HomeMy WebLinkAbout2023-04-17- ARC MinutesCity of Palm Springs
ARCHITECTURAL REVIEW COMMITTEE
Large Conference Room
3200 East Tahquitz Canyon Way, Palm Springs, California 92262
Minutes of April 17, 2023
CALL TO ORDER:
Chair Jakway called the meeting to order at 5:30 pm.
ROLL CALL:
Committee Members Present: Doczi, McCoy, Poehlein, Thompson, Walsh, Vice
Chair Rotman, Chair Jakway
Committee Members Excused: None
Staff Present: Planning Director Hadwin, Principal Planner Lyon,
Engineering Associate Minjares, Associate Planner
Mlaker, Principal Planner Robertson
REPORT OF THE POSTING OF AGENDA:
The agenda was available for public access at the City Hall bulletin board (west side of
Council Chamber) by 9:00 pm, Thursday, April 13, 2023, and posted on the City's
website as required by established policies and procedures.
ACCEPTANCE OF THE AGENDA:
Rotman, seconded by Doczi to accept the agenda, as presented.
AYES: DOCZI, MCCOY, POEHLEIN, THOMPSON, WALSH, ROTMAN,
JAKWAY
PUBLIC COMMENTS: None
1. CONSENT CALENDAR:
1A. APPROVAL OF MINUTES: OCTOBER 17, 2022 AND MARCH 6, 2023
(Noting Member McCoy's and Vice Chair Rotman's abstention on the minutes of
Architectural Review Committee Minutes
April 17, 2023
City of Palm Springs
October 17, 2022; and Member Doczi's abstention on the minutes of March 6, 2023.)
Walsh, seconded by McCoy to approve the Architectural Review Committee minutes of
AYES: DOCZI, MCCOY, POEHLEIN, THOMPSON, WALSH, ROTMAN,
JAKWAY
2. UNFINISHED BUSINESS:
2A. ONE LAS PALMAS, LLC, FOR A MAJOR ARCHITECTURAL
APPLICATION FOR THE REVIEW OF SPECIFIC DESIGNS FOR FOUR
(4) SINGLE-FAMILY HOUSES ON LOTS 10-13 LOCATED AT LAS
PALMAS ESTATES DRIVE, ZONE R-1-13, SECTION 1. (CASE 3.4194
MAJ). (GM)
Member Doczi noted a business -related conflict of interest. He will not be participating
in the discussion and vote.
Associate Planner Mlaker presented the proposed project as outlined in the staff
memorandum.
Public Comment:
Brian Foster, applicant, introduced his development and addressed questions from the
Committee members.
Committee Comments:
Chair Jakway said he thinks the plan addresses almost all of their comments. He said
that it's unfortunate that Lot 12 is wedged in so tightly right up against the driveway;
however, it is a driveway and not a street so and it's not something that's viewed from
the public street. Chair Jakway said he does not see the need for any revisions to
what's before them.
Vice Chair Rotman concurred with Chair Jakway comments.
McCoy, seconded by Thompson to approve, as submitted.
AYES: MCCOY, POEHLEIN, THOMPSON, WALSH, ROTMAN, JAKWAY
ABSTAIN: DOCZI
2
Architectural Review Committee Minutes
April 17, 2023
City of Palm Springs
3. NEW BUSINESS:
3A. RIOS, ON BEHALF OF OLD LAS PALMAS PARTNERS, LLC, FOR THE
APPROVAL OF A MAJOR ARCHITECTURAL APPLICATION FOR A
PROPOSED 73,812-SQUARE-FOOT MIXED -USE PROJECT, WHICH
INCLUDES 24 RESIDENTIAL CONDOMINIUM UNITS AND A 5,411-
SQUARE-FOOT COMMERCIAL SPACE WITH A MAXIMUM BUILDING
HEIGHT OF 30 FEET/TWO-STORIES ON A 2.4-ACRE UNDEVELOPED
PARCEL LOCATED AT 575 NORTH PALM CANYON DRIVE, ZONE
CBD/R-2, SECTION 10 (CASE 3.4191 MAJ). (NK)
Principal Planner Robertson provided background details and presented the proposed
project as outlined in the staff memorandum.
Chair Jakway said that he does not think this application is complete as, there is no
building section shown; no mechanical equipment is shown and there's no pool
equipment shown. He said the critical design elements of this project is what that
metal screen is- they need to see a sample of the metal screen and a sample of the
breeze block.
Public Comments:
Mark Rios, project architect, introduced the development team and provided a
presentation outlining the building architecture, overall site plan, unit layout, circulation
and landscape plan. Mr. Rios was available for questions from the Committee.
Peter Mahler, Old Las Palmas Partners, LLC, spoke about the overall vision and was
available for questions from the Committee.
Chair Jakway said that at the beginning of the presentation he made a comment that he
thought this application was not complete. He said, however, as they've worked their
way through the details this evening and he's very comfortable in approving this project
given that the development team has heard their comments. Mr. Jakway said that
given the responses the development team made he thinks this will be a really good
addition to the city. He thinks the design of the building is special, and he's confident
that they are going to surpass the Committee's expectations.
Member Doczi said in reviewing the landscape plan he thinks there's an opportunity to
consider further spacing of plants because some only get five feet in diameter and are
shown at 24 inches on the center. Mr. Doczi said that although he appreciates the size
of the box trees, his experience with Queen Palms in the valley is that they have a short
longevity and suggested using a substitute plant. He also noted there's a double row of
creosote bush on the north side which is a native plant that is one of the largest species
3
Architectural Review Committee Minutes
April 17, 2023
City of Palm Springs
and suggested reconsideration for something that is water efficient and a bit more
natural and manageable in size well.
Member Walsh noted even though this development has moved away from higher
densities that would have been allowed; he thinks it will have an urban feel to it without
feeling over -crowded based on how the units undulate and avoid each other in terms of
views. Member Walsh suggested consideration be given to the drive aisle facing each
other to ensure they are spaced and landscaped appropriately.
Jakway, seconded by Poehlein to approve Case 3.4191 MAJ, as submitted, with
consideration given to the comments made by the Committee particularly related to the
north fagade since that specifically was direction from the Planning Commission.
AYES: DOCZI, MCCOY, POEHLEIN, THOMPSON, WALSH, ROTMAN,
JAKWAY
COMMITTEE MEMBER COMMENTS: None
STAFF MEMBER COMMENTS: None.
ADJOURNMENT:
The Architectural Review Committee of the City of Palm Springs adjourned at 7:15 pm
to their next regular meeting at 5:30 pm on Monday, May 1, 2023, at 3200 East
Tahquitz Canyon Way, Palm Springs.
OA4�_
Christopher Hadwln
Planning Director
0