Loading...
HomeMy WebLinkAboutMJCIP Apps (15)RRRCITY OF PALM SPRINGS MEASURE J COMMUNITY INITIATED PROJECTS APPLICATION FORM Name of Applicant: David Brinkman Date Submitted: 9/12/2024 Applicant Type: Non-Profit Organization Name of Organization: DAP Health If yes, provide IRS ID# Tell us about your project: 1.Project Name: DAP Health Campus Expansion Vehicular Access Improvement Project 2.Project Address: 1695 N. Sunrise Way, Palm Springs 3.Project Type: Grant 4.This project improves: Health Services, Streets/Roads 5. What demographic(s) does this project serve? Children/Students, Entire PS Community, Individuals with Disabilities,LGBTQ+ and Seniors 6. Estimated project cost: $906,600.00 7. Short description of proposed project. Our project will reduce environmental impact, improve mobility (pedestrian, bike, bus), and integrate housing, shopping, and services in the vicinity of N. Sunrise Way and Vista Chino. This project will improve the safety of City of Palm Springs residents, DAP Health patients, clients; employees, and residents of DAP Health’s affordable housing complex, known as Vista Sunrise II. Phase 1 of this project: Median curb and gutter demolition on N. Sunrise Way adjacent to DAP Health at 1695 N. Sunrise Way. Phase 2: Install median metal screens and landscape. Vehicular access from Sunrise Way will be concentrated at the existing southerly driveway between DAP Health Clinics and newly built Vista Sunrise II Apartments. The driveway entry is 600' south on Vista Chino. The 764’ median design visually links several campus buildings from the east. It addresses safety, sustainability, and aesthetics with curated desert landscape, shade trees, and sculptural forms to block unsafe crossings. Applicant’s information: Name of Contact Person: David Brinkman Contact Person’s Phone Number:(760) 323-2118 Contact Person’s Email Address: dbrinkman@daphealth.org From:William VanHemert To:Melissa Sanchez Cc:William VanHemert Subject:City of Palm Springs 24/25 Measure J Community Initiated Project Application: DAP Health Date:Thursday, September 12, 2024 2:07:54 PM Attachments:image272167.png image356309.png image439578.png image487567.png DAP Health schematics -Vehicle Access Improvement Project.pdf City of Palm Springs Measure J FY24-25_DAP Health_Application with Schematics_09.12.24.pdf NOTICE: This message originated outside of The City of Palm Springs -- DO NOT CLICK on links or open attachments unless you are sure the content is safe. Hello Melissa Sanchez … Today, September 12, 2024, DAP Health has submitted, via the online portal, a City of Palm Springs 24/25 Measure J Community Initiated Project application. This email provides two documents: ·         PDF version of DAP Health’s online application with added project schematics. ·         DAP Health project’s schematics (PDF): Not included in the online submission version. Please utilize as a supplemental document for/with the online application for committee review. DAP Health appreciates this opportunity. Looking forward to continued dialog and ongoing relations with the City of Palm Springs. In collaboration, Bill William VanHemert​​​​ Director of Institutional Giving 760.992.0405 WVanHemert@daphealth.org DAP Health Sunrise IMPORTANT WARNING: This message is intended for the use of the person or entity to which it is addressed and may contain information that is privileged and confidential, the disclosure of which is governed by applicable law. If the reader of this message is not the intended recipient, or the employee or agent responsible for delivering it to the intended recipient, you are hereby notified that any dissemination, distribution or copying of this information is STRICTLY PROHIBITED.  