HomeMy WebLinkAbout24B279 - Riverside Construction Company, Inc.CONTRACT ABSTRACT
Contract/Amendment
Name of Contract:
Company Name:
Company Contact:
Email:
Summary of Services:
Contract Price:
Contract Term:
Public Integrity/ Business
Disclosure Forms:
Contract Administration
Lead Department:
Contract Administrator/ Ext:
Contract Approvals
Council/City Manager Approval Date:
Agreement Number:
Amendment Number:
Contract Compliance
Exhibits:
Insurance:
Routed By:
Bonds:
Business License:
Sole Source Co-Op
CoOp Agmt #: Sole Source
Documents: CoOp Name:
CoOp Pricing:
By: Submitted on:
Contract Abstract Form Rev 8.16.23
Authorized Signers:
Name, Email
(Corporations require 2 signatures)
Contract Change Order No. 1
Riverside Construction Company, Inc.
Jason Moore, Vice President
jmoore@rivconstruct.com
South Palm Canyon Drive Bridge Replacement at Tahquitz Creek
Channel, City Project 12-02
$10,830,913 (includes CCO#1 for $320,000)
03/31/2025 - 12/01/2026
On file
Jason Moore, jmoore@rivconstruct.com
Engineering Services
Joel Montalvo / Juan Segoviano X1096
October 10, 2024, Item 1K
24B279
Contract Change Order No. 1 - TBD
Yes
Yes
Yes
Department
Yes
No
Contract Change Order No. 1 is
attached.
N/A
07/14/2025 Vonda Teed
Docusign Envelope ID: 6B345EB8-AAFA-412D-A45F-84FA12FE7BB5
Page 1 of 6
CITY OF PALM SPRINGS
CONTRACT CHANGE ORDER NO. 001: a. Environmental Compliance,
b. Asbestos Abatement, c. Traffic Control Revisions
CP 12‐02 South Palm Canyon Drive
Bridge Replacement At Tahquitz Creek Channel Project,
Federal Aid Project # BRLS‐5282(042)
Contractor: Riverside Construction Company, Inc. Date: June 25, 2025
CCO 001.a Environmental Compliance, CCO 001.b Asbestos Abatement and CCO 001.c Traffic Control
Revisions will be issued to the Contractor in accordance with Section 2‐7, “Changes Initiated by the Agency,”
of Part II of the Special Provisions.
The changes explained in detail are below.
a. Environmental Compliance:
CONTRACT CHANGE ORDER SUMMARY
In accordance with Section 2‐7, “Changes Initiated by the Agency,” of Part II of the Special Provisions,
the City is issuing this Change Order to incorporate additional scope related to environmental
compliance and mitigation. This includes:
1. the removal of existing bird nests and the painting of areas beneath the bridge prior to nesting
season.
2. the pruning palm trees including associated traffic control.
3. the construction of temporary scaffolding beneath the bridge for the installation of bat
mitigation devices.
4. Providing support for the project biologist to ensure compliance with all applicable
environmental requirements as directed by the engineer.
CONTRACT CHANGE ORDER COST – Force Account (Time & Material)
This Change Order shall be paid as extra work on a force account basis (time & Material), in
accordance with Section 3‐3, “Extra Work,” of the Greenbook (Standard Specifications for Public
Works Construction).
The Contractor will be compensated for actual costs of labor, materials, equipment, and
subcontractor work as incurred in performing the work described in this Change Order. Payment will
include applicable markups as allowed under Section 3‐3. Force account records must be submitted
daily and approved by the Engineer to substantiate all costs.
Final compensation will be based on verified actual costs as documented in daily force account
records and may vary from the estimated total shown above.
Total Change Order 001.a Amount: $100,000.00
Docusign Envelope ID: 6B345EB8-AAFA-412D-A45F-84FA12FE7BB5
Page 2 of 6
b. Asbestos Abatement:
CONTRACT CHANGE ORDER SUMMARY
In accordance with Section 2‐7, “Changes Initiated by the Agency,” of Part II of the Special Provisions,
the City is issuing this Change Order to incorporate additional scope related to removal and disposal
of existing asbestos pipes underneath both westerly and easterly sidewalks of the bridge, including
necessary traffic related to this work.
