revisions, accelerations, resequencing, suspension of KONE’s schedule of Work or other delays outside of KONE’s control. However, should KONE agree to proceed with Extra Work pursuant to a Construction Change Directive or Field Order without a fully executed Change Order, such agreement by KONE is conditioned on the Extra Work being converted promptly to a fully executed Change Order. KONE shall not be obligated to continue performance of Extra Work if the estimated value of unexecuted Change Orders exceeds 10% of the Agreement Price, or if there is a reasonable safety concern, a product limitation, or it is unreasonable to proceed. No action by KONE, including but not limited to KONE performing Extra Work without an executed Change Order, shall be construed to be a waiver of Subcontractor’s right to seek payment for the Extra Work performed, or to obtain a Change Order at a later date. Customer shall remain directly liable to KONE for payment for changed or Extra Work ordered by the Customer for delays caused by Customer or others subordinated to Customer. 13(19) www.kone.us Palm Springs Art Museum Pass FRB KONE Internal 7. Proposal Acceptance We have read in full and accept the content of this Proposal and all attachments. Project Name: Palm Springs Art Museum Pass FRB Proposal No: T-0007200502 Site Address: 101 Museum Drive, Palm Springs, California, 92262 Total Sales Price: $366,300.00 Customer PALM SPRINGS ART MUSEUM INC Date ______________________________ Signature ______________________________ Printed name 14(19) www.kone.us Palm Springs Art Museum Pass FRB KONE Internal Appendix 1: Bid Attachment “A” / KONE Inc. General Terms and Conditions (Modernization) 1. APPLICATION OF THESE TERMS The parties agree to be bound by the terms and conditions contained in the Bid Letter, this Bid Attachment A and Bid Attachment B, including the documents incorporated herein by reference (collectively, the “Proposal”). 2. SPECIAL PURCHASING REQUIREMENTS This Proposal is made without regard to compliance with any special sourcing and/or manufacturing requirements including, but not limited to, Buy America, Buy American, U.S. Steel, FAR clauses, minority / disadvantaged supplier requirements or similar federal and/or state procurement laws. Should such requirements be applicable to this Project, KONE reserves the right to modify and/or withdraw its Proposal. 3. PROPOSAL CONDITIONS The Proposal shall be open for acceptance within the period stated in the Bid Letter or, when no period is stated, for a period of 30 days from the date of the Bid Letter. Prior to commencing manufacture of the equipment described in the Bid Letter (“Equipment”), KONE must have (i) a fully executed contract; (ii) a schedule acceptable to KONE identifying the Equipment installation start date, or alternatively, KONE’s letter specifying the ship date (“Ship Date Letter”) signed by Customer, which, as applicable, is incorporated by reference herein; (iii) the first payment in Section 4 herein; and (iv) fully approved KONE layouts. 4. PAYMENT TERMS Payment of the total Price is due within 30 days from invoice date, as follows: ● 30% of the Price for engineering, site management, and overhead, billable and due upon execution of this Proposal or receipt of the subcontract; ● 50% of the Price for material and shipping, billable and due upon delivery of material to the jobsite or KONE Distribution Center; ● 20% of the Price for Equipment installation, billable and due at the billing cycle following the start of installation. KONE imposes a surcharge for payments made via credit card that is not greater than our cost of acceptance. The surcharge that we impose for this type of transaction is a percentage of the amount paid via credit card, which will be notified to the Customer at the payment portal. KONE reserves the right to delay, suspend, or stop the work, including manufacturing, delivery, installation and/or Equipment turnover, for non-payment, without liability to KONE or being held in default. Simple interest at 1.5% per month shall be charged on amounts not paid when due. Payments to KONE are not contingent on any third-party payments to Customer. Customer shall reimburse KONE for all costs of collection, including courts costs and reasonable attorneys’ fees. Prior to turnover, KONE must be paid in full, less 10% maximum retention, the Price including all change orders. Retention shall be due and payable within 30 days of execution of the Uniform Final Acceptance or Equipment turnover, whichever occurs first. If certified payroll reporting is required, KONE will submit the requested reporting in the format of the U.S. Department of Labor form WH 347 & WH 348. The Price does not include Textura or any other special billing requirements, which can be added via change order at a rate of 0.3% of the Price. 