HomeMy WebLinkAbout2019-03-04- ARC MinutesCity of Palm Springs
ARCHITECTURAL ADVISORY COMMITTEE
Large Conference Room, 3200 East Tahquitz Canyon Way
Palm Springs, California 92262
Minutes of March 4, 2019
CALL TO ORDER:
Chair Jakway called the meeting to order at 3:00 pm.
ROLL CALL:
Present: Doczi, Lockyer, McCoy, Walsh, Vice Chair Rotman, Chair Jakway
Absent: Poehlein
Staff Present: Planning Director Fagg, Associate Planner Newell
REPORT OF THE POSTING OF AGENDA: The Agenda was available for public
access at the City Hall bulletin board (west side of Council Chamber) and the Planning
Department counter by 12:00 pm on Thursday, February 28, 2019.
ACCEPTANCE OF THE AGENDA:
Rotman, seconded by Lockyer to accept the Agenda as presented.
AYES: Doczi, Lockyer, McCoy, Walsh, Rotman, Jakway
ABSENT: Poehlein
PUBLIC COMMENTS: None.
CONSENT CALENDAR:
1. APPROVAL OF MINUTES: FEBRUARY 4, 2019
Lockyer, seconded by McCoy to approve the minutes as amended. (Noting Member
Rotman's abstention on Item 2; and Member Lockyer's abstention on Item 4.)
AYES: Doczi, Lockyer, McCoy, Walsh, Rotman, Jakway
ABSENT: Poehlein
Architectural Advisory Committee Minutes
Monday, March 4, 2019
City of Palm Springs
NEW BUSINESS:
2. THE COLE HOTEL LODGE, LLC FOR A MINOR ARCHITECTURAL
APPLICATION TO RENOVATE AN EXISTING HOTEL, INCLUDING
IMPROVEMENTS TO THE BUILDING FACADES, AN ADDITION OF 528-
SQUARE FEET, AND THE CONSTRUCTION OF A NEW PARKING LOT, AT
2323 NORTH PALM CANYON DRIVE, ZONE C-1, SECTION 3 (CASE 3.0666
MAA). (DN)
Associate Planner Newell presented the proposed hotel renovation, addition and
construction of a parking lot as outlined in the staff memorandum.
Member McCoy questioned the front yard setback requirements.
Member Doczi questioned the setback for the pool equipment. He asked if staff
approved removal of the 2nd driveway on Palm Canyon- (Engineering is reviewing). He
questioned if the remaining driveway would be one-way- (yes).
Member Walsh questioned the requirement for a parcel merger. What is the roof
material? (spray foam)
MATTHEW ROGERS, applicant, provided background details and an overview on the
proposed project. He said one of the issues was shortage in parking of the existing
project. He indicated the shading will be revised to meet the 40% for the parking lot.
Member Lockyer asked what is the driveway material? (Mark Nelson responded that it
is interlocking paver and asphalt.) He questioned if the old curb cut would be replaced?
(yes)
Member Walsh what is the nature of the food & beverage? (only for hotel guests)
Vice Chair Rotman asked about the space above the lounge- (hotel room). And what is
the distance to the property line at the alley- (on property line). He commented that the
rear elevation looks bleak.
Chair Jakway questioned if the trash enclosure is in the public utility easement?
Member Doczi asked if the power poles will remain- (yes).
Member Lockyer asked if the existing A/C units will remain- (will be replacing with the
new ones inside those locations).
Chair Jakway asked where the A/C unit for the bar/lobby will be located? (It will be on
the ground- mini split system.) He asked about the green wall at the entry? (live plant
material)
Architectural Advisory Committee Minutes
Monday, March a, 2019
City of Palm Springs
Member Lockyer asked what the window replacement will be. (like for like, small
aluminum frame)
Vice Chair Rotman asked if the color samples have been provided.
AAC Comments:
Member Doczi suggested softening the hardscape adjacent to the building, alley and
bay parking. He wondered if there's an opportunity if it meets code for parking to do
some cut-outs near the stalls and vertical trees between the bay parking and the
building. He said that the northwest and southwest corner might be locations for other
types of tree forms.
Member Lockyer suggested additional screening at the pool equipment and spa area
between the wall and sidewalk. Otherwise he thinks it a nice project and a welcome
improvement.
Member Walsh thinks the comment about removal of the windows on the ground floor
has merit for those units. If there's a way for a minor encroachment that could be
allowed for some type of canopy over the 2nd floor and would pick up benefit of the
mountain view and some control of the blaring sun.
Member McCoy thinks the landscape area between the wall and sidewalk needs to be
increased. He said the alley elevation could be softened and along with the changes
for shading. He'd like to get a final answer on the trash enclosure location. He said the
triangle area next to the building at the northwest corner needs enhancement.
Vice Chair Rotman noted concern about the windows and colors- he suggested re-
examining the color scheme to be harmonious with the vinyl windows. He thinks if
they'd be any opportunities for vine pockets in the alley it would help tremendously.
Chair Jakway recommended a metal trellis on the south side in front of the bay parking;
enhancing and softening this elevation would be a real bonus for the project. He thinks
the new fascia is too heavy. He said the front door is hidden; and trees should be
increased in size. He would like to see lighting: and prefers pavers in the entry drive
and bay parking and asphalt in new parking lot. He thinks the existing driveway curb
should be removed. He thinks overall it's a great project.
Member Doczi questioned if there is a separate pool fence?
Member Lockyer thinks all the windows in the central interior should be the same; and
the other elevations could be different.
Rotman, seconded by Lockyer to continue to allow the applicant to incorporate AAC
comments.
3
Architectural Advisory Committee Minutes
Monday, March 4, 2019
City of Palm Springs
1. Plant species and sizes to be legible on landscape plan;
2. Lighting plan;
Parking lot material (pavers @ entry driveway, asphalt for new parking
lot);
3. Vinyl window/paint color;
4. Study wall placement and setback along Palm Canyon & reduce size of
pool equipment.
COMMITTEE MEMBER COMMENTS: None.
STAFF MEMBER COMMENTS: None.
ADJOURNMENT:
The Architectural Advisory Committee adjourned at 3:59 pm to the next regular meeting
at 3:00 pm on Monday, March 18, 2019, Large Conference Room, City Hall, 3200 East
Tahquitz Canyon Way, Palm Springs.
Flinn Fagg, AICP
Director of Planning Services
4