HomeMy WebLinkAbout24647RESOLUTION NO. 24647
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
PALM SPRINGS, CALIFORNIA, APPROVING MODIFIED
USER FEE INCREASES RELATED TO THE BUILDING,
FIRE AND PLANNING SERVICES DEPARTMENTS AND
AMENDING THE COMPREHENSIVE FEE SCHEDULE FOR
FISCAL YEAR 2019-20.
WHEREAS, the City, under various statutory provisions under California
Government Code, may set and collect fees for the costs of providing various public
services to the community; and
WHEREAS, the City retained a qualified consultant to prepare a User Fee Study
and Cost Allocation Plan, to compare direct and indirect administrative costs in providing
various public services to the community; and
WHEREAS, the User Fee Study estimated that the City's current developer fees
associated with the Building, Engineering, Fire, and Planning Services Departments (the
"Developer Fees"), do not fully fund the total cost of services provided by the City in those
Departments, and the full cost recovery recommended by the User Fee Study would
generate an additional $1,351,188 in revenue through increased Developer Fees to
ensure the City was adequately recovering its costs to provide services in those
Departments; and
WHEREAS, the increased Developer Fees proposed modifications to certain
development fees, permit fees, and/or regulatory fees that are subject to the Mitigation
Fee Act, codified at California Government Code (CGC) §66000 et seq., and more
specifically in accordance with CGC §66016, §66013, or §66014, and the City, in
considering the User Fee Study, adhered to the procedures of CGC §66016(a); and
WHEREAS, on June 5, 2019, following legal notice in accordance with CGC
§66000 et seq., the City Council conducted a public hearing, at which oral and written
presentations were made, as part of the City Council's regularly scheduled meeting to
review and consider approval of: (1) the User Fee Study and Cost Allocation Plan, (2) the
Fiscal Year 2019-20 Comprehensive Fee Schedule, and (3) a policy for adjustments to
user fees and charges commencing with Fiscal Year 2020-21 (the "CPI Increase"); and
WHEREAS, on June 5, 2019, pursuant to CGC §66000 et seq., the City Council
did adopt Resolution No. 24622 approving increases to certain User Fees, including the
Developer Fees; and
WHEREAS, pursuant to its action adopting Resolution No. 24622, the City Council
deferred the full cost recovery associated with the Developer Fees by phasing the total
fee increase related thereto, whereby 50% of the proposed increase will be implemented
in Fiscal Year 2019-20 and the remaining total fee increase will be implemented in Fiscal
Resolution No. 24647
Page 2
Year 2020-21 with the CPI Increase, (the "Fee Increase Phasing"), in accordance with
and following the statutory requirements identified in CGC §66000 et seq.; and
WHEREAS, the City estimates that the Fee Increase Phasing will result in a
reduction of $675,594 in revenue necessary to fully recover the City's costs for providing
services paid for through Developer Fees; and
WHEREAS, on June 19, 2019, the City Council conducted a duly noticed Public
Hearing with respect to the Fiscal Year 2019-20 and Fiscal Year 2020-21 Budget in which
the City incorporated $750,000 of additional revenue associated with the increased
Developer Fees, and where the Fee Increase Phasing caused a deficit to be resolved
through certain alternative funding recommendations identified by City staff; and
WHEREAS, on June 19, 2019, pursuant to City Charter Section 903 and applicable
law, the City Council did adopt Resolution No. 24636 approving the Budget for Fiscal
Year 2019-20 and Fiscal Year 2020-21, incorporating alternative funding
recommendations to provide a balanced budget, with direction to City staff to schedule a
public hearing for July 10, 2019, pursuant to CGC §66000 et seq., to reconsider the Fee
Increase Phasing in a way to reduce its fiscal impact to the Fiscal Year 2019-20 Budget;
and
WHEREAS, on July 10, 2019, pursuant to CGC §66000 et seq., the City Council
held a public hearing to consider amending its action on June 5, 2019, relating to adoption
of increases to certain User Fees, including the Developer Fees; and
WHEREAS, the City Council continued the July 10, 2019, public hearing to
July 24, 2019, to give further consideration to amending its action on June 5, 2019,
relating to adoption of increases to certain User Fees, including the Developer Fees; and
WHEREAS, notice of the July 24, 2019 public hearing was published, posted and
distributed in accordance with the provisions of the California Government Code; and
WHEREAS, the public data indicating the amount of cost, or estimated cost,
required to provide the services for which the fees or service charges are levied and the
revenue sources anticipated to provide the service, including General Fund revenues,
(the "Fee Data"), was previously provided and made available at least 10 days prior to
the initial June 5, 2019 public hearing, at which the City Council considered the increased
Developer Fees; and
WHEREAS, the public data remains unchanged for the purposes of the continued
July 24, 2019, public hearing to reconsider the Fee Increase Phasing, and was previously
made available at least 10 days prior to the July 10, 2019 public hearing; and
WHEREAS, on July 24, 2019, the City Council conducted a public hearing, at
which oral and written presentations could be made, as part of the City Council's regularly
scheduled meeting; and
Resolution No. 24647
Page 3
WHEREAS, the City Council has considered any verbal and/or written testimony,
and has reviewed and considered the information in the study and supporting data, and
information provided at the public hearing by staff and the public.
THE CITY COUNCIL OF THE CITY OF PALM SPRINGS, CALIFORNIA, HEREBY
RESOLVES, DETERMINES AND APPROVES AF FOLLOWS:
SECTION 1. Factual Findings Pursuant to Government Code §66013, §66014, or
§66016.
A. The City has completed an analysis of certain City fees and charges and
desires to amend the fees and charges.
B. The current user fees are insufficient to cover all the City's costs and
expenses associated with providing the various public services.
C. The cost of such services should be borne by those who are the special
beneficiaries rather than the citizenry at large.
D. There is a reasonable relationship between the amount of the fee and the
estimated reasonable cost of providing the type of services for which the fee is imposed.
E. The amount of services provided does not exceed what is reasonably
necessary in order to process the requested service.
F. The cost estimates set forth in the User Fee Study are reasonable and best
approximate the direct and indirect (overhead) costs of City staff and consultants for
providing the necessary service to respond to public requests.
G. The method of allocating the City's administrative costs of processing
service bears a fair and reasonable relationship to the public burden on, and benefit from,
the services requested by the public.
H. The fees do not exceed the estimated reasonable cost of providing the
service for which the fee is charged.
SECTION 2. Fees Imposed.
A. The City Council hereby amends the Comprehensive Fee Schedule adopted on June
5, 2019, and included as Exhibit B of Resolution No. 24622, specifically related to
Developer Fees subject to the Mitigation Fee Act, codified at California Government
Code (CGC) §66000 et seq., as follows:
1. Implement the full increase for all Building Fees upon the effective date of this
Resolution.
Resolution No. 24647
Page 4
2. Implement the full increase for all Fire Prevention New Construction Plan Check
and Inspection Fees listed under the Building Fees upon the effective date of this
Resolution.
3. Implement the full increase for all Planning Fees upon the effective date of this
Resolution.
4. Implement the full increase of all Engineering Fees upon the effective date of this
Resolution.
B. All other User Fee increases not subject to the Mitigation Fee Act, codified at California
Government Code (CGC) §66000 et seq., are not affected by this Resolution, and
shall be implemented as approved on June 5, 2019.
C. Each person requesting a service in the City of Palm Springs for which a user fee or
charge is imposed shall pay the new fees as set forth in the City's Comprehensive
Fee Schedule.
D. The user fees and charges may also be adjusted if the City conducts a public hearing,
when required, to implement a new or revised fee or fees based upon a new study or
analysis.
E. The adoption of this Resolution does not affect the ability of the City to request an
agreement between an applicant and the City to pay extraordinary processing costs
and to establish deposit accounts.
F. The City Council, in its discretion, may waive or reduce applicable fees for residential
projects that construct lower -cost housing, workforce housing, or affordable housing
meeting state mandated income levels.
SECTION 3. Severability.
Each component of the fees and all portions of this Resolution are severable. Should any
individual component of the fee or other provision of this Resolution be adjudicated to be
invalid and unenforceable, the remaining provisions shall be and continue to be fully
effective, and the fee shall be fully effective except as to that portion that has been judged
to be invalid.
SECTION 4. Effective Date.
In accordance with Government Code §66017, all modified development fees,
permit fees, and/or regulatory fees that are subject to Government Code §66000 et seq.
shall be effective sixty (60) days after the adoption of this Resolution.
Resolution No. 24647
Page 5
SECTION 5. Comprehensive Fee Schedule.
The Director of Finance is hereby authorized and directed to incorporate the
modified Developer Fees identified in Section 2(A) of this Resolution into the
Comprehensive Fee Schedule.
PASSED, APPROVED, AND ADOPTED BY THE PALM SPRINGS CITY
COUNCIL THIS 24T" DAY OF JULY, 2019.
DAVID H. READY, ES .
CITY MANAGER
ATTEST:
ONY J. ME , MM
CITY CLER
CERTIFICATION
STATE OF CALIFORNIA )
COUNTY OF RIVERSIDE ) ss.
CITY OF PALM SPRINGS)
I, ANTHONY J. MEJIA, City Clerk of the City of Palm Springs, hereby certify that
Resolution No. 24647 is a full, true and correct copy as was duly adopted at a regular
meeting of the City Council of the City of Palm Springs on the 24th day of July, 2019, by
the following vote:
AYES: Councilmembers Middleton, Roberts, Mayor Pro Tern Kors
NOES: Councilmember Holstege, and Mayor Moon
ABSENT: None
ABSTAIN: None
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the
City of Palm Springs, California, this - i`{" day of use , 2C (S
6 L'ti �-� LL:a�=3
AN`fHONY J MEJIA, M
CITY CLER
f
CITY OF PALM SPRINGS
COMPREHENSIVE FEES SCHEDULE
FISCAL YEAR 2019-2020
AS ADOPTED 07/24/2019
CITY OF PALM SPRINGS
3200 E TAHQUITZ CANYON WAY
P.O. BOX 2743
PALM SPRINGS, CA 92263-2743
(760) 323-8299
V.07.25.2019
CITY OF PALM SPRINGS
COMPREHENSIVE FEES SCHEDULE
FISCAL YEAR 2019-2020
ON JULY 24, 2019, THE CITY COUNCIL ADOPTED RESOLUTION NO. 24647 ENTITLED "A
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PALM SPRINGS, CALIFORNIA,
APPROVING MODIFIED USER FEE INCREASES RELATED TO THE BUILDING, FIRE AND
PLANNING SERVICES DEPARTMENTS AND AMENDING THE COMPREHENSIVE FEE
SCHEDULE FOR FISCAL YEAR 2019-20.".
AMENDED COMPREHENSIVE FEE SCHEDULE FOR FISCAL YEAR 2019 - 2020,
PREVIOUSLY EFFECTIVE ON AUGUST 4, 2019, WILL NOW BE EFFECTIVE ON
SEPTEMBER 22, 2019.
PRIOR TO THESE NEW DATES BEING EFFECTIVE THE CURRENT FEE
SCHEDULE IS STILL EFFECTIVE.
V.07.2S.2019
CITY OF PALM SPRINGS
COMPREHENSIVE FEES SCHEDULE
FISCAL YEAR 2019-2020
TABLE OF CONTENTS
AIRPORT
4
BUILDING & SAFETY
5
CONTRACT PLAN REVIEW - NEW CONSTRUCTION
11
MISCELLANEOUS ITEMS
17
CITY CLERK
18
COMMUNITY TELEVISION
19
ENGINEERING SERVICES
20
RIGHT-OF-WAY
25
STREETS
26
TRAFFIC
27
WASTEWATER
28
FINANCE & TREASURY
31
FIRE
34
GOLF COURSE
45
LIBRARY
46
SPECIAL PROGRAM COMPLIANCE
CANNABIS BUSINESS AND ACTIVITY
48
VACATION RENTAL COMPLIANCE
50
PARKS & RECREATION
51
PLANNING SERVICES
61
POLICE
67
RENT CONTROL
72
CORRESPONDING FOOTNOTES
73
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
AIRPORT
DESCRIPTION FEE UNIT
AIRPORT PUBLIC PARKING FEES
PUBLIC PARKING - LONG TERM LOT
EACH 20 MINUTES ................................................. $2
EACH HOUR........................................................... $6
MAXIMUM CHARGE FOR 24 HOUR PERIOD ..... $20 DAILY MAXIMUM
- AIRPORT -
4 of 76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
BUILDING DEPARTMENT
DESCRIPTION FEE UNIT
ADMINISTRATIVE FEE AND SPECIAL PURPOSE FEE AS APPLICABLE
FEE REFUNDS
1 THE BUILDING OFFICIAL MAY AUTHORIZE THE REFUNDING OF ANY FEE THAT WAS ERRONEOUSLY PAID OR COLLECTED.
2 THE BUILDING OFFICIAL MAY AUTHORIZE THE REFUNDING OF NOT MORE THAN 80 PERCENT OF THE PERMIT FEE PAID
WHEN NO WORK HAS BEEN DONE UNDER A PERMIT ISSUED IN ACCORDANCE WITH THIS CODE.
3 THE BUILDING OFFICIAL MAY AUTHORIZE THE REFUNDING OF NOT MORE THAN 80 PERCENT OF THE PLAN REVIEW FEE PAID
WHEN AN APPLICATION FOR A PERMIT FOR WHICH A PLAN REVIEW FEE HAS BEEN PAID IS WITHDRAWN OR CANCELLED
BEFORE ANY PLAN REVIEWING HAS OCCURRED.
4 THE BUILDING OFFICIAL SHALL NOTAUTHORIZE THE REFUNDING OF ANY FEE, EXCEPT UPON WRITTEN APPLICATION FILED
BY THE ORIGINAL PERMITTEE NOT LATER THAN 180 DAYS AFTER THE DATE OF FEE PAYMENT.
BOARD OF APPEALS FEE..............................................................................
$308.02
COPYING (MISC. DOCUMENTS, TEXTS, ETC.)
PAGE FEE..........................................................................................
$0.10 PER PAGE
FAST TRACK PLAN REVIEW (WHERE AVAILABLE) .............................
2X PERMIT 2X PLAN REVIEW FEE
GENERAL MISCELLANEOUS FEES
PERMIT PROCESSING ISSUANCE FEE ............................................
$43.14
ALTERNATE MATERIALS / CODE RESEARCH ................................
$279.68
FOUNDATIONS (SIGNS, SOLAR FARMS, ETC.)
1-100 SQ. FT..................................................................
$102.74
EACH ADDITIONAL 100 SQ. FT ....................................
$14.40
REINSPECTION FEES........................................................................
$180.05
INVESTIGATION FEE........................................................................
2X PERMIT
TECHNOLOGY SURCHARGE.......................................................... $1.66 PER $1,000 OF BUILDING
(PERMIT SYSTEM MAINTENANCE, DIGITAL DOCUMENT VALUATION
SCANNING & STORAGE, ETC.)
CERTIFICATE OF OCCUPANCY...................................................... $229.11
CODE COMPLIANCE INSPECTION FEE ........................................... $177.64
UNREASONABLE HARDSHIP WAIVER (ACCESS) .......................... $289.46
GREASE TRAP WAIVER................................................................... $289.46
GENERAL PLAN MAINTENANCE FEE (% OF FEE) ......................... 7% OF FEE
OCCUPATIONAL LICENSING........................................................... $112.53
HOURLY RATES BY FUNCTION
PLANREVIEW.................................................................................. $192.97
BUILDING INSPECTION................................................................... $180.05
CONTRACT PLAN REVIEW $125.00
COUNTER SERVICE.......................................................................... $172.57
AFTER HOURS INSPECTION............................................................ $360.10
- BUILDING DEPARTMENT -
5 of 76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
BUILDING DEPARTMENT
DESCRIPTION
FEE UNIT
INTERNAL PLAN REVIEW [IN-HOUSE)
PLAN REVIEW SFH ADDITION ......................................
$434.19
PLAN REVIEW SFH REMODEL ......................................
$868.37
DOOR / WINDOWS PLAN REVIEW ..............................
$96.49
LATTICE PATIO COVER PLAN REVIEW ........................
$96.49
SOLID PATIO COVER PLAN REVIEW ............................
$96.49
POOL/ SPAS PLAN REVIEW .........................................
$96.49
SFR PHOTOVOLTAIC PLAN REVIEW ............................
$96.49
LOCAL DEVELOPMENT MITIGATION FEE 18
(R22953 AND CPI INCREASE EFFECTIVE 7/1/2015)
RESIDENTIAL, DENSITY LESS THAN 8.0 DWELLING UNITS PER
$1,331
PER DWELLING UNIT
ACRE................................................................................................
RESIDENTIAL, DENSITY BETWEEN 8.1 AND 14.0 DWELLING
$554
PER DWELLING UNIT
UNITSPER ACRE............................................................................
RESIDENTIAL, DENSITY GREATER THAN 14.1 DWELLING
$247
PER DWELLING UNIT
UNITS PER ACRE............................................................................
COMMERCIAL.................................................................................
$5,911
PER ACRE
INDUSTRIAL....................................................................................
$5,911
PER ACRE
MICROFILMING FEES
PAGE FEE
PAGE1.............................................................................................. $2.25 FIRST PAGE
PAGE 2 AND ALL PAGES THEREAFTER .......................................... $0.38 PER PAGE
LARGE PLANS (18'X24'36')............................................................. $1.59 PER SHEET
NEWSRACKS
REGISTRATION................................................................................. $1,356.53 PER NEWSRACK, PER YEAR
IMPOUNDMENT............................................................................. $599.62 PER IMPOUNDED NEWSRACK
OTHER INSPECTIONS AND FEES
ADDITIONAL PLAN REVIEW........................................................ $192.97 PER HOUR
(REQUIRED BY CHANGES, ADDITIONS OR REVISIONS TO
APPROVED PLANS)
EXCEEDING SECOND CHECK.......................................................... $192.97 PER HOUR
MAJOR REVISION TO PLANS.......................................................... $192.97 PER HOUR
INSPECTIONS
OUTSIDE NORMAL BUSINESS HOURS ........................ $360.10 SEE: SPECIAL PURPOSE FEES
WHEN NO SPECIFIC FEE IS INDICATED ....................... $180.06 PER HOUR
INVESTIGATIVE FEE..................................................................... 2XFEE SEE: SPECIAL PURPOSE FEES
(FOR ELECTRICAL WORK STARTED WITHOUT REQUIRED PERMITS)
MAJOR REVISIONS...................................................................... $192.97 PER HOUR
(TO IMPROVEMENT PLANS PRIOR TO APPROVAL)
- BUILDING DEPARTMENT -
6 of 76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
BUILDING DEPARTMENT
DESCRIPTION
FEE
UNIT
ADDITIONAL PLAN REVIEW .......................................................
$192.97
PER HOUR
REQUIRED BY CHANGES, ADDITIONS OR REVISIONS TO APPROVED PLANS
RE -INSPECTION FEES...................................................................
$180.06
(ASSESSED UNDER PROVISIONS OF THE BUILDING ADMIN. CODE)
PERMITS
CODE COMPLIANCE INSPECTION AND REPORT ..........................
$177.64
SEE: SPECIAL PURPOSE FEES
ELECTRICAL PERMIT FEES
PERMIT ISSUANCE ADMINISTRATIVE FEE ..................
$37.79
EACH PERMIT, PLUS OTHER
APPLICABLE PERMIT FEES
MINIMUM ELECTRICAL PERMIT FEE ...........................
$89.31
MECHANICAL PERMIT FEE
PERMIT ISSUANCE ADMINISTRATIVE FEE ..................
$37.79
EACH PERMIT, PLUS OTHER
APPLICABLE PERMIT FEES
MINIMUM MECHANICAL PERMIT FEE .......................
$89.31
PLUMBING PERMIT FEES
PERMIT ISSUANCE ADMINISTRATIVE FEE ..................
$37.79
EACH PERMIT, PLUS OTHER
APPLICABLE PERMIT FEES
MINIMUM PLUMBING FEE ..........................................
$89.30
PERMIT ISSUANCE ADMINISTRATIVE FEE ..........................................
$37.79
PER PERMIT, PLUS OTHER
(BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, &
APPLICABLE PERMIT FEES
PLAN CHECK FEES
(ADD CHARGES FOR PLANNING DIVISION REVIEW WHEN
APPLICABLE.)
(SEE: PLANNING DIVISION: PLAN CHECKING FEES)
STATE ENERGY REGULATIONS PLAN CHECK ................................
10%
OF TOTAL PLAN CHECK FEE
STATE ACCESS REGULATIONS PLAN CHECK .................................
10%
OF TOTAL PLAN CHECK FEE
PROCESSING FEE.............................................................................
$192.97
ADDITIONAL PLAN REVIEW
REQUIRED BY RE -SUBMITTAL DUE TO CHANGES,
ADDITIONS OR REVISIONS TO APPROVED PLAN .............
$192.97
PER HOUR
EXCEEDING SECOND CHECK (MINIMUM ONE HOUR) ............
$192.97
PER HOUR
PUBLIC NUISANCE ADMINISTRATIVE CHARGES
THE ADMINISTRATIVE CHARGE ATTRIBUTABLE TO PUBLIC NUISANCE ABATEMENT SHALL BE THE TOTAL OF THE
FOLLOWING ITEMS:
1. HOURLY
2. OVERHEAD
3. MAILING CHARGES
4. TELEPHONE CHARGES
5. PRINTING COSTS
- BUILDING DEPARTMENT -
7 of 76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
BUILDING DEPARTMENT
DESCRIPTION FEE UNIT
RESIDENTIAL
SINGLE FAMILY HOME (NEW)
1-1200 SQ. FT...................................................................... $1,406.93
EACH ADDITIONAL 100 SQ. FT ......................................... $195.06
SINGLE FAMILY HOME (ADDITION)
1-200 SQ. FT.......................................................................... $480.83
EACH ADDITIONAL 100 SQ. FT. UP TO 1200 SQ. FT....... $75.17
EACH ADDITIONAL 100 SQ. FT. > 1200 SQ. FT ................ $11.76
SINGLE FAMILY ALT. (REMODEL)
1-200 SQ. FT......................................................................... $458.32
EACH ADDITIONAL 100 SQ. FT. UP TO 1200 SQ. FT....... $131.97
EACH ADDITIONAL 100 SQ. FT. > 1200 SQ. FT ................ $12.60
DOORS/WINDOWS
UP TO 2 OPENINGS....................................................... $210.75
EACH ADDITIONAL OPENING ...................................... $30.07
LATTICE PATIO COVER
0-250 SQ. FT.................................................................. $210.75 PLUS,
251 SQ. FT. AND GREATER ........................................... $21.61 ADDITIONAL FEE
SOLID PATIO COVER
0-250 SQ. FT.................................................................. $233.25 PLUS,
251 SQ. FT. AND GREATER ........................................... $21.61 ADDITIONAL FEE
POOLS / SPAS
EACH...............................................................................
$458.32
MASONRY WALLS
0-100 LF..........................................................................
$270.77
PLUS,
EACH ADDITIONAL 25 LF..............................................
$30.07
ADDITIONAL FEE
MISCELLANEOUS SINGLE INSPECTIONS .......................................
$188.42
RESIDENTIAL MEP SIMPLE.............................................................
$124.60
RESIDENTIAL MEP COMPLEX.........................................................
$255.76
TEMPORARY POWER POLE
FIRST POLE.....................................................................
$45.01
PLUS,
EACH ADDITIONAL SUB PANEL ...................................
$30.07
ADDITIONAL FEE
PHOTOVOLTAIC SOLAR
SINGLE FAMILY..............................................................
$318.01
COMMERCIAL UP TO 100 KW .....................................
$448.73
EACH ADDITIONAL KW .................................................
$5.40
COMMERCIAL NEW CONSTRUCTION
FIRST 5000 SQ. FT .........................................................
$2,127.14
EACH ADDITIONAL 500 SQ. FT ....................................