5. INSTALLATION Customer shall be responsible for procurement and cost of all permits, except permits related to installation of the Equipment. Where KONE’s scope of work or other responsibilities include the obligation to utilize materials and/or finishes resembling or identical to those pre-existing in the building, KONE shall use reasonable efforts to procure such materials and Customer acknowledges and accepts that the materials and/or finishes reasonably available may not be in all respects identical to those pre- existing in the building. This Proposal is conditioned upon KONE using its standard installation method. The installation of the Equipment shall start after Customer has completed all work set forth in Bid Attachment B and any other documents describing site requirements (“Site Requirements”), all of which are incorporated by reference herein. Within two (2) weeks prior to the scheduled delivery date for KONE’s materials, KONE shall conduct a standard visual site survey to verify that the Site Requirements are complete and notify Customer if there are outstanding deficiencies preventing KONE from beginning installation. KONE’s site survey may include, but is not limited to, inspection of site access, working and safety conditions on site, wear and tear of any existing structures or surfaces, and planning of any dismantling or removal of existing equipment, components and materials, where applicable. KONE shall not be deemed to have surveyed any hidden structures, latent defects, subsurface conditions, or other non-visible matters, including but not limited to searching for hazardous substances and/or materials, which shall be subject to Section 16. If KONE’s site survey reveals any deficiencies, KONE shall be entitled to delay the start of installation and Customer shall be responsible for all additional costs incurred by KONE, including without limitation, costs associated with: labor reallocation, re- directing materials to and storage in a KONE Distribution Center, additional labor for double handling of materials, and additional trucking, freight and insurance. Once the Site Requirements are completed, the start of installation shall be subject to the availability of labor and the delivery of material, if applicable. KONE’s work shall be performed during regular union working hours of regular working days, Monday to Friday, statutory holidays excluded. If overtime is mutually agreed upon and performed, the additional costs for such work shall be added to the Price at KONE’s standard overtime rates. If the installation cannot be performed in an uninterrupted manner for any reason beyond KONE's control, Customer shall store the Equipment at Customer's cost and compensate KONE for any costs caused by such delay including, but not limited to, double handling of Equipment and demobilization. KONE shall not be required to perform overtime or any Customer directed change to its work (“Extra Work”) without an executed change order. No action by KONE, including but not limited to, performing Extra Work without an executed change order, shall be a waiver of KONE’s right to seek payment for Extra Work performed. KONE shall be entitled to an extension of time and an equitable adjustment in the Price, including but not limited to, any increased costs of labor, including overtime, resulting from any change of schedule, re-direction of KONE personnel to another work area, acceleration, or out of sequence work. KONE shall take reasonable methods to protect its work-in-place while KONE is actively on site and until execution of a KONE Uniform Final Acceptance, which is incorporated by reference herein. Should damage occur to KONE property, material or work-in- place by fire, water, theft or vandalism, Customer shall compensate KONE for said damages. 15(19) www.kone.us Palm Springs Art Museum Pass FRB KONE Internal Additionally, the Customer is solely responsible for ensuring that the equipment maintenance contractor, if not KONE, does not disturb, delay or interfere with KONE’s work. KONE shall abide by Customer’s safety policies and procedures to the extent such policies and procedures are not in conflict with KONE’s Safety Policy. Testing and/or security features of Equipment must be completed before Equipment turnover. KONE is not responsible for damages, either to Equipment or the building, or for any personal injury or death, arising out of or resulting from any code required safety tests performed on Equipment or hoistway access granted by Customer to other trades. 