I NTE RN AT 10 N AL A I R PORT
AIRPORT COMMISSION MEETING
Agenda Item Executive Summary
Airport Conference Room, Palm Springs International Airport
3400 E. Tahquitz Canyon Way, Palm Springs, CA 92262
Wednesday, December 20, 2023 - 5:30 P.M.
The following agenda items were distributed on the next regular business day after the
Airport Commission agenda packet was distributed to the Airport Commission, and at
least 24 hours prior to the Airport Commission meeting.
AGENDA ITEM 6 — Minutes
ATTACHMENT: July 19, 2023 Minutes
AGENDA ITEM 7.113 — Master Plan Update
ATTACHMENTS:
Commission Questions and Answers
The slide titled 'Terminal Project Benchmarking NOT apples to apples" has been removed and
replaced by the following two slides: 1. Terminal Benchmarking (page 52); and 2. PSP Cost per
Gate by Phase (page 53).
AGENDA ITEM 11.A—Airline Activity Report November 2023
ATTACHMENT: Airline Activity Report November 2023
AGENDA ITEM 11.B —Airline Activity Report Fiscal Year Comparison
ATTACHMENT: Airline Activity Report Fiscal Year Comparison
springs
palm
INTERNATIONAL AIRPORT
AIRPORT COMMISSION MEETING AGENDA
Airport Conference Room, Palm Springs International Airport
3400 E. Tahquitz Canyon Way, Palm Springs, CA 92262
Wednesday, December 20, 2023 - 5:30 P.M.
Pursuant to Assembly Bill 361, this meeting may be conducted by teleconference. There will
be in -person public access to the meeting location.
To submit your public comment to the Airport Commission electronically. Material may be emailed
to: Christina. Brown palmspringsca.aov - Transmittal prior to the start of the meeting is required. Any
correspondence received during or after the meeting will be distributed to the Airport Commission and
retained for the official record.
This is a hybrid in -person and virtual meeting. To virtually observe the meeting or to virtually provide
public comments, please use the following Zoom link
https://us02web.zoom.us/i/86019815290?pwd=ZitOZDllyeGZhNUNEQNkU29nTUdPdz09
or call (669) 900-6833 and enter Meeting ID: 860 1981 5290 - Passcode: 583916
City of Palm Springs:
Riverside County:
Margaret Park
City of Cathedral City:
Tony Michaelis
City of Palm Desert:
Kevin Wiseman
Aftab Dada -
Chair
David Feltman
Kevin J. Corcoran
Vice Chair
J Craig Fong
City of Indian Wells:
Robert Berriman
City of Coachella:
Denise Delgado
City of Rancho Mirage:
Keith Young
Vacant
Tracy Martin
Todd Burke
M. Guillermo 5uero
City of La Quinta:
Kathleen Hughes
City of Desert Hot Springs:
Jan Pye
City of Indio:
Rick Wise
Daniel Caldwell
Dave Banks
Palm Springs City Staff
Scott C. Stiles Harry Barrett Jr., A.A.E. Jeremy Keating
City Manager Airport Executive Director Assistant Airport Director
1. CALL TO ORDER — PLEDGE OF ALLEGIANCE
2. POSTING OF AGENDA
3. ROLL CALL
4. ACCEPTANCE OF AGENDA
5. PUBLIC COMMENTS: Limited to three minutes on any subject within the purview of
the Commission
6. APPROVAL OF MINUTES: Minutes of the Airport Commission Regular Meeting of
July 19, 2023
Airport Commission Meeting Agenda
December 20, 2023 — Page 2
7. DISCUSSION AND ACTION ITEMS:
7.A Follow-up to Strategic Planning Session Update
7.13 Master Plan Update
7.0 Financial Summary Update
7.13 Marketing Update
7.E Concessions Update
7.F Projects and Airport Capital Improvement Program Update
8. EXECUTIVE DIRECTOR REPORT
9. COMMISSIONERS REQUESTS AND REPORTS
10. REPORT OF COUNCIL ACTIONS:
10.A Past City Council Actions
10.13 Future City Council Actions
11. RECEIVE AND FILE:
11.A Airline Activity Report November 2023
11.13 Airline Activity Report Fiscal Year Comparison
12. COMMITTEES:
12.A Future Committee Meetings
12.13 Updated Committee's Roster
ADJOURNMENT:
The Airport Commission will adjourn to a Regular Meeting on January 17, 2024, at 5:30
P.M.
AFFIDAVIT OF POSTING
I, Harry Barrett, Jr., Airport Executive Director, City of Palm Springs, California, hereby certify this
agenda was posted on December 14, 2023, in accordance with established policies and
procedures.
PUBLIC NOTICES
Pursuant to G.C. Section 54957.5(b)(2) the designated office for inspection of records in
connection with the meeting is the Office of the City Clerk, City Hall, 3200 E. Tahquitz Canyon
Way. Complete Agenda Packets are available for public inspection at: City Hall Office of the City
Clerk. Agenda and staff reports are available on the City's website www.palmspringsca.gov. If
you would like additional information on any item appearing on this agenda, please contact the
Office of the City Clerk at
(760) 323-8204.
It is the intention of the City of Palm Springs to comply with the Americans with Disabilities Act
(ADA) in all respects. If, as an attendee or a participant at this meeting, or in meetings on a regular
basis, you will need special assistance beyond what is normally provided, the City will attempt to
accommodate you in every reasonable manner. Please contact the Department of,Aviation, (760)
318-3800, at least 48 hours prior to the meeting to inform us of your particular needs and to
springs
►�- palm
INTERNATIONAL AIRPORT
AIRPORT COMMISSION
ACTION SUMMARY MINUTES OF REGULAR ADJOURNED MEETING
Wednesday, July 19, 2023 — 5:30 P.M.
1. CALL TO ORDER:
Chairman Dada called the Airport Commission Meeting to order at 5:30 P.M., and he
invited Vice Chairman Corcoran to lead the Pledge of Allegiance. The meeting was
held in -person and via videoconference.
2. POSTING OF THE AGENDA: Posted on July 13, 2023.
3. ROLL CALL:
Commissioners Present:
Gerald Adams Palm Springs)
Kathleen Hughes La Quinta
Robert Berriman Indian Wells
Scott G. Miller Palm Springs)
Todd Burke Palm Springs)
Tony Michaelis Cathedral City)
Daniel Caldwell Palm Springs)
Margaret Park Riverside Count
Kevin Corcoran Palm Springs) - Vice Chair
Jan P e Desert Hot Springs)
Aftab Dada Palm S rings) - Chair
Rick Wise(City of India
Denise Delgado Coachella
Kevin Wiseman Palm Desert
David Feltman Palm Springs)
Keith Young Rancho Mirage)
J Craig Fong Palm Springs)
Commissioners Absent: M Guillermo Suero (Palm Springs)
Staff Present:
Harry Barrett, Jr., Airport Executive Director
Jeremy Keating, Assistant Airport Director
Daniel Meier, Deputy Director of Aviation, Marketing and Air Service
Victoria Carpenter, Airport Administration Manager
Brenda Pree, City Clerk
Geremy Holm, City Attorney
Christina Brown, Executive Program Administrator
4. NOMINATION AND ELECTION OF OFFICERS:
City Clerk Pree explained the nomination and election process.
Page 1 of 8
ITEM 6
Palm Springs Airport Commission
Action Summary Minutes of Regular Adjourned Meeting
July 19, 2023
Commissioner Adams nominated Chairman Dada to be re-elected as Chairman.
There were no other nominees submitted by the Commission, and Ms. Pree
announced the re-election of Chairman Dada.
Commissioner Wiseman nominated Vice Chairman Corcoran to be re-elected as Vice
Chairman. There were no other nominees submitted by the Commission, and Ms.
Pree announced the re-election of Vice Chairman Corcoran.
6. ACCEPTANCE OF THE AGENDA:
ACTION: Accept the Agenda as presented. Moved by Commissioner Young,
seconded by Commissioner Wise, and unanimously approved noting the
absence of Commissioner Suero.
6. PUBLIC COMMENTS: None
7. APPROVAL OF THE MINUTES:
ACTION: Approve the minutes of the Airport Commission Meeting of March 15, 2023.
Moved by Commissioner Burke, seconded by Vice Chairman Corcoran and
approved by the following roll call vote 12 Yes; 4 Abstain; and noting that
Commissioner Delgado was inadvertently not included in the roll call vote and
with the absence of Commissioner Suero.
8. INTRODUCTIONS AND PRESENTATIONS:
&A Airport Commissioner Daniel Caldwell (Palm Springs)
Chairman Dada introduced newly appointed Airport Commissioner Daniel Caldwell
(Palm Springs). Commissioner Caldwell said that he and his wife have been residents
of Palm Springs for approximately 11 years, and he is a structured settlement
specialist. Commissioner Caldwell said that he believed that the Airport was on to
something big, and he was excited to be serving on the Commission.
83 Airport Commissioner J Craig Fong (Palm Springs)
Chairman Dada introduced newly appointed Airport Commissioner J Craig Fong
(Palm Springs). Commissioner Fong said that he was a semi -retired immigration
lawyer and that he had been in his profession for approximately 40 years.
Commissioner Fong said that he was looking forward to expanding the Airport's
international reach and improving the Airport's baggage handling system. He said that
it was important to him to make sure that the Airport is being responsive to the needs
of the passengers and the airlines, and Commissioner Fong said that he would like to
see if there could be a way to even out the number of flights during the off-season.
Page 2 of 8
Palm Springs Airport Commission
Action Summary Minutes of Regular Adjourned Meeting
July 19, 2023
8.0 Airport Commissioner Denise Delgado (Coachella)
Chairman Dada introduced newly appointed Airport Commissioner Denise Delgado
(Coachella). Commissioner Delgado noted that she is a City of Coachella
Councilwoman that was elected in 2020, and she is a teacher. Commissioner Delgado
said that she was proud to be serving on the Commission.
8.D Airport Commissioner Robert Berriman (Indian Wells)
Chairman Dada introduced newly appointed Airport Commissioner Robert Berriman
(Indian Wells). Commissioner Berriman noted that he had previously served two terms
on the Airport Commission and that he had served on the Business Development and
Operations, Properties and Facilities Committees. He said that he was fully retired, a
volunteer with the Friends of the Desert Mountains, his background was primarily law
enforcement with the California Highway Patrol Air Operations Unit, and he is a pilot.
Commissioner Berriman said that he truly loves the Airport.
8.E Airport Commissioner Margaret Park (Riverside County)
Chairman Dada introduced newly appointed Airport Commissioner Margaret Park
(Riverside County). Commissioner Park said that she is the chief planning officer for
the Agua Caliente Band of Cahuilla Indians in Palm Springs, she has had the privilege
of working for the tribal government since she was 21 years old, and she said that she
is serving on the Commission because the Airport is located within the Agua Caliente
reservation.
9. DISCUSSION AND ACTION ITEMS:
9.A Operations, Properties and Facilities Committee Update
Committee Chairman Feltman said that an update had been provided at the previous
Airport Commission meeting and that he had no further updates to provide to the
Commission.
