Dear Council Members,
On October 25th, we went before the Planning Commission and received an approval for our proposed
Starbucks building at the SEC of Palm Canyon & Racquet Club. At that mee ng, concerns were expressed
that the project was “drive-through only”, with no pedestrian-oriented service point. On November 6th
we also received ARC approval with specific condi ons, and we are prepared to meet those condi ons.
As with the other Starbucks stores in Palm Springs, we would very much like to be a produc ve partner
with the community, so we have gone back to Starbucks to discuss a proac ve response to the concerns
that we heard. We have met with the Starbucks representa ves, and they have agreed to the following
addi onal features:
Pedestrian Friendly
1)A large, covered pa o has been added to the building to add tables and chairs for customers to
enjoy.
2)A pedestrian walk-up window has been added to the building for pedestrians to walk up and
order drinks and food.
3)Bicycle racks have been added to the pa o area so bicyclists can u lize the walk-up window and
pa o areas.
4)The required public restroom has been added to the building as required by the addi on of the
outdoor pa o area.
5)The second drive-through lane has been eliminated to enhance the pedestrian use of the
project.
Architectural Elements
1)We will be addressing the ARC comments to provide be er ar cula on of the building facing
North Palm Canyon Drive.
2)We will be adding a “Keep Clear” marking at the entrance of our Drive Through lane to eliminate
conflict with the adjacent property owners drive-through exit.
To be a good partner, requires being a good listener. We listened to the comments from the Planning
Commission, the Architectural Review Commi ee, and the community and worked with Starbucks to
ensure that the project will be a posi ve addi on to this neighborhood and the en re City. We look
forward to working with the City Council and addressing any concerns that remain
Regards,
Kayman Wong
Kaidence Group LLC
COFFEE SHOP
1,226 S.F.
C-1
ZONE
(EXISTING
DRIVE-THRU)
EXISTING
DRIVEWAY7'-0"24'-0"18'-0"TYP.12'-0"
7
EXISTING
DRIVE
AISLE
MONUMENT
SIGNPROPERTY
L
INE
RETENTION
BASIN
RACQUET CLUB ROAD
NORTH
PA
LM
CANYON
DR
IVE
T
12'-0"12'-0"(E) SIDEWALK
(E
)
S
IDEWA
LK
EXISTING
DRIVE AISLE2'-0"5'-0"1
7
15
BLD
'G
SE
T
BACK
(E)MONUMENT
SIGN
RAM
P
D
N.8.33% M
A
X.
CANOPY
OVERHANG, TYP.2'-0"4' H SCREEN WALL ALONG PERIMETER OF
DRIVE-THRU LANE AS MEASURED FROM
DRIVE-THRU LANE SURFACE TO TOP OF WALL
(E) CURB TO
REMAIN
(E) TRANSFORMER
(E) SIDEWALK
(E) CURB &
GUTTER
(E) CURB &
GUTTER
DRIVE-THROUGH LANE
CLEARANCE BAR
DRIVE-THROUGH LANE
ENTRY SIGN
DRIVE-THROUGH LANE
EXIT/'THANK YOU' SIGN
ORDER BOARD
ORDER MENU
BOARD
9'-0"
TYP.
TRASH ENCLOSURE
PRE-ORDER
MENU BOARD
1
OUTDOOR COVERED
PATIO AREA
WALK-UP
WINDOW
SHADE STRUCTURE
OVER ORDER POINT
18'-0"32'-6"
14'-8"
4' H SCREEN WALL ALONG
PERIMETER OF DRIVE-THRU LANE
AS MEASURED FROM DRIVE-THRU
LANE SURFACE TO TOP OF WALL
BIKE
RACKS
5" x 5" STEEL POLE
2' DIA. CONCRETE
BASE
LED FIXTURE
2'-6"15'-0"8" SMOOTH FACE
CMU WALL PAINTED
TO MATCH BUILDING
PRE-CAST
CONC. CAP 8" CMU WALL WITH
STUCCO FINISH, PAINTED
TO MATCH BUILDING
PRE-CAST
CONC. CAP
4'-0" MIN.4'-0"16'-8"10'-8"7'-6" HIGH, 8"
CMU BLOCK
WALL WITH
PLASTER FINISH,
PAINTED TO
MATCH BUILDING4 YARD
CONTAINER
4 YARD
CONTAINER
64
GAL.