6. TEMPORARY USE Temporary use of certain types of Equipment may be permitted, provided the use period allows adequate time for Equipment restoration for final turnover and Customer executes KONE’s Temporary Use Agreement. Temporary use shall be invoiced separately and subject to payment terms in Section 4 herein. At the end of temporary use, Customer shall return the Equipment to KONE in "like new" condition. 7. HAZARDOUS MATERIALS KONE’s work shall not include any abatement or disturbance of asbestos-containing material (ACM), presumed asbestos-containing materials (PACM) or other hazardous materials (i.e., lead, PCBs) (collectively “HazMat”). KONE shall have the right to discontinue its work in any location where suspected HazMat is encountered or disturbed. Any HazMat removal or abatement, or delays caused by such, required for KONE to perform its work shall be the customer’s sole responsibility and expense. Prior to the execution of the contract, the owner and/or the general contractor are responsible for providing written notification to KONE of the existence of HazMat in any location where KONE’s work will be performed. Should the customer require elevator personnel to position/reposition the elevator equipment to allow the customer’s abatement company to perform abatement work, KONE will present a separate proposal for additional work to the customer. 8. TITLE AND RISK TO EQUIPMENT Title to and ownership of all Equipment intended for incorporation in KONE’s work, whether installed or stored on or off site, shall remain with KONE until final payment is made. Risk of loss in KONE’s work and Equipment passes to Customer upon delivery to the site or off-site storage. Any tools, devices, or other equipment that KONE uses to perform its work or monitor the Equipment remains the sole property of KONE. If this Proposal terminates or expires for any reason, Customer will give KONE access to the premises to remove such tools, devices or equipment at KONE’s expense. 9. TURNOVER Prior to turnover, KONE must receive a final punch list. Upon turnover, KONE requires a signed Uniform Final Acceptance. KONE shall provide its standard electronic O&M manuals, which are only in English, with CD-ROMs in electronic format, if applicable, upon execution of the Uniform Final Acceptance. Standard KONE samples shall be provided upon request. No mock-ups or video training are included in the Price. 10. DELAY KONE shall not be liable for any loss, damage, claim, or delay due to any cause beyond KONE's control, including, but not limited to, acts of domestic or foreign government (including a change in law), strikes, lockouts, work interruption or other labor disturbance, delays caused by others, fire, explosion, theft, floods, inclement weather, riot, civil In the event of such delays, KONE shall be entitled to an extension in time equal to the length of such delay affecting KONE and an equitable adjustment in the Price. Customer shall compensate KONE for labor and material cost escalations resulting from Project delays not caused by KONE, which extend completion of KONE’s work beyond the end of the current calendar year. Customer is on notice that IUEC labor rates increase annually. 11. LIMITED WARRANTY For one (1) year after the acceptance date set forth in the signed Uniform Final Acceptance, date of Equipment turnover, or date of Customer’s use of Equipment (unless such use is pursuant to the Temporary Use Agreement), whichever occurs first, KONE warrants Equipment against defect in workmanship and material. The warranty excludes remedy for damage or defect caused by abuse, misuse, vandalism, neglect; repairs, alteration or modifications not executed by KONE; improper or insufficient maintenance, improper operation, characteristics of the building such as electrical power or security features, natural or other catastrophe such as flood, fire, or storm, or normal wear and tear and normal usage. The warranty excludes training or instruction in the proper operation or maintenance of Equipment. Specific noise ratings and energy efficiencies cannot be guaranteed due to different building characteristics and ambient noise levels. Customer’s remedy is limited to repair or replacement of a defective part, in KONE’s sole discretion, and excludes labor. 12. INDEMNIFICATION KONE shall only indemnify and hold Customer harmless for claims, damages, losses or expenses, but excluding loss of use (“Claims”) due to bodily injury, including death, or tangible property damage (other than the Project or KONE’s work itself) to the extent caused by KONE’s negligent acts or omissions. KONE shall not indemnify Customer for any other Claims. Customer agrees to indemnify and hold KONE harmless from any Claim for bodily injury, including death, or tangible property damage in connection with the use or operation of the Equipment. Each party shall defend itself in the event of a Claim. 