9.13 Ad Hoc Design Review Committee Update
Committee Chairman Corcoran outlined the responsibilities of the Ad Hoc Design
Review Committee for the new Commissioners, and he reported that Paradies had
notified the Committee that the original vision for the projection system that would
project local events on to the ceiling of the Cactus to Clouds Bar that was be
developed in the Bono Concourse was not going to be possible because Paradies
had determined that the projections would not be visible during the daylight hours. He
said that the designers presented an alternative design that added television monitors
to the posts of the bar to promote local events.
Page 3 of 8
Palm Springs Airport Commission
Action Summary Minutes of Regular Adjourned Meeting
July 19, 2023
Committee Chairman Corcoran asked Airport Administration Manager Carpenter if the
concession projects were on schedule. Ms. Carpenter reported that there had been
some slight delays that were due to building permit delays, and she said that the
Airport Planner was aggressively working with City staff to get the building permits
processed as quickly as possible.
9.0 Marketing and Business Development Committee Update
Committee Chairman Burke reported that the Committee had met on July 12th, and he
said that Deputy Director of Aviation, Marketing and Air Service Meier had provide
updates on the Airport's new branding, customer experience, and advertising. He said
that Mr. Meier had reported to the Committee that Phase 1 of the Airport's new
branding rollout had stated on July 10th which focused on the new look and feel of the
Airport's website, social media, advertising, Navigator uniforms, in terminal signage,
media backdrop, and podium sign.
Committee Chairman Burke said that Mr. Meier had reviewed several exciting
customer experience projects that staff was exploring which included a Dementia
Friendly certification, an online Lost and Found Program, and a Ship to Home Program
to help passengers ship home prohibited TSA items. He also said that there were
several projects that were being rolled out such as Good Maps which is designed to
assist visually impaired customers, and a therapy dog program to help reduce
customer anxiety.
Committee Chairman Burke said that Mr. Meier had reported that the Airport's
advertising contractor Fuse had presented some significant revenue opportunities,
and he said that the Committee was pleased with Fuse's performance. Vice Chairman
Corcoran referred to the Fuse contract, and he asked if there had been any changes
made to the technology or equipment being used for advertising. Committee Chairman
Burke said that he would defer the question to Mr. Meier. Commissioner Fong asked
for information on the different phases of the Airport's branding roll out. Committee
Chairman Burke said that he believed that Mr. Meier would be providing information
on the phases in the Marketing Update.
9.D Marketing and Air Service Update
Deputy Director of Aviation, Marketing and Air Service Meier presented the July 2023
Marketing and Air Service update. Commissioner Fong inquired about the branding
phases. Mr. Meier explained that there was a significant number of steps in the
branding phases and that most importantly anything that has the old logo would need
to be updated with the new logo.
Vice Chairman Corcoran referred to the Fuse contract, and he asked if Fuse would be
doing anything new with the advertising technology or equipment. Mr. Meier said that
Lamar had removed the digital static screens in the baggage claim area and that Fuse
Page 4 of 8
Palm Springs Airport Commission
Action Summary Minutes of Regular Adjourned Meeting
July 19, 2023
would be placing new digital screens in the baggage claim area, and he said that the
majority of the static screens throughout the Airport would be replaced with the digital
screens which would allow for the advertising to be changed more quickly. Mr. Meier
noted that the static screens that were in the courtyard had been damaged by the heat
and that Fuse was looking into retrofitting those screens.
9.E Financial Summary Update
Airport Administration Manager Carpenter provided an overview of the financial
summary ending on June 30, 2023. Commissioner Caldwell inquired about the fiscal
year period. Ms. Carpenter explained that the fiscal year was from July 1, 2022 to
June 30, 2023. Commissioner Wise suggested that Ms. Carpenter explain to the new
Commissioners how some of the funds can only be used for certain projects. Ms.
Carpenter explained that Fund 405 could be used for the consolidated rental car
facility, and the PFC funds could be used for FAA approved projects.
Chairman Dada thanked Ms. Carpenter for sharing the investment policy with the
Commission, and he asked about the allowable length of time for an investment. Ms.
Carpenter said that she would need to provide that information at a future Commission
meeting. Chairman Dada asked if the City would retain the interest income or if the
Airport would receive the interest income. Ms. Carpenter said that the Airport would
receive the interest income. Chairman Dada inquired about what the interest income
could be used for. Ms. Carpenter said that the interest income would go into the
Operations and Maintenance revenue account.
9.F Concessions Update
Airport Assistant Director Keating reported that both Paradies and The Marshall Retail
Group (MRG) continue to be responsive to staffs requests and that the Airport staff
holds weekly meetings with Paradies and MRG. He said that staff had received 20
separate design packages which were being reviewed by staff. Mr. Keating reviewed
the schedule for the concession projected opening dates. Commissioner Wiseman
requested that the original project completion dates be provided in the schedule so
that the Commission can see the schedule changes.
9.G Projects and Airport Capital Improvement Program Update
Airport Executive Director Barrett noted that the update had been provided in the
agenda packet, and he reported that staff would be submitting a staff report to the City
Council for the approval of a construction manager at risk agreement with Skansa
USA Building Inc. for the expansion of the baggage claim. Mr. Barrett explained that
in February 2023, the Airport had been awarded a $5.7 million competitive FAA grant
for the renovation of the baggage claim, and staff learned in May that the Airport had
a July 31st deadline to have the construction management agreement in place.
Page 5 of 8
Palm Springs Airport Commission
Action Summary Minutes of Regular Adjourned Meeting
July 19, 2023
10.EXECUTIVE DIRECTOR REPORT:
Airport Executive Director Barrett reported that in the adopted budget for fiscal years
2023-24 and 2024-25, the Airport was authorized 49 additional full time employee
positions, and approximately half of the employees would be hired in fiscal year 2023-
24 and the other half in 2024-25. Mr. Barrett recognized that there had been concerns
about the space planning and onboarding challenges, and he said that staff had been
able to solve the space planning by identifying additional office space and by using
creative thinking to better utilize the space that is currently being used. Mr. Barrett
said that a Human Resources Specialist was hired to report to the Airport exclusively
to facilitate the Airport's recruitments, and the Human Resources Department would
be contracting with a consulting firm that would be working on recruitments with an
emphasis on Airport recruitments. He said that the Airport was focused on hiring staff
for capital development positions, Operations, three new Fire Captains, and an
Accountant.
Mr. Barrett reported that the Airport has an opportunity to potentially have a closer
partnership with a community stakeholder through a naming sponsorship of the
Reginal Jet (RJ) Concourse which would be a revenue generating agreement that
would involve some minor signage as well as some advertising on the boarding
bridges. Deputy Director of Aviation, Marketing and Air Service Meier provided an
example of the placement of the advertising on a jet bridge, and the naming
sponsorship placement on the outside wall of the RJ entrance, and on the inside wall
of the RJ. Mr. Meier noted that advertising wasn't typically approved by the
Commission and that due to the size of the projects, staff felt it would be important to
get the Commission's feedback.
Vice Chairman Corcoran asked how much the Airport would be getting for the
sponsorship. Mr. Meier said that the details were still being worked out, and he said
that it would be over a million dollars. Commissioner Wise inquired about the contract
term. Mr. Meier said that the contract term was also being worked out and that it would
be a multi -year contract. Commissioner Young asked if the staff had any concerns
about the partnership or reputational risk. Mr. Barrett said that staff did not have any
concerns about reputational risk, and he said that staffs main concern was that the
partnership would highlight the benefits of the community while ensuring it was also
respectful to the community, Airport Commission, and the City Council.
Vice Chairman Corcoran asked how the staff would be sharing the sponsorship
updates with the Commission, and when would the information be shared with the
community. Mr. Barrett said that there needed to be further discussions with the
community partner and that staff could provide an update to the full Commission or
the Marketing Committee, and once approved, a public announcement could be
made. Vice Chairman Corcoran asked if the revenue would be added to the
advertising budget. Airport Administration Manager Carpenter said that the revenue
would go into the Operations and Maintenance revenue account.
Page 6 of 8
Palm Springs Airport Commission
Action Summary Minutes of Regular Adjourned Meeting
July 19, 2023
Commissioner Miller inquired about other Airports that offer this type of sponsorship
opportunity. Mr. Meier said that to his knowledge, PSP would be the first to offer
naming rights. Commissioner Miller voiced his concern about the Airport tying itself to
the organization that has the naming rights, and the Airport running the risk of that
organization, outside of the scope of any control the Airport has of that organization,
doing something that could make the Airport look bad. Commissioner Miller suggested
that the Airport proceed with caution, and he said that the Airport's reputation is
invaluable, and money may not be the best reason to proceed with the sponsorship.
Mr. Meier said that there would be a clause in the agreement that would allow the
Airport to cancel the contract.
Executive Program Administrator Brown said that Commissioner Feltman could ask
his question and then the Commission would need to move forward with the agenda
and that the item could be brought back as a Discussion and Action Item for a future
Commission meeting. Commissioner Feltman said that he felt that there should be a
vetting process that would include members of the Commission who have deep ties
to the community in addition to the Airport staff, and it would concern him if it were to
come to the Commission as an announcement. He also questioned why the
sponsorship would be put out for bid, he voiced his concern about it appearing to be
an inside deal, and he noted that the Airport is a public entity. Mr. Barrett clarified that
staff would be bringing this item back to the Commission to get the Commission's
feedback. Vice Chairman Corcoran asked staff to also provide an analysis of the
rationale behind the amount of the sponsorship.
Commissioner Miller asked if staff had informally spoken to any of the City
Councilmembers about the sponsorship. Mr. Barrett said that he had spoken to the
City Manager about the sponsorship opportunity, and the City Manager had notified
the City Council about the sponsorship opportunity. Commissioner Fong asked if the
Commission could review the sponsorship agreement. Mr. Barrett said that he would
need to run the request by the City Attorney. City Attorney Holm said that the
agreement would be vetted by a City Attorney before it would be presented to the
Commission or the City Council.
11.COMMISSIONERS REQUESTS AND REPORTS:
Commissioner Adams shared information with the Commission about other Airport's
choosing to have silent operations which involves the airport eliminating all overheard
speaker announcements to reduce ambient noise, and technology is used to send
announcements out electronically.
12.REPORT OF CITY COUNCIL ACTIONS:
12.A. Past City Council Actions
12.B. Future City Council Actions
Page 7 of 8
Palm Springs Airport Commission
Action Summary Minutes of Regular Adjourned Meeting
July 19, 2023
13.RECEIVE AND FILE:
13.A Airlines Activity Report May 2023
13.B Airline Activity Report Fiscal Year Comparison
14. COMMITTEES:
14.A Future Committee Meetings
Executive Program Administrator Brown announced that an Ad Hoc Design Review
Committee meeting had been scheduled for Wednesday, July 26th at 4:30 p.m.
ADJOURNMENT:
The Airport Commission adjourned at 6:40 P.M. to a Regular Meeting on September 20,
2023, at 5:30 P.M.