If you have received this message in error, please notify us immediately by calling (760) 323- 2118 and destroy the related message. Thank You for your cooperation. 6/14/24, 4:03 PM Community Initiated Project Application | City of Palm Springs https://www.palmspringsca.gov/government/departments/finance-treasury/measure-j/measure-j-community-initiated-projects/measure-j-commission-co… 1/5 Measure J Community Initiated Projects Application Form Date Submitted: September 12, 2024 Project Name: DAP Health Campus Expansion Vehicular Access Improvement Project Project Address: 1695 N. Sunrise Way, Palm Springs, CA 92262 Applicant Name: DAP Health by David Brinkman, CEO First Name Last Name Applicant's Phone Number: 760-323-2118 Applicant's Email: dbrinkman@daphealth.org Name of Organization (if applicable): DAP Health 6/14/24, 4:03 PM Community Initiated Project Application | City of Palm Springs https://www.palmspringsca.gov/government/departments/finance-treasury/measure-j/measure-j-community-initiated-projects/measure-j-commission-co… 2/5 Applicant Type Individual X Non-Profit Organization Neighborhood Other Organization City Commission Non-Profit Organization's - Provide Federal Tax ID#: 33-0068583 Project Type City Implemented Project X Organizational - Implemented Project (Grant) Tell us about your project: *1. Does this project improve…? (check all that apply) Business Community Downtown Enhancements Educational Services Government Services X Health Services Historic Preservation Park/Recreation/Hiking Facilities Police/Fire/Emergency Services Public Art X Streets/Roads Sustainability/Conservation Technology The Economy Tourism Other Select All The DAP Health Campus Expansion Vehicular Access Improvement Project will support the City of Palm Springs by improving the safety of vehicular access to DAP Health for City of Palm Springs residents, DAP Health patients, clients; employees, residents of DAP Health’s affordable housing complex, known as Vista Sunrise II, and others who have business or other needs at DAP Health located at 1695 N. Sunrise Way. This project is divided into two phases: DAP Health will contribute $314,000 in general operating funds toward Phase 1: Median curb and gutter demolition on N. Sunrise Way adjacent to DAP Health located at 1695 N. Sunrise Way. Phase 2: Install median metal screens and landscape. 1. Does this project improve…? (check all that apply) Business Community Downtown Enhancements Educational Services 6/14/24, 4:03 PM Community Initiated Project Application | City of Palm Springs https://www.palmspringsca.gov/government/departments/finance-treasury/measure-j/measure-j-community-initiated-projects/measure-j-commission-co… 3/5 Government Services X Health Services Historic Preservation Park/Recreation/Hiking Facilities Police/Fire/Emergency Services Public Art X Streets/Roads Sustainability/Conservation Technology The Economy Tourism Other Select All 6/14/24, 4:03 PM Community Initiated Project Application | City of Palm Springs https://www.palmspringsca.gov/government/departments/finance-treasury/measure-j/measure-j-community-initiated-projects/measure-j-commission-co… 4/5 2. What demographic(s) does this project serve? (check all that apply) Animal Welfare X Children/Students X Entire Palm Springs Community X Individuals with Disabilities X LGBTQ+ X Seniors X Other: Patients and clients of DAP Health; residents of Vista Sunrise II affordable housing complex on Sunrise Way. Select All 3. Complete the attached Project Overview and Cost Worksheet. This should provide a thorough description of your proposed project including why it is a need, who will