13. INTELLECTUAL PROPERTY KONE shall retain title and ownership of all intellectual property rights relating (directly or indirectly) to the Equipment provided by KONE, including but not limited to software or firmware (whether in the form of source code, object code or other), drawings, technical documentation, or other technical information delivered under the Proposal. KONE grants Customer a non-exclusive and non-transferable license and right to use the software and firmware in connection with the use and maintenance of the Equipment. Customer shall not use any drawings, technical documentation or other technical information supplied by or on behalf of KONE for any purposes other than those directly related to the Proposal or to the use and maintenance of the Equipment. Customer shall not in any form copy, modify or reverse engineer the software, or give access to the software for such use to any third party without KONE’s prior written consent. 16(19) www.kone.us Palm Springs Art Museum Pass FRB KONE Internal commotion, war, malicious mischief, infectious diseases, epidemic, pandemic, quarantine, border or port of entry and exit restrictions or acts of God. 14. INSURANCE In lieu of any Customer insurance requirements, KONE shall provide its standard certificate of insurance, which shall be deemed to satisfy all insurance requirements for this Project. KONE shall not provide loss runs, insurance rate information, copies of its insurance policies or any other information which KONE considers confidential. KONE shall not provide coverage for professional (E&O) liability, pollution liability, data privacy/security, or no-fault medical payments. If the Project is covered by a Wrap Up Insurance Program, KONE agrees to participate provided there is no cost to KONE, no reduction in the Price, and subject to KONE’s review of the proposed program. If KONE’s primary limits are sufficient to satisfy insurance coverage requirements, excess/umbrella liability will not be required or if excess/umbrella is required, KONE’s excess coverage does not follow form although typically provides broader coverage than KONE’s primary policies. The excess coverage is not AM Best Rated nor licensed to do business within the jurisdiction although the carrier has strong Standard & Poor’s and Moody’s financial ratings that may be evidenced upon request. 15. LIMITATION OF LIABILITY In no event shall either party be liable to the other party for any consequential, special, punitive, exemplary, liquidated, incidental, or indirect damages (including, but not limited to, loss of profits or revenue, loss of goodwill, loss of use, increase in financing costs) (collectively, "Consequential Damages") that arise out of or relate to this Proposal even if such party has been advised of the possibility of such Consequential Damages. The limitation set forth in this section shall apply whether the claim is based on contract, tort or other theory. 16. CONCEALED OR UNKNOWN CONDITIONS If during the course of its work, KONE encounters conditions at the site that are subsurface, differ materially from what is represented in the contract documents, or otherwise concealed physical conditions, KONE shall be entitled to an extension of time and additional costs for the performance of its work, which shall not be subject to any payment conditions or contingencies. 17. TECHNICAL SURVEY KONE’s Price and obligations under this Proposal are subject to a technical survey to be performed on Customer’s existing units within 90-days of the effective contract start date. If a safety hazard or code violation is identified during KONE’s technical survey, Customer shall immediately remove the unit from service until repairs are performed. KONE is not obligated to perform tests, correct outstanding violations or deficiencies that were not addressed by the prior service provider and/or the owner, or make related necessary repairs or component replacements on the unit. If additional work is necessary, KONE shall provide a separate proposal or recommendation for such work. Customer agrees to indemnify, defend, and hold KONE harmless for any claims arising out of Customer's failure to comply with KONE's recommendations and proposal, and any obligation on the part of KONE to indemnify or defend Customer with regard to such claim shall be null and void. If Customer does not immediately approve KONE’s proposal or recommendation, KONE reserves the right to terminate this Proposal/contract without penalty. 