HomeMy WebLinkAbout2019-11-13 PC Meeting MinutesPLANNING COMMISSION MINUTES
CITY OF PALM SPRINGS, CALIFORNIA
November 13, 2019
Council Chamber, City Hall
3200 East Tahquitz Canyon Way, Palm Springs, California
CALL TO ORDER:
Chair Woods called the meeting to order at 1:30 pm.
ROLL CALL:
Present: Donenfeld, Garner, Hirschbein, Song, Chair Woods
Excused: Vice Chair Moruzzi
Staff Present: Planning Director Fagg, Attorney Priest, Administrative Coordinator
Hintz, Assistant Director of Engineering Montalvo, Associate
Planner Kikuchi, Associate Planner Mlaker, Principal Planner
Newell, Principal Planner Robertson
REPORT OF POSTING OF AGENDA: The Agenda was available for public access at
the City Hall exterior bulletin board (west side of Council Chamber) and the Planning
Services counter by 6:00 pm on Thursday, November 7, 2019.
ACCEPTANCE OF THE AGENDA:
Chair Woods requested Item 4A moved to the first item on the agenda (to have a
quorum available).
Donenfeld, seconded by Song to accept the agenda as amended.
AYES: DONENFELD, GARNER, HIRSCHBEIN, SONG, WOODS
ABSENT: MORUZZI
PUBLIC COMMENTS:
Chair Woods opened the public comments portion of the meeting:
BRIAN BERKSON, Far West Industries, Item 3A, requested their comments be heard
when project is discussed.
CONSENT CALENDAR:
Song, seconded by Hirschbein to approve the Consent Calendar as presented.
Planning Commission Minutes
November 13, 2019
City of Palm Springs
AYES: DONENFELD, GARNER, HIRSCHBEIN, SONG, WOODS
ABSENT: MORUZZI
1A. APPROVAL OF MINUTES: JULY 24, 2019
Approved, as submitted.
1B. 02 ARCHITECTURE, ON BEHALF OF CAYUCOS COWBOYS, LLC,
FOR A MAJOR ARCHITECTURAL APPLICATION TO CONSTRUCT A
3,695 SQUARE -FOOT SINGLE-FAMILY RESIDENCE (STAPLETON
RESIDENCE) AND AN ADMINISTRATIVE MINOR MODIFICATION
APPLICATION TO DEVIATE THE CODE -REGULATED MAXIMUM
BUILDING HEIGHT AT AN UNDEVELOPED HILLSIDE PARCEL
LOCATED AT THE NORTHEAST CORNER OF NORTH LEONARD
ROAD AND WEST VIA OLIVERA (LOT 20 — APN: 504-182-007), ZONE
R-1-13 (CASE NO. 3.4136 MAJ & 7.1594 AMM). (NK)
Approved, as submitted.
(Item was heard out of order.)
4. NEW BUSINESS:
4A. KOAR PALM SPRINGS, LLC, FOR THE APPROVAL OF A FINAL
DEVELOPMENT PLAN FOR PLANNED DEVELOPMENT DISTRICT
APPLICATION (5.1449 PDD 389); A 95-UNIT, THREE (3) STORY
CONDOMINIUM BUILDING AND A 4,990-SQUARE FOOT RETAIL
STRUCTURE LOCATED AT 1122 EAST TAHQUITZ CANYON WAY,
ZONE REO, SECTION 14. (GM)
Chair Woods noted his abstention on this project. He would not be participating in the
discussion and vote. He left the Council Chamber at 1:34 pm.
Commissioner Donenfeld became the Acting Chair.
Associate Planner Mlaker presented the proposed project as outlined in the staff report.
Acting Chair Donenfeld opened public comments:
LOREN OSTROW, owner, Koar International, addressed questions pertaining to dog
barking at night and balcony railings.
FULYA MC WILLIAM, C2 COLLABORATIVE LANDSCAPE ARCHITECTURE,
addressed questions from the Commission relating to the landscape design.
