DATE: 8/8/2019 APPLICANT
JURIS.
JURISDICTION: Palm Springs
PLAN CHECK #.: 2018-1661 Rev SET: II
PROJECT ADDRESS: 979 E. San Lorenzo
PROJECT NAME: SFD for Luxury Estates
The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction’s building codes.
The plans transmitted herewith will substantially comply with the jurisdiction’s codes
when minor deficiencies identified below are resolved and checked by building department staff.
The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
The check list transmitted herewith is for your information. The plans are being held at EsGil
until corrected plans are submitted for recheck.
The applicant’s copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
The applicant’s copy of the check list has been sent to:
Wade A. Ritchie
EsGil staff did not advise the applicant that the plan check has been completed.
EsGil staff did advise the applicant that the plan check has been completed.
Person contacted: Wade a. Ritchie Telephone #: 760-831-6659
Date contacted: (by: ) Email: waderitchie@hotmail.com Fax: 760-990-1992
Mail Telephone Fax In Person
REMARKS:
By: Richard Moreno for AD Enclosures:
EsGil
7/31/2019
Palm Springs 2018-1661 Rev
8/8/2019
NOTE: The items listed below are from the previous correction list. These
remaining items have not been adequately addressed. The numbers of the items
are from the previous check list and may not necessarily be in sequence. The
notes in bold font are current.
PLANS
1. Please make all corrections and submit THREE new complete sets of prints, to
the Palm Springs building department. Please note: Before correcting the
plans, you should wait until you’ve received comments from other city
departments (Fire, Planning, etc.).
SUBMITTED PLANS FOR REVISION SHOW THAT WHOLE STRUCTURE IS
BEING DEMOLISHED AND ONLY THE SLAB AND THE EAST FACING
GARAGE WALL REMAINS. BECAUSE OF THIS FACT, THE PROJECT IS
CONSIDERED NEW SINGLE FAMILY DWELLING.
No responses were provided with the resubmitted set of plans. Please
make sure that all the corrections noted below are responded to in writing
by the designer and/or engineer and returned to the city along with the
revised set of plans.
2. All sheets of plans must be signed by the person responsible for their
preparation. (California Business and Professions Code). Signatures on the final
sets of plans will be verified before they are approved.
3. Plans shall have the structural portions signed and sealed by the California state
licensed engineer or architect responsible for their preparation, along with
structural calculations. (California Business and Professions Code). Signatures
on the final sets of plans will be verified before they are approved.
FIRE PROTECTION
4. An automatic residential fire sprinkler system shall be installed in one family
dwelling. Please clearly note this on the plans. Section R313.2. I could not
verify where this was addressed on the plans.
On the cover sheet of the plans, specify any items that will have a deferred
submittal (trusses, fire sprinklers/alarms, etc.). Additionally, provide the
following note on the plans: “Submittal documents for deferred submittal
items shall be submitted to the registered design professional in
responsible charge, who shall review them and forward them to the
building official with a notation indicating that the deferred submittal
documents have been reviewed and that they have been found to be in
general conformance with the design of the building. The deferred
submittal items shall NOT be installed until their design and submittal
documents have been approved by the building official.”
Palm Springs 2018-1661 Rev
8/8/2019
FOUNDATION REQUIREMENTS
6. Revise the foundation plan to show that the existing slab, perimeter footings,
grade beams, pad footings including their reinforcements and the underground
utilities for electrical, plumbing and mechanical have been inspected and
approved by the City of Palm Springs and they were found to comply with the
current codes. This was not addressed.
STRUCTURAL
Since this is considered a new structure, the following structural comments
apply: NO REPLY FROM STRUCTURAL ENGINEER OF RECORD OR
STRUCTURAL PLANS WERE SUBMITTED.
7. Show beam A (7 X 16 parallam) as called on page 22 of the structural
calculations. Refer to sheet A.6 of the plans.
8. I was not able to find beam I.
9. There are two beam J shown on sheet A.6 of the plans. Both sizes shown do not
agree with the ones called on pasge27 of the structural calculations.
10. Show hold downs (HDU11) at each end of the shear wall at line B-B, (HDU4) at
each end of the shear wall at line D-D/E-E
11. Show the required grade beams for all the shear walls. Refer to page 50 of the
structural calculations.
12. The plans shall indicate that special inspection will be provided for the following
work. (CBC Chapter 17 and Section 107.2)
A. Expansion anchors. Periodic special inspection should be provided for
anchors installed in hardened concrete. Section 1705.3.
ENERGY CONSERVATION
15. Prior to the initial plan submittal the energy design was required to be registered
with the appropriate HERS provider data registry. Prior to the next plan review,
please register the energy design and resubmit plans with completed forms
(registration number). This was not addressed.
16. Include on the Title Sheet of the plans the following statement: “Compliance with
the documentation requirements of the 2016 Energy Efficiency Standards is
necessary for this project. Registered, signed, and dated copies of the
appropriate CF1R, CF2R, and CF3R forms shall be made available at necessary
intervals for Building Inspector review. Final completed forms will be available for
the building owner.” This was not addressed.
Palm Springs 2018-1661 Rev
8/8/2019
17. Include all applicable sections of the (MF1R) RMS-1 form or the specifications
contained thereon with the plans. This was not addressed.
MISCELLANEOUS
To speed up the review process, note on this list (or a copy) where each correction item
has been addressed, i.e., plan sheet, note or detail number, calculation page, etc.
Please indicate here if any changes have been made to the plans that are not a result of
corrections from this list. If there are other changes, please briefly describe them and
where they are located in the plans.
Have changes been made to the plans not resulting from this correction list? Please
indicate:
Yes No
The jurisdiction has contracted with EsGil, located at 9320 Chesapeake Drive, Suite
208, San Diego, California 92123; telephone number of 858/560-1468, to perform the
plan review for your project. If you have any questions regarding these plan review
items, please contact Richard Moreno for AD at EsGil. Thank you.