Loading...
HomeMy WebLinkAboutA9017- BWW & COMPANY Inc. CONTRACT ABSTRACT 1 Original: Contract Change Order No. 2 Contract Company Name: Company Contact: Summary of Services: Contract Price: Funding Source: Contract Term: BWW & Company Inc. Mary Wilson CP 19-14, Demuth Community Center Egress and HVAC Improvements $917,331.80 (including this CCO#2 for -$7,439.00) Capital Improvement funds To be determined by the Notice to Proceed Contract Administration Lead Department: Contract Administrator: Engineering Services Department Joel Montalvo/Francisco Jaime Contract Approvals Council Approval Date: Contract Change Order #1: Contract Change Order #2: Agreement Number: December 9, 2021, Item 1.I. April 28, 2022 TBD A9017 Contract Compliance Exhibits: Signatures: Insurance: Bonds: On file Attached On file On file Contract Prepared By: Engineering Services Department Submitted on: 08/22/2023 By: Vonda Teed DocuSign Envelope ID: 026175CE-A233-4E09-AE9D-A9477975E05B Page 1 of 1 CITY OF PALM SPRINGS - CONTRACT CHANGE ORDER No. 2 CP 19-14 Demuth CC Egress & HVAC Improvements Contractor: BWW & Company, Inc. Date: August 21, 2023 CONTRACT CHANGE ORDER SUMMARY This Change Order is to formalize a project credit for a line item not fully used. CONTRACT CHANGE ORDER COST ID Description Qty Unit Cost 01 Balancing Change Order - Project Credit 1 LS ($7,439.00) Total Lump Sum Change Order Amount: ($7,439.00) CHANGES TO CONTRACT TIME: HVAC units were initially scheduled to arrive in June 2022 with project closeout by September 2022. However, the manufacturer notified the City of material availability issues and that the units would not arrive for several months. The project was put on hold between August 2022 – December 2022. A partial order was received by January 2023 and crews were allowed to install the items until the rest of the material arrived. During this time, one out of the two units was operational. The project was placed on hold again between March 2023 – June 2023 until the rest of the material arrived. By July 2023, both units were operational and calibrated over the next several weeks. The project was considered complete by July 27, 2023. Due to events outside of the contractor’s control, the project was allowed to be placed on hold so that no liquidated damages would be incurred. Summary of Costs: Original Contract Amount: $898,108.000 Construction Start Date: 02/22/2022 Previous Change Orders: $26,662.80 Previous Agreed Completion Date: 09/22/2022 This Change Order Amount: ($7,439.00) Calendar Days Added: 0 (On Hold) Revised Contract Amount: $917,331.80 Revised Completion: 07/28/2023 I have received a copy of this Change Order and the above AGREED PRICES are acceptable to Contractor. BWW & Company, Inc. Signature – Mary Wilson Date City of Palm Springs Approved By: Joel Montalvo, City Engineer Date Attest By: Brenda Pree, City Clerk Date DocuSign Envelope ID: 026175CE-A233-4E09-AE9D-A9477975E05B 8/22/2023 8/22/2023 8/22/2023 CONTRACT ABSTRACT z ungtnats: contract unange urger rro. t Contract Company Name: BWW & Company Inc. Company Contact: Bobby W. Wilson Summary of Services: CP 19-14, Demuth Community Center Egress and RVAC Improvements Contract Price: $924,770.80 (including this CCO#1 for $26,662.80) Funding Source: Capital Improvement funds Contract Term: To be determined by the Notice to Proceed Contract Administration Lead Department: Development Services — Engineering Division Contract Administrator: Joel Montalvo/Francisco Jaime Contract Approvals Council Approval Date: Agenda Item No.: Contract Change Order # 1: December 9.2021 Item I.I. 0r0.3 C Agreement Number: A9017 Contract Compliance Exhibits: On file Signatures: