HomeMy WebLinkAbout2017-09-18- ARC MinutesCity of Palm Springs
ARCHITECTURAL ADVISORY COMMITTEE
Council Chamber, 3200 East Tahquitz Canyon Way, Palm Springs, California 92262
Minutes of September 18, 2017
CALL TO ORDER: Chair Song called the meeting to order at 3:00 pm.
ROLL CALL:
Committee Members Present: Lockyer*, McCoy, Rotman, Vice -Chair
Cassady and Chair Song
Committee Members Excused: None.
Planning Commissioner Present: Commissioner Hudson
Staff Present: Planning Director Fagg, AICP, Assistant Planner
Kikuchi, Associate Planner Newell
REPORT OF THE POSTING OF AGENDA: The Agenda was available for public
access at the City Hall bulletin board (west side of Council Chamber) and the Planning
Department counter by 5:00 pm on September 14, 2017.
ACCEPTANCE OF THE AGENDA: The agenda was accepted, as presented.
PUBLIC COMMENTS: None.
CONSENT CALENDAR: None.
UNFINISHED BUSINESS:
1. BLACKHAUS HOTELS, LLC TO CONSTRUCT A SIXTEEN ROOM HOTEL ON
A 0.63-ACRE SITE LOCATED ON THE WEST SIDE OF CALLE ENCILIA,
APPROXIMATELY 250 FEET SOUTH OF SATURNINO ROAD (421 SOUTH
CALLS ENCILIA), ZONE LSC OF THE SECTION 14 SPECIFIC PLAN (CASE
5.1424 CUP AND 3.4047 MAJ). (DN)
Associate Planner Newell presented the proposed revisions to the project as outlined in
the staff memorandum.
CHRIS PARDO, Chris Pardo Design, provided detail on the architectural elements and
was available for questions.
Architectural Advisory Committee Minutes
City of Palm Springs
September 18, 2017
Public Comment: None.
Member Lockyer had questions regarding: the roof vents, fence details, mechanical
screening on roof and fire pit details.
Member Rotman verified the use of the laser -cut gate.
Member McCoy commented that the landscape should be fine if maintained properly.
Chair Song verified the roof gutter details and questioned if the fireplace flues would be
necessary. Ms. Song asked if the HVAC equipment could installed on the ground
surface instead of roof mounted. She questioned if the spa is necessary; and noted
that the property could use several more trees.
Member Lockyer verified the HVAC details.
Member Rotman also questioned the HVAC equipment details.
Comments:
Chair Song said she is concerned about the flow of rainwater from roofs; strength of
design is rooflines; and would like HVAC equipment installed on ground.
Member Lockyer asked if the vent pipes need to vent through the roof (use horizontal
vent pipe to keep roof details simple and clean).
ACTION: Recommend approval with changes as submitted.
MOTION: Vice Chair Cassady, seconded by Member Lockyer, and carried on a roll call
vote.
YES: Lockyer, McCoy, Rotman, Vice Chair Cassady, Chair Song
NOES: None.
NEW BUSINESS:
2. OPTIMA ASSET MANAGEMENT SERVICES, INC., ON BEHALF OF SUNRISE
SQUARE PARTNERS, FOR MINOR ARCHITECTURAL REVIEW APPROVAL
FOR A 45,167-SQUARE-FOOT LANDSCAPE REHABILITATION PROJECT
FOR SUNRISE SQUARE, A MULTI -TENANT SHOPPING CENTER, LOCATED
AT 1751 NORTH SUNRISE WAY, ZONE CDN (CASE NO. 5.0646). (NK)
Assistant Planner Kikuchi presented the proposed landscape renovation as outlined in
ra
Architectural Advisory Committee Minutes
City of Palm Springs
September 18, 2017
the staff memorandum.
Chair Song verified the scope of work; and questioned if the applicant is interested in
removing the turf.
TIM WHIPSHAW, Landscape Concepts, (on behalf of property owner), said he will
encourage property owner to pursue turf rebates.
Member McCoy asked if Landscape Concepts will be doing the maintenance. (no) He
agrees with issues identified by staff. He said the plan meets stated goals. However,
the plan is not interesting but is much better than the existing. He advised not to over
prune the Quercus Virginians Trees.
Member Rotman verified the status of the undeveloped building pads.
Member Lockyer said there is lack of planting in parking aisles on Albertson's side of
parking lot (Ficus is Phase 1 - perimeter landscape, parking lot islands will come back
later). Some areas are under planted such as Vista Chino frontage, species/groupings
looks un-interesting.
Chair Song questioned if additional oak trees could be added along Vista Chino
frontage; and questioned plantings behind the wall instead of along the frontage. She
verified the depth and type of DG groundcover.
Chair Song said a closer look needs to be taken at the street frontage, spacing and
sizes. She questioned if it could be approved with conditions.
ACTION: Recommend approval with conditions, subject to further review by staff.
AAC Comments:
1. Continuation of the Oak trees on the Vista Chino frontage (west) - 2 trees.
2. Replace all dead trees (2 trees behind parking wall; 2 trees heading west on
the frontage -future pad area; 1 tree - east by the main entry on Vista Chino.
3. Sheet 1-6-0: Create a screen beautification - add light to tree on the corner.
Behind the monument sign: 4 trees at minimum near the corner are needed
and 2 more as you go further on.
4. Layering - area between the parking and sidewalk with dwarf oleander (lower
in front/higher in back).
MOTION: Vice Chair Cassady, seconded by Member Lockyer, and carried on a roll call
vote.
YES: Lockyer, McCoy, Rotman, Vice Chair Cassady, Chair Song
NOES: None.
Architectural Advisory Committee Minutes
City of Palm Springs
September 18, 2017
COMMITTEE MEMBER COMMENTS: None.
STAFF MEMBER COMMENTS:
Planning Director Fagg reminded the Committee Members of the upcoming Joint
Planning Commission Meeting with the AAC and HSPB on September 27, 2017 @
11:00 am.
ADJOURNMENT: The Architectural Advisory Committee adjourned 3:55 pm to the
next regular meeting at 3:00 pm on Monday, October 2, 2017, Council Chamber, City
Hall, 3200 East Tahquitz Canyon Way, Palm Springs.
Fli n Fagg, AICP
Director of Planning Services