Christina Brown
Executive Program Administrator
Page 8 of 8
palm springs
I NTER N AT IONAL A IRPO RT
�• , palm springs
INTERNATIONAL AIRPORT
Cost Per E
Passenger
airline
aeronautical
revenue
10,00
8,00
6.00
4,99
4.00
200
1,
nplaned Passenger - 2022
6.10
6.68 6.69
6,99
ROC TUS PSP SAV ALB
# Curren[ CPE
Source: Federal Aviation Administration Certification Activity Tracking Form 127
9.18 9.18
8.08
11.71
LIH OSM TUL LGB
PEA palm springs
WINTERNATIONAL AIPPOPT
Aircraft
operations
for PSP
totaled
63,141
Aircraft Operations - 2022
350,000
300,000
250,000
200,000
150,000
100,000
63,141 68,198
53,726
50,000
`a
AiB PSP Ds
Source: Federal Aviation Administration Certification Activity Tracking Form 127
112, 75z
81,952 87,757
ROC TUL UH
137,373
116,420
SAV TUS
330,84D
We
Baggage Handling System Fees
Fiscal year 2023-24 projected operational costs.
Signatory - average fee per enplaned passenger
Non -Signatory -- average fee per enplaned passenger
$897,000
$0.52
$0.65
Capital Improvement Projects
Locatio
n
Budget Funding
Sourc
t Taxiway "W" and "A1" Rehabilitation
Project will design the asphalt based on the needs of
Airside
630,000
Airport
the airfield
2 Wildlife Hazard Management Assessment
Project will conduct a wildlife hazard study of the
Airside
140,000
Airport
airfield
Project will assess the hot spots on the airfield to
3 Airfield Hot Spots Study
improve safety on the airfield and mace a
Airside
200,000
Airport
recommendation to mitigate.
Landsid
4 Master Plan
Project will conduct a full scale master plan of the
e/Airsid
2275,816
Airport
landside, airside and terminal
e/Termi
nal
Project will design and construct the common use at
5 Terminal Optimization (Common Use) the gates to allow the airport, airlines and ground Termina 1,805,000
handling agents to support the optimization of I
passenger processes using shared technologies.
Subtotal Fiscal Year 2022-23 Projects 5,050,816
Airport
571,158 58,842 Q4-2024
126,924 13,076 Q1-2025
181,320 18,680 Q4-2024
2,108,584 217,231 Q1-2025
1,805,000 Q4-2024
2,987,986 2,112,829
Capital Improvement Projects
Project will improve safety by allowing
6 Consolidated Rental Car Facility (Design)
workers to easily reach and maneuver Landside
2,500,000
CFC
2,500,000 Q4-2026
heavy objects.
Project will procure equipment,
7 Parking Revenue System
software and wayfinding to improve Landside
500,000
Airport
500,000
Q4-2024
the public parking system. The existing
system has reached its useful life.
Lot A, Economy Lot Parking, Employee Lot (W of El
Project will rehabilitate 82,720 square
8 Cielo) - (Design)
feet of raw land into an employee Landside
2,400,000
Airport
- 2,400,000
- Q4-2025
parking lot, west of El Cielo.
Electric Charging Station Infrastructure - Chargers
9
Project will procure 80 electric chargers
"B". Landside
300,000
Airport
271,980
- Q42D24
acquisition
to be installed in public parking lot
ACIP
28020
Project will procure Zero Emissions
10 Procure two Zero Emissions Buses
Vehicles (ZEV) to provide transportation Landside
2,000,000
Airport
5,892,900 607,100
- Q4 - 2024
between the terminals and the public
VALE/ZEV Grant
parking.
Capital Improvement Projects
Project will replace existing and
11 Wi-Fi install additional access points Terminal Airport -
around the airport to improve 500,000 350,000
connectivity
Restroom Capacity & ADA Renovations Project will rehabilitate ten restrooms Airport
12 (Construct) and convert them into gender neutralTerminal10,000,000 BIL-ATPGrant 9,500,000 500,000
bathrooms.
Outbound Baggage Handing System Terminal Project will expand existing terminal Airport
13 Expansion & Passenger Screening Facility to incorporate the newly designed Terminal 13,560,000
Expansion (Design) baggage handling system. Z0.000,000 ACID
14 Arrivals Baggage Claim Expansion (Design & Project will procure a consultant to design the baggage claim to add Terminal Airport
Construct -CMAR) additional capacity to the terminal. 6A00,000 BiL-ATPGrant 5,700,000 300,000
.... .........
Project will remove and replace
Carpet Replacement - Main terminal lobby and 15,110 square feet of carpet in the
15 security check point main center terminal and security Terminal 400,000 Airport 150,000
checkpoint.
Q3-2024
Q3-2025
- - Q3-2026
Q4-2025
Q4-2024
a s rin s
► palm p g
INTERNATIONAL AIRPORT
Terminal Area
Alternatives
DECEMBER 24, 2023
� springs
► palm
I N T E RNATION AL A I R PORT
Advantages of Alternative lA
■ Significantly lower total and Phase 1 ROM costs and likely lower costs to be passed along to
airlines.
■ Maintains existing character of PSP by preserving major elements including the Wexler headhouse,
the Bono concourse, the fountain, the Tahquitz Canyon Way connection, the outdoor courtyard,
the mountain view corridors and the minimal walk distances.
• Conveniently locates CONRAC immediately adjacent to the baggage claim.
• Conveniently locates FIS near the existing baggage claim.
■ Eases construction phasing with multiple and entirely separate and modern concourses.
• Estimated timeframe from end of Master Plan to ribbon cutting is 3.5 to 5 years.
• Provides PSP opportunities for stopping points during construction of the four program phases in
the event of an economic downtown or unforeseen demand reduction.
� palm p gs rin s
►
INTERNATIONAL AIRPORT
Disadvantages of Alternative 1A
■ Long term walking distance increases for south concours that would likely require moving
walkways.
■ Requires significant renovation of existing spaces including Wexler headhouse and Bono
concourse and associated energy efficiently impacts.
• Operational challenges during construction include likely having to shuttle rental car passengers.
� palm p Js rin s
►
INTERNATIONAL. AIRPORT
Advantages of Alternative 3
■ Creates brand new terminal and vehicle parking facilities.
■ New terminal systems would likely be more energy efficient and reduce annual operations and
maintenance costs.
■ Minimizes terminal phasing disruptions to existing operations during construction.
■ Provides a larger landside area for the CONRAC.
■ Maintains historic Wexler terminal and allows the community to determine a future non -terminal
related use for this important facility.
Master Plan Alternatives 1A & 3 — Commissioner and VGPS Comments & Questions
Rick Wise
Alternative 1A Pros
Alternative 3 Pros
Comments
• Phase 1 faster
• Airport staff are in favor
It would be interesting to hear what Hospitality has to say about the two
• Keeps Wexler Bldg. part of
of this plan.
alternatives. We need to better understand why passengers grade PSP so
airport operations.
• More modern
high. It's not the waiting on the tarmac for a gate, it's not the very long wait
• Keeps Courtyard accessible
• More efficient
for baggage, it's not the long lines to check -in or get a rental car. It's the
to passengers.
• Less impact on customers
uniqueness of getting off a plane and immediately getting immersed in the
• Less expense per gate
during Phase 1
midcentury uniqueness of Palm Springs. The outside courtyard, the
• Keeps mid-century
beautiful Wexler Building. As a Commission and then ultimately the City
uniqueness.
Council, we need to decide what PSP will be in the future. Do we keep that
• Paster accommodations for
uniqueness or do we become a modern airport like so many others in the
international travel
country.
• Greater use of $35M new
baggage system
Alternative 1A Con
Alternative 3 Cons
• No plan for Rental Cars
• Loss of Courtyard for
during Phase 1
passengers
• Loss of functioning
Wexler Bldg.
• Loss of 3 -4 gates in R1
Terminal for 5-6 years.
Page 1 Revised: 12/14/2023
Master Plan Alternatives 1A & 3 — Commissioner and VGPS Comments & Questions
Tony Michaelis
Questions/Comments:
I believe Airport management and the Consultant should weigh in on which alternative they recommend and why. They are the experts and I see no
reason not to share their opinion and still remain objective moving forward. Is there any reason to believe that the airlines would favor one alternative
over the other? Since cost is likely a major consideration, I assume Alternative 1a would be the preferred option based on initial comments by one airline.
Cost: How will the project be funded? Does Alternative 3's higher cost make it more difficult to fund? I'm particularly concerned that Alternative 3
requires the Airport to commit to the overall program with a significant investment in Phase 1 without any real flexibility to adjust for unforeseen
circumstances.
Disruptions: Which alternative is least disruptive? Beyond car rental offsite requirement what is the likely impact on passenger experience for Alternative
la? It would seem that rental car shuttling is preferable over passenger parking shuttling which would be needed in Alternative 3. Can Airport
management comment or elaborate on whether Alternative 1a disruptions would dramatically impact passenger or airline experience. Delays: Which
Alternative requires the need to use non -airport owned property? If property acquisition is needed, what is likelihood of cost or acquisition issues
delaying the project. Long term operating impact: Alternative 3 is identified to have energy efficiencies, reduction in annual operations and maintenance
costs. Is there any information on the savings or lack thereof from choosing Alternative la. Alternative 1A offers lower cost, quicker build, the ability to
stop construction for unforeseen events, continued active airport use of Wexler building and avoids wasting the money used for the baggage claim
renovation. Disruption impact is major outstanding question.
Robert Berriman
Questions/Comments:
Mead & Hunt Issues: Only the outer exterior views were presented, nothing indicated where the Checkpoint(s) Checked Bag Screening or Baggage
Claim(s) would be for either plan. ALTERNATIVE lA EXPAND AND RENOVATE (Hybrid): • Keep the Wexler Headhouse as a terminal. Do not remove the
Regional and Bono Terminals when an extended new lA Concourse could allow for taxi room around the existing Regional Terminal. This would increase
the gate numbers and keep the airport operational during construction of the new south terminal gate expansion/extension. • By keeping the Wexler
Headhouse, the then to be renovated TSA Baggage system is already in place. • Con: The CONRAC is very distant to passengers arriving or departing
from the farthest new gates. Possibly move the CONRAC to the Plan 3 space designation. Airport Issues: Are there Contractual lease issues with
Signature Air relocation? Many airports have multiple TSA Checkpoints, this gives seasonal flexibility to open or close areas as demand requires. TSA
staffing is generally not based on the number of checkpoints but rather on passenger load. Will there be difficulty finding concessionaires for a large #3
expansion? ALTERNATIVE 3 REPLACE: • Potentially move Signature Air into the Wexler Building • Large Parking Lot A is a considerable distance from
passengers arriving or departing the new terminal. • Can the proposed new parking area actually be purchased? • Pro: the CONRAC is more centrally
located to all passengers.
Page 2 Revised: 12/14/2023
Master Plan Alternatives lA & 3 — Commissioner and VGPS Comments & Questions
Jan Pye
Questions/Comments:
1. First, take into consideration the public's viewpoint:
Alternative 3
a. Wexler Building is important and should be saved ... staff have some options.
b. Alter 3 will benefit the public and operations ... and reduce current operations.
Alternative 1A
a. Quickest alternative and cheapest ...? At what future cost
b. Keeps Wexler as the focal point of Bono.
c. Doesn't allow for all departing/arriving pax to journey through the courtyard.
These observations lean more toward Alternative 3.
2. Terminal Area Alternatives from Commission meeting Dec 6
Advantages of Alternative 1A ... agree with all.
