Loading...
HomeMy WebLinkAbout3D - PresentationHomeless Navigation Center June 5, 2023 City of Palm Springs City Council Meeting 2 Project Component Estimate Building 8 $3,912,490 Building 24 6,521,360 Modular Units 7,353,130 Site Improvements 3,461,622 Land 5,900,000 Soft Costs (Design,4,052,561 Studies, Contingency) Total $31,201,163 Item 3D - Page 2 3 •Regular subcontractors did not bid on the project. •Temporary power costs exceeded $4.9 million. •Extensive infrastructure upgrades to accommodate the buildings and services being added to the Navigation Center. •Service provider and community input were incorporated into the design throughout the process adding desired features: •Walk -in refrigeration systems, •Large multi-purpose rooms, •Recuperative care, •Loading dock and trash compactor, •Extensive landscaping and hardscape, •Shade and screening from the public. •Bids received totaled $50,000,000.Item 3D - Page 3 4 •Building 8 to serve as an Early Entry Facility. Office functions and services will be relocated. •Building C will used to replace some of the office space, case management, employment services, and flex space that will be eliminated from Building 8 and Building 24. •Building 24 reduce the size of the commercial kitchen, dining/ multi-purpose room, and eliminate loading dock, and office space that can be provided in Building C. Recuperative care space can be provided in the modular residential units as needed. •Reduced interior landscaping •Reduced hardscape •Elimination of awnings at the entryways •Eliminate option for use of temporary power •Eliminate keycard and electrified hardware at modular residential units •$50,000,000 cost reduced to $39,965,202. Item 3D - Page 4 Site North 5Item 3D - Page 5 Building 8 Item 3D - Page 6 7Item 3D - Page 7 Navigation Center Operating Budget 8 Project Component Estimate Staff (28 FTE’s)$1,469,968 Expenses 687,675 Administration 302,070 Total $2,459,713 Item 3D - Page 8 Path to Housing 9Item 3D - Page 9