2
Planning Commission Minutes
November 13, 2019
City of Palm Springs
Hirschbein, seconded by Garner to approve Final Development Plan, as submitted.
AYES: DONENFELD, GARNER, HIRSCHBEIN, SONG
ABSENT: MORUZZI
ABSTAIN: WOODS
Chair Woods re-enter the Council Chamber at 2:02 pm.
2. PUBLIC HEARINGS:
2A. FENTON BOOTH ON BEHALF OF GLENWOOD MANAGEMENT
GROUP, LLC, FOR A PROPOSED TENTATIVE PARCEL MAP 37807
(TPM 37807) FOR THE CREATION OF A ONE -LOT CONDOMINIUM
MAP FOR A PREVIOUSLY APPROVED 17-UNIT APARTMENT
COMPLEX LOCATED AT 2150 NORTH ZANJERO ROAD; ZONE R-2;
SECTION 03 (CASE TPM 37807). (ER)
Principal Planner Robertson presented the proposed project as outlined in the staff
report.
Chair Woods opened the public hearing:
ALLEN SANBORN, Sanborn Architecture Group, project engineer, was available for
questions from the Commission.
There being no further speakers the public hearing was closed.
Commissioner Donenfeld said that they were in favor of this project because it would
fulfill the affordable housing need when it was originally approved as an apartment
complex. He would like to have the appIicant/develope r present to discuss the
economics of this project. He said that now that the project is coming before them as a
condominium development, they might want to re -consider the deferred infrastructure
improvements that were approved as part of rental units.
Song, seconded by Garner to recommend approval to the City Council.
AYES: DONENFELD,
NOES: HIRSCHBEIN
ABSENT: MORUZZI
GARNER, SONG, WOODS
Recommendation: With all conditions as originally proposed (City Council to
reconsider deferred conditions.)
Planning Commission Minutes
November 13, 2019
City of Palm Springs
2B. JAMES HILL ON BEHALF OF LABYRINTH XTRACTS, LLC, FOR A
CONDITIONAL USE PERMIT (CUP) APPLICATION TO OPERATE A 1,600-SQUARE
FOOT CANNABIS MANUFACTURING FACILITY WITHIN AN EXISTING
INDUSTRIAL BUILDING LOCATED AT 4779 EAST RAMON ROAD, ZONE M-1,
SECTION 18 (CASE 5.1477 CUP). (ER)
Principal Planner Robertson presented the proposed project as outlined in the staff
report.
JAY TAKACS, Odor Control Specialist, was available for questions from the
Commission.
Chair Woods opened the public hearing:
BOB HILLMAN, CEO, Labyrinth Xtracts, and JAMES HILL, Co -CEO, explained the
extraction process, odor control measures, fire suppression and custom design for the
small building.
KYLE HUSFLOEN, Demuth Park area, although he appreciates the applicant's work at
containing the odor and other chemicals; he thinks this project should be considered in
a Green Zone rather than placing it within a block or two of residential areas. He
requested that the problem of over -saturation in this area be kept in mind when
reviewing projects that are currently in the process.
BOB HILLMAN, applicant rebuttal, said they have followed all the City and State rules.
He said they selected this location because it is permitted for cannabis use.
There being no further speakers the public hearing was closed.
Commissioner Donenfeld said it is difficult because the law will change as of January
2020, but the applicant has shown sufficient safeguards with respect to issues that
concern them and the community. He spoke in support of approving this project.
Commissioner Song spoke in support of the project with two added conditions.
Donenfeld, seconded by Song to approve with the following changes:
1. The applicant shall incorporate the restroom currently located at the
rear of the building into the main cannabis facility.
2. The applicant shall make additional architectural enhancements to the
site and cannabis facility building to be review by city Council.