$195.72
- BUILDING DEPARTMENT-
8 of76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
BUILDING DEPARTMENT
DESCRIPTION FEE UNIT
EACH ADDITIONAL STORY OVER TWO,
ADD 1 HOUR INSPECTION TIME FOR EACH STORY
OVER 2....................................................................... $180.05
COMMERCIAL SHELL
FIRST 5,000 SQ. FT ........................................................ $1,689.92
EACH ADDITIONAL 500 SQ. FT .................................... $67.70
EACH ADDITIONAL STORY OVER TWO,
ADD 1 HOUR INSPECTION TIME FOR EACH STORY
OVER2.......................................................................
$180.05
COMMERCIAL TENANT IMPROVEMENT (TI)
FIRST 1,000 SQ. FT ........................................................
$570.85
EACH ADDITIONAL 500 SQ. FT ....................................
$135.04
PLAN REVIEW................................................................
$771.89
COMMERCIAL MEP SIMPLE .........................................
$177.64
COMMERCIAL MEP COMPLEX .....................................
$385.24
(MEP) MECHANICAL/ ELECTRICAL/ PLUMBING
TRASH ENCLOSURE.........................................................................
$177.64
INTERIOR PARTITIONS: 1-200 LF...................................................
$133.17
PLUS,
INTERIOR PARTITIONS: EACH ADDITIONAL 100 LF .....................
$30.07
ADDITIONAL FEE
CEILINGS: FIRST 200 SQ. FT ...........................................................
$163.24
PLUS,
CEILINGS: EACH ADDITIONAL 100 SQ. FT ....................................
$30.07
ADDITIONAL FEE
RE -ROOF < 3,000 SQ. FT.................................................................
$210.75
RE -ROOF > 3,001 SQ. FT.................................................................
$273.77
DEMO COMPLETE...........................................................................
$210.75
DEMO INTERIOR..............................................................................
$255.76
SPECIAL PURPOSE FEES
CODE COMPLIANCE INSPECTION AND REPORT FEE
(MINIMUM 2 HOURS)...................................................................
$385.94
PLUS
$45.81
EACH ADDITIONAL 1/4 HOUR
INSPECTIONS
NO FEE SPECIFICALLY INDICATED (MINIMUM ONE HOUR) .........
$180.05
PER HOUR
OUTSIDE OF NORMAL BUSINESS HOURS (MIN. TWO HRS.) .......
$360.10
PER HOUR
INVESTIGATIONFEE.....................................................................
2XFEE
(BUILDING, ELECTRICAL, PLUMBING OR MECHANICAL)
WORK STARTED WITHOUT REQUIRED PERMITS ........................
2XFEE
DOUBLE NORMAL FEE
RE -INSPECTION CALLS...................................................................
$90.03
PAYABLE IN ADVANCE
(EXCEEDING ONE REPEAT ACCOMMODATION)
- BUILDING DEPARTMENT -
9 of 76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
BUILDING DEPARTMENT
DESCRIPTION
RENEWAL OF EXPIRED PERMIT ................................................
(BUILDING, ELECTRICAL, PLUMBING, OR MECHANICAL)
FEE
50%
100
RE -ROOFING PERMIT (MINIMUM OF $50.00)................................. $156.87
SOLAR, WATER HEATING............................................................. $89.31
SWIMMING POOL DRAINING PERMITS .................................... $5.73
STREET NUMBER CHANGE............................................................ $168.32
TECHNOLOGY ENHANCEMENT FEE ............................................. $1.66
STRONG - MOTION INSTRUMENTATION PROGRAM FEE ON BUILDING PERMITS
STATE REGULATED FEES
COMMERCIAL (MINIMUM OF $0.50) ..........................
RESIDENTIAL (MINIMUM OF $0.50) ............................
VACANT BUILDINGS
REGISTRATION..............................................................................
INSPECTION FEE FOR SINGLE FAMILY RESIDENCE ..................
INSPECTION FEE FOR MULTI -FAMILY, COMMERCIAL OR
INDUSTRIAL BUILDINGS...............................................................
ANNUAL VACANT COMMERCIAL BUILDING MONITORING24
$0.00028
$0.00013
$37.79
$85.88
$263.36
$1, 943.70
- BUILDING DEPARTMENT -
10 of 76
UNIT
OF ORIGINAL FEE WITHIN
ONE YEAR
OF ORIGINAL FEE AFTER ONE
YEAR
PER $1,000 OF BLDG.
VALUATION
X BLDG. VALUATION
X BLDG. VALUATION
PER APPLICATION
PER INSPECTION
PER INSPECTION
PER BUILDING
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
BUILDING DEPARTMENT
CONTRACT PLAN REVIEW - NEW CONSTRUCTION
COSTRUCTION TYPE
CONSTRUCTION TYPE
CONSTRUCTION TYPE
IA, IB
IIA,118, IIIA,1116, IV
VA, VB
COST FOR EACH
COST FOR EACH
COST FOR EACH
IBC
PROJECT SIZE
BASE COST @
BASE COST @
BASE COST @
IBC OCCUPANCY TYPE
ADDITIONAL
ADDITIONAL
ADDITIONAL
CLASS
THRESHOLD
THRESHOLD SIZE
THRESHOLD SIZE
THRESHOLD SIZE
100 SF'
100 SF'
100 SF'
A-1 ASSEMBLY -
FIXED SEATING
THEATER,
CONCERT HALL
A-2 ASSEMBLY -
FOOD & DRINK
RESTAURANT,
NIGHTCLUB, BAR
1,500
$1,100
43.73
$1,000
$39.03
$1,000
35.18
7,500
$3,724
32.59
$3,342
$27.52
$3,111
24.44
15,000
$6,168
32.59
$5,406
$27.52
$4,944
24.43
30,000
$11,057
32.59
$9,534
$27.52
$8,608
24.43
75,000
$25,726
32.59
$21,917
$27.52
$19,602
24.43
150,000
$50,173
30.00
$42,556
$25.00
$37,925
22.00
1,000
$1,000
39.28
$900
$33.75
$900
29.43
5,000
$2,571
30.50
$2,250
$28.40
$2,077
27.24
10,000
$4,096
28.17
$3,670
$23.92
$3,439
21.59
20,000
$6,913
28.17
$6,062
$23.92
$5,598
21.59
50,000
$15,365
28.17
$13,236
$23.91
$12,075
21.59
100,000
$29,452
26.00
$25,193
$21.00
$22,869
19.00
A-3 ASSEMBLY -
1,200
$1,100
44.88
$1,000
$40.40
$1,000
35.25
WORSHIP,
6,000
$3,254
32.92
$2,939
$27.68
$2,692
26.02
AMUSEMENT
12,000
$5,229
32.92
$4,600
$27.68
$4,253
24.81
ARCADE,
24,000
$9,180
32.92
$7,922
$27.68
$7,231
24.80
CHURCH,
60,000
$21,033
32.92
$17,888
$27.68
$16,160
24.80
COMMUNITY
Noll
120,000
$40,787
30.00
$34,497
$25.00
$31,041
22.00
A-4 ASSEMBLY -
500
$900
39.10
$800
$31.70
$800
25.30
INDOOR SPORT
2,500
$1,682
49.40
$1,434
$42.52
$1,306
38.84
VIEWING ARENA,
5,000
$2,917
32.76
$2,497
$30.02
$2,277
28.58
SKATING RINK,
10,000
$4,555
32.76
$3,998
$27.18
$3,706
24.26
TENNIS COURT
25,000
$9,469
32.75
$8,076
$27.19
$7,346
24.26
50,000
$17,657
30.00
$14,874
$25.00
$13,413
22.00
A A OCCUPANCY
1,000
$800
7.63
$800
7.63
$800
7.63
TENANT
5,000
$1,105
16.62
$1,105
16.62
$1,105
16.62
IMPROVEMENTS
10,000
$1,936
13.18
$1,936
13.18
$1,936
13.18
20,000
$3,254
9.88
$3,254
9.88
$3,254
9.88
50,000
$6,217
9.87
$6,217
9.87
$6,217
9.87
100,000
$11,154
9.00
$11,154
9.00
$11,154
9.00
B BUSINESS -
400
$750
30.18
$700
$21.31
$700
14.56
BANK
2,000
$1,233
46.15
$1,041
$39.45
$933
35.40
4,000
$2,156
34.72
$1,830
$32.07
$1,641
30.10
8,000
$3,545
28.34
$3,113
$22.93
$2,845
20.07
20,000
$6,946
28.34
$5,865
$22.93
$5,254
19.87
40,000
$12,614
27.50
$10,451
$22.00
$9,228
19.00
- BUILDING: CONTRACT PLAN REVIEW - NEW CONSTRUCTION -
11 of 76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
BUILDING DEPARTMENT
CONTRACT PLAN REVIEW - NEW CONSTRUCTION
COSTRUCTION TYPE
CONSTRUCTION TYPE
CONSTRUCTION TYPE
IA, IB
IIA, 118, IIIA, IIIB, IV
VA, VB
COST FOR EACH
COST FOR EACH
COST FOR EACH
IBC
PROJECT 512E
BASE COST @
BASE COST @
BASE COST @
IBC OCCUPANCY TYPE
ADDITIONAL
ADDITIONAL
ADDITIONAL
CLASS
THRESHOLD
THRESHOLD 512E
THRESHOLD SIZE
THRESHOLD SIZE
100 SF*
100 SF*
100 SF*
B
BUSINESS -
1,000
$900
42.07
$800
$34.40
$800
28.65
PROFESSIONAL
5,000
$2,583
30.58
$2,176
$27.92
$1,946
26.42
OFFICE
10,000
$4,112
28.34
$3,572
$22.93
$3,267
19.87
20,000
$6,946
28.33
$5,865
$22.93
$5,254
19.87
50,000
$15,447
28.33
$12,745
$22.93
$11,215
19.87
100,0001
$29,616
27.50
$24,211
$22.00
$21,151
19.00
B
BUSINESS - HIGH
2O,000
$6,946
28.33
RISE OFFICE
100,000
$29,616
28.33
200,000
$57,953
28.33
400,000
$114,628
28.33
1,000,000
$284,653
28.33
2,000,000
$568,027
27.50
B
B OCCUPANCY
1,000
$500
10.00
$500
$10.00
$500
10.00
TENANT
5,000
$900
11.78
$900
$11.78
$900
11.78
IMPROVEMENTS
10,000
$1,489
10.99
$1,489
$10.99
$1,489
10.99
20,000
$2,588
7.46
$2,588
$7.46
$2,588
7.46
50,000
$4,826
7.10
$4,826
$7.10
$4,826
7.10
100,0001
$8,374
6.50
$8,374
$6.50
$8,374
6.50
E
EDUCATIONAL -
1,000
$900
46.10
$850
$37.15
$850
31.72
GROUP
5,000
$2,744
31.62
$2,336
$28.98
$2,119
27.54
OCCUPANCY 6+
10,000
$4,325
30.47
$3,785
$25.06
$3,496
22.17
PERSONS, UP TO
20,000
$7,372
30.46
$6,291
$25.06
$5,713
22.17
THE 12TH GRADE
50,000
$16,512
30.46
$13,809
$25.06
$12,365
22.11
100,0001$31,745
29.50
$26,340
$24.50
$23,449
21.50
E
E OCCUPANCY
1,000
$500
10.00
$500
$10.00
$500
10.00
TENANT
5,000
$900
11.78
$900
$11.78
$900
11.78
IMPROVEMENTS
10,000
$1,489
10.99
$1,489
$10.99
$1,489
10.99
20,000
$2,588
7.46
$2,588
$7.46
$2,588
7.46
50,000
$4,826
7.10
$4,826
$7.10
$4,826
7.10
100,0001
$8,374
6.50
$8,374
$6.50
$8,374
6.50
F-1
FACTORY
4,000
$1,437
20.30
$1,157
$17.13
$977
15.06
INDUSTRIAL-
20,000
$4,686
17.03
$3,899
$13.10
$3,388
10.55
MODERATE
40,000
$8,093
17.03
$6,520
$13.10
$5,498
10.55
HAZARD
80,000
$14,907
17.03
$11,762
$13.10
$9,717
10.55
200,000
$35,348
17.03
$27,487
$13.10
$22,373
10.55
400,000
$69,419
16.00
$53,695
$12.50
$43,467
9.50
- BUILDING: CONTRACT PLAN REVIEW - NEW CONSTRUCTION
12of76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
BUILDING DEPARTMENT
CONTRACT PLAN REVIEW - NEW CONSTRUCTION
COSTRUCTION TYPE
CONSTRUCTION TYPE
CONSTRUCTION TYPE
IA, IB
IIA, 1115, IIIA, 1118, IV
VA, VB
COST FOR EACH
COST FOR EACH
COST FOR EACH
IBC
PROJECT SIZE
BASE COST @
BASE COST @
BASE COST @
IBC OCCUPANCY TYPE
ADDITIONAL
ADDITIONAL
ADDITIONAL
CLASS
THRESHOLD
THRESHOLD SIZE
THRESHOLD SIZE
THRESHOLD SIZE
100 SF"
200 SF"
100 SF"
F-2 FACTORY
3,000
$1,125
22.36
$916
$19.20
$782
16.78
INDUSTRIAL-
15,000
$3,809
16.87
$3,220
$12.94
$2,796
10.65
LOW HAZARD
30,000
$6,340
16.87
$5,161
$12.94
$4,394
10.38
60,000
$11,401
16.87
$9,043
$12.94
$7,510
10.38
150,000
$26,586
16.87
$20,689
$12.94
$16,854
10.38
300,000
$51,893
15.60
$40,099
$12.00
$32,428
9.50
H-1 HIGH HAZARD
1,000
$900
18.80
$800
$12.57
$800
8.65
GROUP H-1 POSE
5,000
$1,652
24.30
$1,303
$19.42
$1,146
17.18
A DETONATION
10,000
$2,867
16.22
$2,274
$14.29
$2,005
13.39
HAZARD
20,000
$4,489
16.05
$3,703
$12.12
$3,344
10.32
50,000
$9,305
16.05
$7,339
$12.12
$6,440
10.32
100,000
$17,331
15.00
$13,400
$11.25
$11,601
9.25
H-2 HIGH HAZARD
2,000
$1,000
23.33
$900
$17.17
$900
12.17
H-3 GROUP
10,000
$2,867
16.22
$2,274
$14.29
$1,874
12.96
H-4
20,000
$4,489
16.05
$3,703
$12.12
$3,170
9.45
40,000
$7,700
16.05
$6,127
$12.12
$5,061
9.45
100,000
$17,331
16.05
$13,400
$12.12
$10,731
9.45
200,000
$33,383
15.00
$25,521
$11.00
$20,184
8.25
H-5 HIGH HAZARD
1,000
$900
42.07
$800
$34.40
$800
28.65
GROUP 1-5
5,000
$2,583
30.58
$2,176
$27.92
$1,946
26.42
10,000
$4,112
28.34
$3,572
$22.93
$3,267
19.87
20,000
$6,946
28.33
$5,865
$22.93
$5,254
19.87
50,000
$15,447
28.33
$12,745
$22.93
$11,215
19.87
100,000
$29,616
27.00
$24,211
$21.50
$21,151
18.50
1-1 INSTITUTIONAL
2,000
$1,233
35.98
$1,058
$32.03
$965
29.87
10,000
$4,112
28.34
$3,621
$23.42
$3,355
20.76
20,000
$6,946
28.34
$5,963
$23.42
$5,431
20.75
40,000
$12,614
28.33
$10,648
$23.42
$9,582
20.76
100,000
$29,616
28.33
$24,702
$23.42
$22,035
20.75
200,000
$57,953
27.00
$48,125
$22.00
$42,792
19.75
1-2 INSTITUTIONAL
2,000
$1,914
52.87
$1,770
$48.72
$1,679
46.00
10,000
$6,143
48.65
$5,668
$43.90
$5,359
40.80
20,000
$11,008
48.65
$10,058
$43.90
$9,439
40.80
40,000
$20,738
48.64
$18,838
$43.89
$17,600
40.80
100,000
$49,927
48.64
$45,176
$43.89
$42,079
40.80
200,000
$98,576
47.50
$89,075
$42.50
$82,880
39.00
- BUILDING: CONTRACT PLAN REVIEW - NEW CONSTRUCTION
13of76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
BUILDING DEPARTMENT
CONTRACT PLAN REVIEW - NEW CONSTRUCTION
COSTRUCTION TYPE
CONSTRUCTION TYPE
CONSTRUCTION TYPE
IA, IB
HA, IIB, IIIA, IIIB, IV
VA, VB
COST FOR EACH
COST FOR EACH
COST FOR EACH
IBC
PROJECT 512E
BASE COST @
BASE COST @
BASE COST @
IBC OCCUPANCY TYPE
ADDITIONAL
ADDITIONAL
ADDITIONAL
CLASS
THRESHOLD
THRESHOLD SIZE
THRESHOLD 512E
THRESHOLD SIZE
100 SF*
100 SF'
100 SF'
1-3 INSTITUTIONAL
1-4 INSTITUTIONAL
L
A
R-1
R-2
MERCANTILE
M OCCUPANCY
TENANT
IMPROVEMENTS
RESIDENTIAL -
TRANSIENT
BOARDING
HOUSES, HOTELS,
MOTELS
RESIDENTIAL -
PERMANENT, 2+
DWELLINGS
APARTMENT,
DORMITORY,
TIMESHARE
2,000
10,000
20,000
40,000
100,000
200,000
1,000
5,000
10,000
20,000
50,000
100,000
1,000
5,000
10,000
20,000
50,000
100,000
$1,385
39.41
$1,192
$35.08
$1,076
32.38
$4,538
32.60
$3,998
$27.19
$3,667
23.88
$7,798
32.59
$6,717
$27.19
$6,055
23.88
$14,317
32.59
$12,155
$27.19
$10,831
23.88
$33,875
32.59
$28,469
$27.19
$25,161
23.88
$66,471
31.50
$55,661
$26.00
$49,042
22.75
$850
43.02
$800
$35.32
$800
30.32
$2,571
30.50
$2,213
$28.16
$2,013
26.86
$4,096
28.17
$3,621
$23.42
$3,356
20.75
$6,913
28.17
$5,963
$23.42
$5,431
20.75
$15,365
28.17
$12,990
$23.42
$11,657
20.75
$29,452
27.00
$24,702
$22.50
$22,035
19.75
$750
31.92
$700
$25.47
$700
20.40
$2,027
26.96
$1,719
$24.94
$1,516
22.34
$3,375
20.97
$2,966
$16.87
$2,633
15.43
$5,472
20.96
$4,653
$16.87
$4,176
14.49
$11,762
20.96
$9,714
$16.87
$8,523
14.48
$22,245
19.75
$18,150
$15.75
$15,767
13.50
1,000
$500
10.00
$500
$10.00
5,000
$900
11.78
$900
$11.78
10,000
$1,489
10.99
$1,489
$10.99
20,000
$2,588
7.46
$2,588
$7.46
50,000
$4,826
7.10
$4,826
$7.10
100,000
$8,374
6.50
$8,374
$6.50
2,000
$1,239
36.12
$1,070
$32.30
10,000
$4,129
28.50
$3,654
$23.75
20,000
$6,979
28.50
$6,029
$23.75
40,000
$12,679
28.50
$10,779
$23.75
100,000
$29,780
28.50
$25,030
$23.75
200,0001
$58,281
27.50
$48,781
$22.50
1,500
$860
36.68
$750
$31.08
7,500
$3,061
23.73
$2,615
$20.50
15,000
$4,841
23.75
$4,153
$19.16
30,000
$8,404
23.75
$7,028
$19.16
75,000
$19,092
23.75
$15,652
$19.16
150,000
$36,905
22.75
$30,025
$18.25
- BUILDING: CONTRACT PLAN REVIEW - NEW CONSTRUCTION
14of76
$500
$900
$1,489
$2,588
$4,826
$8,374
$974
$3,382
$5,485
$9,690
$22,304
$43,329
$700
$2,304
$3,741
$6,202
$13,586
$25,893
10.00
11.78
10.99
7.46
7.10
6.50
30.10
21.03
21.02
21.02
21.02
20.00
26.73
19.16
16.40
16.40
16.40
15.50
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
BUILDING DEPARTMENT
CONTRACT PLAN REVIEW - NEW CONSTRUCTION
COSTRUCTION TYPE
CONSTRUCTION TYPE
CONSTRUCTION TYPE
IA, IB
IIA, 118, IIIA, 11111, IV
VA, VB
COST FOR EACH
COST FOR EACH
COST FOR EACH
IBC
PROTECT SIZE
BASE COST @
BASE COST @
BASE COST @
IBC OCCUPANCY TYPE
I
ADDITIONAL
ADDITIONAL
ADDITIONAL
CLASS
THRESHOLD
THRESHOLD SIZE
THRESHOLD SIZE
THRESHOLD SIZE
100 SF*
100 SF*
100 SF*
R-3
DWELLINGS -
1,500
$1,100
12.40
$1,000
$13.70
$900
12.90
CUSTOM HOMES
2,500
$1,224
39.90
$1,137
$36.40
$1,029
32.30
3,500
$1,623
34.80
$1,501
$33.60
$1,352
32.10
4,500
$1,971
33.80
$1,837
$30.90
$1,673
27.25
6,500
$2,647
25.02
$2,455
$24.88
$2,218
24.77
10,000
$3,523
23.00
$3,326
$22.00
$3,085
22.00
R-3
DWELLINGS -
1,500
$1,100
12.40
$1,000
$13.70
$900
12.90
MODELS, FIRST
2,500
$1,224
39.90
$1,137
$36.40
$1,029
32.30
MASTER PLAN
3,500
$1,623
34.80
$1,501
$33.60
$1,352
32.10
4,500
$1,971
33.80
$1,837
$30.90
$1,673
27.25
6,500
$2,647
25.02
$2,455
$24.88
$2,218
24.77
10,000
$3,523
23.00
$3,326
$22.00
$3,085
22.00
R-3
DWELLINGS -
1,500
$136
6.20
$136
$6.20
$136
6.20
PRODUCTION
2,500
$198
6.20
$198
$6.20
$198
6.20
PHASE OF
3,500
$260
6.20
$260
$6.20
$260
6.20
MASTER PLAN
4,500
$322
5.20
$322
$5.20
$322
5.20
(REPEATS)
6,500
$426
4.77
$426
$4.77
$426
4.77
10,000
$593
4.50
$593
$4.50
$593
4.50
R-4
RESIDENTIAL -
1,500
$977
40.25
$852
$36.40
$782
33.56
ASSISTED LIVING
7,500
$3,392
28.17
$3,036
$23.41
$2,796
21.28
(6-16 PERSONS)
15,000
$5,505
28.17
$4,792
$23.42
$4,392
20.76
30,000
$9,731
28.17
$8,306
$23.42
$7,506
20.75
75,000
$22,409
28.17
$18,846
$23.42
$16,846
20.75
150,000
$43,539
27.25
$36,414
$22.50
$32,414
19.75
R
R OCCUPANCY
1,000
$500
10.00
$500
10.00
$500
10.00
TENANT
5,000
$900
11.79
$900
11.79
$900
11.79
IMPROVEMENTS
10,000
$1,489
10.99
$1,489
10.99
$1,489
10.99
20,000
$2,588
7.46
$2,588
7.46
$2,588
7.46
50,000
$4,826
7.10
$4,826
7.10
$4,826
7.10
100,000
$8,374
6.50
$8,374
6.50
$8,374
6.50
S-1
STORAGE-
1,000
$650
24.70
$600
$17.20
$600
11.32
MODERATE
5,000
$1,638
24.10
$1,288
$19.24
$1,053
15.94
HAZARD
10,000
$2,843
16.13
$2,250
$14.20
$1,850
12.88
20,000
$4,456
15.89
$3,670
$11.95
$3,138
9.28
50,000
$9,223
15.88
$7,257
$11.95
$5,924
9.28
100,000
$17,167
14.75
$13,236
$11.00
$10,568
8.50
- BUILDING: CONTRACT PLAN REVIEW - NEW CONSTRUCTION
15 of 76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
BUILDING DEPARTMENT
CONTRACT PLAN REVIEW - NEW CONSTRUCTION
COSTRUCTION TYPE
CONSTRUCTION TYPE
CONSTRUCTION TYPE
IA, IB
IIA,11B, IIIA, IIIB, IV
VA, VB
COST FOR EACH
COST FOR EACH
COST FOR EACH
IBC
PROJECT SIZE
BASE COST @
BASE COST @
BASE COST @
IBC OCCUPANCY TYPE
ADDITIONAL
ADDITIONAL
ADDITIONAL
CLASS
THRESHOLD
THRESHOLD SIZE
THRESHOLD SIZE
THRESHOLD SIZE
100 SF*
100 SF*
100 SF*
S-2 STORAGE- 500
$450
23.70
$400
$17.50
$400
11.65
LOW HAZARD 2,500
$924
27.96
$750
$20.96
$633
16.20
5,000
$1,623
23.90
$1,274
$19.02
$1,038
15.74
10,000
$2,818
15.94
$2,225
$13.34
$1,825
11.56
25,000
$5,210
15.72
$4,227
$11.79
$3,560
9.12
50,000
$9,141
14.75
$7,175
$10.75
$5,842
8.25
U ACCESSORY
R3 RESIDENTIAL
ROOM ADDITION
SHELL BUILDING
A-2 SHELL: ASSEMBLY
FOOD & DRINK
B
M
SHELL: BUSINESS
PROFESSIONAL
OFFICE
SHELL:
MERCANTILE
200
$250
25.00
$250
$25.00
$250
25.00
1,000
$450
19.50
$450
$10.00
$450
10.00
2,000
$645
20.95
$550
$15.25
$550
8.55
4,000
$1,064
19.35
$855
$15.41
$721
12.36
10,000
$2,225
14.12
$1,780
$12.68
$1,463
10.83
20,000
$3,637
13.25
$3,048
$11.75
$2,546
10.00
50
$190
59.00
$180
$61.50
$180
51.00
250
$308
67.60
$303
$62.40
$282
63.20
500
$477
52.80
$459
$50.60
$440
49.20
1,000
$741
51.67
$712
$48.73
$686
46.00
2,500
$1,516
44.68
$1,443
$42.64
$1,376
40.88
5,000
$2,633
42.00
$2,509
$40.00
$2,398
38.00
1,000
$950
29.90
$900
$24.72
$900
21.27
5,000
$2,146
27.72
$1,889
$26.06
$1,751
25.12
10,000
$3,532
22.54
$3,192
$19.13
$3,007
17.26
20,000
$5,786
22.54
$5,105
$19.13
$4,733
17.27
50,000
$12,548
22.53
$10,844
$19.13
$9,916
17.27
100,000
$23,817
21.50
$20,410
$18.25
$18,551
16.25
1,000
$950
30.15
$900
$23.25
$900
18.52
5,000
$2,156
27.80
$1,830
$25.66
$1,641
24.08
10,000
$3,546
22.67
$3,113
$18.35
$2,845
16.15
20,000
$5,813
22.67
$4,948
$18.34
$4,460
15.89
50,000
$12,614
22.66
$10,451
$18.34
$9,228
15.89
100,0001
$23,948
21.50
$19,624
$17.25
$17,177
14.75
1,000
$750
24.02
$700
$18.12
$700
13.90
5,000
$1,711
24.90
$1,425
$21.14
$1,256
18.78
10,000
$2,956
16.77
$2,482
$14.96
$2,195
14.03
20,000
$4,633
16.77
$3,978
$13.49
$35,998
11.58
50,000
$9,665
16.77
$8,027
$13.49
$7,074
11.59
100,000
$18,052
15.50
$14,776
$12.50
$12,869
10.50
- BUILDING:
CONTRACT
PLAN REVIEW -
NEW CONSTRUCTION -
16 of 76
CITY OF PALM SPRINGS - COMPREHENSIVE FEE SCHEDULE
BUILDING DEPARTMENT
BUILDING - MISCELLANEOUS ITEMS
ITEM CURRENT FEE
MISCELLANEOUS
ARBOR / TRELLIS
$200
AWNING / CANOPY (SUPPORTED BY BUILDING)
$200
BALCONY ADDITION
$200
CARPORT
$200
DECK (WOOD)
$200
FIREPLACE $150
FOUNDATION
FOUNDATION REPAIR $200
PATIO COVER
WOOD FRAME
$200
METAL FRAME
$200
OTHER FRAME
$200
ENCLOSED, WOOD FRAME
$225
ENCLOSED, METAL FRAME
$225
ENCLOSED, OTHER FRAME
$225
PHOTOVOLTAIC SYSTEM
RESIDENTIAL $175
COMMERCIAL, UP TO 4 KILOWATTS (NOTE 1) $250
COMMERCIAL, EACH ADDITIONAL 1 KILOWATT $50
REMODEL - RESIDENTIAL
LESS THAN 300 SF $150
KITCHEN $150
BATH $150
RETAINING WALL (CONCRETE OR MASONRY)
STANDARD (UP TO 50 LF) $150
ADDITIONAL RETAINING WALL (PER 50') $50
STORAGE RACKS
0-8' HIGH (UP TO 100 LF) $150
EACH ADDITIONAL 100 LF $50
OVER 8' HIGH (UP TO 100 LF) $200
EACH ADDITIONAL 100 LF $50
SWIMMING POOL/SPA
GUNITE (UP TO 800 SF) $300
ADDITIONAL POOL (OVER 800 SF) $100
SPA OR HOT TUB (PRE -FABRICATED) $200
- BUILDING: MISCELLANEOUS FEES -
17 of 76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
CITY CLERK
DESCRIPTION FEE UNIT
ADMINISTRATIVE APPEALS BOARD
APPEAL, MINIMUM DEPOSIT FOR HEARING ................................. $172
APPEAL TO CITY COUNCIL
GENERAL ADMINISTRATIVE APPEALS ............................................. $595
CERTIFICATION.............................................................................................. $15 PER DOCUMENT
CITY COUNCIL AGENDAS AND MINUTES
AGENDA...............................................................................................