18. TERMINATION If a party materially breaches this Proposal, the other party shall provide written notice of the breach and a reasonable time to cure the breach, but in no event less than 30 days. If the breaching party fails to cure the breach within the specified time period, the non-breaching party may terminate the Proposal upon 15 days written notice to the other party. If KONE notifies Customer of a material breach pursuant to this paragraph, KONE may temporarily suspend its work without liability. 19. GOVERNING LAW AND DISPUTE RESOLUTION The parties agree that this Proposal shall be governed by the laws of the state where the Project is located, and venue for disputes shall be located in that state. KONE does not agree to participate in arbitration proceedings. 20. PRICE ADJUSTMENT If the materials are manufactured more than twelve months after the Contract date, KONE shall be entitled to an equitable adjustment in the Price, including but not limited to, any increased costs between the time the Contract is signed and the date of manufacture for materials, labor, or shipping. Further, KONE shall be entitled to an equitable adjustment in the Price for any increase in costs resulting from any change in law or tariffs. 21. 24/7 EMERGENCY VIDEO COMMUNICATIONS Applicable only for projects where KONE 24/7 Emergency Video Communications is included: The KONE 24/7 Emergency Video Communications contract addendum and General Terms and Conditions for KONE Digital Services must be signed by the Building Owner. This contract addendum requires the Building Owner to pay a fee for audio, video, and data connectivity. This payment obligation, among other provisions, survives termination of any maintenance agreement. 22. MISCELLANEOUS This Proposal, including the documents incorporated herein by reference, constitutes the entire agreement of the parties and supersedes all prior negotiations, understandings, and representations whether written or oral in relation to the subject matter hereof. Where a conflict or ambiguity exists between this Proposal and any other contract document (including but not limited to, Customer’s drawings and specifications), the terms and conditions of this Proposal shall control. This Proposal may be amended only in writing by the duly authorized representative of both parties. This Proposal may be executed in one or more counterparts. Each counterpart shall be considered an original and all of the counterparts shall constitute a single agreement binding all the parties as if all had signed a single document. For purposes of executing this Proposal, a document signed by electronic means is to be treated as an original document. The failure of either party to insist upon performance or strict performance of any of the terms or conditions of this Proposal shall not be deemed a waiver of any rights or remedies that such party may have or a waiver of any subsequent breach or default under this Proposal. Neither party may assign or transfer the benefit or burden of this Proposal without prior written consent of the other party. 17(19) www.kone.us Palm Springs Art Museum Pass FRB KONE Internal Appendix 2: Bid Attachment “B” / Site Requirements & Work by Other Trades The work described below is a summary of work to be performed by others (“Work by Other Trades”) that may be required in conjunction with the elevator modernization performed by KONE (the “Work”). Purchaser shall provide any and all building electrical, structural and mechanical system upgrades required for code compliance, life safety, and proper equipment installation and operation. The Authorities Having Jurisdiction (AHJ) may require additional remedial or preparatory work. All required remedial or preparatory work shall be performed by properly licensed trade contractors in compliance with applicable codes and based on a schedule of performance that allows for uninterrupted progress of the Work. Under no circumstances shall KONE be responsible for any cost associated with the performance of remedial work by others. Purchaser shall provide the following unless specifically included in KONE’s Work: 1. GENERAL Access to the building to perform the Work and for deliveries with dry, protected storage adjacent to the hoistway. Cutting of existing walls, floors and finishes, together with all repairs made necessary by such cutting or changes, e.g. cutting of lobby walls for flush hall fixtures and removal of encroaching lobby features such as wall-mounted ashtrays. Removal, replacement, and/or repair of any mirrors, millwork, plaster, stone or other special hall finishes. All work of other trades must be complete and ready at time of first elevator inspection, or elevator will not be released for