benefit, what the project entails, where the project is located, etc. Further, describe any substantive discussions or endorsements you have developed with City staff, commissions, or active volunteer groups to shape your proposal and to identify any potential duplication of efforts. For example, if your project is an improvement to a park, have you explored your ideas with the Parks and Recreation Department or its Commission? Applicant's Name and Date DAP Health; September 12 2024 Project Overview and Cost Worksheet Project Name and Location: DAP Health Campus Expansion Vehicular Access Improvement Project. Location: 1695 N. Sunrise Way, Palm Springs Provide a detailed description of the concept and benefits of your proposal: Our project will reduce environmental impact, improve mobility (pedestrian, bike, bus), and integrate housing, shopping, and services in the vicinity of N. Sunrise Way and Vista Chino. This project will improve the safety of City of Palm Springs residents, DAP Health patients, clients; employees, and residents of DAP Health’s affordable housing complex, known as Vista Sunrise II. Phase 1 of this project: Median curb and gutter demolition on N. Sunrise Way adjacent to DAP Health at 1695 N. Sunrise Way. Phase 2: Install median metal screens and landscape. Vehicular access from Sunrise Way will be concentrated at the existing southerly driveway between DAP Health Clinics and newly built Vista Sunrise II Apartments. The driveway entry is 600' south on Vista Chino. The 764’ median design visually links several campus buildings from the east. It addresses safety, sustainability, and aesthetics with curated desert landscape, shade trees, and sculptural forms to block unsafe crossings. Describe and identify any substantive discussions or endorsements you have developed with City staff, commissions, or volunteer groups to shape your proposal and to identify any potential duplication of efforts. On July 25, 2024, David Brinkman, DAP Health CEO, and William VanHemert, DAP Health Director of Institutional Giving met with Naomi Soto, Measure J Commission Chair to discuss scope and components of DAP Health’s proposed DAP Health Campus Expansion Vehicular Access Improvement Project. The discussion resulted in a decision for DAP Health to submitan application for this proposed project. 6/14/24, 4:03 PM Community Initiated Project Application | City of Palm Springs https://www.palmspringsca.gov/government/departments/finance-treasury/measure-j/measure-j-community-initiated-projects/measure-j-commission-co… 5/5 Design/Consulting Costs: $75,000 Equipment/Materials Costs: Costs included in Construction Costs Construction Costs (identify cost allocation for major trades, if available): Total: $693,000. Component costs: Landscape and Irrigation Construction: $163,000; Landscape Structure Construction (arches), $160,000; Street/Median Improvements Construction, $370,000. Insurance Cost: Costs included in Design/Consulting Costs and Construction Costs Other Fees: Costs included in Design/Consulting Costs and Construction Costs Contingency: $138,600 (20% of Construction Costs) Total: $906,600 Project Duration, including lead time to order materials and mobilize contractors Three months Designated Project Manager: Rob Carroll, DAP Health Director of Facilities For organizational implemented grants, identify your other funding sources to complete the project and the percentage of total this represents: DAP Health will contribute $314,000 in general operating funds toward Phase 1 of this proposed project, for median curb and gutter demolition Applicant's Name and Date: David Brinkman, CEO DAP Health; September 12, 2024 TWO WORKING DAYS