$69
ANNUALLY
AGENDA & MINUTES.........................................................................
$149
ANNUALLY
COPIES AND PUBLICATIONS
1-10 PAGES..........................................................................................
NO CHARGE
OVER 10 PAGES..................................................................................
$0.10
PER PAGE
CD/DVD/FLASH DRIVE......................................................................
$11.25
EACH
DOMESTIC PARTNERSHIP REGISTRATION ............................................
$46
FOR REGISTRATION
$23
FOR TERMINATION
GENERAL PLAN
CD
$12
EACH
PAPERCOPY........................................................................................
$281
EACH
INITIATIVE FILING FEE................................................................................
$200
STATE REGULATED FEE
MAILING DOCUMENTS
#10 ENVELOPES.................................................................................. $8
MANILA ENVELOPES.......................................................................... $15
LARGEBOX.......................................................................................... $45
MUNICIPAL CODE......................................................................................... $108
SUPPLEMENT...................................................................................... $37 BASED ON ACTUAL
VENDOR COST - PER YEAR
ROOM RATES 13&14
CONTRACT PROCESSING................................................................... $29
COUNCIL CHAMBER
HALF DAY RENTAL...............................................................
$115
FULL DAY RENTAL................................................................
$229
LARGE CONFERENCE ROOM
HALF DAY (4 HOURS OR LESS).........................................................
$57 HALF DAY
FULL DAY (OVER 4 HOURS)..............................................................
$115 FULL DAY
SMALL CONFERENCE ROOM
HALF DAY (4 HOURS OR LESS)..........................................................
$29 HALF DAY
FULL DAY (OVER 4 HOURS)...............................................................
$57 FULL DAY
- CITY CLERK -
18 of 76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
COMMUNITY TELEVISION
DESCRIPTION FEE
ON -SCREEN TITLES....................................................................................... $11
WHILE IN PRODUCTION FROM THE COUNCIL CHAMBER OR
THE LARGE CONFERENCE ROOM OR IN POST PRODUCTION,
PHONE NUMBERS, PEOPLES NAMES AND TITLES, ETC., CAN
BE SUPERIMPOSED ON SCREEN
POST PRODUCTION EDITING
TRIMMING FOR CONTENT AND/OR LENGTH TO COMPLETE A
VIDEO PROJECT FOR CABLECAST................................................ $112
PRODUCTION RATES
COUNCIL CHAMBER.......................................................................
$64
INCLUDES 4 REMOTE CONTROL CAMERAS, 15 FIXED
MICROPHONES, 1 HAND HELD MICROPHONE WIRELESS, TWO
MONITORS
LARGE CONFERENCE ROOM ........................................................
$64
INCLUDES 3 REMOTE CONTROL CAMERAS, 10 FIXED
MICROPHONES, 1 HAND HELD MICROPHONE WIRELESS, 1
MONITOR
ADDITIONAL EQUIPMENT
MINI DIGITAL / VIDEO CAMERA ...............................
$50
ADDITIONAL MONITORS, MICROPHONES, ETC...
$6
PROGRAMMING TAPES
COPIES OF PROGRAMS PRODUCED BY PSCTV ON DVD .........
$11
SHIPPING OF TAPES
TAPES SHIPPED BY UPS.................................................................
$29
NOTE: 1 ALL EQUIPMENT WILL BE OPERATED BY PSCTV PERSONNEL ONLY.
- COMMUNITY TELEVISION -
19 of 76
UNIT
PER HOUR
(MINIMUM 2 HOURS)
PER HOUR
PER HOUR
(MINIMUM 2 HOURS)
PER HOUR
(MINIMUM 2 HOURS)
PER HOUR (MIN. 2 HRS.)
PER HOUR (MIN. 2 HRS.)
EACH
EACH
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
ENGINEERING DEPARTMENT
DESCRIPTION FEE UNIT
THE FOLLOWING FEES ARE DIRECTLY RELATED TO & IN ADDITION TO THE ASSOCIATED PLANNING FEES
(ARCHITECTURAL REVIEW / CC&Rs / CONDITIONAL USE PERMIT / ENVIROMENTAL DOCUMENTS / PLANNED DEVELOPMENT DISTRICT (P.C.
& C.C.) / SUBDIVISION MAPS)
ARCHITECTURAL REVIEW
SEE: PLANNING -ARCHITECTURAL REVIEW
MAJOR ARCHITECTURAL APPROVAL
COMMERCIAL / INDUSTRIAL / MULTIPLE SF / MF .................... $3,513.40
HILLSIDE SF..................................................................................... $3,513.40
SINGLE-FAMILY HOUSE - MAJOR THOROUGHFARE ................. $1,167.10
CANNABIS BUSINESS AND ACTIVITY
SEE: SPECIAL PROGRAM COMPLIANCE - CANNABIS BUSINESS AND ACTIVITY
PUBLIC WORKS INSPECTION............................................................... $95
APPLIES TO CANNABIS PROJECTS INVOLVING WORK THAT PROVES
NECESSARY IN RIGHT-OF-WAY, OR IN A GROUND -UP BUILD.
CODES, COVENANTS & RESTRICTIONS (CC & Rs)
SEE: PLANNING - CODES, COVENANTS & RESTRICTIONS (CC & Rs)
SEE: PLANNING - CONDITIONAL USE PERMIT
CUP (P.C. & C.C.).................................................................................... $2,086.47
CUP(P.C. ONLY).................................................................................... $1,895.30
CONSTRUCTION PERMITS
ADMINISTRATION PERMIT................................................................... $36.76
TECHNOLOGY SURCHARGE.................................................................. $0.96
MINOR (DRIVEWAY, DUMPSTER, ETC.) .............................................. $687.38
PUBLIC OR PRIVATE IMPROVEMENTS (ENCROACHMENT PERMIT) -
CURRENT VALUATION
$1- $2,000.............................................................................. $687.38
$2,001- $50,000..................................................................... $687.38
$50,001- $200,000............................................................... $3,236.18
OVER $200,000..................................................................... $9,686.18
PENALTY FEE (WORKING WITHOUT PERMIT) ............................................ 2X FEE
- ENGINEERING DEPARTMENT -
20 of 76
EACH PERMIT
/$1,000.00 NEW
CONSTRUCTION VALUE
BASE FEE THEN...
PLUS 5.31% BALANCE OVER
$2,000 ($48,000 x 5.31% _
$2,548.00)
PLUS 4.30% BALANCE OVER
$50,000 ($150,000 x 4.3% _
$6,450.00)
PLUS 3.16% BALANCE OVER
$200,000
DOUBLE FEE PER OFFENSE
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
ENGINEERING DEPARTMENT
DESCRIPTION FEE UNIT
STREET IMPROVEMENT / UTILITY UNDER GROUNDING COVENANT
..............................................................................................
$697.68
PER COVENANT
DRAINAGE FEE7"
NORTH............................................................................................
$7,287.76
PER ACRE
CENTRAL..........................................................................................
$10,311.99
PER ACRE
SOUTH............................................................................................
$8,138.43
PER ACRE
EAST................................................................................................
$4,608.16
PER ACRE
SOUTHEAST....................................................................................
$8,419.37
PER ACRE
EAGLE CANYON..............................................................................
$7,857.49
PER ACRE
THE CANYON AREA..........................................................................
$4,213.00
PER ACRE
ENCROACHMENT AGREEMENTS (BASED ON CONTRACT)
DEPOSITS & BONDS............................................................................... .......................... SET INDIVIDUALLY
(ANNUAL DEPOSITS, BOND FOR CONTINUING USE & ADDITIONAL BOND)
ENCROACHMENT AGREEMENT............................................................ $1,599.93 PER AGREEMENT
PROCESSED*
ENCROACHMENT LICENSE................................................................... $3,200.08 PER AGREEMENT
PROCESSED*
* CONSULTANT DIRECT COST / PASS -THROUGH (SUBJECT TO CHANGE BASED UPON CURRENT CONTRACT)
INSPECTIONS........................................................................................... $211.90 PER HOUR (MIN. 1 HR)
(FOR WHICH NO FEE IS SPECIFICALLY INDICATED)
INSPECTIONS AND STAFF TIME........................................................... $327.14 PER HOUR (MIN. 2 HRS.)
(OUTSIDE NORMAL BUSINESS HOURS)
RE -INSPECTION CALLS.......................................................................... $218.09 PER HOUR (MIN. 1 HR.)
(EXCEEDING ONE REPEAT ACCOMMODATION)
GRADING PERMIT
GRADING PERMIT FEES (3.1.)
50 CUBIC YARDS OR LESS............................................................ $52.21
51 TO 100 CUBIC YARDS............................................................ $104.42
101 TO 1,000 CUBIC YARDS
FIRST 100 CUBIC YARDS............................................................ $104.42 PLUS
EACH ADDITIONAL 100 CUBIC YARDS, OR FRACTION
THEREOF......................................................................................... $52.21
1,001 TO 10,000 CUBIC YARDS
FIRST 1,000 CUBIC YARDS, PLUS ................................................ $469.90 PLUS
EACH ADDITIONAL 1,000 CUBIC YARDS, OR FRACTION
THEREOF......................................................................................... $156.63
10,001 TO 100,000 CUBIC YARDS
FIRST 10,000 CUBIC YARDS, PLUS ............................................. $413.38 PLUS
EACH ADDITIONAL 10,000 CUBIC YARDS, OR FRACTION
THEREOF......................................................................................... $84.58
- ENGINEERING DEPARTMENT -
21 of 76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
ENGINEERING DEPARTMENT
DESCRIPTION FEE UNIT
100,001 CUBIC YARDS OR MORE
FIRST 100,000 CUBIC YARDS ........................................................ $1,168.94 PLUS
EACH ADDITIONAL 10,000 CUBIC YARDS, OR FRACTION
THEREOF................................................................................. $46.43
GRADING PLAN - CHECK (BASED UPON CONTRACT)
PARCEL SIZE:
PER SHEET * PLUS, 82%
LESS THAN 15,000 S.F.................................................................... $548 ADMIN./COORD. FEE
PER SHEET * PLUS, 82%
15,000 S.F. TO 4 ACRES................................................................. $842 ADMIN./COORD. FEE
PER SHEET * PLUS, 82%
4 + ACRES........................................................................................ $1,481 ADMIN./COORD. FEE
* CONSULTANT DIRECT COST / PASS-THRU (SUBJECT TO CHANGE BASED UPON CURRENT CONTRACT)
ADMINISTRATIVE/COORDINATION FEE ............................................ 82% PLUS 82% PER PROJECT
ADDITIONAL PER SHEET CHARGE ON THE FOURTH (4TH)
RESUBMITTAL......................................................................................... 50% PLUS 50 % OF THE ABOVE
AMOUNTS
FAST TRACK PERFORMANCE............................................................... 150% TIMES THE ABOVE AMOUNTS
LOT LINE ADJUSTMENT, PARCEL MERGER, AND CERTIFICATE OF COMPLIANCE
STAFF APPROVAL................................................................................... $4,113.97 INCLUDES: EACH - PLAN
CHECK FEE OF $943 DIRECT
COST/ PASS TH RU * PLUS
ADMIN COORD. FEE OF
$3,263.87
PLAN CHECK FEES FOR IMPROVEMENTS (STREET, SEWER, DRAINAGE)
PER SHEET * PLUS, 82%
TRAFFIC SIGNAL PLANS.........................................................................
$548
ADMIN./COORD. FEE
PER SHEET * PLUS, 82%
STREET PLANS.........................................................................................
$548
ADMIN./COORD. FEE
PER SHEET * PLUS, 82%
SEWER PLANS.........................................................................................
$449
ADMIN./COORD. FEE
PER SHEET * PLUS, 82%
STORM DRAIN........................................................................................
$535
ADMIN./COORD. FEE
PER SHEET * PLUS, 82%
SIGNING & STRIPING PLANS...............................................................
$449
ADMIN./COORD. FEE
* CONSULTANT DIRECT COST / PASS-THRU (SUBJECT TO CHANGE BASED UPON CURRENT CONTRACT)
ADMINISTRATIVE/COORDINATION FEE ............................................
82%
PLUS 82% PER PROJECT
ADDITIONAL PER SHEET CHARGE ON THE FOURTH (4TH)
RESUBMITTAL ADDED........................................................................... 50% OF THE ABOVE AMOUNTS
- ENGINEERING DEPARTMENT -
22 of 76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
ENGINEERING DEPARTMENT
DESCRIPTION FEE UNIT
STREET PLANS 4T" RESUBMITTAL......................................................... $268.00
SEWER PLANS 4T" RESUBMITTAL......................................................... $219.00
STORM DRAIN 4T" RESUBMITTAL......................................................... $268.00
SIGNING & STRIPING 4T" RESUBMITTAL............................................. $324.10
FAST TRACK PERFORMANCE............................................................... 150% TIMES THE ABOVE AMOUNTS
PLAN CHECK / REVIEW (BASED ON CONTRACT)
PROFESSIONAL REPORTS OR PLANS................................................................................... CONSULTANT COST
(NOT SPECIFICALLY COVERED BY THIS SCHEDULE) I.E. HYDROLOGY, PLUS CITY STAFF TIME
WQMP, AND TRAFFIC STUDIES
BASE FEE (PROJECT SET UP AND COORDINATION) ................... $1,118.09
CITY STAFF TIME..................................................................................... $382.33 PER HOUR - FULLY
BURDENED HOURLY RATE -
DIR. OF PUBLIC WORKS
FAST TRACK PERFORMANCE................................................................ 150% TIMES THE ABOVE AMOUNTS
PLANNED DEVELOPMENT DISTRICT' (P.C. & C.C.)
SEE: PLANNING - PLANNED DEVELOPMENT DISTRICT
PRELIMINARY DEVELOPMENT PLAN - 5 ACRES OR UNDER ............
$2,297.35
PRELIMINARY DEVELOPMENT PLAN - > 5 ACRES ..............................
$2,297.35
FINAL DEVELOPMENT PLAN (ALL SIZES)
$3,131.04
PRELIMINARY DEVELOPMENT PLAN - MINOR AMENDMENT ........
$1,071.00
PRELIMINARY DEVELOPMENT PLAN - MAJOR AMENDMENT .........
$1,775.00
PRODUCTIVE HOURLY RATES BY POSITION
DIRECTOR OF PUBLIC WORKS..............................................................
$382.33
ASSISTANT DIRECTOR OF PUBLIC WORKS ..........................................
$311.40
ASSOCIATE CIVIL ENGINEER.................................................................
$219.58
ENGINEERING ASSOCIATE....................................................................
$261.15
SR. PUBLIC WORKS INSPECTOR...........................................................
$218.10
PUBLIC WORKS ADMINISTRATOR.......................................................
$0.00
ENGINEERING ASSIST............................................................................
$217.74
ENGINEERING FIELD TECHS...................................................................
$208.84
ENGINEERING SECRETARY / COUNTER TECH .....................................
$147.03
SENIOR SECRETARY................................................................................
$116.23
FIELD TECH / DUST CONTROL...............................................................
$0.00
SR. ENGINEER....................................................................................
$279.48
REPROGRAPHIC SERVICES
SET-UP FEE...............................................................................................
$11 PER JOB
BLUEPRINTING OR OVERSIZED COPIER ......................................
$11
- ENGINEERING DEPARTMENT -
23 of 76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
ENGINEERING DEPARTMENT
DESCRIPTION FEE UNIT
BLUEPRINTING........................................................................................ $11
AERIALS (INCLUDING STRIP PHOTOS) ............................................... PER MAP,OR PER SERIAL
$11 PHOTO SHEET
ADDITIONAL DUPLICATE COPY .................................................... $11 PER ADDITIONAL DUPLICATE
MAPS
TRACT, PARCEL & RECORD MAPS (18' X 28') ............................ $11
STREET MAPS
1000 SCALE............................................................................ $11 EACH
1/3 OF 600 SCALE.................................................................. $11 EACH
600 SCALE.............................................................................. $11 EACH
PLANS:
STREET & SEWER IMPROVEMENT PLANS (24' X 36') ............... $11 EACH
COPYING:
STANDARD XEROX COPIER (LEDGER OR SMALL COPIES) ............... $0.10 PER PAGE
SUBDIVISION MAPS (ENGINEERING PLAN CHECK)
ALSO SEE: PLANNING - SUBDIVISION MAPS
$647
PER SHEET * PLUS, 82%
PARCEL MAPS..........................................................................................
ADMIN./COORD. FEE
$856
PER SHEET * PLUS, 82%
FINAL MAPS (OR PARCEL MAPS 5 LOTS OR MORE) ..........................
ADMIN./COORD. FEE
ADMINISTRATIVE/COORDINATION FEE ............................................
82%
PLUS 82% PER PROJECT
REVISION OF FINAL AND PARCEL MAPS ............................................
50%
OF ORIGINAL FEE
ADDITIONAL PER SHEET CHARGE ON THE FOURTH (4TH)
RESUBMITTAL..........................................................................................
50%
OF ABOVE AMOUNTS
SUBDIVISION MAPS
ALSO SEE: PLANNING -SUBDIVISION MAPS
PETITION FOR REVERSION TO ACREAGE ..........................................
$1,595
TENTATIVE TRACT MAPS (P.C. & C.C.)................................................
$8,921
TENTATIVE PARCEL MAPS (P.C. & C.C.).............................................
$7,233
VESTINGMAPS.......................................................................................
$12,538
IMAGING FEES (TRACT, PARCEL & VESTING MAPS) ....................................
$75
PARCEL MAP WAIVER...........................................................................
$3,617
TRANSPORTATION PERMIT FEE (OVERSIZE / OVERWEIGHT VEHICLES)
STATE REGULATED FEES / SPECIALIZED CARRIERS & RIGGING ASSOCIATION
...........................................................
ANNUAL PERMIT ................
$90
PER YEAR
SINGLE TRIP PERMIT......................................................................