operation by the AHJ. If the AHJ does allow temporary operation under a Temporary Operating Inspection (TOI), any associated costs shall be Purchaser’s responsibility. Our tender is based on suitable site conditions, material and tooling storage space, and bathroom access being available on site. Any portion of the Work that is subject to the permissions of local authorities beyond the elevator permits must be identified to KONE. Responsibility for permits to be agreed. Permits and appropriate signage indicating any changes to pedestrian access routes for building users must be in place prior to start of the Work. Provide and install finished elevator cab flooring. Owner must provide certification that flooring meets flame spread and smoke density requirements. (ASMEbA17.1/CSA B44 sec 2.14.2.1). Our proposal includes tear out of existing elevator equipment unless stated otherwise in our proposal. Remove of entrances, if required, is by others unless stated otherwise in our proposal. KONE is unable to estimate the amount of on-site mechanic labor required to coordinate the work of other trades unless stated otherwise in the proposal. Thus, KONE has not included any additional time and/or costs (outside of the equipment installation and inspection time) for coordination with the life safety system, security system, or any other trades. KONE shall be entitled to an extension of the contract time and/or additional costs incurred by additional time expended for coordination with other trades. If KONE 24/7 Emergency Video Communications: For units with travel greater or equal to 60 ft (18 m), or if located in a seismic zone and the code year is 2016 or later (regardless the travel): Customer will provide a dedicated Windows-based PC or laptop with Chrome browser and 24-hour/day Internet access. This computer must be accessible by emergency personnel to communicate through voice and text with people in the elevator and to have a video display of the cab interior. 2. SAFETY Emergency evacuation procedures to be clearly defined where required. Subject to site survey and actions agreed. Provide free-standing, removable, OSHA-compliant barricades capable of withstanding 200lb (890N) of force in all directions around all hoistway openings per OSHA 29 CFR 1926.502, and/or any applicable local code. Provide and install full-covering entry protection, made of nylon mesh or reinforced plastic, at all hoistway openings to prevent materials or tooling from falling into the elevator shaft during installation per Federal OSHA requirements listed in 29 CFR 1926.502(j). In Canada, where required by Provincial regulation, enclose the front of the hoistway with removable hoarding or screening to prevent material from entering the hoistway. Design and install entrance protection in such a way as to allow quick accessibility in and out of the hoistway. Provide two (2) lifeline attachments at the top, front of the hoistway. Each must be capable of withstanding a 5000 lbs/2250 kg load per OSHA 29 CFR 1926.502, or any applicable local code. For machine-room-less applications, provide attachments as described above, or install KONE-provided 4” x 4” x 3/8” (100mm x 100mm x 9.6mm) tube steel lifeline beam in the elevator hoistway overhead 10”/254mm from front of hoistway to center line, with bottom of lifeline beam at same elevation as bottom of hoisting I- beam. Lifeline tube steel supplied by KONE by request at no additional cost on US installations only. Safe working environment must be provided and supported by provision for adequate entrance protection, means of hoisting, hoistway dividing screens, and protection of floors walls and doors etc. 3. CONTROL SPACE/MACHINE ROOM Provide a code-compliant, fire-rated, control space/machine room with access as indicated on the KONE final layout drawings. To include a temporary or permanent door that can be locked from outside. Permanent fire-rated door must be self-closing, self- locking, and require a key to open from outside. Provide or maintain fire rating as required by building code. Independent ventilation or an air conditioning system for the elevator machine room, to assure temperature is maintained between 65F/18C degrees and 95F/35C degrees. Maximum allowed humidity is 95% non-condensing. Fire extinguisher inside machine room. Locate connection points at elevator hoistway. Consult your KONE 18(19) www.kone.us Palm Springs Art Museum Pass FRB KONE Internal Minimum clear machine room height of 7’-0”/2130mm. Must have adequate temporary or permanent lighting for installation purposes. Suitable lighting that provides a minimum of 19 ftc at floor. Removal of any non-elevator related equipment and materials from within