Disadvantages of Alternative 1A:
"Long term walking distance increases for south concours that would likely require moving walk ways". With our aging population, is this wise?
For others, not residents here, are we being customer -friendly? It is the same for "Operational challenges during construction include likely
having to shuttle rental car passengers."
Advantages of Alternative 3 - I agree strongly with these advantages.
Disadvantages of Alternative 3
All of the disadvantages are reasonably dependent on the projection of a 5-year plan. Does the Commission or even the Council want to commit
to the cheaper cost? This airport is special concerning tourism, architecture, scenery, etc.
3. For Efficiency:
The Council should consider the Airport staff concerning decentralizing its weakness in Human Resources, Information Technology, Procurement,
and permitting. This may eliminate some of the goal hindrances from the Master Plan to the ribbon cutting.
Page 3 Revised: 12/14/2023
Master Plan Alternatives 1A & 3 — Commissioner and VGPS Comments & Questions
Keith Young
Questions/Comments
• There are two estimates described for the Alternative 1A schedule: 3.5 years and 3.5 to 5 years. Given that the 3.5 year estimate was discussed as a
meaningful advantage to Alternative 1A, please clarify this difference (particularly since 5 years is also listed in the range for Alternative 3).
• Are construction delays more likely with a renovation (e.g. unexpected conditions, historical limitations, or hazards during renovation) than with a
new build? If so, should this impact how we understand the construction time estimates?
• Assuming that P5P remains a popular destination, are the variable costs passed along to airlines likely to impact the frequency of service they choose
to offer as the new facility is opened?
• Please provide in the chart, if possible, the number of gate positions offering jet bridges at each phase (or confirm that all gate positions listed in the
summary will have jet bridges). Please confirm that we should think of gates with jet bridges as offering significantly more turnaround opportunities
(and thus greater passenger capacity) than gates without bridges.
• Are there any of the renovated elements of Alternative 1A that would likely require additional upgrades within 15-25 years? If so, is there any
meaningful way to estimate these costs?
• Would the larger landslide area for the CONRAC in Alternative 3 also potentially yield additional parking spaces that would not be possible in the
CONRAC of 1A?
• Are the "operational challenges" of shuttling rental car passengers (1A) or public parking passengers (3) essentially comparable, but affecting
different passenger types?
• Will the benefits of an improved concourse experience for some travelers in Phase 1 of Alternative 1A outweigh the inconveniences of displaced
rental car lots, etc. that will be experienced by all travelers requiring those services?
We obviously had some discussion at the end about a modified Alternative 3 that somehow incorporated Wexler, The following question refers to that,
in the event that our discussion revisits that idea:
Is there a way that the Wexler Building could house gate car passengers (1A) or public parking passengers (3) essentially comparable, but affecting
different passenger types?
Page 4 Revised: 12/14/2023
Master Plan Alternatives 1A & 3 — Commissioner and VGPS Comments & Questions
David Feltman
Comments:
I continue to favor plan 1 A. I do not agree that an "advantage" of Alternative 3 is that it "Maintains historic Wexler terminal and allows the community
to determine a future non -terminal related use for this important facility." That is a wildly inaccurate statement and is essentially "spin". There is no
future use for that building in this plan so characterizing it as maintaining the building is inaccurate. Furthermore, the community is now in the middle of
the re -use of another facility that is somewhere in the neighborhood of $15-$20 million over budget and the taxpayers are being asked to fund that
overrun. The community is not suited to decide or implement the reuse of this building. Therefore, this plan creates a White Elephant out of a historic
building in the City so, therefore, it is not "maintained."
J Craig Fong
Comments:
Without yet committing myself to one Alternative or the other, I note the following:
Alternative 1A This alternative provides PSP with needed additional gates more quickly than Alternative 3. It is not dependent on acquisition or seizure
of additional land, which could be expensive and problematic. I am particularly cognizant that Alternative 1A provides PSP with faster access to full
international capability, tries to meet community needs more quickly, and has relatively less construction -related disruption than Alternative 3. 1 do not
view the long walking distances as a negative, if there is a moving walkway; indeed, a moving walkway would be an advantage, given the needs of many
area residents. I am, however, somewhat unhappy at the large footprint of the CONRAC. All of this at a cost that is lower than that for Alternative 3.
Alternative 3 This alternative provides the Coachella Valley with a virtually new airport, to carry it through the 21st century. Such an airport would meet
the needs of a community that is unrecognizably different from when PSP was first built. A new terminal would be an engine for tourism growth and
regional development for the rest of the century. Construction would provide employment throughout the region. The Wexler facility was designed for
a markedly different age of air transport, and its use in Alternative 1A saddles airport management with a building that is, even today, no longer fit for
purpose, requiring myriad workarounds detrimental to efficiency. Instead, the iconic Wexler structure could be repurposed as a community landmark,
perhaps in partnership with the USO, as a display space for the Palm Springs Air Museum and the Agua Caliente Cultural Museum, and as a community
conference space.
Scott White - Visit Greater Palm Springs
Comments:
Alternative 1A - In this alternative, the Airport will lose three (3) gates in Phase 2 of construction.
Page 5 Revised: 12/14/2023
TERMINAL AREA ALTERNATIVES COMMISSION QUESTIONS AND ANSWERS
The following questions were submitted by Airport Commissions members to Airport Staff and the
Master Plan Consultant Team. Written answers are provided, and further discussion and clarification
can be provided at the Commission Meeting on December 20th
1) As a Commission and then ultimately the City Council, we need to decide what PSP will be in the
future. Do we keep that uniqueness or do we become a modern airport like so many others in the
country.
■ The is a question that that the Commission and Council should ultimately answer. However, the
Master Plan Team has worked to incorporate the PSP uniqueness in both Alternatives 1A and 3
and many of these unique elements can be incorporate into the terminal design.
2) Is there any reason to believe that the airlines would favor one alternative over the other? Since
cost is likely a major consideration, I assume Alternative la would be the preferred option based on
initial comments by one airline.
■ Yes, Airport Staff and the Master Plan Team meet with the AAAC on December 12 and the airlines
unanimously expressed support for Alternative 1A.
3) How will the project be funded? Does Alternative 3's higher cost make it more difficult to fund? I'm
particularly concerned that Alternative 3 requires the Airport to commit to the overall program with a
significant investment in Phase 1 without any real flexibility to adjust for unforeseen circumstances.
■ A funding plan has not yet been determined. It is a common misconception that airports are
funded with taxpayer dollars. Infrastructure projects at airports in the United States are typically
funded through the following key mechanisms: federal grants through the FAA's Airport
Improvement Program (AIP), the Passenger Facility Charge (PFC) local user fees, airport reserves,
general airport revenue bounds, or public private partnerships.
■ Yes, Alternatives 3's higher costs make funding the terminal improvements more challenging.
4) Which alternative is least disruptive? Beyond car rental offsite requirement what is the likely
impact on passenger experience for Alternative 1A? It would seem that rental car shuttling is
preferable over passenger parking shuttling which would be needed in Alternative 3. Can Airport
management comment or elaborate on whether Alternative lA disruptions would dramatically impact
passenger or airline experience.
■ Both alternatives are disruptive and each of the four phases in both alternatives have varying
descriptions to existing operations. For example, in Alternative 1A, rental car passenger shuttling
would likely be required during CONRAC construction in Phase 1. In Alternative 3, public
passenger shuttling would likely be required during CONRAC construction in Phase 1 as the
CONRAC is sited in the existing public parking area.
■ Airport staff will comment at the December 20'h Airport Commission meeting.
5) Which Alternative requires the need to use non -airport owned property? If property acquisition is
needed, what is likelihood of cost or acquisition issues delaying the project?
■ Both alternatives include a recommendation for airport property acquisition for the purposes of
meeting public parking demand. However, both alternatives could likely move forward without
the acquisition.
palm springs
MASTER PLAN �/ INTERNATIONAL AIRPORT
1
6) Alternative 3 is identified to have energy efficiencies, reduction in annual operations and
maintenance costs. Is there any information on the savings or lack thereof from choosing Alternative
1A?
■ Alternative 1A requires more replacement of existing utilities and building systems. Specific
quantified savings on Operations and Maintenance costs depends on the type of system
equipment procured which is a design consideration that will be evaluated during architectural
design.
7) Disruption impact is major outstanding question.
■ Please see the response to Question number 5.
8) Only the outer exterior views were presented, nothing indicated where the Checkpoint(s) Checked
Bag Screening or Baggage Claim(s) would be for either plan.
■ Gensler has developed a rough interior floor plan for both alternative for the purposes of space
adjacency and to ensure that the functional components of the terminal in each alternative would
fit together.
9) Are there Contractual lease issues with Signature Air relocation?
■ The Airport and Signature do currently have a lease agreement and dependent on timing of the
relocation, that lease agreement may need to be revised and renegotiated.
10) Will there be difficulty finding concessionaires for a large #3 expansion?
■ The Airport recently developed a new concessions program and interest from future
concessionaires is expected to be high in either alternative concept.
11) Can the proposed new parking area in both alternatives actually be purchased?
■ Both alternatives include a recommendation for airport property acquisition for the purposes of
meeting public parking demand. However, both alternatives could likely move forward without
the acquisition.
12) All of the disadvantages of Alternative 3 are reasonably dependent on the projection of a 5-year
plan. Does the Commission or even the Council want to commit to the cheaper cost?
■ A funding plan has not yet been determined.
13) There are two esMmates described for the Alternative 1A schedule: 3.5 years and 3.5 to 5 years.
Given that the 3.5 year esMmate was discussed as a meaningful advantage to Alternative 1A, please
clarify this difference (particularly since 5 years is also listed in the range for Alternative 3).
■ There are a number of variables that impact the design/construction timeline. Because less
square feet of new terminal facilities are being constructed in 1A vs. 3 in Phase 1, its reasonable
to expect that 1A Phase 1 can be completed sooner. The range of timeline for either alternative
is likely 4 to 7 years.
14) Are construction delays more likely with a renovation (e.g. unexpected conditions, historical
limitations, or hazards during renovation) than with a new build? If so, should this impact how we
understand the construction time estimates?
palm springs
MASTER PLAN �, INTERNATIONAL AIRPORT
2
■ Reconfiguring the Wexler Building to house gates, or more specifically hold room space for
walkout gates is possible, but the redundancy of airport systems (i.e. TSA checkpoint, baggage,
etc.) is inefficient.
22) 1 continue to favor Alternative IA. I do not agree that an "advantage" of Alternative 3 is that it
"Maintains historic Wexler terminal and allows the community to determine a future non -terminal
related use for this important facility." That is a wildly inaccurate statement and is essentially "spin".
■ This statement specifically referred to fact that the Wexler building would not be torn down or
removed in Alternative 3.
23) Alternative 1A - In this alternative, will the Airport will lose three (3) gates in Phase 2 during
construction?
■ Construction of Phase 2 in Alternative 1A is anticipated to be at least 18 months meaning that
passengers may have to be bussed to remote aircraft hard stands if gate demand exceeds the
number of gates available.
24) Can you provide some benchmarking to other small hub airports who have undertaken similar
terminal expansions and any small hub airports that operate two independent terminals?