BEFORE YOU DIG Underground Service Alert APPROVED DATEREVISIONNO.DESIGN BY: DRAWN BY: REVIEWED BY: CITY CHECK DATE RIGHT-OF- WAY TRAFFIC ENG'G FIELD ENG'G : : : : : : INITIAL DATE : : : : : :APPROVED BY: CITY ENGINEER DATER.C.E. NO. CITY OF PALM SPRINGS, CALIFORNIA FILE NO. DWG. NO. SHEET DATE CADD FILE NAMER.C.E. NO. RECOMMENDED BY: DAP HEALTH - CAMPUS EXPANSION DIAL: 811 LANDSCAPE PLANS LOCATION BENCHMARK ELEVATION PREPARED UNDER THE DIRECT SUPERVISION OF: MBAKERINTL.COM 75410 Gerald Ford Dr. Ste:100 Palm Desert, CA 92211 Phone: (760) 346-7481 PD-1 PLANTING DETAILS DECOMPOSED GRANITE GVERTICAL ROCK BED 3" 3" THICK DECOMPOSED GRANITE WITH STABILIZER PER THE MANUFACTURER'S SPECIFICATIONS. INSTALL FLUSH WITH ADJACENT PAVING. FINISH GRADE. 90% MOISTURE COMPACTED SUBGRADE. APPLY PRE-EMERGENT HERBICIDE AND POST-EMERGENT HERBICIDE TO SUBGRADE PRIOR TO INSTALLATION. CONCRETE CURB AND GUTTER PER CONSTRUCTION PLANS. 4 3 1 2 FLUSH 5 WIDTH VARIES SEE PLAN 2 1 3 4 5 6 ASPHALT PAVING. CONCRETE CURB AND GUTTER. 3" MIN. COLORED CONCRETE BED TO RECEIVE ROCK. COLOR TO BE 'RUSTIC BROWN' MODEL #6058, AVAILABLE FROM DAVIS COLORS. JOINTS SHALL BE 1" MAX. 90% MOISTURE COMPACTED SUBGRADE. 4"-8" VERTICAL ROCK PAVING POINTED SIDE UP, TYP. COLOR 'BAJA CRESTA'. ROCK TO BE IMBEDDED 50% MIN. INTO MORTAR BASE. FINISH GRADE IN PLANTING AREAS. FLUSH N.T.S. 1 2 4 5 312 3 4 5 6 3" 1" MAX. WIDTH VARIES - PER PLAN NOTES: 1.NO VISIBLE GROUT EXCESS. CONTRACTOR SHALL RAKE & CLEAN JOINTS TO REMOVE EXCESS GROUT. DESIGN INTENT TO HAVE MINIMAL GROUT VISIBLE IN FINAL PRODUCT. 2.CONTRACTOR TO PROVIDE 2'-6" X 6'-0" MOCK-UP OF MORTARED VERTICAL ROCK BED SAMPLE FOR REVIEW AND APPROVAL BY LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. MOCK-UP TO BE INSTALLED IN WORK LOCATION AND CAN REMAIN IF APPROVED. ALL REJECTED MOCK-UPS TO BE REMOVED. TREE PLANTING/STAKINGA N.T.S.TREE ROOT BARRIER C N.T.S. TREE ROOTBALL. DIG PLANTING PIT TWO TIMES THE DIAMETER AND ONE TIMES THE DEPTH OF THE ROOTBALL. SCARIFY SIDES OF PLANT PIT. SET THE ROOTBALL IN THE PLANTING PIT SO THAT ROOT CROWN IS 1" ABOVE FINISH GRADE. PLACE BACKFILL MATERIAL PER THE SPECIFICATIONS, TAMPING AND SETTLING AROUND ROOTBALL. PLANTING TABLETS PER THE SPECIFICATIONS. CREATE 4" IRRIGATION BASIN AT THE EDGE OF THE PLANTING PIT. IRRIGATE WITH HOSE TO SETTLE BACKFILL AND BERM, FILLING BASIN. TAMP TO REMOVE AIR POCKETS AND ADD ADDITIONAL BACKFILL AS NECESSARY. STAKE BELOW CROWN OF TREE. TREE TIES (4 PER TREE) - V.I.T. PRODUCTS CINCH-TIE OR APPROVED EQUAL. 2" DIAMETER X 10' LONG LODGEPOLE PINE STAKE (2 PER TREE) INSTALLED OUTSIDE OF THE TREE ROOTBALL. LOCATE STAKES PARALLEL TO THE DIRECTION OF THE PREVAILING WIND AND DRIVE FIRMLY INTO THE SUBGRADE A MINIMUM OF 3'. ROOT BARRIER PER THE SPECIFICATIONS. INSTALL 3" BELOW TOP OF PAVEMENT. INSTALL 3" THICK LAYER OF STABILIZED DECOMPOSED GRANITE PER DETAIL 'F' THIS SHEET. CONCRETE CURB AND GUTTER OR SIDEWALK PER THE CONSTRUCTION PLANS. EXISTING SUBGRADE. 2X ROOTBALL DIAMETER DEPTH OF ROOTBALL 2X ROOTBALL DIAMETER DEPTH OF ROOTBALL SHRUB ROOTBALL. DIG PLANTING PIT TWO TIMES THE DIAMETER AND ONE TIMES THE DEPTH OF THE ROOTBALL. SCARIFY SIDES OF PLANT PIT. SET THE ROOTBALL IN THE PLANTING PIT SO THAT ROOT CROWN IS 1" ABOVE FINISH GRADE. PLACE BACKFILL MATERIAL PER THE SPECIFICATIONS, TAMPING AND SETTLING AROUND ROOTBALL. PLANTING TABLETS PER THE SPECIFICATIONS. CREATE 4" IRRIGATION BASIN AT THE EDGE OF THE PLANTING PIT. IRRIGATE WITH HOSE TO SETTLE BACKFILL AND BERM, FILLING BASIN. TAMP TO REMOVE AIR POCKETS AND ADD ADDITIONAL BACKFILL AS NECESSARY. INSTALL 3" THICK LAYER OF STABILIZED DECOMPOSED GRANITE PER DETAIL 'F' THIS SHEET. EXISTING SUBGRADE. 