HomeMy WebLinkAbout2022-04-04- ARC MinutesARCHITECTURAL REVIEW COMMITTEE MINUTES
3200 East Tahquitz Canyon Way
Palm Springs, California 92262
(Meeting held Via Zoom)
Minutes of April 4, 2022
CALL TO ORDER:
Vice Chair Rotman called the meeting to order at 5:32 pm.
ROLL CALL:
Present: Doczi, Lockyer, McCoy, Poehlein, Walsh, Vice Chair
Rotman, Chair Jakway
Excused Absence: Thompson
Planning Commissioner: None
Staff Present: Assistant Director of Planning Newell, Planning Technician
REPORT OF THE POSTING OF AGENDA:
The agenda was available for public access at the City Hall bulletin board (west side of
Council Chamber) by 9:00 pm, Wednesday, March 30, 2022, and posted on the City's
website as required by established policies and procedures.
ACCEPTANCE OF THE AGENDA:
Lockyer, seconded by McCoy to accept the agenda, as presented.
AYES: DOCZI, LOCKYER, MCCOY, POEHLEIN, WALSH, ROTMAN, JAKWAY
PUBLIC COMMENTS: NONE
CONSENT CALENDAR:
Member McCoy requested a revision to page 3 of the minutes, specifically that the word
"huck" be "puck".
1. APPROVAL OF MINUTES: MARCH 21, 2022
Architectural Review Committee Minutes
April 4, 2022
City of Palm Springs
Lockyer, seconded by McCoy to approve minutes, as amended.
AYES: DOCZI, LOCKYER, MCCOY, POEHLEIN, WALSH, ROTMAN, JAKWAY
UNFINISHED BUSINESS: NONE
NEW BUSINESS:
2. MINDY REED, FOR A LAND USE PERMIT AND WAIVER TO CONTINUE THE
USE OF AN ENLARGED PARKLET LOCATED AT 140 SOUTH PALM
CANYON DRIVE, ZONE CBD (CASE 21-096 LUP). (AP)
Assistant Director Newell presented the project, as outlined in the staff memorandum.
Vice Chair Rotman asked if the parklet extends to the bulb out. Staff confirmed there is
no parking space between the parklet and the bulb out.
The matter was tabled while staff contacted the applicant to join the meeting to answer
questions. The Committee moved to Item #3.
Assistant Director Newell indicated the applicant was available to answer questions.
MINDY REED, applicant, introduced the project.
Chair Jakway asked if there will be a mister and if so, how it would be conveyed across
the sidewalk. Ms. Reed described the reflective design on the railing in accordance with
the parklet design guidelines.
Vice Chair Rotman confirmed the lighting type.
Member Poehlein clarified the string lights were in fact cafe lights.
Member Doczi requested clarification on the post sizes. Ms. Reed said the posts would
be 4x4 similar to what has been done at Tac/Quila. She clarified the posts colors would
be dark brown to complement the existing building.
Chair Jakway asked about the planter design. Ms. Reed said she will be removing the
existing planters.
Member Poehlein recommended the lanterns be removed and only use the cafe lights.
Member Doczi recommended the planters or pots be the same in size and color within
the parklet.
Doczi, seconded by Walsh to approve, subject to staff conditions and the following:
2
Architectural Review Committee Minutes
April 4, 2022
City of Palm Springs
1. Lantern lights shall be removed from parklet design (only install cafe (festoon)
lights) and;
2. Pots shall be consistent in size and color.
AYES: DOCZI, LOCKYER, MCCOY, POEHLEIN, WALSH, ROTMAN, JAKWAY
3. DIRK MCCULLOCH OF JACKSON MAIN ARCHITECTURE, ON BEHALF OF
NWB PALM SPRINGS, LLC, FOR A MAJOR ARCHITECTURAL
APPLICATION TO CONSTRUCT A 61,704-SQUARE-FOOT SELF -STORAGE
FACILITY WITH A 912-SQUARE-FOOT LEASING OFFICE ON A 3.55-ACRE
UNDEVELOPED PARCEL LOCATED AT 890 NORTH GENE AUTRY TRAIL,
ZONE M-1-P, SECTION 7 (CASE 3.2802 MAJ). (NK)
Associate Planner Kikuchi presented the project, as outlined in the staff memorandum.