$16
EACH TRIP
- ENGINEERING DEPARTMENT -
24 of 76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
ENGINEERING DEPARTMENT
RIGHT-OF-WAY
DESCRIPTION FEE UNIT
DESCRIPTION PREPARATION......................................................... $2,022.00 PER APPLICATION
DEED DESCRIPTION PLAN CHECK $1,825.27 PER APPLICATION**
IF CONSULTANT IS REQUIRED, ACTUAL COST+ 15% ADMIN FEE
RIGHT-OF-WAY / EASEMENTS DEDICATION .......................... $2,372.00 PER APPLICATION
RIGHT-OF-WAY / EASEMENT VACATION* ....................................... $3,453.03 PER APPLICATION
*CONSULTANT DIRECT COST / PASS-THRU (SUBJECT TO CHANGE BASED UPON CURRENT CONTRACT)
"CONSULTANT DIRECT COST/ PASS-THRU (SUBJECT TO CHANGE BASED UPON CURRENT CONTRACT)
- ENGINEERING: RIGHT OF WAY -
25 of 76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
ENGINEERING DEPARTMENT
STREETS
DESCRIPTION FEE UNIT
DOWNTOWN
PARKING
EMPLOYEE PARKING PERMIT (2-HOUR ZONES)
SEPTEMBER - AUGUST, NO PRORATING ................................... $36.64
METERED LOTS (NO DAILY MAXIMUM)
UP TO 2 HOURS..................................................................... $1.15
ADDITIONAL HOUR.............................................................. $1.15 EACH
MONTHLY SPACE RENTAL ................................................... $49.24 PER MONTH, PER SPACE
VALET
PARKING PERMIT.................................................................. $184.35
PARKING PRIVILEDGE FEE ................................................... $0.60 PER CAR PARKED
MANAGED PARKING PROGRAM FEES AND PROCEDURES
PUBLIC WORKS - STREET
DOWNTOWN PARKING
ADJUDICATION
ADMINISTRATIVE HEARING FEE ....................................... $30.92 REFUND IF DECISION IS IN
FAVOR OF APPLICANT
DOCUMENT FEES................................................................ $19.47
DMV ABSTRACT.................................................................. $11.45
- ENGINEERING: STREETS -
26 of 76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
ENGINEERING DEPARTMENT
TRAFFIC
DESCRIPTION FEE UNIT
TRAFFIC SURVEY FEE.................................................................................. $535 FLAT FEE
WARRANT ANALYSIS
IN THOSE CASES WHERE THE RESULT OF THE WARRANT ANALYSIS SHOWS THAT ADDITIONAL INTERSECTION CONTROL
IMPROVEMENTS ARE JUSTIFIED, THE REQUESTER'S FEE SHALL BE RETURNED.
STOP SIGNS AND TRAFFIC SIGNALS ..................................................... $1,403 FLAT FEE
IF CONSULTANT IS REQUIRED, ACTUAL COST PLUS 15% ADMINISTRATIVE FEE
- ENGINEERING: TRAFFIC -
27 of 76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
ENGINEERING DEPARTMENT
WASTEWATER
DESCRIPTION FEE UNIT
SEWER FACILITY FEE
EXCLUSIVE OF STREET MAIN CHARGES OR STREET LATERAL FEE
NEW CONSTRUCTION SHALL PAY THE SEWER FACILITY FEE IN EFFECT AT THE TIME A BUILDING PERMIT IS ISSUED
BY THE CITY, AND SAID FACILITY FEE SHALL BE PAID PRIOR TO THE GRANTING OF A BUILDING PERMIT. SAID
FACILITY FEES SHALL BE DEPOSITED IN THE SEWER FUND
A. RESIDENTIAL UNITS *................................................................ $3,000 /EDU (EQUIVALENT
DWELLING UNIT)
(INCLUDING SINGLE-FAMILY DWELLINGS, APARTMENTS, CO-OP APARTMENTS, CONDOMINIUMS, AND MOBILE HOME PARK SPACES)
1) IF THE COST OF ON -SITE SEWER CONSTRUCTION AND CONNECTION, EXCLUSIVE OF SEWER FACILITY FEE, SHALL
EXCEED THE SUM OF $4,776 PER DWELLING UNIT, OR SUCH GREATER SUM AS SHALL HEREAFTER BE DETERMINED
BY RESOLUTION OF THE CITY COUNCIL, AMOUNTS SHALL BE ADJUSTED ANNUALLY IN ACCORDANCE WITH THE
ENGINEERING NEWS RECORD CONSTRUCTION COST INDEX.
2) IF THE COST OF SEWER MAIN CONSTRUCTION, IN THE EVENT NO SEWER MAIN EXISTS IN PROXIMITY TO SAID
PROPERTY SHALL EXCEED $7,960 PER DWELLING UNIT, OR SUCH GREATER SUM AS SHALL HEREAFTER BE
DETERMINED BY RESOLUTION OF THE CITY COUNCIL, AMOUNTS SHALL BE ADJUSTED ANNUALLY IN ACCORDANCE
WITH THE ENGINEERING NEWS RECORD CONSTRUCTION COST INDEX.
B. COMMERCIAL AND INDUSTRIAL UNITS* ............................... $306 FIXTURE UNIT
C. HOTEL ROOMS (AS DEFINED BY THE ZONING ORDINANCE)
WITHOUT KITCHENS *.............................................. $1,290 UNIT
WITH KITCHENS *...................................................... $1,500 UNIT
D. RECREATIONAL VEHICLE SPACE* ............................................ $2,340 SPACE
(FOR BUILDING PERMITS)
E. ASSESSMENT DISTRICTS
THE SEWER FACILITY FEE TO BE PAID FOR PREMISES WITH SERVICE MADE AVAILABLE BY AN ASSESSMENT DISTRICT
SHALL BE THE FEE IN EFFECT AT THE TIME A PETITION REPRESENTING 60% SUFFICIENCY IS FILED WITH THE CITY,
PROVIDED SAID CONNECTION OCCURS DURING THE COURSE OF CONSTRUCTION BUT IN NO EVENT LATER THAN 30
DAYS AFTER FILING OF NOTICE OF COMPLETION OF THE ASSESSMENT DISTRICT. SHOULD A PERMIT NOT BE SECURED
WITHIN THE TIME FRAME SET FORTH HEREIN, THE FACILITY FEE TO BE PAID SHALL BE THAT FEE IN EFFECT AT THE TIME
THE PERMIT FOR CONNECTION IS SECURED.
PROPERTIES ADJACENT TO CITY *........................................... $6,000 UNIT
PROPERTIES OUTSIDE OF THE CITY SHALL PAY A SEWER FACILITY FEE EQUAL TO TWICE THE RATE ESTABLISHED FOR PROPERTIES
WITHIN THE CITY LIMITS.
- ENGINEERING: WASTEWATER -
28 of 76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
ENGINEERING DEPARTMENT
WASTEWATER
DESCRIPTION FEE UNIT
* NOTE: ALL BUILDING PERMIT APPLICATIONS THAT WERE RECEIVED BY THE CITY'S BUILDING DIVISION ON OR BEFORE JULY 1,
2006, AND BASED UPON THE SUBMISSIONS MADE BY THAT DATE HAVE BEEN DEEMED BY THE CITY TO BE ACCEPTED FOR
REVIEW TO DETERMINE THEIR COMPLIANCE WITH CITY'S REQUIREMENTS, SHALL BE PROCESSED ON A FIRST -COME, FIRST
SERVED BASIS, IN ACCORDANCE WITH THE CITY'S STANDARD POLICIES AND PRACTICES, AND THOSE PERMITS THAT ARE
ISSUED ON OR BEFORE AUGUST 21, 2006, SHALL BE SUBJECT TO THE FEES THAT APPLIED PRIOR TO ADOPTION OF
RESOLUTION 21622.
SEWER MAIN SURCHARGE FEE
IN ADDITION TO SEWER STREET MAIN CHARGE, INSPECTION FEE AND ANY OTHER APPLICABLE FEES, WHEN A SEWER
REIMBURSEMENT AGREEMENT REQUIRES THE COLLECTION OF A SEWER MAIN SURCHARGE FEE, THE BUILDING DIVISION
SHALL COLLECT AND REMIT THE AMOUNT PRESCRIBED BY SUCH AGREEMENT, (INCLUDING INTEREST, IF REQUIRED BY THE
SUBJECT AGREEMENT).
SEWER STREET MAIN CHARGES
IN ADDITION TO THE INSPECTION FEE AND ANY OTHER APPLICABLE FEES, WHEN A PROPERTY CONNECTING TO A CITY SEWER
HAS NOT PAID ITS SHARE OF THE COST OF SAID SEWER, THERE SHALL BE PAID A STREET MAIN CHARGE. SAID STREET MAIN
CHARGE SHALL BE DETERMINED BY THE BUILDING DIVISION, BASED UPON ONE OF THE FOLLOWING FORMULA, WHICHEVER
IS THE GREATER:
1) SIXTEEN DOLLARS ($16) PER LOT FRONT FOOT ALONG SAID
SEWER, OR......................................................................... $16 PER FOOT
2) AT THE RATE ESTABLISHED IN ASEWER REIMBURSEMENT AGREEMENT
ADOPTED BY RESOLUTION OF THE CITY COUNCIL FOR SEWERS CONSTRUCTED
BY A DEVELOPER, OR
3) AT THE RATE ESTABLISHED BY RESOLUTION OF THE CITY COUNCIL FOR
SEWERS AND/OR SEWAGE COLLECTION SYSTEM CONSTRUCTED BY THE CITY
IN A SPECIFIED APPLICABLE AREA.
SAID STREET MAIN CHARGES SHALL BE DEPOSITED IN THE SEWER FUND, EXCEPT FOR THOSE CHARGES COLLECTED THROUGH
A SEWER REIMBURSEMENT AGREEMENT WHEREIN THE ORIGINAL COSTS PLUS INTEREST ARE REIMBURSED TO THE SECOND
PARTY OF SAID AGREEMENT.
SEWER SURCHARGE LIFT STATION NO. 1 AREA FEE 9,10
NEW DEVELOPMENT, NATURALLY CONTRIBUTORY OF SEWAGE FLOWS TO LIFT STATION NO. 1 FOR SECTIONS 20, 29, 20 AND PALM
HILLS
NEW RESIDENTIAL UNITS *................................................................ $365
COMMERCIAL AND INDUSTRIAL UNITS *....................................... $32
HOTEL ROOMS *
WITHOUT KITCHENS................................................................... $161
WITH KITCHENS........................................................................... $182
* NOTE: FOR WHICH A BUILDING PERMIT IS ISSUED ON OR AFTER MAY 18, 1983
SUB -SURFACE SEWAGE DISPOSAL REVIEW FEE ............................. $17
- ENGINEERING: WASTEWATER -
29 of 76
PER UNIT
PER FIXTURE UNIT
PER UNIT
PER UNIT
PER UNIT
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
ENGINEERING DEPARTMENT
WASTEWATER
DESCRIPTION FEE
SEWER SERVICE CHARGES 5
(MONTHLY RATES) (EFFECTIVE 7/1/12 IN ACCORDANCE TO R23120)
EFF. JULY 1, 2016
A) RESIDENTIAL USES....................................................................... $20
B) COMMERCIAL AND INDUSTRIAL USES .................................... $20
(INCLUDING COMMERCIAL FACILITIES IN HOTELS)
$1.98
C) HOTELS (AS DEFINED IN THE ZONING ORDINANCE) .............................. $20
ROOMS WITHOUT KITCHENS
$6.81
D) HOTELS (AS DEFINED IN THE ZONING ORDINANCE) ............................. $13.17
ROOMS WITH KITCHENS
E) MOBILE HOME PARKS (AS DEFINED IN THE ZONING ORDINANCE) - $20
ONE BILL TO PARK OPERATOR FOR COMMUNITY FACILITIES
$1.98
F) PROPERTIES ADJACENT TO CITY .............................................. 150%
(PROPERTIES OUTSIDE OF THE CITY SHALL PAY A SEWER SERVICE
CHARGE EQUAL TO 150% OF THE ESTABLISHED RATES FOR
PROPERTIES WITHIN THE CITY LIMITS.)
G) RECREATIONAL VEHICLE PARKS ............................................... $4.90
FOR COMMUNITY FACILITIES ................................................... $1.98
H) SEPTAGE DUMPING FEE
(*LOADS NOT IN EXCESS OF 1,000 GALLONS)
PROPERTIES WITHIN CITY LIMITS (ANY PARTTHEREOF) ............. $67.58
PROPERTIES OUTSIDE CITY LIMITS (ANY PARTTHEREOF) ............ $135.16
1) SEPTAGE PERMIT FEE.................................................................. $1,930.50
(FOR DISCHARGING SEPTAGE AT THE CITY'S WASTEWATER
TREATMENT PLANT)
UNIT
MONTHLY PER UNIT
MINIMUM CHARGE, PLUS
MONTHLY PER FIXTURE UNIT
PER MONTH, PLUS
MONTHLY PER UNIT
MONTHLY PER UNIT
MONTHLY PER UNIT, PLUS
PER FIXTURE UNIT
OF ESTABLISHED CITY RATE
MONTHLY PER SPACE, PLUS
PER FIXTURE UNIT
EACH LOAD
EACH LOAD
PER APPLICATION
J) SAID SEWER SERVICE CHARGES SHALL BE DEPOSITED IN THE WASTEWATER TREATMENT PLANT FUND.
- ENGINEERING: WASTEWATER -
30 of 76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
FINANCE DEPARTMENT
DESCRIPTION FEE UNIT
ACCOUNTS RECEIVABLE - LATE CHARGE
(A) UNPAID BALANCES OF $300 OR LESS ........................................ $11 PER MONTH
(EXCEPT GOVERNMENTAL AGENCIES WHICH ARE EXEMPT, ON
RECEIVABLES OVER 30 DAYS OLD. *)
(B) UNPAID BALANCES OF MORE THAN $300 .............................. 20% MONTHLY ON UNPAID
(OTHER THAN THOSE OF GOVERNMENTAL AGENCIES, DUE THE RECEIVABLE BALANCE
CITY OVER 30 DAYS OLD. *)
* NOTE: FINANCE DIRECTOR TO HAVE THE AUTHORITY TO
WAIVE CHARGES DEEMED UNECONOMICAL TO COLLECT.
ASSESSMENT DISTRICT BONDS (PER REQUEST) ......................................... $34 PER PARCEL
(INFORMATION PER PARCEL EFFECTIVE 4/1/92)
FEE TO BE WAIVED FOR REAL ESTATE BROKERS AND AGENTS
WITH VALID CITY OF PALM SPRINGS BUSINESS LICENSES, AND FOR
INQUIRIES DIRECTLY FROM THE OWNER OF THE PROPERTY IN
QUESTION.
BINGO PERMIT FEE (INITIAL ISSUANCE OR RENEWAL) ................................... $64 6 MONTH PERIOD OR LESS
BUSINESS LICENSE ADMINISTRATIVE FEE
(NOTE: INCLUDES LICENSES FOR THE EXEMPT AND NON-PROFIT
ORGANIZATIONS)
NEW BUSINESS LICENSE........................................................................... $32
RENEWED BUSINESS LICENSE.................................................................. $21
BUSINESS LICENSE STATE FEE(AB1379)1........................................... $4
STATE REGULATED FEE - DISABILITY ACCESS FEE AND CASp TRAINING
FEE EFFECTIVE 01-01-2018
CITY COUNCIL CHAMBER 13
SEE: CITY CLERK
COLLECTION FEE.............................................................................................. $57 ONETIME FEE
DANCE APPLICATION FEE............................................................................. $96 PER DANCE
CASUALDANCES........................................................................................ NO FEE
DOG LICENSE
SEE: POLICE DEPARTMENT
ESCORT ESTABLISHMENT............................................................................. $637 PER YEAR, PLUS
BUSINESS LICENSE,
PLUS FINGERPRINTING
- FINANCE -
31 of 76
DESCRIPTION
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
FINANCE DEPARTMENT
FEE UNIT
INDIVIDUAL................................................................................................. $128
FOOD HANDLERS CERTIFICATION FEE ....................................................
COLLECTED BY RIVERSIDE COUNTY HEALTH OFFICER FOR A TWO
YEAR FOOD HANDLERS CERTIFICATE.
HORSE DRAWN CARRIAGES
APPLICATIONFEE....................................................................................... $21
PERMITFEE................................................................................................. $44
SPECIAL PERMIT FEE.................................................................................. $32
MASSAGE PERMIT FEE
ESTABLISHMENT..................................................................................... $172
APPLIES TO OWNER - NOT STATE CERTIFIED
PEDICABS*
VEHICLE PERMIT FEE................................................................................. $434
DRIVER PERMIT FEE................................................................................... $567
* ON -TIME RENEWALS MAY BE SUBJECT TO LOWER COSTS.
PSYCHIC ACTIVITIES PERMIT FEE............................................................... $128
RESTAURANT SANITARY GRADE POSTING FEE .................................
RETURNED CHECKS (INSUFFICIENT FUNDS, ETC.) .......................................... $25
STATE REGULATED FEE
$35
SALES PERMITS (NOT REFUNDABLE)
AUCTION SALES PERMITS......................................................................... $108
CLOSING OUT SALES.................................................................................. $108
JEWELRY SALES INVESTIGATION FEE.............................................................
TEMPORARY EVENT PERMITS
TEMPORARY EVENT PERMIT (IF LESS THAN 4 VENDORS) .................... $36
- FINANCE -
32 of 76
PER YEAR, PLUS
BUSINESS LICENSE,
PLUS FINGERPRINTING
BACKGROUND CHECK,
PLUS BUSINESS LICENSE,
PLUS FINGERPRINTING
SEE: POLICE DEPARTMENT
PER VEHICLE / PER YEAR
PER DRIVER / PER YEAR
COLLECTED BY RIVERSIDE
COUNTY HEALTH OFFICER
FIRST OFFENSE
EACH ADDITIONAL ITEM
RETURNED
APPLICATION FEE
FILING OR RENEWAL FEE
SEE: POLICE - HAND DEALER /
PAWNBROKER LICENSE
PER EVENT, PER DAY
(IF LESS THAN 4 VENDORS)
-OR-
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
FINANCE DEPARTMENT
DESCRIPTION FEE
TEMPORARY EVENT PERMIT (FOR 4 VENDORS OR MORE) ................. $9
VALET PARKING PERMIT FEE
SPECIAL EVENT VALET PARKING PERMIT FEE ........................................ $159
TEMPORARY VALET PARKING FEE........................................................... $96
- FINANCE -
33 of 76
UNIT
PER VENDOR, PER DAY
(FOR 4 OR MORE VENDORS)
PER YEAR,
PER APPLICATION,
PER LOCATION
PER APPLICATION,
PER EVENT,
PER DAY
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
FIRE DEPARTMENT
FBR = Fully Burdened Hourly Rates
DESCRIPTION
ADMINISTRATIVE
BLUEPRINT COPY FEE
COPYING - 18X24
COPYING - 24X36
COPYING - LEGAL SIZE
COPYING - LETTER SIZE
INCIDENT REPORTS..................................................................................
FIRE / CODE RESEARCH FEE....................................................................
LATE PERMIT SUBMITTALS......................................................................
NEW PROJECT CONDITIONS - DEVELOPMENT SERVICES ..................
SERVICES NOT SPECIFICALLY LISTED ....................................................
SUBPOENAS(CIVIL)...............................................................................
DEPOSIT ONLY - ACTUAL CHARGE IS EMPLOYEE OVERTIME RATE TIMES
THE NUMBER OF HOURS PLUS FRINGE BENEFITS PLUS THE
ADMINISTRATIVE CHARGE PLUS MILEAGE (HOURS CALCULATED PORTAL
TO PORTAL)
CANNABIS BUSINESS AND ACTIVITY RELATED FEES
SEE: OFFICE OF SPECIAL PROGRAMS
FALSE ALARMS (FIRE / SMOKE / SPRINKLER)
SEE MASTER BAIL SCHEDULE (ORD. 1678)
FIRE & EMERGENCY RESPONSES ...................................................
FIRE INSPECTIONS - GENERAL
SMOKE DETECTOR INSPECTION FEE21...................................................
SMOKE DETECTOR INSPECTION FEE - IMMEDIATE NEED21 ............
(IF AVAILABLE)
ENGINE COMPANY INSPECTIONS (PER CREW HOUR) ..............................
KNOX TM BOX/SWITCH INSPECTIONS....................................................
ARSON INVESTIGATION FEE (PER HOUR) ..................................................
MULTI -RESIDENTIAL FIRE INSPECTION FEE (3 OR MORE UNITS)
(SEE: GROUP R OCCUPANCY INSPECTIONS)
FEE
$39
$243
2X OF REG FEE
$243
$48
$123
$444
$174
$222
NEW BUSINESS LICENSE INSPECTION21 $184
FIRE & LIFE SAFETY STANDBY FEE / SPECIAL SERVICES (4 HR. MIN.) $518
(FOR ALL OTHER SERVICES AND SPECIAL PURPOSES NOT
SPECIFICALLY LISTED) (SEE: POSITION RATES)
PRE-ENGINEERED FIRE SUPPRESSION SYSTEMS ................................... $353
- FIRE DEPARTMENT -
34 of 76
UNIT
CITY SET
FBR @ FIRE MARSHAL
2X OF REGULAR FEE
FBR @ FIRE MARSHAL
FBR / HOURLY
DEPOSIT (HOURLY)
FBR / HOURLY
PER INSPECTION
PER INSPECTION
PER INSPECTION
PER INSPECTION
PER HOUR
II�:�I►><j�X�1L�7�
FULLY BURDENED HOURLY
PER INSPECTION
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
FIRE DEPARTMENT
FBR = Fully Burdened Hourly Rates
DESCRIPTION FEE UNIT
AIRCRAFT HANGARS <40,000 SQ. FT ....................................................
$299
PER INSPECTION
AIRCRAFT HANGARS > 40,001- 150,000 SQ. FT ..................................
$386
PER INSPECTION
AIRCRAFT HANGARS > 150,000 SQ. FT ..................................................
$473
PER INSPECTION
GROUP B & M OCCUPANCY INSPECTIONS
<3,000 SQFT...........................................................................
$212
PER INSPECTION
3,001- 40,000 SQFT............................................................
$287
PER INSPECTION
>40,000 SQFT.....................................................................
$299
PER INSPECTION
GROUP F & 5 OCCUPANCY INSPECTIONS
<3 000 SQFT
$212
PER INSPECTION
3,001- 40,000 SQFT............................................................
$299
PER INSPECTION
>40,000 SQFT.....................................................................
$386
PER INSPECTION
HAZARDOUS MATERIALS FACILITIES......................................................
$174
HOURLY @ DFM
HIGH -PILED STORAGE FACILITIES...........................................................
$174
HOURLY @ DFM
FAILED RE -INSPECTION / ADDITIONAL FIELD INSPECTION .................
$146
PER INSPECTION
ANNUAL HIGH-RISE > 75'........................................................................
$174
HOURLY @ DFM
ANNUAL NON -HIGH-RISE 30'-74'...........................................................
$174
HOURLY @ DFM
WEED ABATEMENT / FIRE HAZARD .......................................................
$299
PER INSPECTION
SPECIAL EVENTS (4 HOUR MINIMUM PER PERSON) ......................................
$174
PER HOUR
FILM PERMIT STANDBY (4 HOUR MINIMUM PER PERSON) ..........................
$696
PER HOUR
OCCUPANT LOAD / SEATING CAPACITY DETERMINATIONS ............
$279
PER INSPECTION
NON -BUSINESS HOURS & WEEKEND INSPECTIONS ..........................
$250
FIRE INSPECTIONS - MULTI -RESIDENTIAL GROUP R OCCUPANCY
APARTMENTS & CONDOMINIUMNS (R - OCCUPANCY)
$160
HOTELS & MOTELS (R - OCCUPANCY) INSPECTIONS -
UNITS: 3-10............................................................................................
$216
APARTMENTS & CONDOMINIUMNS (R - OCCUPANCY)
INSPECTIONS - UNITS: 11-50................................................................
$200
HOTELS & MOTELS (R - OCCUPANCY) INSPECTIONS -
UNITS: 11-50...........................................................................................
$302
APARTMENTS & CONDOMINIUMNS (R - OCCUPANCY)
INSPECTIONS - UNITS: 51-75................................................................
$275
HOTELS & MOTELS (R - OCCUPANCY) INSPECTIONS -
UNITS: 51-75...........................................................................................
$410
APARTMENTS & CONDOMINIUMNS (R - OCCUPANCY)
INSPECTIONS - UNITS: 76-100.............................................................