TOTE
64
GAL.
TOTE
CORRUGATED
METAL DOORS W/
CANE BOLTS,
FINISH TO MATCH
BUILDING CANOPY
6" CURB,
CONTINUOUS
ON 3 SIDES
6" STEEL POSTS,
TYP. OF 3
A.P.N. NO.:504-250-0031
EXISTING ZONING:C-1
SITE AREA:0.46 ACRES (20,028 S.F.)
PROPOSED USE:RESTAURANT (DRIVE-THRU ONLY)
CONSTRUCTION TYPE:V-B
OCCUPANCY:B
BUILDING AREA:1,226 SF
PATIO AREA:480 SF
PARKING PROVIDED:8 SPACES
ACCESSIBLE SPACES REQUIRED:1 SPACE
ACCESSIBLE SPACES PROVIDED:1 SPACE
DRIVE-THRU VEHICLE STACKING REQUIRED:7 VEHICLES
DRIVE-THRU VEHICLE STACKING PROVIDED:15 VEHICLES
SITE DATA
LEGEND:
LANDSCAPED AREA
PROJECT SCOPE OF WORK:
DEVELOP EXISTING VACANT LOT FOR NEW 1,226 SF DRIVE-THRU
COFFEE SHOP WITH WALK-UP WINDOW. PROVIDE NEW PAVING,
LANDSCAPING, SITE LIGHTING, SITE SIGNAGE, AND ON-SITE
STORM WATER RETENTION / FILTRATION SYSTEM.
SHEET NUMBER:
SHEET TITLE:
SCALE: AS SHOWN
STORE #:
PROJECT #:PROJECT NAME:PROJECT ADDRESS:C 2022 STARBUCKS COFFEE COMPANY
R
D E S I G N D E V E L O P M E N T O N L Y - N O T I N T E N D E D F O R C O N S T R U C T I O N U S EISSUE DATE:
2401 UTAH AVENUE SOUTH
SEATTLE, WASHINGTON 98134
(206) 318-1575
STARBUCKS R
DESIGN MANAGER:
DESIGNER OF RECORD:
MCG PROJECT #:
STARBUCKS TEMPLATE VERSION: i2020-04-20
ARCHITECT OF RECORD
22.321.05
THESE DRAWINGS AND THE PROJECT MANUAL ARE
CONFIDENTIAL AND SHALL REMAIN THE SOLE
PROPERTY OF STARBUCKS CORPORATION, WHICH IS
THE OWNER OF THE COPYRIGHT IN THIS WORK. THEY
SHALL NOT BE REPRODUCED (IN WHOLE OR IN PART),
SHARED WITH THIRD PARTIES OR USED IN ANY MANNER
ON OTHER PROJECTS OR EXTENSIONS TO THIS
PROJECT WITHOUT THE PRIOR WRITTEN CONSENT OF
STARBUCKS CORPORATION. THESE DRAWINGS AND
SPECIFICATIONS ARE INTENDED TO EXPRESS DESIGN
INTENT FOR A PROTOTYPICAL STARBUCKS STORE
(WHICH IS SUBJECT TO CHANGE AT ANYTIME) AND DO
NOT REFLECT ACTUAL SITE CONDITIONS. NEITHER
PARTY SHALL HAVE ANY OBLIGATION NOR LIABILITY TO
THE OTHER (EXCEPT STATED ABOVE) UNTIL A WRITTEN
AGREEMENT IS FULLY EXECUTED BY BOTH PARTIES.
12.12.2023
MCG ARCHITECTURESTARBUCKS ATPALM CANYON &RACQUET CLUBSEC W RACQUET CLUB RD &N PALM CANYON DRPALM SPRINGS, CA 92262Revision Schedule
Rev Date By Description
N
0'5'10'20'
SCALE:1" = 10'NOTE: This information is conceptual in nature and is subject to
adjustments pending further verification and Client, Tenant, and
Governmental Agency approvals. No warranties or guaranties of
any kind are given or implied by the Architect.
SITE PLAN
SP-01
TRASH ENCLOSURE PLAN VIEW
SCALE: 1/4" = 1'-0"
C.M.U. SCREEN WALL
SCALE: 1/4" = 1'-0"
SECTION ISOMETRIC VIEW
LIGHT STANDARD
SCALE: 1/4" = 1'-0"
TRASH ENCLOSURE PERSPECTIVE VIEW