HomeMy WebLinkAbout2013-07-22- ARC MinutesCITY OF PALM SPRINGS
ARCHITECTURAL ADVISORY COMMITTEE
Council Chamber, City Hall
3200 East Tahquitz Canyon Way, Palm Springs, CA 92262
MINUTES OF JULY 22, 2013
CALL TO ORDER: Chair Secoy-Jensen called the meeting to order at 3:02 pm.
ROLL CALL:
Committee Members Present:
Also Present:
Committee Member Absent:
Cassady, Fredricks, Hirschbein, Purnel, Song; Vice -Chair
Fauber, Chair Secoy-Jensen
Director Wheeler, Associate Planner Lyon
None
REPORT OF THE POSTING OF THE AGENDA:
The agenda was available for public access at the City Hall bulletin board (west side of
Council Chamber) by 4:00 pm on Wednesday, July 17, 2013..
ACCEPTANCE OF THE AGENDA:
The agenda was accepted, as presented.
PUBLIC COMMENTS:
There were no public comments.
1. CONSENT CALENDAR:
1A. APPROVAL OF MINUTES: JULY 8, 2013
ACTION: M/S/C (Fauber/Hirschbein, 5-0-2 abstained Fred ricks/Purnel) To approve the
minutes of July 8, 2013.
UNFINISHED BUSINESS:
2. A MINOR ARCHITECTURAL APPLICATION (MAA) FOR APPROVAL OF A TENANT
IMPROVEMENT PROJECT IN THE FORMER OKURA AND TACO DEL MAR TENANT
SPACES FOR GYORO GYORO, A PROPOSED 5,272 SQUARE FOOT RESTAURANT
WITH INDOOR AND OUTDOOR SEATING AT THE OASIS COMMERCIAL BUILDING AT
101 SOUTH PALM CANYON, ZONE CBD (CASE 3.1289 MAA). (KL)
Architectural Advisory Committee Meeting
Minutes of July 22, 2013
Staff gave a brief report and pointed out that the minutes from June 11, 2013 HSPB were
distributed.
Committee Member Hirschbein asked about the misting system.
Staff replied that it must be removed or a new plan for AAC review be submitted.
Vice -Chair Fauber asked about flooring.
Committee Member Song asked about fencing, whether it is to be the same on both streets
and the use of brass color
Gregory Williams, architect, replied that black terrazzo would be used for the bar facing and
dark grey porcelain tiles for the floors the terrazzo exceeded the budget. The fences are to
be the same on both streets and about 1/3 brass.
Chair Secoy-Jensen asked about the rope lighting.
Applicant responded that it would be on columns, surface mounted, and running on inside
face.
Committee Member Purnel had multiple questions regarding plant material and preservation
of the major tree and puddling that occurs.
Chair Secoy-Jensen pointed out a correction on a cladded column.
Committee Member Hirschbein had a question regarding the door handles.
Applicant said they have one original and are looking to match the other(s).
Committee Member Song reiterated the importance of fences matching and felt 25% brass
color as a maximum was good.
Committee Member Fredricks wants to see true colors, a misting system and plan with plant
material correctly depicted.
Committee Member Purnel needs a tree preservation plan, correct landscape plan and
resolution of drainage.
Committee Member Hirschbein stated concern regarding the bar overhang as it is not shape
or design of original building.
Vice -Chair Fauber concurred regarding the bar overhang issues and had concerns regarding
redundant entrances.
Chair Secoy-Jensen agreed on the bar overhang and felt the rope lighting and color issues
2
Architectural Advisory Committee Meeting
Minutes of July 22, 2013
were unresolved.
M/S/C (Secoy-Jensen/Fauber, 6-1, Fredricks) To approve with the following conditions:
• Bar roof overhand to be removed. Any new design to be brought back to the AAC for
review.
• Tree preservation plan by an arborist to be submitted at plan check.
• Maximum 25% brass color in fencing.
• Fencing on Palm Canyon and Tahquitz Canyon must be the same.
• Construction plans must have resolution of drainage issues.
