Loading...
HomeMy WebLinkAboutItem 2B - Staff PresentationPROPOSED DRIVE-THROUGH COFFEE SHOP 2466 N Palm Canyon Drive Item 2B Case #DP-2023-0018 / CUP-2023-0020 / VAR-2023-0007December 14, 2023 PLANNING SERVICES DEPARTMENT Item 2B - 1 Background: •0.46-acre irregularly-shaped vacant site •Zone PD 113, GP Mixed-use •Former pad site of demolished Neighborhood shopping center •Palm Canyon at Racquet Club (Major and secondary) •Access easements PLANNING SERVICES DEPARTMENT Item 2B - 2 Parcel is part of a former shopping center demolished in the early 2000’s Various plans in the 1980’s proposed arestaurant, and later a drive-through with a much shorter queuing lane (with indoor& outdoor dining and carhop service). PLANNING SERVICES DEPARTMENT Item 2B - 3 Proposed Project •Drive-through coffee shop. •No walk-up, take-out or dine-in service. •1,150-square foot building. •Drive-through queuing for 19 vehicles. •Extensive landscape buffer with many shade trees & screenwall at queuing lanes. •Off-street parking for staff (7 spaces). PLANNING SERVICES DEPARTMENT Item 2B - 4 Landscape & Site Plan •Shade trees at perimeter public sidewalk, queuing lanes and parking lot. •4-foot screen wall at drive-through. •All new drought tolerant landscape beds. •Stormwater retention basin. PLANNING SERVICES DEPARTMENT Item 2B - 5 Building Elevations Facing Palm Canyon (south) Facing Palm Canyon (west) Facing Racquet Club(north) Facing Del Taco (east) PLANNING SERVICES DEPARTMENT Item 2B - 6 Planning Commission and Architectural Review Committee Review •Staff/Commission Discussion: •Appropriateness of a drive-thru only business •Orientation of buildings in relation to major intersection •Lack of pedestrian access and seating •Landscaping and shading •Affirmative votes by PC on 10-25-23 (3-2 with 1 absent) and ARC 11-6-23 (6-0) with added conditions PLANNING SERVICES DEPARTMENT Item 2B - 7 PC and ARC Added Conditions of Approval: •PC: Full shade structure over queuing lane at pick-up window as required by code. •PC: More shade trees at perimeter of site to screen queuing lanes and back of building. •ARC: Full shade structure at order machine as required by code. •ARC: Better architectural articulation on street-facing sides of the building. •ARC: Add shrubs in front of the queuing lane screen wall to control glare from headlights. •ARC: Prepare a diagram confirming no conflicts in vehicles entering the Starbucks drive- through with those exiting from the adjacent Del Taco drive-through. PLANNING SERVICES DEPARTMENT Item 2B - 8 Proposed Revisions In response to the Council callup, the applicant circulated a memo including a revised site plan that includes: •Elimination of one drive-thru queuing aisle •Addition of a walk-up order window for pedestrians •Addition of covered outdoor patio/seating •Addition of public restroom for patrons •Improved articulation of building facing N Palm Canyon Drive Staff have not conducted an in-depth review of the proposed revisions PLANNING SERVICES DEPARTMENT Item 2B - 9 Process Previous Actions of Planning Commission and Architectural Review Committee set aside Council may: •Affirm, modify, or reverse the previous decision •Continue hearing and return with revised plans and staff report •Refer the matter back to the Planning Commission/ARC with direction (Decision rendered within 15 days of hearing, may be extended to 90 days) Decision based on required findings: •Development Permit (site design; findings: PSZC 94.04.01). •Conditional Use Permit (Drive-through use; findings: PSZC 94.02.00). •Variance (building less than 2,000 sf ; findings PSZC 94.06.00) PLANNING SERVICES DEPARTMENT Item 2B - 10 View looking north along Palm Canyon PLANNING SERVICES DEPARTMENT Item 2B - 11