DIRK MCCULLOCH, JACKSON I MAIN ARCHITECTURE, applicant, noted this project
also falls under the Airport Land Use Commission's prohibition of tree canopies which
create tree habitats for birds, and described the proposed project. Mr. McCulloch
requested consideration for specific project changes, including quantity of trees,
alternate fencing and reduction of overall area of decomposed granite and down spout
protectors on north and south facades relating to PLN 5.
Chair Jakway questioned the height of the overhangs on the north side. He also asked
how parking would be handled on the south side if clients are loading/unloading for
those units.
Mr. McCulloch responded there will be large vehicles, such as U-Hauls, RVs, etc., that
will require more clearance than usual. He also indicated there is no parking on the
south side, as that will be a fire lane; parking will be available at the southeast corner of
the project site.
Member McCoy asked if there will be light fixtures below the overhangs on the north
side overhangs. Mr. McCulloch responded there are canopy lights that consist of
parking garage type LED fixtures.
Chair Jakway clarified that the roof will be a standing metal seam roof.
Vice Chair Rotman confirmed the number of downspouts and exterior lights. Mr.
McCulloch indicated the downspouts would occur roughly every forty feet and the light
temperatures would be about 4,500-kelvin.
Member Walsh requested clarification on the parallel parking in front of the units.
Vice Chair Rotman requested clarification on the fence screening. Mr. McCulloch
described the fence with a vertical steel tube fence with horizontal metal slats on
3
Architectural Review Committee Minutes
April 4, 2022
City of Palm Springs
alternating sides of the fence to allow passing of air.
Chair Jakway noted glass faces Gene Autry at the building corners and questioned if
the glass will be transparent or obscure. Mr. McCulloch described the glass as being
transparent.
Member Doczi asked if fencing or wall could be added on the south side of the property
to provide screening.
Member Lockyer questioned the interior heights of the units. Mr. McCulloch described
interior spaces.
Member Lockyer expressed concerns with overall height for an interior room height of
10 feet. He also requested clarification on what is visible on the interiors at the building
corner.
Member McCoy said the street view shows a healthy oleander hedge and existing lights
along the south property line and questioned if that will remain and whether new
landscape would be installed. Mr. McCulloch said new landscape would be installed on
the north side of that landscape hedge.
The Committee members requested further clarification on the exterior lighting fixtures
and intensity, as well as interior lighting timeframes at the building corners and along
Gene Autry Trail. Mr. McCulloch also clarified the business would operate from 6am to
10pm daily.
Vice Chair Rotman said the project will be highly exposed with a lot of garage doors and
thinks the project will need more screening. He said the lighting needs to be updated
with 3,000 kelvin or 3,500 kelvin. Mr. Rotman suggested adding landscape pockets
along the north and south sides and recommended block wall instead of picket fence.
Mr. Rotman thinks the wall sconces are acceptable at the building corners but is not in
favor of the wall packs between.
Chair Jakway said the scale of the north overhang appears out of scale with the design
of building and questioned the use of blue doors around the building and thinks it should
be a desert neutral color. He agreed with the screening comments of other members.
Member Doczi agreed and thinks there are other selections available for the desert
locus tree. He said there are smaller, understory trees that could be added to assist
with the screening from the adjacent residential project.
Member Lockyer said he would like to see the building height reduced to roughly 12 feet
at edges of building. He expressed concern with the height of twenty feet and the
overhang on the north side at eighteen feet, resulting in lack of building design
particularly between the building corners.
EI
Architectural Review Committee Minutes
April 4, 2022
City of Palm Springs
Chair Jakway agreed that the wall along Gene Autry Trail looks very plain.
Members Doczi and Lockyer questioned the lack of information on the plant symbols
and the use of 1-gallon size plants.
Chair Jakway recommended better undulation on the west elevation and more
screening at the south side of the property.
Member McCoy noted concern with the lighting heights, especially the 25' poles on the
east and north sides of the building.
Member Walsh said the letters from the neighbors are clear; screening from the
residential to the east will need to be addressed. Mr. Walsh also had concerns on the
lack of cohesive design on all sides of the building.
Jakway, seconded by Rotman to continue the project to allow the applicant to make
revisions per ARC comments.
