Loading...
HomeMy WebLinkAbout3A - Presentation1 Palm Springs Navigation Center June 29, 2023 City of Palm Springs City Council Meeting Site Plan 2 Building C Building 8 Building 24 KIDS AREA DOG RUN 3 Bids May 2023 •Service provider and community input were incorporated into the design throughout the process adding desired features: •Walk-in refrigeration systems •Large multi-purpose rooms •Recuperative care •Loading dock and trash compactor •Extensive landscaping and hardscape •Shade and screening from the public •Extensive infrastructure upgrades to accommodate the buildings and services being added to the Navigation Center. •Temporary power costs exceeded $4,900,000. •Fewer bids than anticipated, possibly due to timing issues and complex nature of work, resulted in construction cost increases. •Bids received totaled $49,000,000 Building 8 –February 2023 Building 8 -Proposal •Building 8 to serve as an Early Entry Facility. •Office functions and services will be relocated to Building C. 6 Building 24 –February 2023 7 Building 24 -Proposal •Eliminate loading dock, and office space that can be provided in Building C. •Recuperative care space can be provided in the modular residential units as needed. 8 Building C Offices Building C •Building C will used to replace some of the office space, case management, employment services, and flex space that will be eliminated from Building 8 and Building 24. •No improvements needed to Building C. •Second story offices and conference room not shown. 9 Additional Value Engineering •Reduced interior landscaping •Reduced hardscape •Elimination of awnings at the entryways •Eliminate option for use of temporary power •Eliminate keycard and electrified hardware at modular residential units •$49,000,000 cost reduced to $39,965,202 10 Budget Funding Sources February 2023 Proposed % of Total HomeKey 2 Grant (City/County)$16,035,202 $16,035,202 40% American Rescue Plan Act (County)7,000,000 8,000,000 20% Inland Empire Health Plan /Molina (County)5,500,000 7,500,000 19% City Funds 3,160,000 8,160,000 21% Total $31,695,202 $39,695,202 100% Uses Building 8 3,099,031 753,900 2% Building 24 5,824,032 9,981,307 25% Modular Units 6,377,923 5,555,555 14% Site Work 3,091,472 7,326,748 18% Indirect Cost of Work 2,856,144 5,629,216 14% Soft Project Costs:10,446,598 10,446,598 26% TOTAL 31,695,200 39,693,324 100% Navigation Center Operating Budget 11 •Redesign and addition of Navigation Center (including Early Entry Facility and Access Center) still being developed. •Operating budget contingent upon final design and programming of Navigation Center. •HHAP Grant funds in the amount of $5,300,000 dedicated to operating costs. •HomeKey2 Grant Funds in the amount of $3,024,000 also dedicated to operating costs. Path to Housing 12 13 14 15 16 17 18 19 20 21 22 23 24