$421
- FIRE DEPARTMENT -
35 of 76
FBR = Fully Burdened Hourly Rates
DESCRIPTION
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
FIRE DEPARTMENT
FEE
HOTELS & MOTELS (R - OCCUPANCY) INSPECTIONS -
UNITS: 76-100 ......................................................................................... $496
APARTMENTS & CONDOMINIUMNS (R - OCCUPANCY)
INSPECTIONS - UNITS: 101 + UNITS .................................................... $615
HOTELS & MOTELS (R - OCCUPANCY) INSPECTIONS -
UNITS: 101 + UNITS................................................................................ $771
FIRE INSPECTIONS - STATE 850 FIRE CLEARANCE (LICENSED FACILITIES)
RESIDENTIAL CARE FACILITIES - CLIENTS/PATIENTS: 1-6
(OCCUPANCY GRROUP R-3.1).............................................................. $212
FAMILY DAY CARE - CLIENTS: 7-25 (OCCUPANCY GROUP 1-4)........ $212
FAMILY DAY CARE - CLIENTS: >25 (OCCUPANCY GROUP 1-4)........... $299
RESIDENTIAL OR INSTITUTIONAL CARE FACILITIES -
CLIENTS/PATIENTS 7-25 (OCCUPANCY GROUPS 1-2; R-2.1; R4) ......
$357
RESIDENTIAL OR INSTITUTIONAL CARE FACILITIES -
CLIENTS/PATIENTS 26-50 (OCCUPANCY GRPS 1-2; 1-4; R-2.1) .........
$647
RESIDENTIAL OR INSTITUTIONAL CARE FACILITIES -
CLIENTS/PATIENTS 50-100 (OCCUPANCY GRPS 1-2; 1-4; R-2.1)........
$792
INSTITUTIONAL CARE FACILITIES - CLIENTS/PATIENTS: >100 .........
$966
LICENSED FACILITIES - ALL OTHER REVIEWS ......................................
$475
NEW CONSTRUCTION FIRE INSPECTIONS
NEW SINGLE FAMILY DWELLING..........................................................
NEW MULTI -RESIDENTIAL (HOTEL, MOTEL, APT., CONDO. PROJECTS) ........ $299
NEW COMMERCIAL / INDUSTRIAL....................................................... $299
RESIDENTIAL ADDITION / REMODELS .................................................
COMMERCIAL / TENNANT IMPROVEMENT ........................................
COMMERCIAL / INDUSTRIAL ADDITION OR REMODEL .....................
COMMERCIAL COOKING HOOD AND DUCT SYSTEMS ......................
WATERSYSTEMS....................................................................................
(FIRE HYDRANTS, WATER MAINS, SPRINKLER RISERS)
PRE-ENGINEERED FIRE SUPPRESSION SYSTEMS .................................
(HALON, DRY-CHEM. SYSTEM)
FIRE ALARM SYSTEMS............................................................................
FIRE SPRINKLER SYSTEMS (SINGLE FAMILY DETACHED) ...................
FIRE SPRINKLER SYSTEMS (MULTI -FAMILY 3 OR MORE UNITS) .....
FIRE SPRINKLER SYSTEMS (COMMERCIAL/ INDUSTRIAL)
0 - 35,000 SQ. FT...................................................................................
- FIRE DEPARTMENT -
36 of 76
$299
$299
$299
$299
$212
$299
$299
$734
UNIT
PLUS INSPECTION FEE AT FBR
BLDG DEPTINSP
BLDG DEPT INSP
BLDG DEPT INSP
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
FIRE DEPARTMENT
FBR = Fully Burdened Hourly Rates
DESCRIPTION FEE UNIT
FIRE SPRINKLER SYSTEMS (COMMERCIAL / INDUSTRIAL)
35,001- 75,000 SQ. FT......................................................................... $1,082
FIRE SPRINKLER SYSTEMS (COMMERCIAL / INDUSTRIAL)
75,001- 120,000 SQ. FT....................................................................... $1,430
FIRE SPRINKLER SYSTEMS (COMMERCIAL / INDUSTRIAL)
> 120, 000 SQ. FT.................................................................................. $1,430
FIRE SPRINKLER TENANT IMPROVEMENT (>10 HEADS) ................ $256
FIREPUMPS.............................................................................................
$386
FIRE STANDPIPE SYSTEMS.....................................................................
$386
FIRE SPRINKLER SYSTEM SUPERVISION & ALARMS ...........................
$212
SMOKE CONTROLS................................................................................
$386
(SMOKE & HEATVENTS, BARRIERS, ENCLOSURES, ETC.)
FIRE WATER TANKS..............................................................................
$386
UNDERGROUND WATER SUPPLY TO SPRINKLER RISER ....................
$299
PER RISER
FIRE MISCELLANEOUS............................................................................
$212
FIREFINAL.............................................................................................
$212
(USED TO FINAL A PROJECT)
FIRE RELEASE...........................................................................................
$212
(USED FOR FD RELEASE TO BUILDING DEPT.)
FIRE DEPARTMENT ONLY - MISC.
MISC. - FAILED / ADDITIONAL FIELD INSPECTIONS ..............................
$212
PER INSPECTION / HOURLY
MISC. - EXIT ANALYSIS PLANS.................................................................
$212
PER INSPECTION / HOURLY
MISC. - OCCUPANT LOAD DETERMINATIONS .......................................
$279
PER INSPECTION / HOURLY
MISC. - PLAN RESUBMITTALS..................................................................
$212
PER INSPECTION / HOURLY
MISC. - PLAN REVIEWS, OTHER..............................................................
$212
PER HOUR
PLAN CHECK DEPOSIT (FOR SERVICES NOT LISTED ABOVE) ........................
$406
PER HOUR
NEW CONSTRUCTION FIRE PLAN REVIEW
NEW SINGLE FAMILY DWELLING............................................................
$146
PER APPLICATION
NEW MULTI-RESIDENTIAL...................................................................
$362
PER APPLICATION
(HOTEL, MOTEL, APT., CONDO. PROJECTS)
NEW COMMERCIAL / INDUSTRIAL.........................................................
$362
PER APPLICATION
RESIDENTIAL ADDITION / REMODELS ....................................................
$146
PER APPLICATION
COMMERCIAL / TENNANT IMPROVEMENT ..........................................
$254
PER APPLICATION
COMMERCIAL / INDUSTRIAL ADDITION OR REMODEL .....................
$254
PER APPLICATION
COMMERCIAL COOKING HOOD AND DUCT SYSTEMS ......................
$146
PER APPLICATION
- FIRE DEPARTMENT -
37 of 76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
FIRE DEPARTMENT
FBR = Fully Burdened Hourly Rates
DESCRIPTION
WATER SYSTEMS..................................................................................
(FIRE HYDRANTS, WATER MAINS, SPRINKLER RISERS)
PRE-ENGINEERED FIRE SUPPRESSION SYSTEMS ...............................
(HALON, DRY-CHEM SYSTEM)
FIRE ALARM SYSTEMS..........................................................................
FIRE SPRINKLER SYSTEMS (SINGLE FAMILY DETACHED) ...................
FIRE SPRINKLER SYSTEMS (MULTI -FAMILY 3 OR MORE UNITS) ......
FIRE SPRINKLER SYSTEMS (COMMERCIAL/ INDUSTRIAL)
0 - 35,000 SQ.FT......................................................................................
FIRE SPRINKLER SYSTEMS (COMMERCIAL/ INDUSTRIAL)
35,001 - 75,000 SQ. FT...........................................................................
FIRE SPRINKLER SYSTEMS (COMMERCIAL/ INDUSTRIAL)
75,001- 120,000 SQ. FT.........................................................................
FIRE SPRINKLER SYSTEMS (COMMERCIAL / INDUSTRIAL)
> 120, 000 SQ.FT.....................................................................................
FIRE SPRINKLER TENANT IMPROVEMENT (>10 HEADS) ...................
FIREPUMPS.............................................................................................
FIRE STANDPIPE SYSTEMS.....................................................................
FIRE SPRINKLER SYSTEM SUPERVISION & ALARMS ...........................
SMOKE CONTROLS.................................................................................
(SMOKE & HEAT VENTS, BARRIERS, ENCLOSURES, ETC.)
FIRE WATER TANKS................................................................................
FIREMISCELLANEOUS............................................................................
FIREFINAL.............................................................................................
(USED TO FINAL PROJECT)
FIRE RELEASE...........................................................................................
(USED FOR FD RELEASE TO BUILDING DEPT.)
UNDERGROUND WATER SUPPLY TO SPRINKLER RISER ...................
(PER RISER)
FIRE DEPARTMENT ONLY - MISC.
FEE
UNIT
$254 PER APPLICATION
$254 PER APPLICATION
$254
PER APPLICATION
$146
PER APPLICATION
$254
PER APPLICATION
$362 PER APPLICATION
$362 PER APPLICATION
$362 PER APPLICATION
$362
PER APPLICATION
$146
PER APPLICATION
$254
PER APPLICATION
$254
PER APPLICATION
$146
PER APPLICATION
$254
PER APPLICATION
$254
PER APPLICATION
$146
* + INSPECTION AT FBR
$146
* + INSPECTION AT FBR
$146 * + INSPECTION AT FBR
$299 * + INSPECTION AT FBR
MISC. - FAILED / ADDITIONAL FIELD INSPECTIONS .............................. $0
MISC. - EXIT ANALYSIS PLANS................................................................. $254
MISC. - OCCUPANT LOAD DETERMINATIONS ....................................... $256
MISC. - PLAN RESUBMITTALS.................................................................. $108
MISC. - PLAN REVIEWS, OTHER.............................................................. $108
- FIRE DEPARTMENT -
38 of 76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
FIRE DEPARTMENT
FBR = Fully Burdened Hourly Rates
DESCRIPTION
FEE
UNIT
CONTRACT PLAN CHECK FEE (ADMINISTRATIVE SURCHARGE 15%) ..........
%
NOTE: LEAVE BLANK
FIRE PREVENTION PLAN REVIEW AND INSPECTION FEE
NEW SINGLE FAMILY DWELLING............................................................
$288
* + INSPECTION AT FBR
NEW MULTI-RESIDENTIAL...................................................................
$633
* + INSPECTION AT FBR
(HOTEL, MOTEL, APT., CONDO. PROJECTS)
NEW COMMERCIAL / INDUSTRIAL.........................................................
$633
* + INSPECTION AT FBR
RESIDENTIAL ADDITION / REMODELS ....................................................
$288
* + INSPECTION AT FBR
COMMERCIAL / TENNANT IMPROVEMENT ..........................................
$460
* + INSPECTION AT FBR
COMMERCIAL / INDUSTRIAL ADDITION OR REMODEL .....................
$460
* + INSPECTION AT FBR
COMMERCIAL COOKING HOOD AND DUCT SYSTEMS ......................
$288
* + INSPECTION AT FBR
WATER SYSTEMS..................................................................................
$460
* + INSPECTION AT FBR
(FIRE HYDRANTS, WATER MAINS, SPRINKLER RISERS)
PRE-ENGINEERED FIRE SUPPRESSION SYSTEMS .................................
$460
* + INSPECTION AT FBR
(HALON, DRY-CHEM. SYSTEM)
FIRE ALARM SYSTEMS..........................................................................
$460
* + INSPECTION AT FBR
FIRE SPRINKLER SYSTEMS....................................................................
$288
* + INSPECTION AT FBR
(SINGLE FAMILY DETACHED)
FIRE SPRINKLER SYSTEMS....................................................................
$460
* + INSPECTION AT FBR
(MULTI -FAMILY 3 OR MORE UNITS)
FIRE SPRINKLER SYSTEMS.................................................................... $633 * + INSPECTION AT FBR
(COMMERCIAL / INDUSTRIAL)
UNDERGROUND WATER SUPPLY TO SPRINKLER RISER ................. $288 * + INSPECTION AT FBR
(PER RISER)
FIRE MISCELLANEOUS $146 * + INSPECTION AT FBR
(SPECIAL EVENTS, TRADESHOWS, LUP'S, ETC.) .................................
* STATED FEE FOR THE ABOVE PROJECTS IS FOR PLAN REVIEW. INSPECTION FEES WILL BE ADDED AT THE FULLY -
BURDENED RATE OF THE EMPLOYEE CONDUCTING THE INSPECTION. THE APPLICANT WILL BE REQUIRED TO PLACE A
DEPOSIT FEE FOR THE ANTICIPATED INSPECTION FEE AT THE TIME THE PERMIT IS ISSUED AT THE DESCRETION OF THE
FIRE CHIEF.
OPERATIONAL PERMITS (* DENOTES A RENEWAL PERMIT)
FIRST TIME PLAN REVIEW........................................................................ $146
AEROSOL PRODUCTS *............................................................................ $386 PLUS INSPECTION FEES AT
FBR
- FIRE DEPARTMENT -
39 of 76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
FIRE DEPARTMENT
FBR = Fully Burdened Hourly Rates
DESCRIPTION FEE UNIT
AIRCRAFT REFUELING VEHICLE *............................................................
$270
INSPECTION INCLUDED
AIRCRAFT REPAIR HANGER *..................................................................
$386
PLUS INSPECTION FEES AT
FBR
AMUSEMENT BUILDINGS........................................................................
$386
INSPECTION INCLUDED
AUTO WRECKING YARD *........................................................................
$212
PLUS INSPECTION FEES AT
FBR
AVIATION FACILITIES *.............................................................................
$386
PLUS INSPECTION FEES AT
FBR
BATTERY SYSTEMS *.................................................................................
$212
PLUS INSPECTION FEES AT
FBR
CANDLES AND OPEN FLAMES IN ASSEMBLY AREAS * .........................
$301
CARNIVALS / FAIRS / CIRCUS..................................................................
$212
INSPECTION INCLUDED
CELLULOSE NITRATE FILM STORAGE *..................................................
$212
PLUS INSPECTION FEES AT
FBR
COMBUSTIBLE DUST OPERATIONS.........................................................
$212
PLUS INSPECTION FEES AT
FBR
COMBUSTIBLE MATERIALS STORAGE *.................................................
$212
PLUS INSPECTION FEES AT
FBR
COMMERCIAL RUBBISH HANDLING OPERATION * ..............................
$386
PLUS INSPECTION FEES AT
FBR
COMPRESSED GASSES *..........................................................................
$212
PLUS INSPECTION FEES AT
FBR
CRYOGENIC FLUIDS *...............................................................................
$212
PLUS INSPECTION FEES AT
FBR
CUTTING & WELDING *...........................................................................
$386
PLUS INSPECTION FEES AT
FBR
DRY CLEANING PLANTS *........................................................................
$212
PLUS INSPECTION FEES AT
FBR
DUST PRODUCING OPERATION *...........................................................
$212
PLUS INSPECTION FEES AT
FBR
EXHIBITS & TRADE SHOWS......................................................................
$212
PLUS INSPECTION FEES AT
FBR
EXPLOSIVES OR BLASTING AGENTS *....................................................
$212
PLUS INSPECTION FEES AT
FBR
- FIRE DEPARTMENT -
40 of 76
FBR = Fully Burdened Hourly Rates
DESCRIPTION
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
FIRE DEPARTMENT
FEE
FIRE HYDRANTS & VALVES (FLOW TESTS) ................................................. $146
FIRE PERFORMANCES (DANCERS/BATON, ETC.) ................................. $165
FIREWORKS (MANUFACTURE, COMPOUND, STORE) *.................................... $386
FIREWORKS PYROTECHNIC DISPLAYS (INDOOR / OUTDOOR)
(4 HOUR MINIMUM)............................................................................
FIREWORKS PYROTECHNIC SPECIAL EFFECTS (THEATRICAL /
MOVIES) (4 HOUR MINIMUM)...........................................................
FLAMMABLE & COMBUSTIBLE LIQUIDS -CONTAINERS / TANKS * .
FLAMMABLE & COMBUSTIBLE LIQUIDS -TANK REMOVAL*
(4 HOUR MINIMUM)...........................................................................
FLAMMABLE & COMBUSTIBLE LIQUIDS -UNDERGROUND TANKS
$165
$165
UNIT
INSPECTION INCLUDED
PER INSPECTION
PLUS INSPECTION FEES AT
FBR
PLUS STANDBY FEES
PLUS STANDBY FEES
$212 PLUS INSPECTION FEES AT
FBR
$165 FBR PER HR X 4 HOURS
$212
FLAMMABLE & COMBUSTIBLE LIQUIDS *............................................. $212
FUMIGATION OR THERMAL INSECTICIDE FOGGING ........................... $339
HAZARDOUS MATERIALS (STORAGE / USE) *............................................ $386
HIGH -PILED STORAGE *........................................................................... $386
HOT WORK, CUTTING & GRINDING OPERATIONS ............................... $339
IMPAIRMENTS (PLANNED) - FIRE PROTECTION SYSTEMS ...................... $513
KNOX BOX - RESIDENTIAL *..................................................................... $125
LIQUEFIED PETROLEUM GASES (STORE, USE, HANDLE, DISPENSE) * ......... $447
LIQUID / GAS -FUELED VEHICLES IN AN ASSEMBLY .............................. $212
LUMBER YARDS *..................................................................................... $212
- FIRE DEPARTMENT -
41 of 76
PLUS INSPECTION FEES AT
FBR
PLUS INSPECTION FEES AT
FBR
PLUS INSPECTION FEES AT
FBR
PLUS INSPECTION FEES AT
FBR
PLUS INSPECTION FEES AT
FBR
PLUS INSPECTION FEES AT
FBR
PLUS INSPECTION FEES AT
FBR
PLUS INSPECTION FEES AT
FBR
PLUS INSPECTION FEES AT
FBR
PLUS INSPECTION FEES AT
FBR
PLUS INSPECTION FEES AT
FBR
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
FIRE DEPARTMENT
FBR = Fully Burdened Hourly Rates
DESCRIPTION FEE UNIT
MISC. COMBUSTIBLE STORAGE > 2,500 CIF *........................................
$212
PLUS INSPECTION FEES AT
FBR
MOTOR VEHICLE FUEL DISPENSING STATION *.......................... I........
$212
PLUS INSPECTION FEES AT
FBR
OPEN FIRES (INCLUDES RECREATIONAL & BONFIRES) ......................................
$212
PLUS INSPECTION FEES AT
FBR
ORGANIC COATINGS *.............................................................................
$212
PLUS INSPECTION FEES AT
FBR
PARADE FLOATS........................................................................................
$125
PLUS INSPECTION FEES AT
FBR
PLACES OF ASSEMBLY (50-100 OCCUPANTS) *...........................................
$212
PLUS INSPECTION FEES AT
FBR
PLACES OF ASSEMBLY (101-300 OCCUPANTS) *.........................................
$299
PLUS INSPECTION FEES AT
FBR
PLACES OF ASSEMBLY (OVER 300 OCCUPANTS) *.......................................
$386
PLUS INSPECTION FEES AT
FBR
PLANT EXTRACTION.................................................................................
$386
PLUS INSPECTION FEES AT
FBR
PRIVATE FIRE HYDRANTS *.....................................................................1
$212
PLUS INSPECTION FEES AT
FBR
RADIOACTIVE MATERIALS *....................................................................
$212
PLUS INSPECTION FEES AT
FBR
REFRIGERATION EQUIPMENT *..............................................................
$212
PLUS INSPECTION FEES AT
FBR
REPAIR GARAGES *...................................................................................
$212
PLUS INSPECTION FEES AT
FBR
SPRAYING OR DIPPING *.................................... ...
................................. .
$212
PLUS INSPECTION FEES AT
FBR
TENTS, CANOPIES OR MEMBRANE STRUCTURES < 400 SQ FT ...........
$266
PLUS INSPECTION FEES AT
FBR
TENTS, CANOPIES OR MEMBRANE STRUCTURES > 400 SQ FT ...........
$320
PLUS INSPECTION FEES AT
FBR
TIRE STORAGE *........................................................................................
$212
PLUS INSPECTION FEES AT
FBR
WASTE HANDLING FACILITIES *.............................................................
$212
PLUS INSPECTION FEES AT
FBR
- FIRE DEPARTMENT -
42 of 76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
FIRE DEPARTMENT
FBR = Fully Burdened Hourly Rates
DESCRIPTION FEE UNIT
WELDING / CUTTING OPERATIONS *..................................................... $212 PLUS INSPECTION FEES AT
FBR
WOOD PRODUCTS * .............................................................. ................... $212 PLUS INSPECTION FEES AT
FBR
OPERATING WITHOUT REQUIRED PERMIT (2X PERMIT FEE)* ................. PERMIT FEE PLUS 2X PERMIT FEE*
POSITION RATES (FBR)
DEPUTY FIRE CHIEF (40 HOUR)..................................................................
$240
PER HOUR
FIRE BATTALION CHIEF............................................................................
$230
PER HOUR
FIRE CAPTAIN............................................................................................
$222
PER HOUR
PREVENTION CAPTAIN (40 HOUR).............................................................
$174
PER HOUR
SUPPRESSION CAPTAIN / PARAMEDIC (CAPT. PLUS 5%) ..........................
$183
PER HOUR
DEPUTY FIRE MARSHAL...........................................................................
$243
PER HOUR
FIRE ENGINEER..........................................................................................
$174
PER HOUR
FIRE ENGINEER / PARAMEDIC.................................................................
$155
PER HOUR
FIREFIGHTER / PARAMEDIC.....................................................................
$164
PER HOUR
FIREFIGHTER..............................................................................................
$138
PER HOUR
EMERGENCY SERVICES COORDINATOR .................................................
$95
PER HOUR
PLANS EXAMINER II (40 HOUR)..................................................................
$108
PER HOUR
FIRE PREVENTION SPECIALIST (40 HOUR) .................................................
$108
PER HOUR
CLERICAL....................................................................................................
$58
PER HOUR
RENEWABLE PERMIT FEES (SEE: OPERATIONAL PERMITS)
SAFETY TRAINING
SAFETY TRAINING TO INCLUDE, BUT NOT BE LIMITED TO CARDIOPULMONARY RESUSCITATION (CPR), & C.A.R.E.S. (COMMUNITY
ASSISTANCE AND RESPONSE TO EMERGENCY SITUATIONS) TRAINING; MEDICAL AID DURING EMERGENCY/DISASTER, EMERGENCY
PREPAREDNESS/RESPONSE AND BASICS OF FIRE EXTINGUISHMENT, LIGHT SEARCH AND RESCUE, AND INTRODUCTION TO
DISASTER PSYCHOLOGY AND COMMUNITY EMERGENCY RESPONSE TEAMS (CERT).
3 HOUR CLASS / MINIMUM CLASS SIZE - 6 (PLUS COURSE MATERIALS)
4 HOUR CLASS / MINIMUM CLASS SIZE - 6 (PLUS COURSE MATERIALS)
5 HOUR CLASS / MINIMUM CLASS SIZE - 6 (PLUS COURSE MATERIALS)
6 HOUR CLASS / MINIMUM CLASS SIZE - 6 (PLUS COURSE MATERIALS)
8 HOUR CLASS / MINIMUM CLASS SIZE - 6 (PLUS COURSE MATERIALS)
4 HOUR CLASS / MINIMUM CLASS SIZE - 4 (PLUS COURSE MATERIALS)
FIRE EXTINGUISHER TRAINING (DEPUTY FIRE MARSHAL FBR) ...................
- FIRE DEPARTMENT -
43 of 76
$94
PER STUDENT (CLASS OF 6)
$123
PER STUDENT (CLASS OF 6)
$152
PER STUDENT (CLASS OF 6)
$181
PER STUDENT (CLASS OF 6)
$239
PER STUDENT (CLASS OF 6)
$184
PER STUDENT
$181
PER HOUR,
20 STUDENT CLASS
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
FIRE DEPARTMENT
FBR = Fully Burdened Hourly Rates
DESCRIPTION FEE UNIT
SPECIAL EVENTS STANDBY (I.E. PARADES, ETC.)
