Loading...
HomeMy WebLinkAboutPresentation Item - Bridge updateBridge Project Update Five Federally Funded Bridges andIndian Canyon Flooding/Blow Sand Bridge June 13, 2024 ENGINEERING SERVICES INDIAN CANYON VISTA CHINO RAMON ROAD E. PALM CANYON S. PALM CANYON 1 Funding Projects Initiated by City between 2001 -2012Federal Funds •Highway Bridge Program (88.53% Participation)Coachella Valley Association of Governments •Measure A Regional (75% of 11.47% Participation)City of Palm Springs •Measure A Local (25% of 11.47% Participation) ENGINEERING SERVICES 2 Escalating Project Costs “Bridge construction cost in California have increased significantly… by more than 35% on average from 2021 to 2024. …. It is due to the strong economy…… and plenty of projects in the market to bid. The s ta te -wide average unit price on certain construction items increased by more than 70% from 2021 to 2023…… unit price in District 8 (our district) has increases by more than 45%.” One example of escalating costs is the Vista Chino Bridge.. “the original estimate without Value Engineering increased from $67 million to $113 million through the life of the project. With the Value Engineering exercise design revision, the cost was lowered to $94 million.” Ja mes Lu – CNS Engineering ENGINEERING SERVICES 3 Typical Phases •Preliminary Engineering •Environmental (CEQA/NEPA) •Right of Way (Temporary and Permanent Easements) •Value Engineering (High-Cost Bridges) •Final Engineering, Specifications and Cost Estimate •Bidding •Construction ENGINEERING SERVICES 4 Location - Indian Canyon Drive at the Railroad Year Project Initiated - 2001 Phase - Construction Cost (actual) - $45,000,000 Anticipated Completion – April 2026 Contractor – Steve P. Rados Engineer – Dokken Engineering Construction Manager – Harris and Associates ENGINEERING SERVICES 5 Location – South Palm Canyon over Tahquitz Creek Year Project Initiated - 2012 Phase – Bidding Cost (Anticipated) - $10 Million Anticipated Start of Construction – Late 2024 Engineer – CNS Engineering Bridge Replacement and Widening ENGINEERING SERVICES 6 Location – Ramon Road over Whitewater River Year Project Initiated - 2008 Phase – Right of Way Cost (Anticipated) - $40 Million Anticipated Start of Construction – Late 2025 Engineer – CNS Engineering Bridge Widening and Retrofitting ENGINEERING SERVICES 7 Location – East Palm Canyon over Palm Canyon Wash Year Project Initiated - 2012 Phase – Right of Way Cost (Anticipated) - $15 Million Anticipated Start of Construction –Late 2025 Engineer – Dokken Engineering Bridge Widening and Retrofitting ENGINEERING SERVICES 8 Location – Vista Chino over Whitewater River Year Project Initiated - 2010 Phase – Right of Way Cost (Anticipated) - $105 Million Anticipated Start of Project – Mid 2027 Engineer – CNS Engineering New Bridge at Low Water Crossing ENGINEERING SERVICES 9 Location - Indian Canyon Drive at Wash Year Project Initiated – 2019/20 CVAG Phase – Preliminary Engineering Cost (anticipated) - $100 Million Anticipated Construction – Early 2027 Engineer – Michael Baker International ENGINEERING SERVICES 10 Questions? Five Federally Funded Bridges andIndian Canyon Flooding/Blow Sand Bridge June 13, 2024 ENGINEERING SERVICES 11