AYES: DONENFELD, SONG, WOODS
NOES: GARNER, HIRSCHBEIN
ABSENT: MORUZZI
4
Planning Commission Minutes
November 13, 2019
City of Palm Springs
2C. NEW CHURCH II, LLC FOR A TIME EXTENSION OF THE
ENTITLEMENTS TO RENOVATE THE EXISTING HISTORIC
COMMUNITY CHURCH AND ORCHID TREE INN FOR ADAPTIVE RE-
USE, AND DEMOLISH PORTIONS OF THE SITE FOR THE
CONSTRUCTION AND OPERATION OF A HOTEL WITH ACCESSORY
SPA, RESTAURANT AND MEETING SPACE ON A 3.1-ACRE SITE
LOCATED AT 222 SOUTH CAHUILLA ROAD, ZONE R-3, SECTION 15
(CASE 5.1345 CUP, HSPB 23, HSPB 72 & 3.0678 MAJ). (DN)
Hirschbein, seconded by Song to continue the item and public hearing to the regularly
scheduled meeting of December 11, 2019.
AYES: DONENFELD, GARNER, HIRSCHBEIN, SONG, WOODS
ABSENT: MORUZZI
2D. CITY OF PALM SPRINGS FOR A CHANGE OF ZONE AT THREE
LOCATIONS: (1) CITY -OWNED PROPERTY ZONED "CU" AT 190
WEST SUNNY DUNES ROAD, (2) CITY -OWNED PROPERTY ZONED
"CU" LOCATED SOUTHWEST OF THE INTERSECTION OF NORTH
INDIAN CANYON DRIVE AND STEVENS ROAD, AND (3) PRIVATELY -
OWNED PROPERTY ZONED "CU" AT 342 NORTH PALM CANYON
DRIVE (CASE 5.1467 CZ). (DN)
Principal Planner Newell presented the proposed change of zone for three locations as
outlined in the staff.
Chair Woods opened the public hearing and with no speakers coming forward, the
public hearing was closed.
Song, seconded by Hirschbein to recommend approval of the proposed zoning map
amendments to the City Council.
AYES: DONENFELD, GARNER, HIRSCHBEIN, SONG, WOODS
ABSENT: MORUZZI
2E. CITY OF PALM SPRINGS FOR A ZONE TEXT AMENDMENT TO
ALLOW RESIDENTIAL USES IN PROFESSIONAL ZONES WHERE
SPECIFICALLY PERMITTED BY THE GENERAL PLAN LAND USE
ELEMENT (CASE 5.1467 ZTA). (DN)
Principal Planner Newell presented the proposed zone text amendment as outlined in
the staff report.
Planning Commission Minutes
November 13, 2019
City of Palm Springs
Chair Woods opened the public hearing and with no speakers coming forward, the
public hearing was closed.
Song, seconded by Hirschbein to recommend approval of the proposed zoning code
amendments to the City Council.
AYES: DONENFELD, GARNER, HIRSCHBEIN, SONG, WOODS
ABSENT: MORUZZI
Commissioner Donenfeld left at 3:37 pm for the remainder of meeting.
A recess was taken at 3:37 pm. The meeting resumed at 3:46 pm.
3. UNFINISHED BUSINESS:
3A. FAR WEST INDUSTRIES FOR THE FINAL DEVELOPMENT PLAN AND
A REVISED TENTATIVE TRACT MAP TO CONSTRUCT "ELAN" — A
RESIDENTIAL PROJECT CONSISTING OF (56) SINGLE-FAMILY
RESIDENCES, (25) MULTI -FAMILY RESIDENTIAL CONDOMINIUMS
AND RELATED ON -/OFF -SITE IMPROVEMENTS ON A 12.38-ACRE
SITE LOCATED AT 777 SOUTH PALM CANYON DRIVE, ZONE PD-379
(CASE NOS. 5.1378 PD-379 & TTM 36914). (DN)
Principal Planner Newell presented the proposed project as outlined in the staff report.
IRA GLASICY, Far West Industries, provided details on the revisions to the project as
outlined in the staff memorandum.
JARVIS PAYNE, RGA Landscape, landscape architect, provided details on the
landscape design adjacent to the Tahquitz Creek (will all be native plants per the
Tahquitz Creek Master Plan).