■ A benchmarking slide has been prepared for the December 201h Commission meeting. There are
no small hubs that the Master Plan team is aware of that operate two separate terminals.
Z7AM��palm springs
MASTER PLAN INTERNATIONAL AIRPORT
4
Palm SpringsAirport
Master Plan
Airport Commission Briefing
December 20, 2023
!W- W-.A
2Apalm springs
INTERNATIONAL AIRPORT
Mead
blunt
Alt IA and Alt 3 Phases
and Cost Estimates
Refined Alternatives 1A and 3
+ Alternative 1A — Renovate and Expand
Signficant expansion of Wexler building with two new concourse located
north and south
+ Alternative 3 R,-e
/ New terminal facilities to the south and eventually repurpose the Wexler
building
r,Anw_ pa 1 m springs AIRPORT MASTER PLAN
INTERNATIONAL AIRPORT
MOMMM
Cost Estimates by Phase
Alternative
Alternative 1A
Phase
TOTAL
Cost Estimate
$2,207,886,262
1A - Phase 1
$879,427,910
1A - Phase 2
$1,145,490,054
1A - Phase 3
$93,188,731
1A - Phase 4
$89,779,568
Alternative 3
TOTAL
$2,786,979,408
3 - Phase 1
$2,226,513,141
3 - Phase 2
$349,194,794
3 - Phase 3
$95,783,136
3 - Phase 4
$115,488,337
Source: Leyland Saylor
►� palm springs AIRPORT MASTER PLAN
,. INTERNATIONAL AIRPORT
Mead
&-+Iunt
Updated Timeline
Mead
blunt
Terminal Project
Benchmarking
PSP Cost per Gate by Phase
Alternative
Number
1A Cost
of
per ,
Phase
Gill
Phase 1***
Cost
7
of Program
$346,016,000
Cr per Gate
$50,000,000
Phase 2
9
$1,145,491,000
$128,000,000
Phase 3
5
$93,189,000
$19,0000`000
Phase 4
5
$89,780,000
$18,000,000
Total Constructed
26
$1,674,474,000
$64,403,000
Gates
Notes:
*The scope of each phase differs causing a wide
range of costs per gate
in each phase (i.e. some phases include apron, roadwork,
baggage handling systems, etc. while others do not).
•'Number of gates constructed in that phase
"Cost Estimate does not include CONRAC and
contingencies along with the CONRAC
Alternative
3 ost per Go te
PhaseNumber
Gatil
Of
r of Program
Costper Gate
Phase 1***
20
$1,705,102,000
$83,000,000
Phase 2
4
$349,195,000
$88,000,000
Phase 3
4
$95,784,000
$24,000,000
Phase 4
4
$115,489,000
$29,000,000
Total Constructed
32
$2,265,568,000
$70,799,000
Gates
Notes:
*The scope of each phase differs causing a wide range of
costs per gate in each phase (i.e. some phases include apron, roadwork,
baggage handling systems, etc. while others do
not),
"Number of gates constructed in that phase
—Cost Estimate does not include CON RAC and cont�ngencnes along with the CONRAC
aW-
,,palm springs AIRPORT MASTER PLAN
If4TERNATIONAL AIRPORT
Mead
blunt
Feedback and Questions
from Airport Commissioners
Mead
blunt
Questions/Discussion
-- — —— — — — — —--
Q I
A)L Ask
Phase ROM Cost Y $900M
,
I ,
I
I
VAC,n `. r LOT A
1 R I 5' A 'SO CtSP `�
eocate Ignawre vlatlan,-
and rental car parking to accommodate
LOfi9
the new CONFLAC.
2. New Central Utility Plant.
H I
3. New north concourse with International
arrivals capability.
4. New for
E!
LOT C
apron aircraft parking and
�a /
C,
updated taxiway striping.tt7
5- Potential parking lot expansions to
z4
Ra
accommodate displaced parking from
4/
the proposed GTC, accommodate project'
parking demand growth, and provide
additional surface parking for rental car
vehicles during constructions of the
\�
CONRAC.
LOT G
6. 5-level CONRAC facility with customer
service lobby located adjacent to bag
claim.
7. GTC flanking central garden at entry.
�`
\
2
�P-
4
8. Connector road for commercial access to
,
the GTC.
` 2 O '
\, 0
9. Potential remain overnight (RON)
0p
aircraft parking.
Aircraft Parking 23 (25 Narrow Body);..-
LOTI
,
i5l
L!
J
,
f
J.
LOT i
f
I
LOT E
t I
i
.l .'
-
g.-• ��
.— �
_ __III' .,-,
AUTO PARKING
LOT
AREA
SPACES'
A
70,600 SF
N/A
-
e
80,000 SF
N/A
C
247,000 SF
760
Dom--55,000
SF
172
-
E
116,600 SF
356
r
F
419A00 SF
1286
}
G
66,0065E
204
LEGEND:
� LxrsrlNc, srGNal �
i
rxonrnl n sN�NAI i
AIR{RAFT AT GATE
AIRCRAFTRON
AIRCRAFT MOVEMENT AREA
_ FXINTMr AJLrY.NG TO REVAN
_ �rt nuuus,E
nAlre lNc,
UNTP 11 9,11Y L,I AN1
— &WWN6 TRANSPORtArO CfWTER
i C(1t.NTYARO I �F SPAN
GONRAC
C = fUTORE PROPERTY A(-,MISITION
fxtw'NI:AIRPORIMt.."Rry
I
Alternative 1A — Phase 3 Phase ROM cost $loons 3 rf-
°----------------------- - - - -__-----------1----- 1
r 'i +
V ^
^♦♦ LOTA J \
n`
i�♦� i �\ LOT
f( LOT C
eo
\♦, LOTD
�I
�P
. ♦ �Q a
1. South pier expands to the east. Ap
2. New aircraft parking apron on both sides of the pier. m�-
Aircraft Parking Count: 27 J29 Narrow Body)
♦ OTi'
LOT G
1000,
LOT E
jt
R A°• `i
LEGEND: '
4
r ExlsTx�cswnAE '1
PRDPasrD srcNAr
AUTO PARKING
10`1
ARIA
SPACES,
A
70,000 SF
WA :A
8
WAN 5f
WA
C
337,0005F
1036 'a
D
56,ODDSP
17z
E
181,000 SF
SS6 IF
F
123,0D0 5F
378
G
342,DDo 5F
1052
yffff� AIRCRAFTATGATE
111K-'T RON
--y1 AIRCRM T MOVEMEM1 AREA
�, FwSnNG RufDrNG ro Rr+�:,iN
nEaorlc�:,t
PARRIN3
ctwmA UTILITY RJWT
L.unc:�Ar.�x
- GRMx ND TRANBPORTATOM CENTER
COLpTYAFi6' GFEPNSPACE
CONRAC
C, EU%RE PNLWERf� ACWrSIION
Ir C��] ! M 8 fM AIKKMt YH(W j'
Alternative 1A — Phase 4
LOT A
LOt
�L,
� ¢
F LOT c
1.
1.4
'N LOT D
1. South pier expands to the east.
2. New aircraft parking apron surrounding the end of the pier. q'r
Aircraft Parking Count: 32 (34 Narrow Body)
i. Phase ROM Cost = $100M
LOT E
01
f
} / I LEGEND:
lily
Ff l
'
LOT G
�'•
� PrtorasEo slcwAl
AIR[RIIfT aT GATE - ---
AIRCRAFT RON
� I
AIR(RII1
1 MOVEMENT 6REA `
Ii[nplglf�:l
CFNTRµ uY in Fim
�UfA.4u+x
_ CROUNO TRANSPOR?ATIOII CENTER
_ COURT ARD fIRrFNRPA--F
CONNAC
C;;=� IlSll l`:.: -"i 7YAGOLI51TM
�Vil . .ice 4
Alternative 1A
"Southwest View"