the machine room and proper disposal of oil and other hazardous or non-hazardous substances and materials. If control space is adjacent to the hoistway, provide all applicable sleeves, or penetrations, located per control space plan view on the KONE final layout drawings. Provide a clean and dry elevator machine room. If applicable, provide a governor access door of size and location shown on the KONE final layout drawings. The access door shall be secured against unauthorized access. It shall be self-closing, self-locking and operable from the inside without a key. 4. ELECTRICAL A properly rated three phase fused disconnect switch, externally operable and lockable in the open position, located as required by code. Accommodate any increases in motor size or feeder loads. A dedicated 110 VAC fused disconnect switch, externally operable and lockable in the open position adjacent to the machine room door for cab lighting and ventilation, located as required by code. Shunt-trip disconnect if fire sprinklers are present in machine room or hoistway. GFI 120 VAC convenience outlets in machine room and pit. Separate outlet in the pit area if a sump pump is installed. Telephone line service brought to the elevator machine room for emergency communication device. Any required RF shielding of TV or radio transmitters, antennae and/or wave-guides. Conduit with pull boxes from each elevator bank to any remote fire control or communication panels specified. If required by building code, standby/emergency power, sufficiently sized to provide power of permanent characteristics to each elevator’s disconnect, simultaneously, upon loss of regular power, including feeders, transfer switches and auxiliary contact signal outputs to elevator controllers. Where applicable, provide 220 VAC single-phase temp. power and 115 VAC single-phase temp. power, of permanent characteristics at each elevator landing for lighting and installation method tools. representative for confirmation of location and type of temporary power. Fuses are to be current limiting class RK1 or equivalent. Circuit breakers are to have current-limiting characteristics equivalent to RK1 fuses. Provisions of these fuses are the responsibility of others, not KONE. Provide a separate15-amp, 115 VAC fused service with ground (powered by building emergency power system, when available) for KONE 24/7 Emergency Video Communications, when specified. Must include the means to disconnect each service and lock-off in the “open” position (NFPA 70 article 620.22 and 620.53 or CEC article 38.22 and 38.53). 5. HOISTWAY Provide a clear and plumb hoistway of size shown on approved KONE final layout drawings. Any variations from the detailed dimensions may not exceed 2”/50 mm and may not be less than the clear dimensions detailed (tolerance: -0”/-0mm + 2”/50mm). Provide or maintain fire rating as required by building code. Our tender is contingent on the results of a laser survey of the elevator hoistway performed by KONE to determine suitable hoistway conditions. Patching of all holes in hoistway walls with fire rated material. Beveling all ledges within hoistway measuring over 4”/100mm. Removal of any non-elevator related equipment and materials from within the hoistway and proper disposal of oil and other hazardous or non-hazardous substances and materials. A guarded light fixture and light switch in pit. Switch must be located 42”/1065mm above the lowest landing floor level. A means of displacing water located in the pit and containing and disposing of oil, chemicals, and other substances in compliance with environmental laws and regulations (KONE assumes no responsibility for discharge of oil, chemicals, and other substances into storm water systems, sanitary sewer systems, retention ponds, etc.). Sumps and/or sump pumps (where permitted) located within the pit may not interfere with the elevator equipment. Sumps to be covered with flush mounted, non- combustible cover capable of withstanding 150 lbs per square foot (7 kPa). The sump pump/drain must, at minimum, remove 3,000 gal/h (11.4 m3/h) per elevator. Elevator hoistway ventilation to the outside atmosphere as required by building code. Provide a legal, dry and clean pit, built per KONE final layout drawings. Pit shall be reinforced to sustain vertical forces detailed on KONE final layout drawings (vertical forces detailed are two times the static loads). Provide for installation of hoisting I-beam in the elevator hoistway power, car lighting power, car ventilation power, car heating power, 19(19) www.kone.us Palm Springs Art Museum Pass FRB KONE Internal overhead per the KONE final layout drawings. Beam supplied by KONE unless otherwise noted on the layout