HomeMy WebLinkAboutMJCIP Apps (49)RRRCITY OF PALM SPRINGS
MEASURE J COMMUNITY INITIATED
PROJECTS APPLICATION FORM
Name of Applicant: Timothy Schoeffler
Date Submitted: 9/30/2024
Applicant Type: Neighborhood
Name of Organization: Old Las Palmas Neighborhood Organization
If yes, provide IRS ID#
Tell us about your project:
1.Project Name: Revitalization of Public Spaces in Old Las Palmas
2.Project Address: W. Via Las Palmas, W Chino Drive, W Mountain View Place, Palm
Springs
3.Project Type: Grant
4.This project improves: Streets/Roads, Sustainability/Conservation, Tourism
5. What demographic(s) does this project serve?
Entire Palm Springs Community
6. Estimated project cost: $22,760.00
7. Short description of proposed project.
There are 8 city owned parcels within Old Las Palmas, which include 2 multiple
long blocks medians, & 6 traffic triangles. AREA # 1 is the 4 block long median on
Chino Drive. It is 6 feet wide and 918 feet long. It currently has 154 Firecracker
plants and 30 palm trees. It has a thinning coat of LG (landscape gravel) and needs
planting to supplement the firecracker plants and needs a new coat of Mojave Gold
3/4" gravel. Area # 2 is the 2 block long median strip (320 feet long and 10 feet wide) on
Mountain View Place. The plants are in good condition but the medians need
landscape gravel on dirt patches to prohibit weeds. Area #3 and #4 are the triangle on
each side of Via Las Palmas. These areas need landscape gravel and 40 new plants
on each end to replace plants that have died over the years, and especially this
summer. The Areas #5, #6, #7, and#8 are smaller traffic triangles that need
sustainable planting and tree trimming to clear view of traffic signs
Applicant’s information:
Name of Contact Person: Timothy Schoeffler
Contact Person’s Phone Number:(202) 997-1519
Contact Person’s Email Address: timschoeffler@gmail.com