10'10' 24" PLAN VIEW SECTION VIEW LESS THAN 8' CONCRETE CURB/PAVING EDGE. PLANTING AREA. CONTINUOUS ROOT BARRIER, 24" DEPTH WITH RAISED DEFLECTOR FACING THE PLANTING AREA. LOCATE ADJACENT TO THE EDGE OF PAVING. INSTALL 3" BELOW TOP OF CURB. TREE. PROVIDE A MINIMUM OF 10' OF BARRIER ON EACH SIDE OF THE TREE TRUNK. INSTALL DECOMPOSED GRANITE PER DETAIL 'F' THIS SHEET. EXISTING SUBGRADE. INSTALL WHEN TREE IS WITHIN 8' OF CURB/PAVING EDGE AND WHERE SHOWN ON THE PLANTING PLANS. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 10 9 3 6 7 8 1 4 5 12 13 11 2 14 1 2 3 4 5 6 7 8 9 3 6 7 8 5 1 4 2 9 PALM TREE PLANTING D 1 2 3 4 5 6 7 8 8 4 3 2 1 5 1 6 3 7 N.T.S. N.T.S. SHRUB PLANTING E 2X ROOTBALL DIAMETER TREE ROOTBALL. DIG HOLE TWICE THE WIDTH AND DEPTH OF THE ROOTBALL AND FILL WITH WATER AND ALLOW TO PERCOLATE INTO SUBSOIL. BACKFILL 100% WASHED CONCRETE SAND TO GRADE. DO NOT COVER SAND WITH DECOMPOSED GRANITE OR TOP SOIL. SAND MUST BREATHE. SET ROOTBALL IN HOLE SO THAT ROOT CROWN IS 1" ABOVE FINISH GRADE. 4" PERFORATED PIPE WRAPPED WITH FILTER CLOTH. 4" CLEANOUT WITH CAP. SPRINKLER PER IRRIGATION PLANS. FINISHED SURFACE PER PLANS. COVER AND ELEVATE THIS END OF PIPE DRAIN WATER TO ELBOW. PALM TREE TRUNK. TIE PALM FRONDS TOGETHER WITH BIODEGRADABLE SISAL TWINE. TWINE SHALL BE REMOVED AFTER 90 DAYS OF TRANSPLANTING UNLESS OTHERWISE DIRECTED. 1 2 3 4 5 6 7 8 NOTES: 1.HEAVY SOIL PIPE MAY BE CONNECTED TO A COMMON DRAIN OR EXTENDED DOWN INTO AN AUGERED HOLE THEREBY EXTENDING THE DRAIN PIPE. 2.PALM TRUNKS SHALL BE SKINNED, TRIMMED, AND VERTICAL. 9 10 11 10 7 6 8 5 3 1 2 9 4 11 BROWN TRUNK HEIGHT MEASUREDFROM BASE OF THE NEWESTFROND TO FINISHED GRADEB N.T.S. F N.T.S. 2 3 LANDSCAPE BOULDER PER THE LANDSCAPE PLANTING PLAN AND SPECIFICATIONS. FINISHED GRADE. 90% MOISTURE COMPACTED SUBGRADE BELOW BOULDER LOCATIONS. 2 3 OF BOULDER HEIGHT 13 BOULDER HEIGHT 1 2 3 FLAT BOULDER SET TO HIDE FLAT SIDE AND EDGES FRACTURED BOULDER SET TO HIDE BROKEN EDGES NOTES: 1.BOULDERS SHALL NOT BE EVENLY SPACED APART AND SHALL BE GROUPED AS SHOWN ON THE LANDSCAPE PLANTING PLAN TO APPEAR NATURAL IN THE LANDSCAPE. 2.THE BOULDER LOCATIONS AND PLACEMENT SHALL BE APPROVED BY THE LANDSCAPE ARCHITECT PRIOR TO PLACEMENT. SIZE PER LEGEND 1 LANDSCAPE BOULDERS SUNRISE WAY IMPROVEMENTS TWO WORKING DAYS BEFORE YOU DIG Underground Service Alert APPROVED DATEREVISIONNO.DESIGN BY: DRAWN BY: REVIEWED BY: CITY CHECK DATE RIGHT-OF- WAY TRAFFIC ENG'G FIELD ENG'G : : : : : : INITIAL DATE : : : : : :APPROVED BY: CITY ENGINEER DATER.C.E. NO. CITY OF PALM SPRINGS, CALIFORNIA FILE NO. DWG. NO. SHEET DATE CADD FILE NAMER.C.E. NO. RECOMMENDED BY: DAP HEALTH - CAMPUS EXPANSION DIAL: 811 LANDSCAPE PLANS LOCATION BENCHMARK ELEVATION PREPARED UNDER THE DIRECT SUPERVISION OF: MBAKERINTL.COM 75410 Gerald Ford Dr. Ste:100 Palm Desert, CA 92211 Phone: (760) 346-7481 RD-1 MEDIAN RENDERINGS SUNRISE WAY IMPROVEMENTS SUNRISE WAY - LOOKING SOUTH SUNRISE WAY - LOOKING WEST TWO WORKING DAYS BEFORE YOU DIG Underground Service Alert APPROVED DATEREVISIONNO.DESIGN BY: DRAWN BY: REVIEWED BY: CITY CHECK DATE RIGHT-OF- WAY TRAFFIC ENG'G FIELD ENG'G : : : : : : INITIAL DATE : : : : : :APPROVED BY: CITY ENGINEER DATER.C.E. NO. CITY OF PALM SPRINGS, CALIFORNIA FILE NO. DWG. NO. SHEET DATE CADD FILE NAMER.C.E. NO. RECOMMENDED BY: DAP HEALTH - CAMPUS EXPANSION DIAL: 811 LANDSCAPE PLANS LOCATION BENCHMARK ELEVATION PREPARED UNDER THE DIRECT SUPERVISION OF: MBAKERINTL.COM 75410 Gerald Ford Dr. Ste:100 Palm Desert, CA 92211 Phone: (760) 346-7481 PD-1 PLANTING DETAILS DECOMPOSED GRANITE GVERTICAL ROCK BED 3" 3" THICK DECOMPOSED GRANITE WITH STABILIZER PER THE MANUFACTURER'S SPECIFICATIONS. INSTALL FLUSH WITH ADJACENT PAVING. FINISH GRADE. 