Loading...
HomeMy WebLinkAbout2018-1661 Zoning Check 3 City of Palm Springs Department of Building and Safety John Shoemaker ● Plans Examiner 3200 East Tahquitz Canyon Way ● Palm Springs, CA 92262 Tel: 760.323.8242 x8720 ● Fax: 760.322.8349 Email: john.shoe@palmsprings-ca.gov TRANSMITTAL COVER To: Controlled Construction Attn: Donovan Dodd Fax Number: None Provided Email Address: donovan@controlledconstructioninc.com Date: 28 August 2018 Time: 09:08 Number of Pages (Including Cover): 4 Description of Transmitted Documents: Zoning Related Corrections for Plan Check Number 2018-1661 Transmitted Via: ☐ Fax ☒ Email ☐ Snail Mail ☐ Hand ☐ Other: ☒ This is the only copy you will receive ☐ For your information ☐ A copy will be emailed to you today ☐ Per your request ☐ A copy will be faxed to you today ☐ Please review and return your comments ☐ An original will be mailed to you today ☐ Other: Message: Please call if you do not receive all pages. City of Palm Springs Department of Building and Safety John Shoemaker ● Plans Examiner 3200 East Tahquitz Canyon Way ● Palm Springs, CA 92262 Tel: 760.323.8242 x8720 ● Fax: 760.322.8349 Email: john.shoe@palmsprings-ca.gov Date: 28 August 2018 To: Controlled Construction Attn: Donovan Dodd 71377 Halgar Road Rancho Mirage, CA 92270 Regarding: Plan Check Number: 2018-1661 Project Address: 979 East San Lorenzo Road Project Description: Addition and Remodel This letter is to inform you that the above captioned project may be subject to review by various City Departments and, at times, outside agencies. Please be aware that it will be the responsibility of the applicant to address any and all of the comments from each Department and to resubmit plans directly to the Departments. Once the comments have been addressed to each Department’s satisfaction, they will notify the Building Department that the plans are approvable. Building permits shall not be issued until such a time as all of the Departments have been satisfied. Please secure the approvals of all applicable Departments in a timely manner so as not to delay the issuance of your permits at the conclusion of the plan check process. Thank you in advance for your attention to this matter. Respectfully. John Shoemaker Building Plans Examiner ICC Certified Cc: Plan Check File The following is a list of City Departments. The status of each Department review is checked below its name. Building: ☒ Approved ☐ Previously Forwarded ☐ Enclosed ☐ Forthcoming ☒ By EsGil Corporation ☐ With Conditions Zoning Requirements: ☐ Approved ☐ Previously Forwarded ☒ Enclosed ☐ Forthcoming ☐ Not Applicable Engineering: ☐ Approved ☐ Previously Forwarded ☐ Enclosed ☐ Forthcoming ☒ Not Applicable ☐ With Conditions Fire: ☒ Approved ☐ Previously Forwarded ☐ Enclosed ☐ Forthcoming ☐ Not Applicable ☐ Provisionally City of Palm Springs Department of Building and Safety John Shoemaker ● Plans Examiner 3200 East Tahquitz Canyon Way ● Palm Springs, CA 92262 Tel: 760.323.8242 x8720 ● Fax: 760.322.8349 Email: john.shoe@palmsprings-ca.gov PLAN CHECK CORRECTION LIST PLAN CHECK DATA: Plan Check Number: 2018-1661 Date of Submittal: 2 May 2018 Today’s Date: 28 August 2018 PROJECT DATA: Project Address: 979 East San Lorenzo Road Project Description: Addition and Remodel COMMENTS OR CORRECTIONS: 1. The City has contracted with EsGil Corporation to perform the review of this project. They do not, however, review plans for Zoning Ordinance and/or Municipal Code requirements. Therefore the following comments shall be considered to be in addition to the comments made by them. If you should have any questions regarding this, please do not hesitate to contact this office. 2. Effective April 1, 2015 and pursuant to Section 19827.5, Health and Safety Code, a permit that includes the demolition of structural elements shall not be issued except upon the receipt from the permit applicant of a copy of each written asbestos notification regarding the building that has been required to be submitted to the United States Environmental Protection Agency, or to a designated stared agency (SCAQMD). The permit may be issued without the applicant submitting a copy of the written notification if the applicant declares that the notification is not applicable to the scheduled project. (See the attached document.) 3. Unless granted relief from the Zoning Ordinance, the minimum setbacks shall be 25’ in the front, 10’ on both sides and 15’ in the rear. Please note that setback shall be measured perpendicular to the property lines. Note: The garage addition appears to be too close to the side property line. 4. The plans for Permit 2017-1646 show the addition behind the garage (the master bathroom) to be inset 7” (to 10’ from the property line). The new plans should show that. Note: An option for fixing the “distance to side property line” issue is an AMM through the Planning Department. I spoke to one of the Planners. He didn’t where you had made an application for the AMM, but he agreed to take the plans to their staff meeting to ask the Director, in advance of having to cough up the money for the application, if he would support the AMM since the lot does not seem substandard in size or width. I will find out either this evening or in the morning the outcome of the meeting. If the Director is supportive, you will need to pay for an AMM and the Planning Department will complete the AMM process. If he is not supportive, you will need to fix the plans to show the distance from the side property line to all of the additions including, but not limited to, the garage and the master bathroom, as 10’. Whichever path is taken, it will have to be completed prior to the plans being approved. END OF DOCUMENT