ENGINE (S/CAP, ENG, FF/P)................................................................................. $521 PER HOUR / CREW OF 3
LADDER TRUCK (S/CAP, ENG, FF/P)............................................................ $521 PER HOUR / CREW OF 3
WATER TENDER (2-ENG)........................................................................... $348 PER HOUR / CREW OF 2
COMMAND (BC)......................................................................................... $230 PER HOUR / CREW OF 1
FIRE ATTACK (ENG, FF/P)........................................................................... $338 PER HOUR / CREW OF 2
MEDIC SQUAD (2-FF/P)............................................................................. $328 PER HOUR / CREW OF 2
UNDERGROUND STORAGE TANKS (SEE: OPERATIONAL PERMITS)
- FIRE DEPARTMENT -
44 of 76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
GOLF COURSE
DESCRIPTION FEE UNIT
DISCOUNTS
FOR REGULATIONS CONCERNING; DISCOUNT CARDS, ANNUAL RENEWAL OF DISCOUNT CARD, JR. GOLF, PSHS
GOLF TEAM, RESERVATIONS, HOLIDAYS, PROMOTIONAL/TOURNAMENT RATES, PRIVATE CARTS, PRIME TIME,
RESIDENCE DEFINED
RESIDENT DISCOUNT CARDS.................................................................... $34
GREEN FEES (INCLUDES CART)
RESORT COURSE
OCTOBER THRU DECEMBER 23..................................................... $52
$60
DECEMBER 24 THRU MAY.............................................................. $56
$62
JUNE THRU SEPTEMBER................................................................. $25
$34
LEGEND COURSE
OCTOBER THRU DECEMBER 23..................................................... $31
$37
DECEMBER 24 THRU MAY.............................................................. $37
$42
JUNE THRU SEPTEMBER................................................................. $11
$23
- GOLF COURSE -
45 of 76
ANNUAL FEE
MON -THUR
FRI - SUN & HOLIDAYS
MON - THURS
FRI - SUN & HOLIDAYS
MON -THURS
FRI - SUN & HOLIDAYS
MON -THUR
FRI - SUN & HOLIDAYS
MON - THUR
FRI -SUN & HOLIDAYS
MON -THURS
FRI - SUN & HOLIDAYS
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
LIBRARY
DESCRIPTION FEE UNIT
BARCODE OR RFID TAGS REPLACEMENT FEE ....................................... $1
CHARGES - PRINTERS / COPIERS
COPIERS..................................................................................................... $0.25 PER COPY
MICROFILM.............................................................................................. $0.25 PER COPY
MICROFICHE............................................................................................ $0.25 PER COPY
DAMAGE & CLEANING FEES FOR CASINGS
AUDIO BOOK CASE.................................................................................. $9
CD & DVD CASE........................................................................................ $2
DAMAGE CHARGES....................................................................................... REPLACEMENT COST PLUS
$10.00 PROCESSING FEE
DAMAGED BEYOND REPAIR...................................................................... REPLACEMENT COST PLUS
$10.00 PROCESSING FEE
FEES AND CHARGES
RESEARCH (GREATER THAN 20 MINUTES) .........................................
$55
PER HOUR
COPIES FOR RESEARCH..........................................................................
$6
INTERLIBRARY LOAN REQUEST.................................................................
$5
PER REQUEST
INTERNET PRINTING......................................................................................
$0.25
PER PAGE
LOST (BOOKS, DVDS, CD, AUDIO BOOKS)...............................................................
REPLACEMENT COST PLUS
$10.00 PROCESSING
FEE
LOST / DAMAGED ITEM IN SET..................................................................
$11
PER ITEM
DELIQUENT COLLECTION FEE
$10
EACH ACCOUNT SENT TO
COLLECTIONS
NON -PICKUP OF INTERLIBRARY LOANS (WITHIN S DAYS) ....................... $5 EACH
REGISTRATION
RESIDENT BORROWERS......................................................................... FREE
NON-RESIDENT BORROWERS
ONE CARD FOR 1 MONTH............................................................
$11 MONTHLY
ONE CARD FOR 3 MONTHS...........................................................
$22
ONE CARD FOR 1 YEAR..................................................................
$33
TWO CARDS FOR 1 YEAR * ................... ........................................
$44
*FOR 2 ADULTS AT THE SAME ADDRESS
REPLACEMENT CARD..............................................................................
$1 PER CARD
SLIGHT DAMAGE OR DEFACEMENT.........................................................
$5 PER ITEM
- LIBRARY -
46 of 76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
LIBRARY
DESCRIPTION FEE UNIT
THE LEARNING CENTER RENTAL**
ROOM RENTAL (HALF DAY)..................................................................... $132 UP TO 4 HOURS / HALF DAY
ROOM RENTAL (FULL DAY)..................................................................... $265 UP TO 8 HOURS / FULL DAY
NON-PROFIT RATE.................................................................................. 50% OF THE ABOVE FEE
SET-UP....................................................................................................... $28
WELWOOD / CORNELIA WHITE COMMUNITY ROOM / WELWOOD RENTAL**
ROOM RENTAL.......................................................................................
$220
UP TO 4 HOURS
ROOM RATE...........................................................................................
$661
UP TO 12 HOURS
NON-PROFIT RATES (HALF DAY) .........................................................
50%
OF THE ABOVE FEE
NON-PROFIT RATES (FULL DAY) .........................................................
50%
OF THE ABOVE FEE
SET-UP....................................................................................................
$28
LIBRARY -ATRIUM **
ROOM RENTAL.......................................................................................
$220
UP TO 4 HOURS
ROOM RATE...........................................................................................
$661
UP TO 8 HOURS
NON-PROFIT RATES (HALF DAY) .................................... I....................
50%
OF THE ABOVE FEE
NON-PROFIT RATES (FULL DAY) .........................................................
50%
OF THE ABOVE FEE
SET-UP....................................................................................................
$28
ATTENDANT..........................................................................................
$68
PER HOUR
MUNICIPAL ALCOHOL BEVERAGE
IN ADDITION TO FACILITY RENTAL FEE AND ANY APPLICABLE POLICE DEPARTMENT FEES
ROOM RENTAL.......................................................................................
$112
UP TO 4 HOURS
ROOM RATE...........................................................................................
$223
UP TO 8 HOURS
NON-PROFIT RATES (HALF DAY) .........................................................
50%
OF THE ABOVE FEE
NON-PROFIT RATES (FULL DAY) .........................................................
50%
OF THE ABOVE FEE
SET-UP....................................................................................................
$28
** CANCELLATION POLICY:
REFUNDABLE WITHIN 72 HOURS BEFORE SCHEDULED RENTAL OTHERWISE FEE IS FORFEITED AND DUE UPON RECEIPT
OF INVOICE.
- LIBRARY -
47 of 76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
SPECIAL PROGRAM COMPLIANCE
CANNABIS BUSINESS AND ACTIVITY
DESCRIPTION FEE UNIT
CANNABIS BUSINESS AND ACTIVITY R24467
APPLICATION FEE................................................................................. $4,092
RELATED FIRE INSPECTION FEES
APPLICATION REVIEWS ....................................... $239
DISPENSARY INSPECTIONS ................................ $185
CULTIVATION INSPECTIONS .............................. $468
MANUFACTURING INSPECTIONS ...................... $558
DISPENSARY WITH CULTIVATION INSPECTIONS
......................................................................................
$653
CULTIVATION WITH MANUFACTURING
$1,025
INSPECTIONS.........................................................
DISPENSARY WITH CULTIVATION &
MANUFACTURING INSPECTIONS ......................
$1,210
FIRE CODE RESEARCH FEES .................................
$239
COMPRESSED GASES (CO2)
[CULTIVATION; MANUFACTURING] ..................
$485
HAZADOUS MATERIALS [MANUFACTURING] ...
$485
INDUSTRIAL OVENS [MANUFACTURING] ..........
$485
GAS DETECTION SYSTEMS
[CULTIVATION; MANUFACTURING] ...............
$485
PLANT EXTRACTION SYSTEMS
[MANUFACTURING] .............................................
$485
RELATED ENGINEERING/PUBLIC WORKS INSPECTION FEES
PUBLIC WORKS INSPECTION .............................. $95
APPLIES TO CANNABIS PROJECTS INVOLVING
WORK THAT PROVES NECESSARY IN RIGHT-OF-
WAY, OR IN A GROUND -UP BUILD.
RELATED POLICE INSPECTION FEES
PER APPLICATION
IF REQUIRED
PER HOUR
DISPENSARY INSPECTION ............................ $157
CULTIVATION / MANUFACTURING
INSPECTION .................................................. $157
CANNABIS RELATED LIVE SCAN REVIEW
(FOR NON -OWNERS / OPERATORS) ............ $36 EACH EMPLOYEE
APPEAL FEE..................................................................................... $3,581 EACH APPEAL
SPECIAL PROGRAM COMPLIANCE:
- CANNABIS BUSINESS AND ACTIVITY -
48 of 76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
SPECIAL PROGRAM COMPLIANCE
CANNABIS BUSINESS AND ACTIVITY
DESCRIPTION FEE
PERMIT RE -ISSUANCE / REPLACEMENT FEE ............................ $102
RENEWAL APPLICATION.................................................................... $1,000
FEE DUE AT TIME OF FILING RENEWAL APPLICATION
AUDIT FEE............................................................................ $2,000
APPLICABLE ONLY TO RETAIL SALES, MANUFACTURING, AND
DISTRIBUTION
BACKGROUND FEE.............................................................. $261
IF ADDING OWNER(S) OR OPERATOR(S)
SITE INSPECTION(S) AT COST
EXTRA SERVICES AT COST
SPECIAL PROGRAM COMPLIANCE:
- CANNABIS BUSINESS AND ACTIVITY -
49 of 76
UNIT
PER RENEWAL APPLICATION;
PLUS AUDIT FEE (IF
APPLICABLE)
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
SPECIAL PROGRAM COMPLIANCE
VACATION RENTAL
DESCRIPTION FEE
VACATION RENTALS23
VACATION RENTAL
NEW REGISTRATION........................................................................ $944
RENEWAL.......................................................................................... $944
HOMESHARE
NEW REGISTRATION........................................................................ $236
RENEWAL.......................................................................................... $236
APPEAL OF VACATION RENTAL OR HOMESHARE SUSPENSION /
REVOCATION / PERMANENT INELIGIBILITY, OPERATING WITHOUT
CERTIFICATE; ONLY APPLICABLE TO CITATIONS WITH PENALTY
GREATER THAN $1,000.......................................................... $802
TRANSFER FEE........................................................................................ $153
SPECIAL PROGRAM COMPLIANCE:
- VACATION RENTAL -
50 of 76
UNIT
PER APPLICATION
PER RENEWAL
PER APPLICATION
PER RENEWAL
PER OCCURRENCE
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
PARKS & RECREATION
DESCRIPTION FEE
ASSOCIATION FEE (PER YEAR)
RESIDENT
ADULT (INDIVIDUAL)...................................................................... $5
YOUTH(AGES 4-12)........................................................................ $5
NON-RESIDENT
ADULT (INDIVIDUAL)...................................................................... $95
YOUTH (AGES 4-12)........................................................................ $25
BANNERS
CASTLE
FIRSTWEEK.................................................................................... $21
ADDITIONAL WEEKS.................................................................... $6
STREET
INSTALL, DISPLAY AND REMOVE ............................................... $236
COMMERCIAL FILMING / PHOTOGRAPHY PERMITS"
FACILITIES FEE: FACILITIES MANAGED BY VARIOUS CITY
DEPARTMENTS HAVE FEE SCHEDULES ESTABLISHED FOR THEIR USE.
USE FEES APPROPRIATE TO THESE FACILITIES WILL BE APPLIED IN
ADDITION TO APPLICATION AND LOCATION FEES.
PRODUCTION PERMIT (FILMING MOTION PICTURE)
THE APPLICATION FEE.......................................................................... $172
LOCATION FEE
PERDAY................................................................................. $46
PER WEEK (7 DAY PERIOD) ..................................................... $229
SERVICE FEE: FEES WILL BE CHANGED TO COVER EXPENSES TO THE
CITY FOR PERSONNEL, EQUIPMENT, AND VEHICLE EXPENSES
INCURRED BY THE CITY TO ASSIST FILM PROJECT. THIS WILL
REFLECT ACTUAL COST TO THE CITY AND ARE APPLIED, IN ADDITION
TO APPLICATION AND LOCATION FEES.
STILL PHOTOGRAPHY
APPLICATION FEE.......................................................................... $86
LOCATION FEE................................................................................ $17
- PARKS / RECREATION -
51 of 76
UNIT
PER PRODUCTION
PER DAY -OR-
PER WEEK (7 DAY PERIOD)
PER PRODUCTION
PER DAY
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
PARKS & RECREATION
DESCRIPTION FEE
DEMUTH COMMUNITY CENTER11
APPLICATION DEPOSIT.......................................................................... $344
$573
FACILITY ATTENDANT...........................................................................
$39
GYMNASIUM (MAX. OCCUPANCY 320)
BASE RENT (4 HOURS - INCLUDING SET-UP & CLEAN-UP) .......................
$460
EXTENDED USE (PER HOUR - AFTER THE BASE RENT) ................
$31
MULTI -PURPOSE ROOM (MAX. OCCUPANCY 100)
BASE RENT (4 HOURS - INCLUDING SET-UP & CLEAN-UP) .......................
$153
EXTENDED USE (PER HOUR - AFTER THE BASE RENT) ................
$34
KITCHENUSE FEE..........................................................................
$102
MUNICIPAL ALCOHOLIC BEVERAGE FEE ............................................
$39
UNIT
NO ALCOHOL -
DEPOSIT ONLY
WITH ALCOHOL -
DEPOSIT ONLY
PER HOUR
PER MEETING
PER HOUR - OVER 4 HOURS
FIRST HOURS
PER HOUR - OVER 4 HOURS
DESERT HIGHLAND CENTER 11
APPLICATION DEPOSIT.......................................................................... $344 NO ALCOHOL -
DEPOSIT ONLY
$573 WITH ALCOHOL -
DEPOSIT ONLY
FACILITY ATTENDANT........................................................................... $39 PER HOUR
RESIDENT FACILITY RENTAL
BASE RENT- MEETINGS (DAILY) .................................................... $52 PER MEETING
NON-RESIDENT FACILITY RENTAL
BASE RENT....................................................................................... $172 FIRST 4 HOURS
EXTENDED USE (PER HOUR - AFTER THE BASE RENT) .............. $34 PER HOUR - OVER 4 HOURS
MUNICIPAL ALCOHOLIC BEVERAGE FEE ............................................ $39
PROGRAMS
EARLY CHILDHOOD LITERACY (ECL)
RESIDENT.............................................................................. $20 PER MONTH
NON-RESIDENT.................................................................... $175 PER MONTH
SUMMER CAMP
RESIDENT.............................................................................. $5 PER WEEK
NON-RESIDENT.................................................................... $85 PER WEEK
- PARKS / RECREATION -
52 of 76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
PARKS & RECREATION
DESCRIPTION FEE UNIT
AFTER SCHOOL STUDY
RESIDENT......................................................................................... NO FEE
NON-RESIDENT................................................................................ $52 PER MONTH
SPRING / WINTER CAMP
RESIDENT......................................................................................... $5 PER WEEK
NON-RESIDENT................................................................................ $60 PER WEEK
LEISURE CENTER
CASHIER....................................................................................................
$1
PER TRANSACTION
COMMUNITY ROOM 11
APPLICATION DEPOSIT.................................................................
$64
ATTENDANT....................................................................................
$39
PER HOUR
BASE RENT
COMMERCIAL
MEETINGS (UP To 3 HOURS) ..........................................
$190
PER MEETING
EVENTS (DAILY).............................................................
$216
PER EVENT
RESIDENTS
MEETINGS (3 HOURS) ...................................................
$76
PER MEETING
EVENTS (DAILY).............................................................
$128
PER EVENT
TAX-EXEMPT / NON-PROFIT 4
MEETINGS (3 HOURS) ...................................................
$108
PER MEETING
EVENTS (DAILY).............................................................
$108
PER EVENT
NON-RESIDENT STANDARD, NON-PROFIT & COMMERCIAL
FEES............................................................
125%
OF CURRENT BASE EVENT
MUNICIPAL ALCOHOLIC BEVERAGE FEE ............................................
$39
DANCE STUDIO 11
APPLICATION DEPOSIT................................................................
$32
ATTENDANT....................................................................................
$39
BASE RENT (3 HOURS)
COMMERCIAL.......................................................................
$128
RESIDENTS..............................................................................
$76
TAX-EXEMPT/ NON - PROFIT4...........................................
$38
EXTENDED USE (PER HOUR -AFTER THE BASE RENT) ........
$25
PER HOUR AFTER BASE RENT
NON-RESIDENT STANDARD, NON-PROFIT & COMMERCIAL
FEES............................................................
125%
OF CURRENT BASE EVENT
- PARKS / RECREATION -
53 of 76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
PARKS & RECREATION
DESCRIPTION FEE UNIT
MUNICIPAL ALCOHOL BEVERAGE FEE
COMMERCIAL, RESIDENTS, TAX-EXEMPT/ NON-PROFIT° ............. $39
PALM SPRINGS STADIUM 11
APPLICATION DEPOSIT.......................................................................... $1,145 DEPOSIT ONLY
BASE RENT -DAILY
COMMERCIAL................................................................................. $1,909
RESIDENT......................................................................................... $922
TAX-EXEMPT / NON-PROFIT 4................................................... $444
LIGHTS...................................................................................................... $32 PER HOUR,
MINIMUM 2 HOURS
MUNICIPAL ALCOHOLIC BEVERAGE FEE ............................................ $39
FIELD PREPARATION.............................................................................. $52
NON-RESIDENT STANDARD, NON-PROFIT & COMMERCIAL FEES 125% OF CURRENT BASE RENT
PARK & PLAYFIELD RESERVATIONS AND USE 11
NON-RESIDENT STANDARD, NON-PROFIT & COMMERCIAL FEES
125%
OF CURRENT BASE RENT
PICNIC AREA RESERVATION - ALL PARKS
APPLICATION DEPOSIT.................................................................
$115
DEPOSIT ONLY
BASE RENT (3 HOURS)
COMMERCIAL.........................................................................
$166
RESIDENTS..............................................................................
$96
TAX-EXEM PT / NON-PROFIT 4.............................................
$96
PLAYING FIELDS - SOCCER (MINIMUM 2 HOURS)
FIELD RENTAL
LEAGUES.................................................................................
$50
PER FIELD, PLUS
$52
PER DAY FOR PREPARATION
TOURNAMENT......................................................................
$50
PER FIELD, PLUS
$52
PER DAY FOR PREPARATION
LIGHTS
DEMUTH PARK...................................................................... $32 PER HOUR,
MINIMUM 2 HOURS
RESERVATIONS............................................................................. $10
- PARKS / RECREATION -
54 of 76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
PARKS & RECREATION
DESCRIPTION FEE UNIT
PLAYFIELDS - SOFTBALL & BASEBALL (MINIMUM 2 HOURS)
FIELD RENTAL
LEAGUES................................................................................. $50 PER FIELD, PLUS
$52 PER DAY FOR PREPARATION
RESIDENTS............................................................................. $26 PER HOUR
TAX-EXEMPT / NON - PROFIT 4........................................... $26 PER HOUR
TOURNAMENT...................................................................... $50 PER TEAM
LIGHTS
DEMUTH PARK...................................................................... $32 PER HOUR,
MINIMUM 2 HOURS
PAVILION WAY (CERRITOS RD) PRACTICE FIELD ................. $32 PER HOUR,
MINIMUM 2 HOURS
RESERVATIONS............................................................................... $10
PAVILION 2,11
EVENTS (8 HOURS), WITHOUT ALCOHOL .............................................. $639
EVENTS (8 HOURS), WITH ALCOHOL ...................................................... $887
MEETINGS (UP TO 3 HOURS)..................................................................... $128
ATTENDANT............................................................................................ $39 PER HOUR
BASE RENT
COMMERCIAL
EVENTS (8 HOURS)........................................................................... $1,271
MEETINGS (UP TO 3 HOURS)............................................................ $540
RESIDENTS
EVENTS (8 HOURS)..........................................................................
$1,080
PER EVENT
MEETINGS (UP TO 3 HOURS)........................................................
$319
PER EVENT
TAX-EXEMPT / NON-PROFIT4
EVENTS (8 HOURS)..........................................................................
$540
PER EVENT
MEETINGS (UP TO 3 HOURS).........................................................
$159
PER MEETING
NON-RESIDENT STANDARD, NON-PROFIT & COMMERCIAL
FEES............................................................
125%
OF CURRENT BASE EVENT
KITCHEN USE FEE (RESIDENT & NON - RESIDENT) .................................... $237 PER RENTAL
MUNICIPAL ALCOHOLIC BEVERAGE FEES .......................................... $39
- PARKS / RECREATION -
55 of 76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
PARKS & RECREATION
DESCRIPTION FEE UNIT
PROGRAMS
FITNESS CENTER
DROP IN FEE (DAILY)..................................................................
$5
PER PERSON, PER CLASS
MONTHLY (INDIVIDUAL).......................................................
$20
PER PERSON, PER MONTH
MONTHLY (FAMILY)............................................................
$30
PER FAMILY, PER MONTH
CAMP
SUMMER CAMP**
RESIDENT
PARTIAL DAY................................................................
$75
PER WEEK
FULL DAY......................................................................
$115
PER WEEK
NON-RESIDENT
PARTIAL DAY................................................................
$95
PER WEEK
FULL DAY......................................................................
$145
PER WEEK
CAMP CHIC-A-POO***
RESIDENT
PARTIAL DAY................................................................
$75
PER WEEK
FULL DAY......................................................................
$115
PER WEEK
NON-RESIDENT
PARTIAL DAY................................................................
$95
PER WEEK
FULL DAY......................................................................
$145
PER WEEK
BASKETBALL LEAGUE FEES....................................................................
$414 - $591
PER TEAM, PER SEASON
SURCHARGE FOR PAYMENT RECEIVED AFTER THE 15TH OF THE
MONTH(PER CLASS)................................................................................
$11
FOLKDANCING 4............................................................ I.......................
.............................
SEE INSTRUCTOR
FOR KIDS ONLY (AFTER SCHOOL PROGRAM)
RESIDENT..............................................................................
$117
PER MONTH
NON-RESIDENT...................................................................
$165
PER MONTH
PEE WEE REC (4 DAYS PER WEEK)
RESIDENT.......................................................................................
$112
PER MONTH
NON-RESIDENT............................................................................
$175
PER MONTH
SOFTBALL LEAGUES *.............................................................................
$460 - $614
PER TEAM
SOFTBALL TOURNAMENTS * ............ ......
..............................................
$368 - $614
PER TEAM
- PARKS / RECREATION -
56 of 76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
PARKS & RECREATION
DESCRIPTION FEE UNIT
SWIMMING
PARENT & ME, SWIM / PRESCHOOL BEGINNER SWIM /
BEGINNER SWIM......................................................................... $49 PER MONTH
PRIVATE SWIM LESSONS / ADULT GROUP ................................ $66 PER MONTH
SWIM TEAM (HIGH SCHOOL) ................................................... $38 PER MONTH
WATER POLO........................................................................................... $40 PER MONTH
* FEES COULD CHANGE BASED ON OFFICIAL CONTRACTS AND
MAXIMUM LIMITS SET ON ENTRY FEES FOR NATIONAL
TOURNAMENTS
** SUMMER CAMP: $25.00 DISCOUNT IF PAID THURSDAY WEEK
PRIOR; $15.00 DISCOUNT IF PAID FRIDAY WEEK PRIOR.
*** CAMP CHIC-A-POO: $5.00 DISCOUNT IF PAID BY THURSDAY
WEEK PRIOR
• SEE INSTRUCTOR
RECREATIONAL VEHICLE PARKING FEES
MULTIPLE -DAY EVENTS* ...................................................
$21
PER NIGHT,
INCLUDES TRANSIENT
OCCUPANCY TAX
CITY CONTRACTED
THERE MUST BE A GUARANTEED MINIMUM OF 25 RV'S IN
ORDER TO PARK IN CITY FACILITIES
SNOWMOBILE 11
APPLICATION DEPOSIT..........................................................................
$102
DEPOSIT ONLY
RENTAL 1ST 3 HOURS..............................................................................
$1,065
EACH ADDITIONAL HOUR.....................................................................
$364
TOWING CHARGES (REFLECT ACTUAL COST TO CITY) ...............................
$60
TRANSPORTATION / LABOR..................................................................