90% MOISTURE COMPACTED SUBGRADE. APPLY PRE-EMERGENT HERBICIDE AND POST-EMERGENT HERBICIDE TO SUBGRADE PRIOR TO INSTALLATION. CONCRETE CURB AND GUTTER PER CONSTRUCTION PLANS. 4 3 1 2 FLUSH 5 WIDTH VARIES SEE PLAN 2 1 3 4 5 6 ASPHALT PAVING. CONCRETE CURB AND GUTTER. 3" MIN. COLORED CONCRETE BED TO RECEIVE ROCK. COLOR TO BE 'RUSTIC BROWN' MODEL #6058, AVAILABLE FROM DAVIS COLORS. JOINTS SHALL BE 1" MAX. 90% MOISTURE COMPACTED SUBGRADE. 4"-8" VERTICAL ROCK PAVING POINTED SIDE UP, TYP. COLOR 'BAJA CRESTA'. ROCK TO BE IMBEDDED 50% MIN. INTO MORTAR BASE. FINISH GRADE IN PLANTING AREAS. FLUSH N.T.S. 1 2 4 5 312 3 4 5 6 3" 1" MAX. WIDTH VARIES - PER PLAN NOTES: 1.NO VISIBLE GROUT EXCESS. CONTRACTOR SHALL RAKE & CLEAN JOINTS TO REMOVE EXCESS GROUT. DESIGN INTENT TO HAVE MINIMAL GROUT VISIBLE IN FINAL PRODUCT. 2.CONTRACTOR TO PROVIDE 2'-6" X 6'-0" MOCK-UP OF MORTARED VERTICAL ROCK BED SAMPLE FOR REVIEW AND APPROVAL BY LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. MOCK-UP TO BE INSTALLED IN WORK LOCATION AND CAN REMAIN IF APPROVED. ALL REJECTED MOCK-UPS TO BE REMOVED. TREE PLANTING/STAKINGA N.T.S.TREE ROOT BARRIER C N.T.S. TREE ROOTBALL. DIG PLANTING PIT TWO TIMES THE DIAMETER AND ONE TIMES THE DEPTH OF THE ROOTBALL. SCARIFY SIDES OF PLANT PIT. SET THE ROOTBALL IN THE PLANTING PIT SO THAT ROOT CROWN IS 1" ABOVE FINISH GRADE. PLACE BACKFILL MATERIAL PER THE SPECIFICATIONS, TAMPING AND SETTLING AROUND ROOTBALL. PLANTING TABLETS PER THE SPECIFICATIONS. CREATE 4" IRRIGATION BASIN AT THE EDGE OF THE PLANTING PIT. IRRIGATE WITH HOSE TO SETTLE BACKFILL AND BERM, FILLING BASIN. TAMP TO REMOVE AIR POCKETS AND ADD ADDITIONAL BACKFILL AS NECESSARY. STAKE BELOW CROWN OF TREE. TREE TIES (4 PER TREE) - V.I.T. PRODUCTS CINCH-TIE OR APPROVED EQUAL. 2" DIAMETER X 10' LONG LODGEPOLE PINE STAKE (2 PER TREE) INSTALLED OUTSIDE OF THE TREE ROOTBALL. LOCATE STAKES PARALLEL TO THE DIRECTION OF THE PREVAILING WIND AND DRIVE FIRMLY INTO THE SUBGRADE A MINIMUM OF 3'. ROOT BARRIER PER THE SPECIFICATIONS. INSTALL 3" BELOW TOP OF PAVEMENT. INSTALL 3" THICK LAYER OF STABILIZED DECOMPOSED GRANITE PER DETAIL 'F' THIS SHEET. CONCRETE CURB AND GUTTER OR SIDEWALK PER THE CONSTRUCTION PLANS. EXISTING SUBGRADE. 2X ROOTBALL DIAMETER DEPTH OF ROOTBALL 2X ROOTBALL DIAMETER DEPTH OF ROOTBALL SHRUB ROOTBALL. DIG PLANTING PIT TWO TIMES THE DIAMETER AND ONE TIMES THE DEPTH OF THE ROOTBALL. SCARIFY SIDES OF PLANT PIT. SET THE ROOTBALL IN THE PLANTING PIT SO THAT ROOT CROWN IS 1" ABOVE FINISH GRADE. PLACE BACKFILL MATERIAL PER THE SPECIFICATIONS, TAMPING AND SETTLING AROUND ROOTBALL. PLANTING TABLETS PER THE SPECIFICATIONS. CREATE 4" IRRIGATION BASIN AT THE EDGE OF THE PLANTING PIT. IRRIGATE WITH HOSE TO SETTLE BACKFILL AND BERM, FILLING BASIN. TAMP TO REMOVE AIR POCKETS AND ADD ADDITIONAL BACKFILL AS NECESSARY. INSTALL 3" THICK LAYER OF STABILIZED DECOMPOSED GRANITE PER DETAIL 'F' THIS SHEET. EXISTING SUBGRADE. 10'10' 24" PLAN VIEW SECTION VIEW LESS THAN 8' CONCRETE CURB/PAVING EDGE. PLANTING AREA. CONTINUOUS ROOT BARRIER, 24" DEPTH WITH RAISED DEFLECTOR FACING THE PLANTING AREA. LOCATE ADJACENT TO THE EDGE OF PAVING. INSTALL 3" BELOW TOP OF CURB. TREE. PROVIDE A MINIMUM OF 10' OF BARRIER ON EACH SIDE OF THE TREE TRUNK. INSTALL DECOMPOSED GRANITE PER DETAIL 'F' THIS SHEET. EXISTING SUBGRADE. INSTALL WHEN TREE IS WITHIN 8' OF CURB/PAVING EDGE AND WHERE SHOWN ON THE PLANTING PLANS. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 10 9 3 6 7 8 1 4 5 12 13 11 2 14 1 2 3 4 5 6 7 8 9 3 6 7 8 5 1 4 2 9 PALM TREE PLANTING D 1 2 3 4 5 6 7 8 8 4 3 2 1 5 1 6 3 7 N.T.S. N.T.S. SHRUB PLANTING E 2X ROOTBALL DIAMETER TREE ROOTBALL. DIG HOLE TWICE THE WIDTH AND DEPTH OF THE ROOTBALL AND FILL WITH WATER AND ALLOW TO PERCOLATE INTO SUBSOIL. BACKFILL 100% WASHED CONCRETE SAND TO GRADE. DO NOT COVER SAND WITH DECOMPOSED GRANITE OR TOP SOIL. SAND MUST BREATHE. SET ROOTBALL IN HOLE SO THAT ROOT CROWN IS 1" ABOVE FINISH GRADE. 