palm spring J AIRPORT MASTER PLAN
INTERNATIONAL AIRPORT
Source: Gensler 2023
am= =MW
4
Alternative 3 - Phase 2 ------ Mif Phase ROM Cost = $400M
t+++++
Map-
1 -r
IT
- N-1
OLOT D
I. Restoration of the original Wexler Terminal Building for future uses. �11
2. New pavement and striping for triple Group III taxilane. /QD�
3. New pavement for aircraft parking. a�
4. Activate the 4 Pate on the west side of the central pier.
S. Potential for remain overnight (RON) aircraft parking. mo-
•S
Aircraft Parking Count: 22 (24 Narrow Body)
LEGEND; %
EKMMG SIGNAL
/ROPOSEO SIGNAL -
+�fAIRCRAFT AT GATE -
RAF --
AIRCRAFT MUVEMLNT ARLA I
FXIVWV VILDWG TORE"N
1RuaxnlEF
;' PMNiyfj
® CT'NigA. iJi., i'r PI AkT
GROW D NkNS"TATlON UNTER
CdxtlrARR: 3RFFw9P4f"r
- covuc
C..� nm1RrG FRS AC1%170N
C__:3 EMnNGNWOR7Ml Rtt
4w
Operating Revenue
Operating Expenditures
Surplus / (Deficit)
1,500,000
1,000,000
500,000
(500,000)
(1,000,000)
(1,500,000)
(2,000,a00)
(2,500,000)
(3,000,000)
CITY OF PALM SPRINGS
PALM SPRINGS INTERNATIONAL AIRPORT
Financial Summary
Ending November 30, 2023
9,181,327 1,486,202 16% 1,277,139 16%1
11,780,574 - 0% - 0%
(2,599,247) 1,486,202 -57% 1,277,139 -1696
Fund 405 - Customer Facility Charges - Net Balance
12,599,247)
a FY 23-24 ■ FY 23-24 i FY 22-23
Revised Budget Actual Actual
ITEM 7.0
Page 1 of 10 12/11/2023
CITY OF PALM SPRINGS
PALM SPRINGS INTERNATIONAL AIRPORT
Financial Summary
Ending November 30, 2023
Operating Revenue 6,450,776 1,628,058 25% 1,416,237 15%
Operating Expenditures 9,072,099 3,485 0%
Surplus / (Deficit) (2,621,323) 1,624,573 -62% 1,416,237 15%
2,000,000
1,500,000
1,000,00u
500,00n
(s00,000)
(110001aoo(
(1,500,0oo)
(2,000,000)
(2,500,000)
(3,000,000)
Fund 410 - Passenger Facility Charges - Net Balance
(2,621,323)
FY 23-24 ■ FY 23-24 ■ FY 22-23
Revised Budget Actual Actual
Page 2 of 10
12/11/2023
CITY OF PALM SPRINGS
PALM SPRINGS. INTERNATIONAL AIRPORT
Financial Summary
Ending November 30, 2023
Page 3 of 10
12/11/2023
CITY OF PALM SPRINGS
PALM SPRINGS INTERNATIONAL AIRPORT
Financial Summary
Ending November 30, 2023
Airline Revenue
Landing Fees
5,910,134
1,216,890
21%
765,941
59%
Landing Fee Surcharge
-
(93,778)
0%
462,510
-120%
Terminal Airline Space/Joint Use
9,467,216
1,986,394
21%
687,636
189%
Gate Per Use Fees
3,470,605
323,416
9%
338,959
-5%
Passenger Loading Bridge Fee
1,255,064
220,692
18%
-
0%
Baggage Handling System Fees
897,000
285,832
32%
-
0%
Total Airline Revenues
21,000,019
3,939,446
19%
2,255,046
75%
Other Revenue
CARES Act
-
-
0%
5,989,698
-100%
CRRSAA-Airport
4,783,916
1,408,292
29%
-
0%
CRRSAA-Concessions
280,390
-
0%
-
0%
ARPA-Airport
1,481,290
0%
6,020,652
-100%
ARPA-Concessions
1,121,560
-
0%
-
0%
Total Other Revenue
7,667,156
1,408,292
18%
12,010,350
-88%
Non -Airline Revenue
General Aviation
406,000
66,940
16%
70,424
-5%
Non -Aeronautical Ground Rental
457,315
171,984
38%
155,307
11%
Aeronautical Ground Rental
1,247,329
512,622
41%
684,872
-25%
Parking
6,697,064
2,411,297
36%
2,362,234
2%
Ariport Use Permits
53,263
23,865
45%
10,327
131%
Non -Airline Terminal Rent Fee
9,998,816
699,732
7%
691,725
1%
Rental Car - Overflow Parking
371,809
200
0%
11,030
-98%
Advertising
315,951
63,245
20%
121,814
-48%
On Airport Rental Car
11,944,780
2,327,703
19%
2,911,763
-20%
Commerical Services Fees
1,099,000
222,483
20%
210,783
6%
Ground Transportation Fees
1,195,000
361,176
30%
294,346
23%
Customs
336,296
49,719
15%
54,057
-8%
All Other Revenue
1,301,070
424,330
33%
254,846
67%
Total Non -Airline Revenue
35,423,694
7,335,295
21%
7,833,528
-6%
Total Operating Revenues 64,090,869 12,683,032 20% 22,098,924 -43%
Page 4 of 10 12/11/2023
CITY OF PALM SPRINGS
PALM SPRINGS INTERNATIONAL AIRPORT
Financial Summary
Ending November 30, 2023
YTD Actual Revenue
25,000,000
FY 23-24 (Y 22 23
Note: FY22-23 had $12M in revenues from one-time CARES & ARPA grant funds
FY 23-24 OPERATING FUND REVENUES
BY CATEGORY
Total Non -
Airline
Revenue
58%
0
Cal Airline
avenues
31%
Other
enue
L%
Page 5 of 10 12/11/2023
CITY OF PALM SPRINGS
PALM SPRINGS INTERNATIONAL AIRPORT
Financial Summary
Ending November 30, 2023
Operating Expenditures
Airport Administration
8,155,945
1,554,700
19%
1,459,588
94%
Airport Information Technology
1,026,206
102,695
10%
16
0%
Airport Law Enforcement
3,130,981
896,963
29%
1,193,766
133%
Aviation Security
1,936,264
56,676
3%
-
0%
Airside Operations
5,981,668
1,187,476
20%
106,276
9%
Airport Rescue - Fire
4,828,582
982,807
20%
1,410,266
143%
Landside Operations
2,217,250
644,894
29%
628,649
97%
Grounds Maintenance
691,680
155,666
23%
207,293
133%
Terminal Building Operations
8,270,483
1,303,353
16%
2,545,045
195%
Passenger Boarding Bridges
120,000
9,931
8%
3,506
35%
Bagagge Handling System
897,000
84,529
9%
73,219
87%
Control Center Operations
4,169,247
1,213,030
29%
1,337,814
110%
U.S. Customs
336,436
69,387
21%
107,518
155%
Planning & Projects
723,776
18,538
3%
-
0%
Airport Pass Thru to Others
1,401,950
1,291,809
92%
0%
PERS Cast Recovery
500,000
-
0%
0%
Budget Transfer Out
6,983,634
-
0%
-
0%
Total Operating Expenditures
51,371,103
9,572,453
19%
9,072,957
95%
Surplus/ (Deficit)
12,719,766
3,110,579
24%
13,025,967
419%
Page 6 of 10 12/11/2023
12,000,000
10,000,000
8,000,000
6,000,000
4,000,000
2,000,000
9,572,453
FY 23-24
CITY OF PALM SPRINGS
PALM SPRINGS INTERNATIONAL AIRPORT
Financial Summary
Ending November 30, 2023
YTD Actual Expenditures
18%
9,072,957
I
FY 72-23
7,710,243
FY 21-22
238%
FY 23-24 OPERATING FUND FY 23-24 OPERATING FUND
EXPENDITURES BY DEPARTMENT EXPENDITURES BY CATEGORY
Airport
Administration
16% Airport Law
' Enforcemen Materials &
Control Supplies t
Center
Operations
13% _Add&;
Utilities
7%
Terminal
Alb
Building
Airside
Operations
Operations
14% Grounds
1 Airport 12%
Maintenanc
Landside Rescue -
e
Operations Fire
2%
7% 10%
Services
18%
Salaries &
Benefits'
52%
Page 7 of 10
12/11/2023
r
CITY OF PALM SPRINGS
PALM SPRINGS INTERNATIONAL AIRPORT
Financial Summary
Ending November 30, 2023
uptrdUil6' f tCVtIIUC U3,1V1,17U ,JV4,' 04 am -11—
Operating Expenditures 78,188,130 4,055,749 5% 2,985,245 36%
Surplus / (Deficit) (8,486,335) (3,513,268) 41% (592,902) 493%
(1,000,000)
(2,000,000)
(3,000,000)
(4,000,000)
(5,000,000)
(6,000,000)
(7,000,000)
(8,000,000)
(9,000,000)
Fund 416 - Airport Capital Projects - Net Balance
(8,486,335)
■ FY 23-24 11 FY 23-24 ■ FY 22-23
Revised Budget Actual Actual
Page 8 of 10
12/11/2023
CITY OF PALM SPRINGS
PALM SPRINGS INTERNATIONAL AIRPORT
Financial Summary
Ending November 30, 2023
Fund 405 40,118,850 30,710,626 25,794,777
Fund 410 2,895,137 1,825,632 2,330,104
Fund 415 Unrestricted Sub -Total 15,990,359 24,744,431 10,362,750
Fund 416 2,427,453 6,712,551 5,404,035
45,000,000
40,000,000
35,000,000
30,000,000
25,000,000
20,000,000
15,000,000
10,000,000
5,000,000
40,118,850
30,710,626
25,794,777
Cash by Fund
24,744,431
15,990, 359
10,3 62, 750
6,712,551
1,825,632
2.895,137 2,330,104
1,404,035
2,427.453
Fund 405 Fund 410
Fund 415 Unrestricted Sul- Fund 416
■ FY 23-24 ■ FY 22-23 a FY 21-22 Total
Actual Actual
Actual
Page 9 of 10
12/11/2023
CITY OF PALM SPRINGS
PALM SPRINGS INTERNATIONAL AIRPORT
Financial Summary
Ending November 30, 2023
Coronavirus Aid, Relief, and Economic Security Act (CARES) -
Expires - May 10, 2024 11,067,877 11,067,877
Coronavirus Response and Relief Supplemental Appropriations
(CRRSA)- Airport Operations
Expires - April 14, 2025 4,785.805 4,785.805
Coronavirus Response and Relief Supplemental Appropriations
(CRRSA)- Concessions
Expires - May 31, 2025 280,390 280,390
American Rescue Plan Act of 2021 (ARPA) - Concession
Expires - May 31, 2025 1,121,560 1,121,560
American Rescue Plan Act of 2021 (ARPA) - Airport Operations
Expires - August 10, 2025 10,791,632 10,791,632
Bipartisan Infrastructure Law (BIL)*
Expires - 2027 15 918,762 -
Total Grants 43,966,026 28.047,264
Grants - Remaining Balance
18,000,000
$16,000,000
$14, 000,000
$12,000,000 $11,067,877,C $10,791,632.0
$10,000,000
$ 8,000,000
$ 6,000,000 $4, 785, 805.0
$4,000,000
$2,000,000 $2803900 $1,121,560.0
$0
Coronavirus
Response
Coronavirus
American
Coronavirus
and Relief
Response
American
Rescue Alan
Aid, Relief,
Supplementa
and Relief
Rescue Plan
Act of 2021
and
1
Suppfementa
Act of 2021
(ARPA) -
Economic
Appropriatio
I
(ARPA] -
Air
Security Act
ns (CRRSA)-
Appropriatio
(CARES) -
Airport
ns {CRRSA)-
Concession
Operaatiott ns
Expires-
Expires -
Expires-
Operations
Concessions
May 31, 2025
August 10,
May 10, 2024
Expires -
Expires -
2025
April 14,
May 31, 2025
2025
15 918,762
15 918, 762
$15, 918, 762.0
Bipartisan
Infrastructur
e Law (RIL)*
Expires -
2027
1 Grant Awarded by the FAA to the Airport 11,067,877 4,785,805 280,390 1,121,560 10,791,632 15,918,762
■ Actual Used as of 11/30/23 11,067,877 4,785,805 280,390 1,121,560 10,791,632 -
RemainingActualUnused - - - - - 15,918,762
Page 10 of 10 12/11/2023
palm springs
INTERNATIONAL AIRPORT
ZW-- springs
palm
INTERNATIONAL AIRPORT
RJ Concourse
- Local entity has agreed to a 3-year deal to place their name on the Rj Concourse
- Agreement includes:
- Naming rights to the Rj Concourse
- Rj Concourse activation space to include amenities for passengers such as seating and potential
charging stations
- Other in -terminal advertising
PSP Concession Projected Opening Dates
1D 16 Task Task Name Qtr 3, Z023 j Qtr 4, 2023 Qtr 1, 2024 Qtr 2, 2024 Qtr 3, 2024 Qtr 4, 2024
Mode Jun i Jul 1 Au I Se p II Oct � Nov Dec J Jan I Feb I Mar . A r I may Jun I W __Aug.. ,Sep_; Oct _—Nov __Dec:
_
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
aF�
LAS PALMAS OASIS (TEMP TAKEOVER)
UPTOWN ESSENTIALS [TEMP KIOSK]
THE PINK DOOR
I HEART PSP & VENDING
Nine Cities Craft
HEY JOSHUA
Cactus to Clouds
LAS PALMAS OASIS
UPTOWN ESSENTIALS
El Mirasol & Coachella Valley Coffee
INMOTION
COACHELLA DUTY FREE CART
COURTYARD - COFFEE TRUCK/TRAILER
Vino Volo
Trio
Half Moon Empanadas
9/11
♦ 9/12
♦ 1/30
1/30
♦ 2/2
2/27
♦ 4/12
♦ 4/ 16
♦ 4/16
♦ 5/10
5/14
♦ 6/21
♦ 8/19
9/30
♦ 9/30
♦I
ITEM 7.E
Palm Springs International Airport Wed 12/13/23
PE
palm springs
,A INTERNATIONAL AIRPORT
A Department of the City of Palm Springs
DATE: December 20, 2023
TO: Chairman Dada and Airport Commissioners
FROM: Harry Barrett, Jr., Airport Executive Director
SUBJECT: Projects and Airport Capital Improvement Update
Capital Projects
Airport Master Alan (Updated December 11, 2023)
Palm Springs International Airport
3400 E. Tahquitz Canyon Way, Suite 1
Palm Springs, CA 92262-6966
flypsp.com
T: (760) 31 B-3800
Background: This project is a 30-month comprehensive study to plan and develop capital program
requirements thru the year 2045. The study is scoped to be sustainable, and incorporates future goals
related to terminal complex, landside access and parking, and airside improvements for future generating
aircraft.