CONTRACT CHANGE ORDER COST – Force Account (Time & Material)
This Change Order shall be paid as extra work on a force account basis (time & Material), in
accordance with Section 3‐3, “Extra Work,” of the Greenbook (Standard Specifications for Public
Works Construction).
The Contractor will be compensated for actual costs of labor, materials, equipment, and
subcontractor work as incurred in performing the work described in this Change Order. Payment will
include applicable markups as allowed under Section 3‐3. Force account records must be submitted
daily and approved by the Engineer to substantiate all costs.
Final compensation will be based on verified actual costs as documented in daily force account
records and may vary from the estimated total shown above.
Total Change Order 001.b Amount: $100,000.00
c. Traffic Control Revisions
CONTRACT CHANGE ORDER SUMMARY
Pursuant to Section 2‐7, 'Changes Initiated by the Agency,' of Part II of the Special Provisions, the City
is issuing this Change Order to include:
1. the addition of a Changeable Message Sign (CMS) on Indian Canyon Drive,
2. the installation of several construction signs as directed by the City,
3. and the removal of the existing median on South Palm Canyon Drive just north of East Sunny
Dunes Road to implement the Revised Traffic Control Plans, as shown on Sheets 4 and 5 of
this Change Order.
CONTRACT CHANGE ORDER COST – Force Account (Time & Material)
This Change Order shall be paid as extra work on a force account basis (time & Material), in
accordance with Section 3‐3, “Extra Work,” of the Greenbook (Standard Specifications for Public
Works Construction).
The Contractor will be compensated for actual costs of labor, materials, equipment, and
subcontractor work as incurred in performing the work described in this Change Order. Payment will
include applicable markups as allowed under Section 3‐3. Force account records must be submitted
daily and approved by the Engineer to substantiate all costs.
Docusign Envelope ID: 6B345EB8-AAFA-412D-A45F-84FA12FE7BB5
Page 3 of 6
Final compensation will be based on verified actual costs as documented in daily force account
records and may vary from the estimated total shown above.
Total Change Order 001.c Amount: $120,000.00
Docusign Envelope ID: 6B345EB8-AAFA-412D-A45F-84FA12FE7BB5
Page 4 of 6 Docusign Envelope ID: 6B345EB8-AAFA-412D-A45F-84FA12FE7BB5
Page 5 of 6 Docusign Envelope ID: 6B345EB8-AAFA-412D-A45F-84FA12FE7BB5
Page 6 of 6
CONTRACT CHANGE ORDER COST – Force Account (Time & Material)
Total Change Order 001 Amount: $320,000.00
CHANGES TO CONTRACT TIME
No time adjustment is granted under this Change Order 1.a. Any impact to the project schedule resulting
from this work will be evaluated upon receipt of proper documentation and a written request from the
Contractor in accordance with Section 6‐6, “Delays and Extensions of Time,” of the Greenbook. Time
consideration is hereby deferred.
Time: Deferred
SUMMARY OF COSTS
Original Contract Amount: $10,510,913.00 Construction Start Date: 03/31/2025
Previous Change Orders: $0.00 Previous Agreed Completion Date: 12/01/2026
This Change Order Amount: $320,000.00 Working Days Added: 0
Revised Contract Amount: $10,830,913.00 Revised Completion: 12/01/2026
The undersigned Contractor hereby agrees to the terms, conditions, and pricing of this Change Order.
Execution of this Change Order constitutes full and final settlement for all costs and impacts (direct and
indirect), except for time, which is deferred for Change Order 1.a as noted above. The Contractor reserves
the right to submit a request for time adjustment in accordance with Section 6‐6, “Delays and Extensions
of Time,” of the Standard Specifications for Public Works Construction (Greenbook).
This Change Order is hereby acknowledged and accepted:
Riverside Construction Company, Inc.
