Loading...
HomeMy WebLinkAboutA8360 - CURTIS ROSENTHAL, Inc #3CONTRACT ABSTRACT 2 Originals: Appraisal Services Agreement; 1 Original: Insurance Contract Company Name: Curtis-Rosenthal, Inc. Company Contact: Randall Blaesl, Director, Appraisal & Litigation Consulting Summary of Services: Appraisal Services ofAPN: 513-460-001, 003, 010, 033, Oswit Canyon Contract Total: $ 6,750 Contract Term: Until Terminated or Completion of work Contract Administration Lead Department: Assistant City Manager Contract Administrator: Marcus Fuller City Manager Approval: TBD Agreement Number: TBA 3 Contract Compliance Exhibits: attached Signatures: attached Insurance: attached Bonds: N/A Contract Prepared By: Office of the Assistant City Manager Submitted on: 09/30/19 By: Tabitha Richards Mon,30 Sep 2019 18:16:56 V CITY OF PALM SPRINGS Contract Change Order To: G & M Construction. Date: October 31, 2019 1055 S. Palm Canyon 18-15 Palm Springs, Ca. 92264 Project: Ramon Road Storm Tel: (760) 322-6918 Water Retention Fax: (760) 778-6708 Change Order No'. 1 (one) Purchase Order Attn: Eric Brown Account No. 135-4370-55000 Changes to Contract Quantities Items Description Quantity Cost Per Unit Total Cost A7 Remove Existing Sidewalk 223 SF 5.00 1,115.00 Al2 Construct PCC 4"Thick PCC 7 SF 8.00 56.00 SideWalkPerC!tyStd. 210 A13 Construct 6"Thick PCC Driveway 220 SF 15.00 3,300.00 Apron per COPS Std.201 Includes AC Slot Patch A14 Construct 6"Thick PCC Access 50 LF 17.50 875.00 Road per Detail on Plans A15 Standard Pipe Gate (Single Gate) 1 LS 10,000.00 10,000.00 per SPPWC Sid. Plan 602-3 L=16' A17 Field Order 1 LS 15,000.00 15,000.00 TOTAL DEDUCT 30,346.00 This Contract Change Order No. 1 makes adjustments to contract quantities that were more or less than originally estimated. Items A13, and Al (Driveway Apron and Pipe Gate) were eliminated from contract by the City after it was determined that it would be a safety concern with high volume traffic and speed on Ramon Rd. Field Order was not utilized on the project and therefore the funds are being credited to the contract.. This is a final/balancing change order.'This Change Order results in a net deduct to the contract of-$30,346.00 (-6.0%). Chancres to Contract Time: No additional working days were added to the contract. Source of Funds: The following account will be credited: 135-4370-55000 Summary of Costs: Original Contract 182,059.00 Original Completion 30 Working Days This Change Order:30,346.00 Days Added 0 Revised Contract 151,713.00 Revised Completion 30 Working Days G & M Construction Signature Date AR YO.Q- fV fQ 4z' C.Lune.r inted Name and Title City of Palm Springs Approved By: 16 1,A1t,t, ,& Marcus Fuller, Assistant City Manager/City Engineer Date Attest By: A,v 1 An ony ej lerk Date Distribution: Original Conformed Copy: Conformed- File Copy: Contractor 1)Engineering Pay File 1) City Clerk 1)City Proiect File 1) Purchasinq 1) Finance 1)