AYES: DOCZI, LOCKYER, MCCOY, POEHLEIN, WALSH, ROTMAN, JAKWAY
A recess was taken at 7:20pm. The meeting resumed at 7:28 pm.
4. STUDIO AR & D ARCHITECTS, ON BEHALF OF HENRI AND JENNIFER
COURPRON, FOR A MAJOR ARCHITECTURAL APPLICATION TO
CONSTRUCT A 5,436-SQUARE-FOOT SINGLE-FAMILY RESIDENCE WITH A
922-SQUARE-FOOT ATTACHED GARAGE AND A 632-SQUARE-FOOT
DETACHED GARAGE WITH THE MAXIMUM BUILDING HEIGHT OF 19.1
FEET ON A 49,712-SQUARE-FOOT HILLSIDE PROPERTY LOCATED AT
2363 WINTER SUN DRIVE (APN: 504-390-008 & 504-390-009), ZONE ESA-
SP, SECTION 4 (CASE 3.4308 MAJ & CASE 7.1650 AMM). (NK)
Member Lockyer recused himself from this project due to business conflict and turned
his camera and microphone off.
Planner Kikuchi described the proposed residence as outlined in the staff
memorandum.
NICK LAFARO, Studio AR&D, applicant, presented the project and described the arroyo
running through the site, necessitating the minor modification to building height. He
gave an overview of the topography and noted a 30' differential across the site. Mr.
Lafaro described the design process with orienting the garage with a side entry as
required by the Specific Plan, the location of the rest of the home and ground -mounted
solar panels and the proposed project materials.
5
Architectural Review Committee Minutes
April 4, 2022
City of Palm Springs
Chair Jakway said the gym is cantilevered and asked if the master bedroom is
cantilevered too. Mr. Lafaro responded no.
Chair Jakway questioned if there will be balconies on the gym. Mr. Lafaro said there
will be glass railing.
In response to Chair Jakway's questions, Mr. Lafaro described the front elevation pop -
out and the roof drainage.
Vice Chair Rotman asked what surrounds the pool. Mr. Lafaro explained the dotted line
on Sheet PL-6 is a fence barrier around the pool.
In response to Mr. Rotman's questions, Mr. Lafaro described the proposed ventilation
system utilizes an underground design to avoid use of rooftop, and further clarified
where split -systems are proposed. Mr. Lafaro described the reason for using separate
materials for the pavers.
Member Doczi said the detached driveway extends beyond the solar panel areas and if
that could be shortened to allow for additional landscape. Mr. Lafaro agreed that is a
location to add more landscape screen from the street. The Committee further
discussed screening opportunities on the east and south.
Chair Jakway commented that on Sheet PL-1, noting that there appears to be an
imbalance without anchoring the wall. Mr. Lafaro described the challenges with the
arroyo and drainage issue.
Member Poehlein said the detached garage does not appear to integrate with the rest of
house (which is designed well) and is not in favor of the garage design.
Vice Chair Rotman agreed and thinks the garage is "clumsy" compared to the rest of the
house.
Member Walsh said the lot merger gives a greater use of space but questioned how
guest parking is handled particularly with shade. Engineering Minjares responded there
are no guest parking spaces within the development which is the reason for adding
additional garage space on this project. Mr. Minjares provided additional clarification on
the no -build easement on a double lot condition.
Vice Chair Rotman stated he is in favor of the minor modification to the height standard.
Jakway, seconded by Rotman to approve as submitted, suggesting committee
comments be considered including the addition of landscape on the east side of the
solar panels.
AYES: DOCZI, MCCOY, POEHLEIN, WALSH, ROTMAN, JAKWAY
ABSTAINED: LOCKYER
Ce
Architectural Review Committee Minutes
April 4, 2022
City of Palm Springs
COMMITTEE MEMBER COMMENTS: NONE
STAFF MEMBER COMMENTS: NONE
ADJOURNMENT:
The Architectural Review Committee of the City of Palm Springs adjourned at 8:22 pm
to the next regular meeting at 5:30 pm on Tuesday, April 19, 2022, 3200 East Tahquitz
Canyon Way, Palm Springs.
avid Newell, AICP
Assistant Planning Director
7