Signature – Ryan Camp, Project Manager Date
City of Palm Springs
Recommended By:
Ibrahim Bakirci, Resident Engineer (Consultant) Date
Recommended By:
Joshua Nickerson, Project Manager (Consultant) Date
Recommended By:
Joel Montalvo, City Engineer Date
Approved By:
Scott C. Stiles, City Manager Date
Attest By:
Brenda Pree, City Clerk Date
06/26/25
Jason Moore, Vice President
06/30/2025
Docusign Envelope ID: 6B345EB8-AAFA-412D-A45F-84FA12FE7BB5
7/14/2025
7/14/2025
7/14/2025
CONTRACT ABSTRACT
Contract/Amendment
Name of Contract:
Company Name:
Company Contact:
Email:
Summary of Services:
Contract Price:
Contract Term:
Public Integrity/ Business
Disclosure Forms:
Contract Administration
Lead Department:
Contract Administrator/ Ext:
Contract Approvals
Council/City Manager Approval Date:
Agreement Number:
Amendment Number:
Contract Compliance
Exhibits:
Insurance:
Routed By:
Bonds:
Business License:
Sole Source Co-Op
CoOp Agmt #: Sole Source
Documents: CoOp Name:
CoOp Pricing:
By: Submitted on:
Contract Abstract Form Rev 8.16.23
Authorized Signers:
Name, Email
(Corporations require 2 signatures)
Agreement (Construction Contract)
Riverside Construction Company, Inc.
Bryan Lounsbury
blounsbury@rivconstruct.com
South Palm Canyon Drive Bridge Replacement at Tahquitz Creek
Channel, City Project 12-02
$10,510,913
To be determined by the Notice to Proceed
On file
Donald M. Pim, dpim@rivconstruct.com
Bryan Lounsbury, blounsbury@rivconstruct.com
Engineering Services
Joel Montalvo / Francisco Jaime X8750
October 10, 2024, Item 1K
24B279
N/A
Yes
Yes
Yes
Department
Yes
No
Agreement, Bonds, and
Insurance are attached.
N/A
10/28/2024 Vonda Teed
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
AGREEMENT 24B279
(CONSTRUCTION CONTRACT)
THIS AGREEMENT made this 10th day of October, 2024, by and between the City of Palm
Springs, a charter city, organized and existing in the County of Riverside, under and by virtue of
the laws of the State of California, hereinafter designated as the City, and Riverside Construction
Company, Inc., a California corporation, hereinafter designated as the Contractor. The City and
the Contractor, in consideration of the mutual covenants hereinafter set forth, agree as follows:
ARTICLE 1 -- THE WORK
For and in consideration of the payments and agreements to be made and performed by City,
Contractor agrees to furnish all materials and perform all work required to complete the Work as
specified in the Contract Documents, and as generally indicated under the Bid Schedule(s) for
the Project entitled:
SOUTH PALM CANYON DRIVE BRIDGE REPLACEMENT AT TAHQUITZ CREEK CHANNEL
CITY PROJECT NO. 12-02
The Work comprises of reconstruction of the bridge over Tahquitz Creek Channel,
reconstruction of channel slopes, street reconstruction of South Palm Canyon Drive from E.
Sunny Dunes Road to approximately 900 feet south of E. Sunny Dunes Road consisting of curb
and gutter, sidewalk, storm drain, and landscaped medians and parkways, singing and striping,
Traffic Signal improvements, installation of temporary traffic signals for a construction detour,
and installation of a 16” Domestic Waterline.
ARTICLE 2 -- COMMENCEMENT AND COMPLETION
The Work to be performed under this Contract shall commence on the date specified in the
Notice to Proceed by the City, and the Work shall be fully completed within the time specified in
the Notice to Proceed.
The City and the Contractor recognize that time is of the essence of this Agreement, and that the
City will suffer financial loss if the Work is not completed within the time specified in Article 2,
herein, plus any extensions thereof allowed in accordance with applicable provisions of the
Standard Specifications, as modified herein. The parties also recognize the delays, expense,
and difficulties involved in proving in a legal proceeding the actual loss suffered by the City if the
Work is not completed on time. Accordingly, instead of requiring any such proof, the City and
the Contractor agree that as liquidated damages or delay (but not as a penalty), the Contractor
will pay the City the sum specified in Section 6-9 of the Special Provisions for each calendar day
that expires after the time specified in Article 2, herein. In executing the Agreement, the
Contractor acknowledges it has reviewed the provisions of the Standard Specifications, as
modified herein, related to liquidated damages, and has made itself aware of the actual loss
incurred by the City due to the inability to complete the Work within the time specified in the
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
10/30/2024
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB
Docusign Envelope ID: EE3B2E2D-A285-4848-AA41-A706271DF4CB