Attached Insurance: On file Bonds: On file Contract Prepared By: Engineering Division Submitted on: 04/12/2022 By: Vonda Teed V CITY OF PALM SPRINGS CONTRACT CHANGE ORDER No. 1 CP 19-14 Demuth CC Egress & HVAC Improvements Contractor: BVM & Company, Inc. Date: March 30, 2022 CONTRACr CHANGE ORDER SUMMARY This lump sum Contract Change Order No. 1 is to address ADA issues in the north courtyard between two new access points (doors) and existing doors by removing and replacing the existing concrete, remove nonfunctioning evaporating cooler and patching drywall, add a water line as requested by maintenance, address door changes to the gym to allow for more visibility when exiting, address replacement of mirrors, add cages around egress signs to limit damages from accidental basketball strikes, adjust south wall exit signs, relocate drain lines, door credit for boxing mom courtyard access, replacing %" rock with Class 11 base to minimize trip hazards, and address additional over -excavation necessary to remove an organic rich soil layer not suitable for the HVAC foundations. CONTRACT CHANGE ORDER COST ID I Description Qty Unit Cost PEX pipe with all associated connections, valves, and hose connection. 75 LF $ 2,884.00 Ol Pressure test and buried 18 inches below ground surface. 4" thick concrete slab north courtyard (2,500 psi), rock salt finish, 02 control joints every 5', expansion joints at transitions and every 3rd line. 485 SF $14,976.80 Radius edges adjacent to soil. #3 rebar,18" O.C. each way. Remove soil as needed, recompact to 95% Concrete slopes ADA compliance. 03 Remove evap cooler at north courtyard. Cap opening & match paint 1 LS $ 2,352.00 04 Double door at RM108: doors to include vision lite 1 LS $ 250.00 Mirrors adjacent to 102-2 and 102-3 to be removed and replace mirror 1 is $ 3,800.00 OS with a mirror length 4" shorter from storefrontjamb 06 Safety cages for new exit signage at gymnasium 1 LS $ 690.00 07 Price difference for replacing 3/4" gravel with Class II Base 1 LS $ 300.00 Additional footing excavation in west courtyard due to organic rich soil 1 LS $1,350.00 08 layer (roots) and Class 11 base needed to bridge subgrade Adjust gym south wall exit sign from behind the basketball hoop to 1 LS $700.00 09 either side (two signs). Each sign to have a cage cover. 10 Move building and HVAC drain lines 18" west of HVAC pads. 1 LS $300.00 11 Credit line item for moving boxing door to within glass area 1 IS $ (940.00) Total Lump Sum Change Order Amount: $zb,bbz.uu CHANGES TO CONTRACT TIME: 90 Calendar days will be added to the contract time due to HVAC manufacturer delays. HVAC units were initially scheduled to arrive in early June, but manufacturer has now stated late August_ Page 1 of 2 Source of Funds: Sufficient funds are available in Account No. 2613205-80000-19-14- AP IMPRV-MFACIMPR-DCCFIRESPK. Summary of Costs: Original Contract Amount: $898,108.00 Construction Start Date: 02/22/2022 Previous Change Orders: $0.00 Previous Agreed Completion Date: 06/22/2022 This Change Order Amount: $26,662.80 Calendar Days Added: 90 Revised Contract Amount: $924,770.80 Revised Completion: 09/22/2022 I have received a copy of this Change Order and the above AGREED PRICES are acceptable to Contractor. BV11W & Company, Inc. �Y[vf t" f 7 6 ;LJ' Signature- Bo by Wayne Wilson, Owner Date City of Palm Springs Recommended By: Approved By: Montalvo, City Engineer Date -� Flinn Fad Deputy City Manager bate' Attest By: 4 ZP MoniZIV Lomeli, Interim City Clerk Date �9df l Distribution: Original Conformed Copy: Contractor (1) City Clerk (1) Conformed - File Co Engineering Pay File (1) City Project File (1) Purchasing (1) Finance (1) Page 2 of 2