Status: In process. On September 18th, the Federal Aviation Administration provided an approval of PSP's
Aviation Forecasts thru the year 2043. The consultant has produced Initial Alternatives that were
presented to the City Council on September 14th and in a public open house on September 19th that was
attended by approximately 160 people. Mead & Hunt has reviewed all comments and incorporated them
into a refined Terminal Alternatives document which was presented to the Master Plan Working Group
on October 12th. Airport staff and the consultant presented the revised terminal development
alternatives to airport tenants including the airlines, car rental companies and concessionaires on
November 2, 2023 during monthly tenant meeting. The Airport hosted a second meeting with the
Signatory Airlines to discuss additional details related to the terminal development alternatives on
December 12, 2023. The airport is presenting the revised alternatives to the Airport Commission for a
selection and recommendation to the City Council on December 20, 2023.
Terminal Common Use (Updated December 11, 2023)
Background: This project is to install Common Use Passenger Processing System (CUPPS) at each of the
18 boarding gates and at the non -signatory airline ticket counters. This includes renovations to the Bono
Concourse which involve replacement of customer service podiums, lighting and signage upgrades and
carpet replacement for both concourses.
Status: In process - construction. Invitation For Bid #21-28 was issued on February 15th for construction
of Bono concourse podiums and the renovation of the concourse. The City Council approved a contract
with the most qualified firm (CalTec) on May 11, 2023. The Regional Jet (RJ) concourse gates have been
fully converted onto the Common Use platform. New carpet installation is nearly complete in the RJ
ITEM 7.F
concourse as a part of this project. Renovation of boarding gates 5 & 7 of the Bono concourse have been
completed. Gate 9 is currently under construction with an estimated completion date of December 141n
Gate 11 will be the next gate taken out of commission with an expected completion date of January 3,
2024. The airport is closely monitoring medium -range flight schedules to determine if an extension to
the CalTec contract is warranted to enable increased frequency starting in February.
Employee and Economy Parking tots & Commercial Transit reconfiguration (updated December 11,
2023)
Background: This project aims to complete three objectives: 1) design and build a new employee parking
lot west of the airport at El Cielo and Baristo; 2) convert the current overflow and employee lots to
economy lots; and 3) make changes to commercial ground transportation staging areas. PSP's focus is
on incorporating and improving technology thru these designs by introducing a new Parking and Revenue
Control System, adding EV charging, and upgrading fiber capability to accommodate security
improvements. Staff has been working thru state and federal programs to procure EV charging capability.
Status: In process. The Airport has given direction to the consulting firm C and S to conduct a Project
Definition Report with the aim of better defining scope and costs for construction. The Airport has
directed C and S to focus on Lot A, as well as the site at the corner of El Cielo and Baristo which is
anticipated to be the future Employee Parking Lot. Airport staff have asked C and S to delay most study
and analysis related to the current overflow lot at the south end of the Airport until such time as there is
a City Council approved terminal development alternative selected.
Restroom Renovations (updated December 11, 2023)
Background: City Council approved Airport staff to design and renovate all public restrooms airport wide
in the FY 2023 budget. This would include demolition and replacement of all flooring and fixtures,
upgrades to ventilation and lighting systems, and conversion of some restrooms to gender neutral
facilities.
Status: In progress — Project Definition. Airport staff provided Gensler with Notice to Proceed with a
project definition report for design and renovation of restrooms at the Bono concourse and in the
courtyard areas while a decision and approval of a terminal development alternative is pending. These
areas will be considered Phase I of the project. Airport staff intend to provide direction to Gensler to
commence design upon City Council approval of a preferred terminal alternative.
Taxiway W and AI Rehabilitation (updated December 11, 2023)
Background: This is an Airport Improvement Program (AIP) funded project to design and rehabilitate the
Airport's primary commercial taxiway under the Pavement Management Program.
Status: In Design. The Airport's on -call engineering firm RS&H completed surveying and destructive
testing of the pavement to determine the project approach for rehabilitation. The rehabilitation design
has been underway since March. RS&H has notified airport staff that 90% design is ready for Airport
review. The Airport will meet with the RS&H team on December 12th for an updated. PSP is applying to
the FAA for competitive discretionary funding which, if successful, would enable this project to move
forward for construction in CY 2024.
Palm Springs �Uternational Airport 2
Outbound Baggage Handling System Replacement: (Updated October 16, 2023)
Background: This project is intended to modify or replace the current outbound baggage handling system
with a new inline baggage handling system to improve capacity and process efficiency, implement
additional technology for bag tracking, reduce or eliminate single points of failure, and improve
ergonomics.
Status: In process - design: City Council approved the selection of AECOM for inline outbound baggage
handling system design services. AECOM is underway on design with expected 30% designs in late
October. Airport staff and AECOM have held a number of meetings with TSA and FAA stakeholders to
review initial concepts and seek input. Airport staff will be meeting with airline stakeholders in the
coming weeks to garner feedback on initial design concepts. The timing of federal funding suggests that
PSP will target CY 202S for construction.
Baggage Claim Expansion and Renovation (Updated October 16, 2023):
Background: This project was previously identified on the Airport's Capital Improvement Program (CIP)
list for start in FY 2025.
Status: In process - design. In the Fall of 2022, Airport staff applied for a nation-wide competitive grant
under the Airports Terminal Program (ATP) under the 2021 Bipartisan Infrastructure Law. Airport staff
was notified on February 27th that PSP had been awarded a $5.7M grant to partially fund expansion of
baggage claim. Airport staff has determined that a Construction Manager at Risk (CMAR) project delivery
methodology is appropriate for this project and Request for Proposal #34-23 was advertised. A contract
award for Construction Manager at Risk to Skanska was approved by the City Council in July 2023 with a
project budget of $27M. Primary funding sources for this project include BIL ATP, BIL allocation, and
Airport Improvement Program funds. This project was included in the airport's proposed budget and as
such the airport will also be working with the airlines upon adoption of the 2024 budget on capitalizing
any remaining costs. The Airport's on -call consultant is working toward 30% design and has held initial
stakeholder input meetings with the airlines, car rental companies, TSA and Airport staff.
Public Parking Electrification — Lot D (Updated October 16, 2023)
Background: Airport staff applied for the Southern California Edison electric vehicle charging
infrastructure rebate program in the winter of 2022. The program is designed to provide no -cost
infrastructure to enable Level 2 electric vehicle charging with the caveat that sponsors self -procure level
2 chargers.
Status: PSP was approved for expansion of electric infrastructure under the SCE rebate program. Request
for Proposal #04-23 was issued on June 1, 2023 for procurement of 40 level two chargers to serve 80
parking positions. Airport staff have ordered the Level 2 chargers which are set to arrive by the end of
October. Staff is preparing an Request for Proposal to install the chargers once the infrastructure work
has been completed by SCE. The Airport anticipates that, infrastructure work to commence in the late fall
of 2023. Airport staff is developing costs recovery rate and fee plans for EV charging spaces and
anticipates bringing proposals to the finance committee in the winter of 2023.
Palm Springs uaternational Airport 3
Sterile Area Shade Structures (updated October 16, 2023)
Background: This project aims to add shade structures post security to encourage broader use of the
Airport during summer months. This project is partially funded through a grant facilitated by Visit Greater
Palm Springs.
Status: Awaiting Permit. Design of the sterile area shade structures was completed and airport staff
sought permits for construction in August. As a result of the Wexler Terminal being listed on the Federal
Historic Preservation Register, the structures are subject to additional approvals and vetting before
permits can be secured. The airport is currently awaiting permit approval.
Program Updates
Feasibility Study for Federal Inspection Station (international Air Service) (Updated December 11,
2023)
Background: This two -phased study (partially funded by Visit Greater Palm Springs) seeks to analyze how
small and medium hub airports have successfully constructed an FIS and expanded international routes
to their facilities, and subsequently develop a business plan for expansion of Customs and Boarder
Protection Services for commercial flights at PSP.
Status: In Process — Phase II; Airport staff gave InterVISTAS Notice to Proceed on Phase II of the study
which involves a PSP-specific FIS plan on October 4, 2023. InterVISTAS is currently working on two tasks:
the market demand analysis and the economic impact analysis. Airport staff have a meeting scheduled
with InterVISTAS staff on December 12th to discuss the status of the study and to provide direction as
required. Airport staff is continuing discussions with Customs and Boarder Protection regional leadership
about PSP plans to expand international air service.
Palm Springs 4%ternational Airport
promoted three Maintenance Workers to the position of Maintenance Technician I thru an external
recruitment. Since the start of the fiscal year, the HR team has recruited for nine different classifications
and has filled 8 of 13 FTEs across those nine classifications. Of the 85 airport only positions allocated to
PSP there are currently 21 vacancies. The airport HR Specialist has been hired and began work on August
2$th
Commissioner request for agenda item to update on Persons without Legitimate Business & Unhoused
Population (Updated December 11, 2023)
Background: Airport staff received a Commissioner request for ongoing updates surrounding the
unhoused population at the Airport. The Airport has experienced an increase in persons without
legitimate business within the terminal area, including unhoused persons living on the Airport campus
and populating the terminal.
Report: Airport staff and the Police Department began enforcement of the Legitimate Business ordinance
at midnight on March 12th. There was an immediate and noticeable decline in persons without legitimate
business and unhoused individuals occupying the Airport property upon enforcement. The Airport can
report that the situation remains unchanged and there has been no observed increase in persons without
legitimate business on the airport.
Palm Springs international Airport 2
Attachments
Item 1 F
SUBJECT
APPROVAL OF AMENDMENT NO. 1 TO CONTRACT SERVICES AGREEMENT NO.
A9154 WITH AMADEUS AIRPORT IT AMERICAS, INC. TO PROVIDE A
COMMONISHARED USE PASSENGER PROCESSING SYSTEM FOR THE PALM
SPRINGS INTERNATIONAL AIRPORT BOARDING GATES
RECOMMENDATION:
1. Approve Amendment No. 1 to Contract Services Agreement No. A9154 with
Amadeus Airport IT Americas, Inc. for the addition of eleven ticket counter
common/shared use positions in the ticketing wing, eight customer service counter
common/shared use positions in the Bono Concourse, and four spare
common/shared use positions, in an amount not to exceed $225,859.51 and to
extend the schedule for the common/shared use project to a completion date of
March 29, 2024, and for the project to be fully operational by April 19, 2024,
2. Appropriate $225,859.51 from Airport Fund 416 to the account 4167065.80000
budget.