4" PERFORATED PIPE WRAPPED WITH FILTER CLOTH. 4" CLEANOUT WITH CAP. SPRINKLER PER IRRIGATION PLANS. FINISHED SURFACE PER PLANS. COVER AND ELEVATE THIS END OF PIPE DRAIN WATER TO ELBOW. PALM TREE TRUNK. TIE PALM FRONDS TOGETHER WITH BIODEGRADABLE SISAL TWINE. TWINE SHALL BE REMOVED AFTER 90 DAYS OF TRANSPLANTING UNLESS OTHERWISE DIRECTED. 1 2 3 4 5 6 7 8 NOTES: 1.HEAVY SOIL PIPE MAY BE CONNECTED TO A COMMON DRAIN OR EXTENDED DOWN INTO AN AUGERED HOLE THEREBY EXTENDING THE DRAIN PIPE. 2.PALM TRUNKS SHALL BE SKINNED, TRIMMED, AND VERTICAL. 9 10 11 10 7 6 8 5 3 1 2 9 4 11 BROWN TRUNK HEIGHT MEASUREDFROM BASE OF THE NEWESTFROND TO FINISHED GRADEB N.T.S. F N.T.S. 2 3 LANDSCAPE BOULDER PER THE LANDSCAPE PLANTING PLAN AND SPECIFICATIONS. FINISHED GRADE. 90% MOISTURE COMPACTED SUBGRADE BELOW BOULDER LOCATIONS. 2 3 OF BOULDER HEIGHT 13 BOULDER HEIGHT 1 2 3 FLAT BOULDER SET TO HIDE FLAT SIDE AND EDGES FRACTURED BOULDER SET TO HIDE BROKEN EDGES NOTES: 1.BOULDERS SHALL NOT BE EVENLY SPACED APART AND SHALL BE GROUPED AS SHOWN ON THE LANDSCAPE PLANTING PLAN TO APPEAR NATURAL IN THE LANDSCAPE. 2.THE BOULDER LOCATIONS AND PLACEMENT SHALL BE APPROVED BY THE LANDSCAPE ARCHITECT PRIOR TO PLACEMENT. SIZE PER LEGEND 1 LANDSCAPE BOULDERS SUNRISE WAY IMPROVEMENTS TWO WORKING DAYS BEFORE YOU DIG Underground Service Alert APPROVED DATEREVISIONNO.DESIGN BY: DRAWN BY: REVIEWED BY: CITY CHECK DATE RIGHT-OF- WAY TRAFFIC ENG'G FIELD ENG'G : : : : : : INITIAL DATE : : : : : :APPROVED BY: CITY ENGINEER DATER.C.E. NO. CITY OF PALM SPRINGS, CALIFORNIA FILE NO. DWG. NO. SHEET DATE CADD FILE NAMER.C.E. NO. RECOMMENDED BY: DAP HEALTH - CAMPUS EXPANSION DIAL: 811 LANDSCAPE PLANS LOCATION BENCHMARK ELEVATION PREPARED UNDER THE DIRECT SUPERVISION OF: MBAKERINTL.COM 75410 Gerald Ford Dr. Ste:100 Palm Desert, CA 92211 Phone: (760) 346-7481 RD-1 MEDIAN RENDERINGS SUNRISE WAY IMPROVEMENTS SUNRISE WAY - LOOKING SOUTH SUNRISE WAY - LOOKING WEST From:City of Palm Springs To:Melissa Sanchez Subject:*NEW SUBMISSION* Measure J Community Initiated Projects Application Form Date:Thursday, September 12, 2024 12:57:31 PM NOTICE: This message originated outside of The City of Palm Springs -- DO NOT CLICK on links or open attachments unless you are sure the content is safe. Measure J Community Initiated Projects Application Form Submission #:3480693 IP Address:76.89.123.60 Submission Date:09/12/2024 12:57 Survey Time:35 minutes, 11 seconds You have a new online form submission. Note: all answers displaying "*****" are marked as sensitive and must be viewed after your login. Measure J Community Initiated Projects Application Form Date Submitted 09/12/2024 12:00 AM Project Name DAP Health Campus Expansion Vehicular Access Improvement Project Project Address 1695 N. Sunrise Way Palm Springs, California 92262 Applicant Name David Brinkman Applicant's Phone Number (760) 323-2118 Applicant's Email dbrinkman@daphealth.org Name of Organization (if applicable) DAP Health Applicant Type Non-Profit Organization Non-Profit Organization's - Provide Federal Tax ID# 33-0068583 Project Type Organizational - Implemented Project (Grant) Tell us about your project: 1. Does this project improve…? (check all that apply) Health Services Streets/Roads 2. What demographic(s) does this project serve? (check all that apply) Children/Students Entire Palm Springs Community Individuals with Disabilities LGBTQ+ Seniors 3. Complete the attached Project Overview and Cost Worksheet. This