BRIAN BERKSON, Far West Industries, project manager, stated that this development
has been through many iterations, owner and developers. Far West has a tradition of
building what they start and have built many communities out here such as Tuscany
Heights and Murano. He said they took the Commission's comments made at the last
meeting to heart and have incorporated those changes into what they have before
them. He provided details on the additional site simulations on Belardo Road. He said
they are proposing the walls along Belardo Road be wrought iron instead of breeze -
block or solid wall and provided a simulation with a view of the mountain.
Commissioner Hirschbein thanked the applicant for looking at their concerns seriously.
He thinks the change to the original pad elevations along the west side of the site will
cause a substantial impact to the development. He is sensitive to the removal of the
public benefit to this project and the important view corridor on the south end. He thinks
9
Planning Commission Minutes
November 13, 2019
City of Palm Springs
there are options for the drainage concerns such as reconfiguration of the houses. He
has a concern with the public's desire for this view corridor.
Commissioner Song said that she is under-whelmed by the site perimeter design and
the impact on Belardo Road. She said when the elevation was lower it was a lesser
impact onto the street. She thinks the houses are too close to the edge of the street
and the buildings are too close together.
Commissioner Garner said she is concerned about how close the homes are to the
street.
Chair Woods said that although he agrees with his the Commissioners; however, he
thinks that they have done all they can with the direction the Commission gave them.
He suggested providing conditions for the developer and with that made a motion for
approval.
Chair Woods, seconded by Song to approve with conditions as follows:
1. Fence/wall facing Belardo Road shall have an undulating/offset design along
the street.
2. Dog park fencing to be revised.
3. Palm trees to be up and down -lit at project entry.
4. Landscape bulb -outs to be enhanced with additional landscape.
5. Palm trees along west side of Palm Canyon Drive to be consistent with the
design on the east side of the street.
6. Tahquitz Creek trailhead to be well -lit and include pedestrian fixtures
(benches, etc.).
7. Buildings along Belardo Road to be setback a minimum of 10-feet.
8. Enhance entry to project.
AYES: SONG, WOODS
NOES: GARNER, HIRSCHBEIN
ABSENT: DONENFELD, MORUZZI
MOTION FAILED, DUE TO A TIE VOTE.
Song, made a motion to deny the project based the finding that the pad elevations are
not consistent with the Preliminary Planned Development.
MOTION FAILED, DUE TO A LACK OF SECOND.
Woods, seconded by Song to approve with the following changes:
7
Planning Commission Minutes
November 13, 2019
City of Palm Springs
1. Fence/wall facing Belardo Road shall have an undulating/offset design along
the street.
2. Dog park fencing to be revised.
3. Palm trees to be up and down -lit at project entry.
4. Landscape bulb -outs to be enhanced with additional landscape.
5. Palm trees along west side of Palm Canyon Drive to be consistent with the
design on the east side of the street.
6. Tahquitz Creek trailhead to be well lit and include pedestrian fixtures
(benches, etc.).
7. Buildings along Belardo Road to be setback a minimum of 10-feet.
8. Enhance entry to project.
9. The applicant to work with staff on the above requirements.
AYES: GARNER, SONG, WOODS
NOES: HIRSCHBEIN
ABSENT: DONENFELD, MORUZZI
PLANNING COMMISSION REPORTS, REQUESTS AND COMMENTS:
• The Commission bid farewell to recently appointed City Council members,
Dennis Woods and Grace Garner.
CITY COUNCIL LIAISON REPORT: NONE.
PLANNING DIRECTOR'S REPORT:
• 2020 Public Meeting Schedule
• Joint AAC and Planning Commission Meeting
• Status of Tova Hotel and Dream Hotel
ADJOURNMENT: The Planning Commission adjourned at 5:10 pm to 1:30 pm,
Wednesday, December 11, 2019, City Hall, Council Chamber, 3200 East Tahquitz
Canyon Way.
Flinn Fagg, AIC
Director of Planning Services