drawings. Provide adequate support for guide rail brackets from pit floor to the top of the hoistway. Locate rail backing per KONE final approved layout drawings. When maximum bracket span is exceeded, additional support shall be provided at purchaser’s expense. Any bracket mounting surface that is not in line with the clear hoistway dimension detailed on the approved KONE final layout drawings may need to be corrected to meet the proper dimension at purchaser’s expense. If concrete block wall construction, refer to the approved KONE final approved layout drawings for proper installation of rail bracket attachments. Inserts provided by KONE unless otherwise noted on the approved KONE final approved layout drawings. Insert type must be approved by KONE. Concrete masonry units, mortar and grout, shall conform to IBC 2000 or any applicable local code. Concrete masonry units shall have a minimum compressive strength of 1500 PSI (10.5 MPa). Mortar and grout shall have a minimum compressive strength of 2000 PSI (13.8 MPa). When entrances are being replaced, arrange for entrance walls to be constructed at the time doorframes and sills are installed to facilitate timely installation of hall fixture faceplates. Entire front wall must be left open at top and bottom landings until elevator equipment is installed. Intermediate landings must have rough openings of the size and location shown on KONE final approved layout drawings to allow installation of entrances. All entrance openings must be aligned vertically. Adequate support for entrance attachment points shall be provided at all landings. Any marble, stone or similar wall material must be prepared after the entrance frames are installed. Provide corridor lines for any marble or “special finish” walls. When entrances are being replaced, provide elevator landings suitably prepared to accept entrance sill installation per KONE final layout drawings. Grouting to be done by purchaser after sills are installed. Note: Traditional angle or concrete sill support is not required. If the control space is located remote from the elevator hoistway top landing the following may apply: 1. If applicable, provide machine space access door of the size and in the location shown on the KONE final layout drawings. The access door shall be secured against unauthorized access. It shall be self-closing, self-locking and operable from the inside without a key. 2. Provide suitable lighting in or above the machine space access with light switch located within 18”/457 mm of strike jamb side of access space door where practical. When permitted by state and local code the light switch should also control the machine space lighting. 3. Conductors and cables located outside of the elevator hoistway, machine space and control space, that provide normal or standby car air conditioning power, control signals, communication with the car and fire/heat-detecting systems control signals to Fire Service Access Elevators, shall be protected by construction having a fire- resistance rating of not less than 2 hours (APPLICABLE ONLY IN JURISDICTIONS ENFORCING THE IBC BUILDING CODE OR ANY APPLICABLE LOCAL CODES). Provide and install GFCI-type receptacle located at machine in the top of the hoistway or in machine room as applicable (NFPA 70 article 620.85 or CEC article 38.85 whichever is applicable). Provide and install light switch located at manual brake release location: may also be required in control space per local jurisdiction. 6. FIRE SERVICE Fire alarm smoke detectors with wiring and relays in the machine room terminating at elevator controller. Fire alarm initiating devices must be located in front of each elevator entrance as well as in the machine room and at the top of the hoistway. Where sprinklers exist in the machine room and/or hoistway, a fire alarm initiating device within 12”/305mm of each sprinkler head. 7. ACCESS INTEGRATION/SECURITY Our proposal includes KONE logic and possible requested provisions for the specified Touchscreen(s), Keypad Destination Operating Panel(s), Monitoring System(s) and Multi-Media Equipment. Card Readers and/or any additional required hardware & software for proper functionality of access control/security system(s) shall be furnished and installed by others. Any required software to ensure proper communication between KONE control system(s) and building system(s) shall be the responsibility of others. A designated 115V 15A circuit is required at each of the remote monitoring stations. KONE recommends a minimum 100 Mbit/s Ethernet for each of the following application(s): Integrated Touchscreen/Keypad Destination Operating Panels, Monitoring System, Multi-Media Equipment, and Card Readers.