should provide a thorough description of your proposed project including why it is a need, who will benefit, what the project entails, where the project is located, etc. Further, describe any substantive discussions or endorsements you have developed with City staff, commissions, or active volunteer groups to shape your proposal and to identify any potential duplication of efforts. For example, if your project is an improvement to a park, have you explored your ideas with the Parks and Recreation Department or its Commission? Applicant's Name and Date DAP Health; September 12 2024 Project Overview and Cost Worksheet Project Name and Location DAP Health Campus Expansion Vehicular Access Improvement Project. Location: 1695 N. Sunrise Way, Palm Springs Provide a detailed description of the concept and benefits of your proposal Our project will reduce environmental impact, improve mobility (pedestrian, bike, bus), and integrate housing, shopping, and services in the vicinity of N. Sunrise Way and Vista Chino. This project will improve the safety of City of Palm Springs residents, DAP Health patients, clients; employees, and residents of DAP Health’s affordable housing complex, known as Vista Sunrise II. Phase 1 of this project: Median curb and gutter demolition on N. Sunrise Way adjacent to DAP Health at 1695 N. Sunrise Way. Phase 2: Install median metal screens and landscape. Vehicular access from Sunrise Way will be concentrated at the existing southerly driveway between DAP Health Clinics and newly built Vista Sunrise II Apartments. The driveway entry is 600' south on Vista Chino. The 764’ median design visually links several campus buildings from the east. It addresses safety, sustainability, and aesthetics with curated desert landscape, shade trees, and sculptural forms to block unsafe crossings. Describe and identify any substantive discussions or endorsements you have developed with City staff, commissions, or volunteer groups to shape your proposal and to identify any potential duplication of efforts On July 25, 2024, David Brinkman, DAP Health CEO, and William VanHemert, DAP Health Director of Institutional Giving met with Naomi Soto, Measure J Commission Chair to discuss scope and components of DAP Health’s proposed DAP Health Campus Expansion Vehicular Access Improvement Project. The discussion resulted in a decision for DAP Health to submit an application for this proposed project. Design/Consulting Costs $75,000 Equipment/Materials Costs Costs included in Construction Costs Construction Costs (identify cost allocation for major trades, if available) Total: $693,000. Component costs: Landscape and Irrigation Construction: $163,000; Landscape Structure Construction (arches), $160,000; Street/Median Improvements Construction, $370,000. Insurance Cost Costs included in Design/Consulting Costs and Construction Costs Other Fees Costs included in Design/Consulting Costs and Construction Costs Contingency $138,600 (20% of Construction Costs) Total $906,600 Project Duration, including lead time to order materials and mobilize contractors Three months Designated Project Manager Rob Carroll, DAP Health Director of Facilities; rcarroll@daphealth.org For organizational implemented grants, identify your other funding sources to complete the project and the percentage of total this represents DAP Health will contribute $314,000 in general operating funds toward Phase 1 of this proposed project, for median curb and gutter demolition Applicant's Name and Date David Brinkman, CEO DAP Health; September 12, 2024 Thank you, City of Palm Springs This is an automated message generated by Granicus. Please do not reply directly to this email.