3. Allow the City Manager or designee to execute all necessary documents.
Attachments
Item 1 G
SUBJECT
APPROVE CONTRACT SERVICES AGREEMENT NO. 2313225 WITH GRANITE
CONSTRUCTION COMPANY FOR ON -CALL PAVEMENT REPAIR SERVICES FOR
PALM SPRINGS INTERNATIONAL AIRPORT
RECOMMENDATION:
1. Approve Contract Services Agreement 238225 with Granite Construction Company
to provide on -call pavement repair services for the Palm Springs International Airport
in an amount not to exceed $3,000,000 for the initial three-year term beginning
November 1, 2023, through October 31, 2026, with two one-year extension options
at the City's sole discretion.
2. Authorize the City Manager or designee to execute all necessary documents
Attachments
Item 11
ITEM 10.A / 12-20-23 Page 213
SUBJECT
SECOND READING AND ADOPTION OF ORDINANCE NO. 2072 TO AMEND
SECTION 16.36.020 OF THE PALM SPRINGS MUNICIPAL CODE RELATING TO
THE CONDUCT AND APPEARANCE OF AIRPORT COMMERCIAL VEHICLE
OPERATORS
RECOMMENDATION:
Waive the second reading of text in its entirety, read by title only, and adopt
Ordinance No. 2072, "AN ORDINANCE OF THE CITY COUNCIL OF THE CITY
OF PALM SPRINGS, CALIFORNIA, AMENDING SECTION 16,36.020 OF THE
PALM SPRINGS MUNICIPAL CODE RELATING TO THE CONDUCT AND
APPEARANCE OF AIRPORT COMMERCIAL VEHICLE OPERATORS."
Attachments
Item 1 CC
ITEM 10.A / 12-20-23 Page 313
ITEM 10.13 - FUTURE CITY COUNCIL ACTIONS
Airport Commission Meeting of December 20, 2023
December 14. 2023
• USA Shade & Fabric Structures — Cooperative agreement for shade structures
• DeAngelo Contracting Services, LLC — On -call weed abatement services
• Genesis Floor Covering, Inc. — On -call flooring repair and replacement services
• MobileMoney, Inc. —Lease agreement for Airport ATM's
• Turo Inc. — Non-exclusive operating agreement for Peer -to -Peer vehicle sharing
• Tetra Tech AMT — Contract services agreement for safety system services
ITEM 10.8 / 12-20-23 Page 111
Palm Springs International Airport
MONTHLY PASSENGER ACTIVITY REPORT - 2023
Enplaned
Deplaned
Total Passengers
2023
2022
% Change
2023
2022
% Change
2023
2022
% Change
January
169.746
118,204
43.6%
171,910
119,184
44.2%
341,656
237,388
43.9%
February
184,973
142,206
30.1%
188,877
150,130
25.8%
373,850
292,336
27.9%
March
223,314
202,993
10.0%
226,832
200,890
12.9%
450,146
403,883
11.5%
April
200,753
185,946
8.0%
178,600
172,169
3.7%
379,353
358,115
5.9%
May
129,695
123,736
4.8%
116,491
109,503
6.4%
246,186
233,239
5.6%
June
71,635
73,861
-3.0%
66,826
68,663
-2.7%
138,461
142,524
-2.9%
July
63,647
68,071
-6.5%
60,689
65,593
-7.5%
124,336
133,664
-7.0%
August
59,309
65,368
-9.3%
59,947
64,584
-7.2%
119,256
129,952
-8.2%
September
73,813
79,599
-7.3%
77,748
83,235
-6.6%
151,561
162,834
-6.9%
October
126,702
120,659
5.0%
133,106
126,798
5.0%
259,808
247,457
5.0%
November
162,180
160,129
1.3%
165,290
159,108
3.9%
327,470
319,237
2.6%
December
159,846
-100.0%
161,369
-100.0%
-
321,215
-100.0%
Year to Date
1,465,767
1,500,618
9.3%
1,446,316
1,481,226
9.6%
2,912,083
2,981,844
1
Page 1 of 4 ITEM 11.A
Palm Springs International Airport
ACTIVITY BY AIRLINE
NOVEMBER 2023
AIRLINES
Enplaned
2023 2022 % Change
Deplaned
2023 2022 % Change
Total
2023 2022 % Change
(E & D)
Market Share
Air Canada
5,670
4,443
27.6%
5,771
4,744
21.6%
11,441
9,187
24.5%
3.5%
Alaska
30,823
31,217
-1.3%
30,674
30,999
-1.06/"
61,497
62,216
-1.2%
18.8%
American
23,979
24,770
-3.2%
24,029
23,008
4.4%
48,008
47,778
0.5%
14.7%
Avelo Air
2,477
1,710
44.9%
2,560
1,911
34,011%
5,037
3,621
39.1%
1.5%
Delta Air
51840
5.611
4.1%
5,840
5,674
2.9%
11,680
11,285
3.5%
3.6%
Mesa (AA)
-
74
-100.0%
-
73
-100.0%
-
147
-100.0%
0.0%
SkyWest (Delta Connection)
5,403
5,077
6.4%
5,467
4,969
10.0%
10,870
10,046
8.2%
3.3%
SkyWest (United Express)
8,324
10,027
-17.0%
8,827
9,760
-9.6%
17,151
19,787
-13.3%
5.2%
SkyWest (AA)
5,314
3,522
50.9%
5,120
3,542
44.6%
10,434
7,064
47.7%
3.2%
Southwest Air
29,421
29,673
-0.8%
30,654
29,935
2.4%
60,075
59,608
0.8%
18.3%
United
20,427
14,659
39.3%
20,384
14,478
40.8%
40,811
29,137
40.1%
12.5%
WestJet
16,585
18,151
-8.6%
17,883
18,521
-3.4%
34,468
36,672
-6.0%
10.5%
Alle iant Air
1,457
2,039
-28.5%
1,468
2,010
-27.0%
2,925
4,049
-27.8%
0.9%
Flair
-
1,862
-100.0%
-
1,862
-100.0%
-
3,724
-100.0%
0.0%
JetBlue
3,284
3,729
-11.9%
3,143
3,767
-16.6%
6,427
7,496
-14.3%
2.0%
MN Airlines (Sun Country)
3,176
3,565
-10.9%
3,470
3,855
-10.0%
6.646
7,420
-10.4%
2.0%
Charters
-
-
0.0%
-
-
0.0%
-
-
0 0%
0.0%
TOTAL
162,180
160,129
1.3%
165,290
159,108
3.9%
327,470
319,237
2.6%
100.0%
Page 3 of 4
Palm Springs International Airport
PASSENGER ACTIVITY REPORT - FISCAL YEAR COMPARISON
ENPLANED PASSENGERS
DEPLANED PASSENGERS
TOTAL
PASSENGERS
FY '23=24
xcwxoc
FY'22-'23
x
FY'21=22
c
FY '20=21
FY'23=24
xcwwoc
FY '22=23
xuwpc
FY'21=22
xcw.nc
FY '26=21
FY'23-'24
x
FY'22=23
FY'21=22
xcwunc
FY'20=21
July
63,647
-6%
68,071
3%
65,869
282%
17,231
60,689
-7%
65,593
3%
63,594
1- 284%
16,545
124,336
-7%
133,884
t 3%
129,463
253%
33 778
August
59309
-9%
65,368
11%
58,793
220%
10,389
59,947
-7%
44,584
9%
99,159
T_ 227%
18,093
119256
-8%
129,952
10%
117, 552
,. 223%
36,482
September73,813
-7%
79,599
21%
65,882
104%
23,087
77,748
-7%
33,235
17%
7098d
:. 888%
24,828
151561
-7%
182 334
99%
136¢66
^' 1B5%
47,915
October
126,702
1' 5%
120,659
11%
108,923
'" 162%
41.597
133,106
.. 5%
1215,798
8%
177068
148%
47,180
259,508
5%
247,457
9%
225,991
155%
88,777
November
162, 180
1%
160129
18%
135,677
157%
52,874
165,290
+ 4%
159,108
17%
136,287
147%
55,169
327470
3%
319.237
17%
271.944
- 152%
108,043
December
-1 00%
159, 448
17%
136897
230%
41,517
-100%
781,369
16%
139,630
234%
41,745
-100%
321.215
1;° 16%
278.527
- 232%
83,262
January
-100%
189748
44%
116,204
198%
39814
-100%
171910
44%
119,164
202%
39488
-100%
341,656
44%
237,388
200%
79,OB2
February
%,-100%
184973
30%
142206
147%
57530
-100%
188,677
28%
150,130
138%
63.127
-
-100%
373.850
28%
292,336
142%
120,657
March
-100%
223314
10%
202,993
89%
107577
-100%
226,832Hl�i
2 00.990
88%
1D6,900
-100%
450146
11%
403,883
^� 89%
214477
April
-100%
20D,753
8%
1B5,948
� 67%
111376
-100%
179,600
172,169
65%
104401
-10D%
379353
; 6%
358,115
�.'� 55%
215,777
May
-100%
129,695
5%
123.736
33%
92,820
-100%
116,491
109 503
3A%
81,715
-100°k
246 18S
^' 6%
233,239
34%June
-100%
71,635
-ff 3%
73,861
rt?, 10%
B6,885
-100%
56828
68,863
9%
62,987
-
-100%
138,481
-3%
142,524
. 10%
129,B72
YTD
45,5,651
. 0%
,633, 88
1
8, 81
,, 1W%
670,49
4 , 80
,610,223
1,407,El41
7, 1137
662.1581
982,431
IW -7()%l
3,244,011
1r 15Y.1
2,825,020
1^1 112%
1,332,655
ITEM 11.13
III A M I WIMA 11 ill JO aueeliv,Ilyilr092121 M1=l49V[&I
Airport Commission Meeting of December 20, 2023
Date
Time
Committee
January 17, 2024
4:00 P.M.
Noise Committee
TBD
TBD
Ad Hoc Design Review Committee
TBD
TBD
Budget and Finance Committee
TBD
TBD
Marketin and Business Development Committee
TBD
TBD
Operations, Properties and Facilities Committee
ITEM 12.A •/ 12-20-23 Page 1 11
AIRPORT COMMITTEES FY2023-24
REVISED 12-14-23
REPRESENTING
COMMISSIONERS
Marketing
(7 Members)
Budget
{7 Members)*
Operations
(7 Membersj
Noise
(5 Membersj
Ad Hoc Design
Review
(5 Members)*
Indian Wells
BERRIMAN, Robert
Member
Palm Springs
BURKE, Todd
Chair
Member
Member
Palm Springs
CALDWELL, Daniel
Member
Member
Palm Springs
CORCORAN, Kevin
Member
Member
_
Palm Springs
DADA, Aftab
Palm Springs
FELTMAN, David
Chair
Member
Palm Springs
FONG, J Craig
Member
Member
La Quinta
HUGHES, Kathleen
Member
Palm Springs
MARTIN, Tracy
Chair
Cathedral City
MICHAELIS, Tony
Member
Member
Riverside County
PARK, Margaret
Member
Desert Hot Springs
PYE, Jan
Member
Member
Palm Springs
SUERO, Guillermo
Member
Palm Desert
WISEMAN, Kevin
Member
Member
Chair
Member
Indio
WISE, Rick
Member
Member
Rancho Mirage
YOUNG, Keith
Member
Member
*Budget & Finance Committee has one (1) vacancy
Ad Hoc Design Review Committee has one (1) vacancy