$60
SPECIAL EVENTS - ALL PARKS
APPLICATION DEPOSIT
REVIEWFEE............................................................................................. $62
BASE RENT (50 PEOPLE OR MORE)............................................................ $190
COMMERCIAL......................................................................................... $255 PER DAY
RESIDENTS............................................................................................... $255 PER DAY
TAX-EXEMPT / NON-PROFIT 4.............................................................. $128 PER DAY
- PARKS / RECREATION -
57 of 76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
PARKS & RECREATION
DESCRIPTION FEE UNIT
SPECIAL EVENTS -APPLICATION DEPOSIT .......................................... $63
SPECIAL EVENTS INSURANCE PROCESSING FEE .............................. $21
SPECIAL EVENTS REVIEW FEE................................................................. $199
SWIM CENTER
DAILY ADMISSIONS
RESIDENTS:
ADULT (13 & OVER).................................................................
$5
PER VISIT
YOUTH (4 -12).........................................................................
$3
PER VISIT
NON-RESIDENTS:
ADULT (13 & OVER).................................................................
$15
PER VISIT
YOUTH (4 -12).........................................................................
$10
PER VISIT
POOL PASS (PUNCH CARD - 25 SWIMS)
RESIDENT ADULT (AGES 13 & UP) ...................................................
$75
NON RESIDENT ADULT (AGES 13 & UP) .........................................
$200
NON - PROFIT (5010) SWIM TEAMS (IE. CLUB TEAMS)
NON-EXCLUSIVE USAGE
1-25 SWIMMERS...................................................................
$304
PER MONTH
26-50 SWIMMERS..................................................................
$571
PER MONTH
51-75 SWIMMERS..................................................................
$856
PER MONTH
76-100 SWIMMERS...............................................................
$1,143
PER MONTH
101-125 SWIMMERS............................................................
$1,429
PER MONTH
125-150 SWIMMERS............................................................
$1,715
PER MONTH
151-175 SWIMMERS............................................................
$2,002
PER MONTH
176-200 SWIMMERS............................................................
$2,288
PER MONTH
ABOVE 200 SWIMMERS......................................................
$8
/SWIMMER PER MONTH
EXCLUSIVE USAGE.........................................................................
$1.43
/SWIMMER PER MEET
SCHOOLS / SCHOOL DISTRICT (IE. PSUSD)
NON-EXCLUSIVE USAGE...............................................................
$40
PER HOUR
EXCLUSIVE USAGE.........................................................................
$80
PER HOUR
RESIDENT RESERVATION
NON-EXCLUSIVE USAGE...............................................................
$11
PER HOUR
EXCLUSIVE USAGE.........................................................................
$57
PER HOUR
NON-RESIDENT RESERVATION
NON-EXCLUSIVE USAGE...............................................................
$23
PER HOUR
EXCLUSIVE USAGE..........................................................................
$80
PER HOUR
- PARKS / RECREATION -
58 of 76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
PARKS & RECREATION
DESCRIPTION FEE UNIT
TENNIS COURTS / PICKLEBALL COURT
RENTAL......................................................................................................
$11
PER HOUR / PER COURT
VILLAGE FEST
USER FEES (FOR ALL VILLAGE FEST FEES)
APPLICATION FEE.........................................................................
$34
GENERALVENDOR
ANNUAL (JA"'-Dec.)
SEASON 1111. - MAY)
......................................................
$315
MONTH
SEASON 2 (1UN.-SEPT.)
...................................................
$189
MONTH
FOOD SERVICE VENDOR
ANNUAL(1AN: Dec.).........................................................
$3,034
SEASON 1 (OCT.-MAY)......................................................
$389
MONTH
SEASON 2(JUN.-SEPT.)...................................................
$240
MONTH
RETAIL MERCHANT VENDOR (MAXIMUM 1- MONTH PER VENDOR)
SEASON 1 ("'-MAY) .............................................. I.......
$160
MONTH
.................................................
SEASON 2 (JUN.-SEPT.) .....
$97
MONTH
ATTRACTIONS VENDOR
SEASON 1 (OCT.-MAY) PALM SPRINGS .........................
$315
MONTH
SEASON 2 (JUN.-SEPT.)PALM SPRINGS ........................
$189
MONTH
SEASON 1 (OCT. - MAY) ................
............................
$378
MONTH
SEASON 2(1IN. -SEPT.)......................................................
$229
MONTH
NON-PROFIT VENDOR (4-WEEK MAXIMUM - PAID IN ADVANCE)
ANNUAL (JAN.-DEC.)
..................................................
$52
WEEK
SEASON 1 (oa. MAY) ......................................................
$52
WEEK
SEASON 2 (JUN.-sEPr.>
...................................................
$52
WEEK
POLITICAL VENDOR (8-WEEK MAXIMUM - PAID IN ADVANCE)
ANNUAL(JA".-DEC.) .........................................................
$63
WEEK
SEASON 1 (Orr. - MAY)
......................................................
$63
WEEK
SEASON 2 (Ju"-sEPT.)
' ..................................................
$63
WEEK
CORPORATE SPONSORSHIP
ANNUAL (JAN.-DEC.)
.........................................................
NEGOTIATED BY CONTRACT
SEASON 1 (OCT. - MAY)
......................................................
NEGOTIATED BY CONTRACT
(JUN.-sEPT.)
SEASON 2 ...................................................
NEGOTIATED BY CONTRACT
COMMERCIAL VENDOR
ANNUAL (JAN: DEC .........................................................
$252
WEEK
SEASON 1 (OCT. - MAY)
..........................................
$ 252
WEEK
SEASON 2 (JUN.-sEPT.)
...................................................
$252
WEEK
- PARKS / RECREATION -
59 of 76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
PARKS & RECREATION
DESCRIPTION FEE UNIT
STANDBY VENDOR
(JAN.-DEC.)
ANNUAL .................................................. N/A
SEASON 1 ""-nnAr)
...................................................... $109 WEEK
SEASON 2 (JUN. sEPr.)................................................... $109 WEEK
ENTERTAINERS Rzasae 23
LATE PAYMENT FEE................................................................................ $29
- PARKS / RECREATION -
60 of 76
DESCRIPTION
COMPREHENSIVE FEE SCHEDULE
PLANNING DEPARTMENT
FEE
FEE
UNIT
PLANNING
1 A PLANNING APPLICATION THAT INCLUDES MULTIPLE ASSOCIATED APPLICATIONS BEING PROCESSED SIMULTANEOUSLY AS
ONE PROJECT SUBJECT TO THE REVIEW AND APPROVAL BY THE PLANNING COMMISSION AND/OR CITY COUNCIL, ARE
SUBJECT TO A 50% FEE DISCOUNT ON THE ASSOCIATED APPLICATIONS, WITH THE HIGHER APPLICATION FEE APPLIED AT
100%AND ALL OTHER ASSOCIATED APPLICATION FEES APPLIED AT 50%. PROJECTS INCLUDING MULTIPLE APPLICATIONS
REQUIRING SEPARATE ACTIONS BY THE PLANNING COMMISSION AND/OR CITY COUNCIL ARE NOT SUBJECT TO A 50% FEE
DISCOUNT.
2 WORK DONE WITHOUT PERMITS WILL BE ASSESSED THE BASE FEE PLUS A FINE OF THE SAME AMOUNT.
3 MAJOR PROJECT REVISIONS DURING APPLICATION REVIEW/PLAN CHECK MAY RESULT IN 50% ADDITIONAL FEE.
* FEES ARE DEPOSIT BASED; ACTUAL FEE WILL REFLECT FULL REIMBURSEMENT OF CITY COSTS INCURRED.
ADMINISTRATIVE MINOR MODIFICATIONS ........................... $11 $1,833
ADULT ORIENTED BUSINESS PERMITS
PROCESSING AND ISSUING..................................................................................... $2,525
ANNEXATION TO PALM SPRINGS
ACTUAL CONSULTANT / ATTORNEY / STAFF COSTS ............................................... $5,597 DEPOSIT*, PLUS
ATTORNEY FEE AND
STAFF COSTS
APPEALS
PLANNING COMMISSION DECISION TO CITY COUNCIL .......... $30
$1,546 PLUS NOTIFICATION
PLANNING DIRECTOR DECISION TO PLANNING COMMISSION
................................................................................................... $30
$1,283
ARCHITECTURAL REVIEW
SEE: "PLAN CHECKING FEE - PLANNING" FOR ADDITIONAL CHARGES
SEE: BUILDING DIVISION "PERMITS" AND "PLAN CHECK"
MAJOR ARCHITECTURAL APPROVAL
(SEE NOTE RE: DISCOUNTED FEES)
COMMERCIAL / INDUSTRIAL / MULTIPLE SF / MF..........................................
$9,510
HILLSIDESF..........................................................................................................
$5,551
SINGLE-FAMILY HOUSE - MAJOR THOROUGHFARE .......................................
$3,220
MINOR ARCHITECTURAL REVIEW
STAFFAPPROVAL................................................................................................
$667
PLANNING COMMISSION APPROVAL..............................................................
$2,404
AGRICULTURAL FACILITIES................................................................................
$11,102
INCIDENTAL PERMITS........................................................................................
$101
CECIA - SEE ENVIRONMENTAL DOCUMENT SECTION
CHANGE OF ZONE (COZ) (P. C. & C. C.) $131
$14,036 PLUS NOTIFICATION
CITY ATTORNEY REVIEW OF DEVELOPMENT PROJECTS
ACTUAL COST AT CURRENT HOURLY RATE - DEPOSIT
REQUIRED (SUBJECT TO CHANGE) .............................................
$4,008 DEPOSIT*
- PLANNING DEPARTMENT -
61 of 76
COMPREHENSIVE FEE SCHEDULE
PLANNING DEPARTMENT
DESCRIPTION
CODES, COVENANTS & RESTRICTIONS (CC&Rs) -
STAFF ADMINISTRATION FEE
CITY ATTORNEY COST..................................................................
CC&R AMENDMENTS.............................................................
CONDITIONAL USE PERMIT
(SEE NOTE BELOW - AMENDMENTS AT 50%)
(AAC FEES INCLUDED FOR NEW CONSTRUCTION TYPE I & II)
CUP(P.C. & C.C.).....................................................................
CUP(P.C. ONLY)......................................................................
CUP FOR CANNABIS FACILITIES ..........................................
CUP AMENDMENT................................................................
NOTES: IMAGING FOR AMENDMENTS - FULL FEES.
DETERMINATIONS BY PLANNING COMMISSION ...............
DEVELOPMENT AGREEMENTS (DA) - PLANNING .............
SEE NOTE RE: DISCOUNTED FEES
PLUS CITY ATTORNEY DEPOSIT REQUIRED ...............................
WILL BE BILLED ON ACTUAL COST
DEVELOPMENT AGREEMENT AMENDMENT ...........................
ENVIRONMENTAL DOCUMENTS
INITIAL STUDY / MINOR PROJECT (CITY PREPARED) ..................
ENVIRONMENTAL DOCUMENTS ..............................................
(MND/EIR) (CITY CONSULTANT PREPARED)
MITIGATION MONITORING -
FIELD REVIEW (PER SITE VISIT) .................................................
MITIGATION MONITORING -
SUBMITTED REVIEW (PER SITE VISIT) ......................................
MITIGATION MONITORING -
ONGOING MONITORING............................................................
FEE
$18
$11
$206
$60
$298
$18
$18
CATEGORICAL EXEMPTION ..................................................
ENVIRONMENTAL DOCUMENTS - DEPT. FISH & GAME
SEE DEPARTMENT OF FISH & WILDLIFE / FEES COLLECTED BY FISH & WILDLIFE
(SB1535:ADJUSTED ANNUALLY BY FISH & GAME SECTION 713)
EVENT HOUSE APPLICATION (R22418)
EVENT HOUSE FEE..........................................................................
EVENT HOUSE APPEAL (Rzzais)
.....................................................
FILES RETRIEVED FROM STORAGE - PRA................................
FILES RETRIEVED - OPTIONAL EXPEDITED SERVICE ..................
- PLANNING DEPARTMENT -
62 of 76
FEE UNIT
$738 PLUS CITY
ATTORNEY COST
$4,008 DEPOSIT*
$1,023
$5,480 PLUS NOTIFICATION
$4,625 PLUS NOTIFICATION
$8,395 PLUS NOTIFICATION
$2,241 PLUS NOTIFICATION
$1,582.53
$8,135.36
$4,008 DEPOSIT
$8,135.36
$4,419.00
CONSULTANT FEE PLUS 15%ADMIN. FEE
$1,401
$350
CONSULTANT FEE
$618
$637
$462
NO COST
CITY COST
DEPOSIT
DEPOSIT
PLUS 15%ADM IN.
FEE AND DEPOSIT (IF
APPLICABLE)
PER APPEAL
DESCRIPTION
FINAL PLANNING INSPECTION
COMPREHENSIVE FEE SCHEDULE
PLANNING DEPARTMENT
FEE
FEE
FINAL PLANNING INSPECTION - MINOR ARCHITECTURAL .... $274
FINAL PLANNING INSPECTION - MAJOR ARCHITECTURAL ... $817
SUBDIVISION - FINAL PLANNING INSPECTION - FIRST SFR ... $390
SUBDIVISION - FINAL PLANNING INSPECTION - EACH
ADDITIONAL SFR........................................................................... $72
GARAGE SALE PERMITS
SINGLE GARAGE SALE PERMIT ...................................................... $20
MULTIPLE GARAGE SALE PERMIT ................................................ $40
UNIT
GENERAL PLAN AMENDMENT (GPA) (P.C. & C.C.) ... $41 $14,054 PLUS NOTIFICATION
GENERAL PLAN & ZONING LETTER
VERIFICATION OF ZONING.................................................................. $407
INVESTIGATION OF ZONING CONFORMANCE ........................... $1,280
GENERAL PLAN MAINTENANCE SURCHARGE ..................... $24 $0.78 /$1,000.00 NEW
CONST.
GENERAL PLAN & GENERAL PLAN MAP
SEE CITY CLERK
HISTORIC SITE PRESERVATION - MILLS ACT -
CLASSI.........................................................................................
RSPB -APPLICATION FOR CERTIFICATE OF
APPROPRIATENESS FOR MAJOR ALTERATIONS TO A
CLASS 1/2/3 HISTORIC SITE ................................................
HSPB-APPLICATION FOR CERTIFICATE OF
APPROPRIATENESS FOR MINOR ALTERATIONS TO A
CLASS 1/2/3 HISTORIC SITE (STAFF LEVEL) .......................
HSPB - DEMOLITION OF CLASS 1/2/3 SITES .......................
IN -LIEU PARKING FEES (ESTABLISHED BY RESOLUTION 21578)
AREAS BOUNDED BY AMADO & BELARDO ROAD, MUSEUM
WAY, RAMON ROAD & INDIAN CANYON DRIVE .....................
NEW CONSTRUCTION - PER SPACE, NORTH OF AMADO
ROAD.........................................................................................
EXISTING CONSTRUCTION - PER SPACE ..............................
AGREEMENT PREPARATION...................................................
LAND USE PERMITS (L.U.P)
(SEE NOTE RE: DISCOUNTED FEES)
$18
$30
MINOR LAND USE PERMITS.......................................................... $11
- PLANNING DEPARTMENT -
63 of 76
$525
$2,761
$14,733.28
$4,800.68
$2,400.90
$635.76
$398.58
COMPREHENSIVE FEE SCHEDULE
PLANNING DEPARTMENT
DESCRIPTION FEE FEE
(POSTCARD RACKS, OWNERSHIP TRANSFERS, ETC.)
MAJOR LAND USE PERMITS..........................................................
$1,536.22
LANDSCAPE & IRRIGATION PLAN
SINGLE FAMILY RESIDENCE..........................................................
$659.38
MF / SF SUBDIVISION....................................................................
$2,937.59
COMMERCIAL / INDUSTRIAL < 5 ACRES .....................................
$1,513.71
COMMERCIAL / INDUSTRIAL > 5 ACRES .....................................
$2,368.04
LOT TIE AGREEMENT......................................................................
$1,071.79
MURAL PERMITZZ................................................................................
$1,258.88
NOTIFICATION CHARGES
PLANNING COMMISSION ONLY ..................................................
$1,859.00
PLANNING COMMISSION AND CITY COUNCIL ..........................
$2,601.00
STAFF PREPARED MAILING LABELS ............................................
$399.00
PARK FEES IN -LIEU OF DEDICATION is
QU IM BY PARK ACT
PLAN CHECKING FEES - PLANNING
(SEE PLAN CHECK FEES - PLANNING FOR ADDITIONAL CHARGES)
THE FOLLOWING FEE MAY BE ADDED TO ANY PLAN REQUIRING PLANNING DIVISION REVIEWS.
SINGLE - FAMILY RESIDENTIAL (TOTAL BUILDING AREA:)
ANYSIZE: .............................................................................. $325
COMMERCIAL / PLANNED DEVELOPMENTS - LESS THAN 1
ACRE...................................................................
$558
COMMERCIAL / PLANNED DEVELOPMENTS, ETC. -
1 TO 5 ACRES.........................................................................
$985
COMMERCIAL/ PLANNED DEVELOPMENTS, ETC. -
OVER 5 ACRES........................................................................
$2,409
COMMERCIAL TENANT IMPROVEMENT .........................
$1,030
MULTI - FAMILY RESIDENTS - 0 TO 5 ACRES ...................
$888
MULTI - FAMILY RESIDENTS - OVER 5 ACRES ...................
$1,891
FINAL LANDSCAPE / EXT. LIGHTING (NEW) .....................
$1,045
PLANNED DEVELOPMENT DISTRICT (P.C. & C.C.)
PRELIMINARY DEVELOPMENT PLAN - 5 ACRES OR UNDER ...
$9,640
PRELIMINARY DEVELOPMENT PLAN - > 5 ACRES ...................
$16,839
FINAL P.D.D. - FOR 5 ACRES ....................................................... $206
$5,213
FINAL P.D.D. - OVER 5 ACRES .................................................... $206
$6,423
AMENDMENT (PRELIMINARY PDD OR FINAL PDD) ................
50%
PRELIMINARY DEVELOPMENT PLAN - MINOR AMENDMENT $2,972
PRELIMINARY DEVELOPMENT PLAN - MAJOR AMENDMENT $7,320
- PLANNING DEPARTMENT -
64 of 76
UNIT
PLUS NOTIFICATION
PLUS NOTIFICATION
PLUS NOTIFICATION
OF ORIGINAL
APPLICATION FEE
COMPREHENSIVE FEE SCHEDULE
PLANNING DEPARTMENT
DESCRIPTION
FEE
FEE
UNIT
INCIDENTAL CHANGE TO APPROVED PD (STAFF) ............
$22
$667
PRE -APPLICATION - 50% APPLIED TO FEE FOR REGULAR
APPLICATION.........................................................
$89
$1,371
PRODUCTIVE HOURLY RATES BY CATEGORY
DIRECTOR OF PLANNING..............................................................
$480
PRINCIPAL PLANNER.....................................................................
$416
ASSOCIATE / ASSISTANT PLANNER .............................................
$285
PLANNING ADMIN COORDINATOR .............................................
$236
CLERICAL (SR. SECRETARY)...........................................................
$188
PLANNING TECH.............................................................................
$158
RECREATIONAL VEHICLE PARKING PERMIT ........................
$1,128
REFUNDS
NET OF ESTIMATED STAFF TIME EXPENDED ...............................
$285
RESOLUTION OF CONVENIENCE & NECESSITY .....................
$24
$997
SEARCHLIGHT PERMITS.................................................................
$11
$701
SIGN PERMITS
REVIEW AND APPROVAL
BY PLANNING COMMISSION ..................................................
$30
$2,744
BY CITY COUNCIL.......................................................................
$60
$2,744
BYSTAFF.....................................................................................
$11
$247
TEMPORARY SIGNS..................................................................
$6
$377
PER SIGN
TEMPORARY CONSTRUCTION FENCE GRAPHICS ...............
$11
$377
SIGN VARIANCE - INCLUDES NOTIFICATION ....................
$35
$3,088
SIGN PROGRAM
$2,189
SIGN PROGRAM - MULTI -TENANT-/ AMENDMENT ......
$35
$1,094
SEE NOTE RE: DISCOUNTED FEES
SIGN DISTRICTS (PLUS NOTIFICATIN FEE C.C.) ................
$2,563
SPECIFIC PLAN - INITIAL DEPOSIT ................................ (RATE
$207
$14,054
DEPOSIT, PLUS
CHARGED AT PRINCIPAL PLANNER'S FULL HOURLY RATE.)
NOTIFICATION
SPECIFIC PLAN - AMENDMENT - INITIAL DEPOSIT - TEXT
AMENDMENT.................................................................. $207 $7,528 DEPOSIT, PLUS
NOTIFICATION
STREET NAME CHANGE..................................................................
$30
$4,566 PLUS
PLUS COST OF CHANGING STREET SIGNS)
SUBDIVISION MAPS
PETITION FOR REVERSION TO ACREAGE ....................................
$4,272
REVISED MAPS
APPLICATION FEE - MINOR ......................................................
$18
$1,929 PLUS NOTIFICATION
APPLICATION FEE - MAJOR ......................................................
$18
$2,810 PLUS NOTIFICATION
- PLANNING DEPARTMENT -
65 of 76
COMPREHENSIVE FEE SCHEDULE
PLANNING DEPARTMENT
DESCRIPTION FEE FEE
TENTATIVE TRACT MAPS (P.C. & C.C.)........................................ $77 $5,126
(SEE NOTE RE: DISCOUNTED FEES)
TENTATIVE PARCEL MAPS (P.C. & C.C.)...................................... $77 $4,272
(SEE NOTE RE: DISCOUNTED FEES)
VESTING MAPS................................................................................ $77 $7,555
PARCEL MAP WAIVER.................................................................... $3,601
TECHNOLOGY SURCHARGE........................................................... $1.92
TIME EXTENSIONS........................................................................... $30 $3,036
VARIANCE......................................................................................... $30 $4,625
(FROM TYPE I C.U.P. AMENDMENT 1 TO 5 ACRES)
ZONING / CODE COMPLIANCE INSPECTION & LETTER
(SEE GENERAL PLAN AND ZONING LETTER / INVESTIGATION OF ZONING COMFORMANCE)
- PLANNING DEPARTMENT -
66 of 76
UNIT
PLUS NOTIFICATION
PLUS NOTIFICATION
PLUS NOTIFICATION
/$1,000.00 NEW
CONSTRUCTION
VALUE
PLUS NOTIFICATION
PLUS NOTIFICATION
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
POLICE DEPARTMENT
FBR = Fully Burdened Hourly Rates
DESCRIPTION FEE
ADMINISTRATIVE HEARING FEE
DANGEROUS AND VICIOUS DOG HEARING .................. $128
ALARM ORDINANCE FEES
USER'S ALARM PERMITS
ANNUAL ALARM PERMIT .......................................... $31
REISSUED ALARM PERMIT ......................................... $31
RENEWAL FEE (YEARLY) ................................................ $27
FALSE ALARMS
SEE: MASTER BAIL SCHEDULE (ORD. 1678)
UNIT FEE UNIT
DEAD ANIMALS FEES (ANIMAL CONTROL)
DELIVERED DEAD ANIMALS
UNLOADING & ADMINISTRATIVE PROCESSING FEE
BY DELIVERER (No ASSISTANCE RECEIVED) .................. NO CHARGE, PLUS DISPOSAL FEE
WITH ASSISTANCE (FROM DELIVERER) (R22239) ......... $17 PER 5 ANIMALS, PLUS DISPOSAL FEE
WITHOUT ASSISTANCE (FROM DELIVERER) )R22239) $31 PER 5 ANIMALS, PLUS DISPOSAL FEE
DISPOSAL ONLY (OF DEAD ANIMALS)
SMALL/ MEDIUM ANIMAL ....................................... $11 PER ANIMAL, PLUS COST
LARGE ANIMAL........................................................... $32 PLUS COST
PICK-UP & DISPOSAL
SMALL/ MEDIUM ANIMAL ....................................... $38
LARGE ANIMAL........................................................... $64 PLUS COST
TRAP RENTAL FEES
INITIAL FEE PER WEEK ............................................... $32
EXTRA DAY
WITH PERMISSION ................................................ $6 PER DAY
WITHOUT PERMISSION ........................................ $32 PER DAY
ANIMAL CONTROL TO PICK UP OR RECLAIM ...... $128 PER ATTEMPT
LATE FEE PER DAY ...................................................... $32
SERVICES, SPECIAL:
ANIMAL REMOVALS
FROM CHIMNEYS
INITIAL CALL RESPONSE, DOOR TO DOOR,
MINIMUM 2 STAFF REQUIRED ................... $69 PER STAFF, PER HOUR
EACH 1/2 HOUR AFTER FIRST HOUR ......... $34 PER STAFF, PER 1/2 HOUR
- POLICE DEPARTMENT -
67 of 76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
POLICE DEPARTMENT
FBR = Fully Burdened Hourly Rates
DESCRIPTION FEE UNIT FEE UNIT
BILLING SURCHARGE .................................................. $32
RELOCATION OF NON -DOMESTIC ANIMALS
FROM CITY OWNED TRAPS
SET-UP, CHECKING AND CLEARING ......... $128
CLEARING
NON -SKUNK TRAPS ................................... $32
SKUNKS
FROM SKUNK TRAP ................................... $32
FROM NON-SKUNKTRAP ......................... $68
NOT CONTAINED IN CITY TRAPS
INITIAL CALL RESPONSE, 2 HOUR MINIMUM $65
EACH 1/2 HOUR .................................................... $34
EMERGENCY SERVICES FEE - "AFTER HOURS"
CALLOUTS................................................................. $128
/SET-UP CALL
PLUS COSTS
PLUS COSTS
PLUS COSTS
PER STAFF, PER HOUR
PER STAFF, PER 1/2 HOUR
PLUS ANY ADDTT FEES THAT MAY APPLY
MICROCHIPPING FEE
DANGEROUS OR VICIOUS ANIMALS ..................
