HomeMy WebLinkAboutPresentation B - Convention Center PresentationPalm Springs Convention Center
Master Plan
Rob Hampton, General Manager
March 28, 2024
Palm Springs City Council
03.28.2024
MASTER PLAN
palmsprings
convention center
Reflect the Spirit
of Palm Springs
Achieve Design
Continuity
Elevate Technology
and Infrastructure
vision&goals
Upgraded convention center serves as an economic catalyst
for client retention and attraction
GUIDING PRICIPLES
thespiritofpalmsprings
vision&goalsexistingfacility
Interior Renovation Refresh Exterior Infrastructure
Upgrades
3areas ofmodernization
•Exhibit Halls
•Primrose Ballroom
•Meeting Rooms
•Lobby &Corridor
•Exterior Paint
•Upgrade Landscape
•Patch &Repair Room
•Replace Chiller
phase1 E Amado Road
E Andreas Road NAvenidaCaballerosNCalleAlvaradoConnecting Corridor
Refresh
Smoketree &Mesquite
Meeting Room Refresh
Exhibit Hall Refresh
Refresh Restrooms
Replace Existing Chiller
Primrose Ballroom Refresh
Lobby Refresh
Refresh Exterior
Landscape
continuityofdesign
EXHIBIT HALLS
EXISTING
•Re-Finish Air Walls
•Re-Finish Acoustic Panels
•Paint
•Carpet and Base
•Refinish Ceilings
•Lighting and Controls
•Selective Demolition
continuityofdesign
CONNECTING CORRIDOR
EXISTING
•Paint
•Carpet and Base
•Refinish Ceilings
•Lighting and Controls
•LED Signage
•Selective Demolition
preliminarycost estimate
Subtotal $22,592,773
Total
Total Cost of the Work by Subcontractor
General Contractor's General Conditions,Bonds &
Insurance,GC Fee,Design Contingency
Assume 3 years to midpoint of construction
Project Changes during Design &Construction
A/E Fees,Permit Fees,Tests &Inspections.Excludes
FF&ETOTALDirectConstructionCost$22,592,773
Indirect Construction Cost 37%$8,359,326
Years to Mid-Point of Construction 15%$3,388,916
A Total Construction Costs $34,341,015
Owner's Project Contingency 10%$3,434,101
Soft Costs 15%$5,151,152
B Total Project Cost $42,926,268
Description Cost/Unit Unit Quantity Total Comments
1 Lobby Refresh $65 SF 22,155 $1,440,075 Includes Comprehensive New Lighting System
Throughout Facility
2 Primrose Ballroom Refresh $65 SF 20,244 $1,315,860 Includes New Lighting System Throughout Facility
3 Oasis Exhibit Hall Refresh $60 SF 94,440 $5,666,400 Includes New Lighting System Throughout Facility
4 Connecting Corridor Refresh $60 SF 13,744 $824,640 Includes New Lighting System Throughout Facility
5 Mesquite &Smoketree Meeting
Rooms Refresh $70 SF 17,730 $1,241,100 Includes New Lighting System Throughout Facility
6 Restroom Refresh $150 SF 5,000 $750,000 Assumes Replacement of Finishes Only.Minimal
Plumbing Rework
7 Replace Existing Chiller $30 SF 251,731 $7,551,930
8 Patch &Repair Existing Roof $19 SF 269,173 $767,143 Assume Patch &Repair of 15%of Roof
9 Exterior Paint &Accent Lighting $7 SF 251,731 $1,792,325
10 Refresh Exterior Landscape $50 SF 24,866 $1,243,300 Remove &Replace Existing Landscaping & Irrigation
at Building Perimeter.Includes removing/replacing
existing two electronic marquees
futurephases
modernization/addition
jlhplaza&east lawn
RE-WORK &EXPANSION
JLH Plaza East Lawn
LOBBY
5,227 SF
MEETING
ROOM
950 SF
MEETING
ROOM
950 SF
MEETING
ROOM
950 SF
KITCHEN
PREP
300 SF
OUTDOOR
SPACE
OUTDOOR
SPACE OUTDOOR
SPACE
ENTRY PLAZA
east entry expansion
Proposed Expansion
Existing East Entry
(Street View)
east entry expansion
•p -L &::...--""'""
,_.;:a,..-;s.:::
..I '-Ir._.............,,........-.,::;....._,-_,
-'.'
-pr --r"-------..----:,..
--::-::
next steps
•Community Engagement
•Secure City Funding for Project
•Develop Agreement for Design Services
•Design Services (Approx.10 Months)
•Plan Check (Approx.4 Months)
•Construction (Approx.12 Months)
thankyou
Palm Springs Convention Center
Master Plan Report Summary
Scott White, President & CEO
Visit Greater Palm Springs
March 28, 2024
Palm Springs City Council
18
ROOM NIGHT IMPACTS
19
FINANCIAL & ECONOMIC IMPACTS
Thank You!