HomeMy WebLinkAbout2022-03-07- ARC MinutesARCHITECTURAL REVIEW COMMITTEE MINUTES
3200 East Tahquitz Canyon Way, Palm Springs, California 92262
(Meeting held Via Zoom)
Minutes of March 7, 2022
CALL TO ORDER:
Chair Jakway called the meeting to order at 5:35 p.m.
ROLL CALL:
Present: Doczi, Lockyer, Walsh, Vice Chair Rotman, Chair Jakway
Absent: McCoy, Poehlein, Thompson,
Planning Commissioner: None
Staff Present: Assistant Director of Planning Newell, Planning Technician
Bruno
REPORT OF THE POSTING OF AGENDA:
The agenda was available for public access at the City Hall bulletin board (west side of
Council Chamber) by 9:00 p.m., Wednesday, March 2, 2022, and posted on the City's
website as required by established policies and procedures.
ACCEPTANCE OF THE AGENDA:
Chair Jakway reported Staff and Committee Members requested Item 2, One Las
Palmas, be continued to allow the applicant to submit more details.
Doczi, seconded by Rotman to continue Item 2 and accept the agenda, as amended.
AYES: DOCZI, LOCKYER, WALSH, ROTMAN, JAKWAY
ABSENT: MCCOY, POEHLEIN, THOMPSON
PUBLIC COMMENTS: None
CONSENT CALENDAR:
Vice Chair Rotman requested a minor correction to page 3 to add "He suggested
removing posts on the overhang at the front and rear elevations ... ".
1. APPROVAL OF MINUTES: FEBRUARY 22, 2022
Architectural Review Committee Minutes
March 7, 2022
City of Palm Springs
Rotman, seconded by Walsh to approve minutes, as amended.
AYES: DOCZI, WALSH, ROTMAN
ABSENT: MCCOY, POEHLEIN, THOMPSON
ABSTAIN: LOCKYER, JAKWAY
UNFINISHED BUSINESS:
2. ONE LAS PALMAS, LLC FOR A MAJOR ARCHITECTURAL APPLICATION
FOR THE REVIEW OF FOUR (4) SINGLE-FAMILY HOUSE TYPES ON
ELEVEN (11) HILLSIDE LOTS AND AN ADMINISTRATIVE MINOR
MODIFICATION FOR A FRONT YARD SETBACK REDUCTION FOR THREE
LOTS AND INCREASE IN BUILDING HEIGHT FOR FOUR (4) HOUSE
ELEVATIONS LOCATED AT LAS PALMAS ESTATES DRIVE, ZONE R-1-13,
SECTION 1 (CASE 3.4194 MAJ & 7.1648 AMM). (GM)
Tabled and removed from agenda during Acceptance of Agenda.
NEW BUSINESS:
3. FLANNERY EXCHANGE LLC, REQUESTING EXTERIOR ARCHITECTURAL
MODIFICATIONS TO INCLUDE A SECOND FLOOR SHADE STRUCTURE,
SPIRAL STAIRCASE AND THE PERMANENT INSTALLATION OF AN
AIRSTREAM TRAILER TO A SECOND FLOOR PATIO OF A COMMERCIAL
BUILDING LOCATED AT 750 NORTH PALM CANYON DRIVE, ZONE C-1 (CASE
3.3795 MAA). (RB)
Member Lockyer noted he would be abstaining on this project and left for the remainder
of the meeting.
Planning Technician Bruno presented the proposed exterior modifications including
installation of an airstream trailer as outlined in the staff memorandum.
MICHAEL FLANNERY, applicant, provided details on the project and was available for
questions from the Committee.
Chair Jakway questioned if the bar on the second floor is for the event space or will it be
open to the public. Mr. Flannery responded that at this point he's uncertain, but the idea
is that the bar will be there for the event space. Chair Jakway said it's unclear on the
drawings what type of material the shade structure will be. The applicant responded the
shading material will be the fabric type.