$21
OWNERS REQUEST, RECLAIMED ANIMALS,
WHEN OBTAINING CITY DOG LICENSE ...........
$21
CREMATION HOLD -DELIVERED ................................
$3
PICK-UP / CREMATION HOLD ....................................
$33
BICYCLE LICENSE FEES
APPLICABLE UNTIL STATE LAW AND/OR LOCAL ORDINANCES MANDATE OTHERWISE
ISSUANCE OR REPLACEMENT OF LICENSE ....................
$1 PER LICENSE
CANNABIS BUSINESS AND ACTIVITY
SEE: DEPARTMENT OF SPECIAL PROGRAM COMPLIANCE
CONCEALED CARRY WEAPON PERMIT
TWO-YEAR STANDARD ............................................... $228 PLUS, DOJ FEE $93 D.O.J. FEE
THREE-YEAR JUDGE .................................................... $228 PLUS, DOJ FEE $115 D.O.J. FEE
FOUR-YEAR RESERVE POLICE OFFICER .................. $228 PLUS, DOJ FEE $137 D.O.J. FEE
- POLICE DEPARTMENT -
68 of 76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
POLICE DEPARTMENT
FBR = Fully Burdened Hourly Rates
DESCRIPTION FEE
RENEWAL FEES
TWO-YEAR STANDARD .............................................. $92
THREE-YEAR JUDGE .................................................... $81
FOUR-YEAR RESERVE POLICE OFFICER .................. $81
MODIFICATION / AMENDMENT FEE .............................. $55
(I.E.) CHANGE OF NAME, GUNS, ADDRESS)
ANNUAL RANGE QUALIFICATION FEES ...................... $77
(CHANGE OF NAME, GUNS, ADDRESS)
INDIVIDUAL FEE (NON -CITY EMPLOYEE) ........................ $77
NON-PSPD CITY EMPLOYEE ....................................... $77
STATE MANDATED FIREARMS TRAINING
BASIC RANGE USE OUT OF STATE HR 218
QUALIFICATIONS ............................................. $77
INITIAL APPLICANT ............................................. $186
(14 HRS OF CLASSROOM OF 6 TO 20 STUDENTS
AND 2 HRS RANGE INSTRUCTION)
RENEWALS......................................................... $102
(4 HOURS OF CLASSROOM OF 4 TO 17 AND
RANGE INSTRUCTION)
CRIME AND ACCIDENT REPORT FEES ........................... $0.11
FINGERPRINT FEE
STATE CORI
FEDERAL CORI
UNIT FEE UNIT
PLUS, DOJ FEE
$52
D.O.J. FEE
PLUS, DOJ FEE
$74
D.O.J. FEE
PLUS, DOJ FEE
$96
D.O.J. FEE
PER PAGE
$39
PLUS, STATE AND/OR FEDERAL CORI
$32
STATE REGULATED FEE
$17
STATE REGULATED FEE
INITIAL CANNABIS RELATED BUSINESS AND
ACTIVITY APPLICATION FILING FEE* 2......................... $261
* INCLUDES A PASS-THRU INCREASE FROM GOVERNMENTAL AGENCY.
PER PERSON
(INCLUDES: BACKGROUND CHECK AND FINGERPRINTING)
LETTER PREPARATION
ALCOHOLIC BEVERAGE CONTROL $27 EACH
BACKGROUND $27 EACH
- POLICE DEPARTMENT -
69 of 76
FBR = Fully Burdened Hourly Rates
DESCRIPTION
POSITION RATES
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
POLICE DEPARTMENT
FEE
UNIT FEE UNIT
COMMUNITY SERVICE OFFICER .................................
$102
PER HOUR
DISPATCHER....................................................................
$99
PER HOUR
LIEUTENANT...................................................................
$239
PER HOUR
SERGEANT.......................................................................
$205
PER HOUR
SWORN OFFICER............................................................
$147
PER HOUR
PRESSPASS...........................................................................
$56
EACH
RANGE USE
OUTSIDE LAW ENFORCEMENT AGENCIES
PERHOUR........................................................................ $133
INCLUDING TRIBAL POLICE
RETIRED PSPD CONCEALED WEAPONS ......................... $50
ANNUAL QUALIFICATIONS
PALM SPRINGS CITY EMPLOYEE USE PER HOUR .......... $77
NON -POLICE OFFICER
ROOM RATES
POLICE TRAINING CENTER ROOMS (101 A, B & C)
HALF DAY (4 HOURS OR LESS) .........................................
$50 PER ROOM
FULL DAY (OVER 4 HOURS) .............................................
$84 PER ROOM
SECOND HAND DEALER/PAWNBROKER LICENSE ...
$203
SOUND TRUCK PERMITS ..................................................
$17
STATISTICAL DATA REPORTS ..........................................
$135 PER HOUR
VEHICLE TOW CHARGE
CLASS A
$168
PER TOW
TOW - TRUCK 2 AXLE (MEDIUM DUTY)
$200
PER TOW
TOW - TRUCK 3 AXLE (HEAVY DUTY)
$225
PER TOW
VEHICLE TOW STORAGE CHARGE
AUTOMOBILES
$56
PER DAY
TRUCK - UP TO 20 FT.
$65
PER DAY
TRUCK - OVER 20 FT.
$75
PER DAY
MOTORCYCLCES
$40
PER DAY
MOTOR HOME
$65
PER DAY
- POLICE DEPARTMENT -
70 of 76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
POLICE DEPARTMENT
FBR = Fully Burdened Hourly Rates
DESCRIPTION
VEHICLE TOWING ADMINISTRATIVE COST
RECOVERY FEE (VTACR*) R24471-EFF.07-18-2018 /A6280
PSMC 11.82.100 / VC228SI
PER TOW (PASS THRU FEE)**
FIXED ADMINISTRATIVE COSTS***
* 30 DAY IMPOUND FEE COLLECTED
** BASED ON AN AVERAGE OF 525 TOWS PER YEAR;
PLUS***
*** ANNUAL FIXED ADMINISTRATIVE COSTS WILL BE
DIVIDED EQUALLY AMONG THE APPROVED
ROTATIONAL TOW CONTRACTORS.
FEE
UNIT FEE UNIT
$147,126.13 ANNUAL FEE TO BE COLLECTED AS FOLLOWS:
$185 PLUS***
$50,000 PER YEAR
DIGITAL MEDIA COPYING ............................................. $26
VOLUNTARY GUN REGISTRATION ................................ $21
911 EMERGENCY COMMUNICATIONS SYSTEM RESPONSE FEE R24557
PER PHONE LINE PER MONTH OR .................................. $1.30
PER 911 EMERGENCY CALL FOR THOSE WHO CHOSE
TO SELECT THE PAY -PER -CALL OPTION ..................... $74
- POLICE DEPARTMENT -
71 of 76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
RENT CONTROL
DESCRIPTION FEE UNIT
ANNUAL REGISTRATION RENEWAL FEE ............................................ $60 PER RENTAL UNIT
($12.00 PER UNIT REGISTRATION FEE INCLUDED)
SUBJECT TO RENT CONTROL, WITH FEE DUE AND PAYABLE
ANNUALLY ON OR BEFORE SEPTEMBER 1
LATE FEE - ANNUAL REGISTRATION
30 DAYS PAST DUE................................................................................. 10%
60 DAYS PAST DUE................................................................................. 30%
90 DAYS PAST DUE................................................................................. 50%
RENT REVIEW REQUEST........................................................................... $1,903
- RENT CONTROL -
72 of 76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
CORRESPONDING FOOTNOTES
CORRESPONDING FOOTNOTES
1) NOT USED
2) FEE EXEMPT GROUPS: THE FOLLOWING GROUPS WILL BE EXEMPT FROM PAYMENT OR RENTAL FEES IN
ACCORDANCE WITH R12742 SECTION 1: CITY SPONSORED AND CO -SPONSORED ACTIVITIES. EXEMPTION
DOES NOT APPLY TO PSUSD PER FACILITIES JOINT USE AGREEMENT 04119 ENTERED JUNE 1, 1999.
3) NOT USED
4) DISCOUNT RENTAL RATES ARE AVAILABLE TO THOSE GROUPS WHICH MEET ALL OF THE FOLLOWING
CRITERIA:
1) THE GROUP IS A NONPROFIT TAX EXEMPT CORPORATION BY A STATE;
2) ITS ACTIVITIES QUALIFY CONTRIBUTORS FOR INCOME TAX DEDUCTIONS UNDER SECTION 501(C) 3 OF
THE U.S. INTERNAL REVENUE CODE OR EQUIVALENT STATE LAW;
3) IT EXTENDS MEMBERSHIP PRIVILEGES TO ANY PERSON REGARDLESS OF RACE, COLOR, OR PLACE OF
NATIONAL ORIGIN.
5) FIXTURE UNIT EQUIVALENTS TO BE USED IN CONJUNCTION WITH THE SEWER SERVICE CHARGE RATE
SCHEDULE ARE DETERMINED AS FOLLOWS, BASED ON THE AMOUNT AND TYPE OF FLOW THROUGH THE
GIVEN FIXTURES:
FIXTURE TYPE
EQUIVALENT
BATHTUB
2
LAVATORY
1
TOILET
6
LAUNDRY TRAYS
2
SHOWER
2
DISHWASHER
RESIDENTIAL
2
COMMERCIAL
25
AUTOMATIC WASHERS
COMMUNITY FACILITIES
2 EACH 10 LB. CAPACITY
LAUNDRY OR COMMERCIAL LAUNDRY
7 EACH 10 LB. CAPACITY
DRINKING FOUNTAINS
1
URINAL
2
GARBAGE DISPOSAL
RESIDENTIAL
6
COMMERCIAL
28
6) ANIMAL PLACEMENT FEES: ANY OF THE ANIMAL PLACEMENT FEES MAY BE WAIVED IN WHOLE OR IN PART
BY THE CITY MANAGER, OR HIS DESIGNEE, UNDER SPECIAL CIRCUMSTANCES AS HE MAY DETERMINE
WHERE THE PUBLIC AND CITY'S INTEREST MAY BE SERVED THEREBY.
- CORRESPONDING FOOTNOTES -
73 of 76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
CORRESPONDING FOOTNOTES
7) DRAINAGE FEES SHALL APPLY TO ALL EXISTING VACANT PROPERTIES WHICH ARE NOT PART OF AN EXISTING
SUBDIVISION OR THAT ARE LEGAL LOTS OF RECORD HAVING BEEN PART OF A SUBDIVISION RECORDED
PRIOR TO THE EFFECTIVE DATE OF THIS RESOLUTION. FOR PROPERTIES SMALLER THAN ONE (1) ACRE, A PER -
SQUARE -FOOT FEE SHALL BE ESTABLISHED BASED ON THE ACREAGE FEE FOR A GIVEN SUBDRAINAGE AREA.
A DRAINAGE FEE SHALL BE REQUIRED FOR ALL DEVELOPED PROPERTIES WHEN AN ADDITION OF HARD
SURFACED AREA EXCEED 50% OF THE EXISTING HARD SURFACED AREA.
8) IF IT IS FOUND UPON REVIEW AND REVISION OF THE MASTER DRAINAGE PLAN, THAT THE REVISED PLAN
CAN BE IMPLEMENTED AT LESSER COST THAN THE ORIGINAL PLAN, THEN THE BASE FEE WILL BE LOWERED.
IN CASES WHERE DEVELOPMENTS HAVE PREVIOUSLY BEEN ASSESSED THE HIGHER FEE, THE DIFFERENCE
BETWEEN THE FEE PAID AND SUCH REVISED FEE WILL BE REFUNDED.
THE DEVELOPER WILL BE GRANTED CREDIT TOWARDS DRAINAGE FEES FOR ACTUAL COSTS WHICH CITY
VALIDATES DEVELOPER HAS INCURRED FOR ASSOCIATED DESIGN AND/OR CONSTRUCTION OF ON -SITE
AND/OR OFF -SITE 10-YEAR RETENTION/DETENTION, OR OTHER MEASURES WHICH DIRECTLY REDUCE THE
DESIGN AND/OR CONSTRUCTION COSTS OF THE MASTER STORM DRAINAGE SYSTEM OF THE CITY OF PALM
SPRINGS.
IN THOSE CASES WHERE THE DEVELOPER ELECTS TO CONSTRUCT THE IMPROVEMENTS, ACTUAL COSTS
WHICH CITY VALIDATES DEVELOPER HAS INCURRED FOR DESIGN AND/OR CONSTRUCTION OF STORM
AND/OR DRAINAGE IMPROVEMENTS AS SHOWN IN THE MASTER DRAINAGE PLAN, SHALL BE CREDITED
TOWARDS THE DRAINAGE FEE OTHERWISE DUE. IN THE EVENT SUCH COSTS EXCEED THE FEE OTHERWISE
DUE, THE CITY WILL ENTER INTO AN AGREEMENT TO REIMBURSE THE DEVELOPER FOR THE EXCESS COST.
SUCH REIMBURSEMENT SHALL BE MADE FROM DRAINAGE FEES WHEN COLLECTED FROM OTHER PROJECTS
WITHIN THE BASIN AREA WITHIN WHICH THE DEVELOPMENT OCCURRED.
9) WHEN ANY PROPERTY OWNER NOT WITHIN THE CITY LIMITS REQUESTS APPROVAL FOR SEWER
CONNECTION, WHETHER EXISTING PRIOR TO MAY 18, 1983 OR CONSTRUCTED THEREAFTER, THIS WILL
RESULT IN THE CONTRIBUTION OF SEWAGE FLOWS TO LIFT STATION NO. 1, THAT SEWER SURCHARGE LIFT
STATION NO. 1 FEES BE DETERMINED BY THE CITY MANAGER, AND THAT SUCH FEE BE APPROVED BY THE
CITY COUNCIL IN CONJUNCTION WITH THE ISSUANCE OF AUTHORIZATION TO CONNECT TO THE CITY'S
SEWER SYSTEM; AND
10) SUCH FEES SHALL BE COLLECTED AT THE TIME OF ISSUANCE OF A BUILDING PERMIT FOR CONSTRUCTION
OR IN THE CASE OF DEVELOPMENT AT THE TIME SUCH CONNECTION IS AUTHORIZED. SUCH FEE SHALL BE
IN ADDITION TO THE INSPECTION FEE, SEWER FACILITY FEE, STREET MAIN CHARGE, AND ANY OTHER
APPLICABLE FEES, AND SHALL BE DEPOSITED INTO THE SEWER FUND.
11) FACILITY RENTAL NOTES:
1) RENTAL FEES AS DETERMINED BY THE SPECIAL EVENTS MANAGER WILL VARY ACCORDING TO SERVICE
LEVELS REQUIRED BY THE PROPOSED USE.
2) EXTENDED, MULTIPLE DAY, AND MULTIPLE FACILITY USE FEES WILL BE SET BY THE SPECIAL EVENTS
MANAGER.
- CORRESPONDING FOOTNOTES -
74 of 76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
CORRESPONDING FOOTNOTES
3) ADDITONAL PARKS & RECREATION DEPARTMENT FACILITIES ARE AVAILABLE FOR RENT WITH FEES
ESTABLISHED BY THE DEPARTMENTS BASED ON ACTIVITY AND SERVICE LEVELS REQUIRED
12) FEES AND CHARGES FLUCTUATE BASED ON ACTIVITY, SUPPLIES AND LEVEL OF SUPERVISION. ALL FEES AND
CHARGES ARE IN ACCORDANCE WITH THE RESOLUTION ADOPTED BY COUNCIL MAY 7, 1986
13) USE OF THE FACILITY SHALL BE LIMITED TO NON-PROFIT ORGANIZATIONS FOR MEETINGS WHICH ARE OPEN
TO THE GENERAL PUBLIC, AND AVAILABLE ONLY AS AN ALTERNATIVE TO OTHER CITY FACILITIES.
14) THE CITY CLERK IS AUTHORIZED TO WAIVE THE FEE FOR STATE, FEDERAL OR COUNTY AGENCIES
REQUESTING USE OF THE FACILITY FOR THE PURPOSE OF CONDUCTING A PUBLIC MEETING TO INFORM, OR
RECEIVE INPUT FROM THE GENERAL PUBLIC AT -LARGE. CITY HALL CONFERENCE ROOMS MAY BE RENTED
NO MORE THAN 10 DAYS IN ADVANCE, WHICH SHOULD ACCOMMODATE STAFF, COUNCIL AND
COMMISSION NEEDS. EXCEPTION TO FEE: SCHOOL.
15) THE DEVELOPER MAY BE REQUIRED TO PAY TO THE CITY A FEE IN -LIEU OF MAKING A DEDICATION OF LAND.
UNDER SUCH CIRCUMSTANCES, THE DEVELOPER WILL BE REQUIRED TO PAY A FEE IN AN AMOUNT AS
PRESCRIBED IN ORDINANCE 1632, AS AMENDED. FOR DEVELOPMENT IN THE CITY'S CENTRAL BUSINESS
DISTRICT, THE DEVELOPER MAY ELECT TO PAY A PER RESIDENTIAL DWELLING UNIT FEE IN -LIEU OF THE
DEDICATION AND/OR FEE FORMULA PROVIDED IN SECTION VII AND SUBSECTIONS A THROUGH F OF
SECTION VI OF ORDINANCE 1632, AS AMENDED, PURSUANT TO THE FOLLOWING SCHEDULE (AMENDED BY
ORD1718/R22021 EFFECTIVE 11/5/07):
NUMBER OF BEDROOMS AMOUNT OF FEE
STUDIO / ONE BEDROOM UNIT $750
TWO BEDROOM UNIT $1,000
THREE OR MORE BEDROOM UNIT $1,500
16) ON JULY 1ST OF EACH YEAR, ALL SERVICE FEES AND CHARGES SHALL BE AUTOMATICALLY ADJUSTED BY AN
AMOUNT EQUAL TO THE PERCENTAGE OF INCREASE OR DECREASE IN TOTAL EMPLOYEE COMPENSATION
FOR THE CURRENT FISCAL YEAR'S ADOPTED BUDGET VERSUS THE NEW FISCAL YEAR'S BUDGET AS LAST
COMPUTED BEFORE THE PUBLIC HEARING - PURSUANT RESOLUTION NO. 23854 SECTION 2.D.
17) A PERSON SUBJECT TO THE FEE IMPOSED BY THE RESOLUTION MAY APPLY TO THE CITY COUNCIL FOR
ADJUSTMENT TO THAT FEE, OR A WAIVER OF THAT FEE, OR REIMBURSEMENT OF PART OR ALL OF THE FEE,
SOLELY BY FOLLOWING THE WRITTEN PROTEST PROCEDURE IN THE TIME AND MANNER PRESCRIBED BY
GOVERNMENT CODE SECTION 66020 AND DETAILING THE REASONS FOR THE ADJUSTMENT, WAIVER OR
REIMBURSEMENT PURSUANT TO RESOLUTION NO. 20849 SECTION 3.
18) PURSUANT TO RESOLUTION NO. 22953 SHOULD AN AMENDMENT TO THE MSHCP BE APPROVED AND
IMPLEMENTED, THAT PROVIDES FOR THE CITY OF DESERT HOT SPRINGS AS A PERMITTEE; ON THE
EFFECTIVE DATE OF SUCH AMENDMENT, THE LOCAL DEVELOPMENT MITIGATION FEES SHALL
AUTOMATICALLY BE ADJUSTED AS FOLLOWS:
- CORRESPONDING FOOTNOTES -
75 of 76
CITY OF PALM SPRINGS
COMPREHENSIVE FEE SCHEDULE
CORRESPONDING FOOTNOTES
RESIDENTIAL, DENSITY LESS THAN 8.0 DWELLING UNITS PER ACRE
RESIDENTIAL, DENSITY BETWEEN 8.1 AND 14.0 DWELLING UNITS PER
ACRE
RESIDENTIAL, DENSITY GREATER THAN 14.1 DWELLING UNITS PER ACRE
COMMERCIAL
INDUSTRIAL
$1,290 PER DWELLING
UNIT
$537 PER DWELLING
UNIT
$239 PER DWELLING
UNIT
$5,728 PER ACRE
$5,728 PER ACRE
19) EFFECTIVE JANUARY 1, 2018 UNTIL DECEMBER 31, 2023 THE CASP FEE IS $4 FEE PER AB 1379 (CHAPTER 667,
STATUTES OF 2017). EFFECTIVE JANUARY 1, 2024 THE CASP FEE IS $1 AS PER AB 1379 (CHAPTER 667,
STATUTES OF 2017).
20) PER ORDINANCE 1909, EACH PERSON WHO IS AN OWNER, SUPERVISOR OR EMPLOYEE OWNING A 20%
INTEREST IN THE APPLICANT BUSINESS WILL BE SUBJECT TO BACKGROUND CHECK AND FINGERPRINTING.
BACKGROUND CHECKS FOR ALL CANNABIS RELATED BUSINESSES AND ACTIVITIES TAKE PLACE PER SECTION
5.45.080 (E)(8) AND 5.55.080 (E)(8) AS CODIFIED IN THE NEWLY ADOPTED ORDINANCES.
21) AFTER JULY 1, 2018, THE FOLLOWING INSPECTIONS (SMOKE DETECTOR, SMOKE DETECTOR (IMMEDIATE
NEED), AND NEW BUSINESS LICENSE) WILL BE CONDUCTED BY FIRE PREVENTION SPECIALISTS AT STRAIGHT
TIME. CPI-U INCREASE FREEZE WILL BE EFFECTIVE JULY 1, 2018 UNTIL JUNE 30, 2023. CPI-U INCREASE WILL
BE ADJUSTED FOR COMPREHENSIVE FEES SCHEDULE FISCAL YEAR 2023-2024 AND EFFECTIVE JULY 1, 2023.
22) IN ACCORDANCE BY ORDINANCE 1948 ADOPTED BY RESOLUTION 24349, MODIFYING USER FEES FOR ART
MURAL APPLICATIONS - REDUCING THE FEE.
23) IN ACCORDANCE BY ORDINANCE 1907 AND 1918 ADOPTED BY RESOLUTION 24138 MODIFYING USER FEES
FOR VACATION RENTAL REGISTRATION AND RENEWAL FEES; AND RESOLUTION 24162 HOMESHARING
REGISTRATION AND RENEWAL FEES AND ESTABLISHING CIVIL FINES AND PENALTIES FOR FALSIFICATION OF
APPLICATIONS.
24) IN ACCORDANCE BY ORDINANCE 1949 ADOPTED BY RESOLUTION 24350, MODIFYING USER FEES FOR
ANNUAL VACANT COMMERCIAL BUILDING MONITORING.
- CORRESPONDING FOOTNOTES -
76 of 76