Loading...
HomeMy WebLinkAboutCUP 2024-0003_650 Commercial Road_Presentation_20240724 - Item 2BUnited Parcel Service (UPS) 650 North Commercial Road Planning Commission ReviewCase CUP 2024-0003 July 24, 2024 * Architectural drawings and renderings provided by: RED Architectural Group PLANNING SERVICES DEPARTMENT Site Details: Property address: 650 N. Commercial Road APN #507-380-024 Zone District: Planning Research and Development Park (M-1-P) General Plan: Industrial (IND) Project Site & Context PLANNING SERVICES DEPARTMENT Approval Request: Conditional Use Permit (CUP) to allow for the expansion of the site. Project Site & Context PLANNING SERVICES DEPARTMENT Site Context Photograph 2: South Elevation of the existing building viewed from North Commercial Road. ** COMPLAINTS REGARDING COMMERICAL ACTIVITY ON COMMERCIAL ROAD: UPS has removed all commercial vehicles off Commercial Road since the submission and processing of this CUP request. Scope of work addresses this concern and the Planning conditions of approval address this concern. Site Context Photograph 1: Aerial view showing surrounding uses. AIRPORT VACANT STORAGE RELIGIOUSVACANTMEDICAL OFFICE Project Site & Context PLANNING SERVICES DEPARTMENT Existing Condition: “Portable Distribution Center” (PDC) attached to existing structure Existing Condition: PDC and package truck in use Existing Condition: Condition of PDC units on site Proposed Site Plan Parking Requirements: Distribution (Transportation Terminal): 25,432 sf Parking Ratio = 1/800 sf Office Use: 1,188 sf Parking Ratio = 1/200 sf Required Parking = 38 spaces Provided Total: 219 spaces (151 additional spaces provided) •7 accessible spaces & 7 EV spaces*) 120 package truck spaces (50 additional spaces provided) 23 trailer spaces (15 additional spaces provided) *An additional 3 EV spaces are required. This is included in the Planning Conditions of Approval. Proposed Site Plan Parking Requirements: Distribution (Transportation Terminal): 25,432 sf Parking Ratio = 1/800 sf Office Use: 1,188 sf Parking Ratio = 1/200 sf Required Parking = 38 spaces Provided Total: 219 spaces (151 additional spaces provided) •7 accessible spaces & 7 EV spaces*) 120 package truck spaces (50 additional spaces provided) 23 trailer spaces (15 additional spaces provided) *An additional 3 EV spaces are required. This is included in the Planning Conditions of Approval. Area of illegal expansion Proposed Site Plan 68 existing parking spaces Parking Requirements: Distribution (Transportation Terminal): 25,432 sf Parking Ratio = 1/800 sf Office Use: 1,188 sf Parking Ratio = 1/200 sf Required Parking = 38 spaces Provided Total: 219 spaces (151 additional spaces provided) •7 accessible spaces & 7 EV spaces*) 120 package truck spaces (50 additional spaces provided) 23 trailer spaces (15 additional spaces provided) *An additional 3 EV spaces are required. This is included in the Planning Conditions of Approval. Area of illegal expansion Proposed Site Plan 68 existing parking spaces 50 additional package truck spaces Parking Requirements: Distribution (Transportation Terminal): 25,432 sf Parking Ratio = 1/800 sf Office Use: 1,188 sf Parking Ratio = 1/200 sf Required Parking = 38 spaces Provided Total: 219 spaces (151 additional spaces provided) •7 accessible spaces & 7 EV spaces*) 120 package truck spaces (50 additional spaces provided) 23 trailer spaces (15 additional spaces provided) *An additional 3 EV spaces are required. This is included in the Planning Conditions of Approval. Area of illegal expansion Proposed Site Plan 68 existing parking spaces 50 additional package truck spaces 15 additional trailer parking spaces Parking Requirements: Distribution (Transportation Terminal): 25,432 sf Parking Ratio = 1/800 sf Office Use: 1,188 sf Parking Ratio = 1/200 sf Required Parking = 38 spaces Provided Total: 219 spaces (151 additional spaces provided) •7 accessible spaces & 7 EV spaces*) 120 package truck spaces (50 additional spaces provided) 23 trailer spaces (15 additional spaces provided) *An additional 3 EV spaces are required. This is included in the Planning Conditions of Approval. Area of illegal expansion Preliminary Landscape Plan PLANNING SERVICES DEPARTMENT Parking Shading Requirements: 50 + spaces = 50% minimum of parking area to be shaded. No covered shade structure is proposed. Development StandardsPLANNING SERVICES DEPARTMENT Conditional Use Permit: PSZC 92.02.00 (B)(6)Compliance That the use applied for at the location set forth in the application is properly one for which a conditional use permit is authorized by this Zoning Code.Y That the use is necessary or desirable for the development of the community, is in harmony with the various elements or objectives of the general plan and is not detrimental to existing uses or to future uses specifically permitted in the zone in which the proposed use is to be located. Y That the site for the intended use is adequate in size and shape to accommodate such use, including yards, setbacks, walls or fences, landscaping and other features required in order to adjust such use to those existing or permitted future uses of land in the neighborhood. Y That the site for the proposed use relates to the streets and highways properly designed and improved to carry the type and quantity of traffic to be generated by the proposed use.Y That the conditions to be imposed and shown on the approved site plan are deemed necessary to protect the public health, safety and general welfare and may include minor modification of the zone’s property development standards. Y Conclusion A “Transportation Terminal” for package distribution is considered an appropriate use in the M-1-P zone district. The proposal to expand the existing use by enlarging the building and associated parking will allow for all commercial operations of the current business to be contained within the property boundaries. The Conditional Use Permit request meets the findings and criteria pursuant to PSZC Section 94.02.00(B)(6). Staff Recommendation Recommends the Planning Commission (PC) approve the proposed application (CUP 2024-0003) for the establishment of a Conditional Use Permit for the existing UPS transportation terminal and the completion of related site improvements, subject to the conditions listed in Exhibit A which is attached to the draft resolution. PLANNING SERVICES DEPARTMENT