• Replace rope lights with recessed LED lights or shield with aluminum trim or other
comparable material to be reviewed by AAC subcommittee.
• Plant material, size, location plan resubmittal to be reviewed by the same AAC
subcommittee (Fredricks, Hirschbein and Purnel).
NEW BUSINESS:
3. A MINOR ARCHITECTURAL APPLICATION (MAA) FOR APPROVAL OF
RECONSTRUCTION OF THE SECOND FLOOR FACADE AND STREET -FRONT CLAY
TILE ROOF PLANE AT THE CARNELL BUILDING; A CLASS 2 HISTORIC SITE AT 184-
196 NORTH PALM CANYON DRIVE; ZONE CBD (CASE 3.3200). (KL)
Staff gave a brief presentation and responded to questions that the space was not usable,
roofing material will be the "floor" and it will be waterproofed.
Architect Chris Sahlin, representing the project, said they would be using materials as close
as possible to match the existing and confirmed the upper story would not be habitable and
would be seismically secured.
M/S/C (Fred ricks/Hirschbein, 7-0) To approve with conditions:
• Must be fully waterproof
• Work closely with staff to match colors and materials.
4. AN AMENDMENT TO A PREVIOUSLY APPROVED PLANNED DEVELOPMENT
DISTRICT 288 TO CONSTRUCT ELEVEN NEW HOMES IN THE FINAL PHASE OF THE
PARTIALLY BUILT DISTRICT LOCATED AT LUGO ROAD; ZONE PDD 288 (CASE
5.0977-PD 288 AMND). (ER)
Chris Prado and Michael Braun, applicants, described the project and why they changed
designs from the previous phase.
Committee Member Song asked about overhang size and shade protection.
3
Architectural Advisory Committee Meeting
Minutes of July 22, 2013
Committee Member Purnel asked about the landscape plan.
Applicants indicated the landscape and hardscape plans will return
Chair Secoy-Jensen asked about the pool option.
Applicants said previous project had a shared pool which wasn't popular. New units will have
yard, pool or rooftop spa options.
Vice -Chair Fauber stated that he was pleased with the street access to the units and not
gated.
Committee Member Fredricks said when landscape plan comes back it needs to address
adjacent landscaping, needs to be a positive asset and also look at equipment and utility
locations.
M/S/C (Fredricks/Fauber, 7-0) To approve architectural design without landscape.
5. A MAJOR ARCHITECTURAL APPLICATION TO CONSTRUCT AN
APPROXIMATELY 10,300-SQUARE FOOT SERVICE / MANUFACTURING BUILDING ON
A VACANT PROPERTY LOCATED AT 200 WEST OASIS ROAD; ZONE M-1 (CASE
3.3649-MAJ). (ER)
Applicant Mr. Mukareb Imad described his project.
Chair Secoy-Jensen asked about the shade structure.
Applicant indicated it was wood.
Committee Member Purnel had concerns regarding the landscaping especially Mesquite
trees in the windy area and size of material in small planter area and ground cover not
shown.
Chair Secoy-Jensen questioned parking space #13.
M/S/C (Secoy-Jensen/Fredricks, 7-0) To approve with conditions:
• Wood trellis to be replaced with metal.
• Study site plan for parkway location alternative.
• Consider replacing concrete block.
• Landscape plan to return to subcommittee (Fredricks and Purnel).
Architectural Advisory Committee Meeting
Minutes of July 22, 2013
COMMITTEE MEMBER COMMENTS:
Date for Planning Commission and Architectural Advisory Committee workshop of
September 25th did not work for all. Sept. 11th is an acceptable alternative.
Important to work on a checklist.
STAFF MEMBER COMMENTS:
Remember to call with questions, request for materials so we can get for you.
ADJOURNMENT: The Architectural Advisory Committee adjourned at 5:23 pm to the next
regular meeting at 3:00 pm on Monday, August 12, 2013, Council Chamber, City Hall, 3200
East Tahquitz Canyon Way, Palm Springs.
kr
rgo Wheeler, AICP
Director of Planning Services
5