Vice Chair Rotman questioned how the spiral staircase will be secured during off -hours.
Mr. Flannery responded the stairway will be open during off hours; however, there will
2
Architectural Review Committee Minutes
March 7, 2022
City of Palm Springs
be a gate on second floor during off -hours. He indicated the entire property is
monitored with cameras and speakers to alert trespassers. Mr. Rotman asked the
applicant how they would handle providing adequate screening for the air stream trailer.
Mr. Flannery said they could possibly use the fabric type shading that matches the patio
cover.
Member Walsh questioned if there are any concerns with bracing and anchoring the
airstream trailer. Mr. Flannery responded the second -floor design was constructed with
steel beams to provide strong support and is not concerned.
Chair Jakway noted that Sheet 105 calls for a proposed new bar where the trailer sits
but it is not shown on the elevation and questioned if they plan to build the bar as part of
this work. Mr. Flannery responded they will leave the airstream trailer downstairs and
will not submit plans for the construction of a bar for at least six months. He explained
the type of shading material noting that the upstairs will be done first and then
downstairs.
Member Doczi questioned if additional material will be added to create a sense of place
for the airstream trailer. Mr. Flannery thinks it's a great idea and could use planters on
the west end to screen the trailer. He agreed that vegetation would look better than
wood to screen it. Mr. Dozci suggested a combination of planters and elongated
planters could be used to create a setting.
Member Comments:
Chair Jakway said he likes the trailer and doesn't think it needs to be hidden. He
suggested a trellis on the upper level and eliminating one bay of the trellis that's closest
to the street; noting that right now there's three bays and if the smaller bay was
removed the facade of the building would step back a bit. Mr. Jakway said if you take
Member Doczi's idea of a planter on the railing that faces Palm Canyon and replace it
with a continuous a wooden planter with a small quantity of plants; it won't block the
views of the mountain. Chair Jakway complemented the applicant because he's taken
an eyesore and has made it into a significant part of the community and wished more
developers would do this.
Member Walsh concurred with Chair Jakway and does not agree with staff comments
about the need to screen the trailer. This helps the whole challenge of the second floor
commercial; if there's something of interest it tends to draw your interest up there. He
thinks it would be a good idea to figure out how the shade structure works since the
fabric and wind are a chronic design challenge.
Vice Chair Rotman agrees with the previous comments that have been made.
Chair Jakway asked the Members what they think about removing the first bay closest
to the street so that the shade structure steps back a little bit.
3
Architectural Review Committee Minutes
March 7, 2022
City of Palm Springs
Member Walsh said he's a bit hesitant about the west elevation with the lower angle
and the hot afternoon sun shining directly on the front of the building.
Vice Chair Rotman said he's been on that rooftop and it's a substantial size that even
removing that front bay there is enough space.
Jakway, seconded by Rotman to approve the airstream trailer (as submitted), shade
structure on second story, circular staircase with the following added conditions:
1. The one bay of overhang closest to the street on the upper level be removed.
2. The trailer is approved, as is, without any screening.
3. The bar on the lower level shall be future submittal.
4. The applicant shall consider landscaping applications along the Palm Canyon
side of the building by installing planters or greenery to add variation to the
railing.
AYES: DOCZI, WALSH, ROTMAN, JAKWAY
ABSENT: MCCOY, POEHLEIN, THOMPSON
ABSTAIN: LOCKYER
COMMITTEE MEMBER COMMENTS: None
STAFF MEMBER COMMENTS:
• The ARC agenda packet will be provided digitally after this meeting and any
member wishing to receive print versions may do so, but it will require the
member to pick up the packet from the Planning office.
ADJOURNMENT:
The Architectural Review Committee of the City of Palm Springs adjourned at 6:05 p.m.
to the next regular meeting at 5:30 pm on Monday, March 21, 2022, 3200 East Tahquitz
Canyon Way.
David Newell, AICP
Assistant Planning Director
C!