HomeMy WebLinkAboutA2558 - SO CAL GAS COMPANY COGEN So. Calif. Gas Co - COGEN Gas
Service - Civic Center Site
AGREEMENT 2558-A
MO 4158, 4-6-88
Contract for Gas Service
Prime Account Number 19-8388-165-801-1
This contract ("Contract") is made this 16th day of March,
1988 between Southern California Gas Company, a California corporation
("Utility") and City of Palm Springs, a
municipal corporation ("Customer") .
The Utility has filed with the Public Utilities Commission
of the State of California ("CPUC") rate schedules and rules
applicable to service of natural gas which are open to public
inspection at the offices of the Utility. The Customer desires gas
service and the Utility is willing to furnish such service under the
applicable rate schedule(s) and rules specified below.
Now, therefore, it is mutually agreed as follows:
Customer's gas service is primarily for use for:
Cogeneration at Customer's facilities located at: 3200 E.
Tahquitz-McCallum, Palm Springs, CA 92263 . Customer's equipment is
described in Attachment A which is attached hereto and incorporated
herein.
Customer elects X sales and/or transportation
gas service (check one or both) as provided herein under the following
tariff rate schedules which are attached hereto and incorporated
herein as an integral part of this Contract: GN-50, GN-20 .
customer agrees to the rates and conditions set forth in the then
current applicable rate schedule(s) and any revisions thereof
authorized by the CPUC.
Customer' s gas usage is classified at the priorities set
forth on the Billing Schedule in Paragraph 1. 7 herein. The Utility
reserves the right to reassign the Customer' s priority based on
changes in the Customer' s equipment and/or operations.
- 1 -
. f f
Article I
GENERAL SERVICE
1. 1 Customer Charge: The Customer agrees to pay monthly
Customer Charges which are specified in Customer's applicable tariff
rate schedules.
1. 2 Demand Charge: The Customer shall also pay Demand
Charges based on the total gas throughput to Customer under Customer' s
applicable sales and transportation rate schedules which provide for
demand charges. These quantities may change monthly according to the
applicable tariff rate schedules.
1. 3 Volumetric Charge: In addition, Customer shall pay a
per therm transmission Volumetric Charge as specified in Customer' s
applicable tariff rate schedule(s) . This charge may change according
to the applicable tariff rate schedules.
1. 4 The gas will be considered delivered for billing
purposes in the order established in the Billing Schedule, with core
volumes delivered first, followed by core-elect volumes.
1.5 Minimum Charge: Customer' s Monthly Minimum Charge
shall be the total of all Customer Charges plus all Demand Charges
applicable for that month.
1. 6 Termination: Customer must provide twelve (12) months
prior written notification to Utility of termination of Service under
rate schedules subject to demand charges hereunder. At the end of the
twelve (12) month period, if service is terminated, the D-1 and D-2
demand charges will no longer be due and payable.
- 2 -
1.7 The Billing Schedule below specifies the sequence in
which rates are applied, to the Customer's usage. It will
identify fixed base volumes and percentages for volumes used in
excess of the base.
Billing Schedule
Prime Account Number: 19-8388-165-801 -1
Contracted otherwise
Billing Sequence Primary CPUC Applicable CPUC
% Th/Mo Rate Priority 'Rate Priority
---------- -------- ---------- --------- ----------- --------
1 100 GN-50N 3A GN-20N 2A
2 .
3 .
4.
5.
6.
7.
8.
9 .
10.
Supplemental Account Numbers: 02-2i48-010-400-1
Note: Cogeneration transportation customers whose monthly
facility requirements exceed their transported quantities will
procure gas under either rate schedule or
Form No. 6412 - 3 -
Article II
GAS PROCUREMENT
(Applicable to Customers procuring gas from the Utility)
2 . 1 Customer elects to purchase gas from the following
portfolio(s) . Customer will pay the procurement rates currently
specified in the applicable rate schedules in addition to the Customer
Charges, Demand Charges and Volumetric rates specified in Article I.
a. Core Rate Schedule: Percentage of
load: or Monthly Fixed Quantity: therms. Estimated
Annual Core Contract Quantity: therms. This core rate will
be equal to the core rate specified on the appropriate rate schedule,
and is subject to change semi-annually. The first quantities of gas
delivered to the Customer each month will be these core volumes.
b. Core-Elect Rate Schedule(s) N/A. Annual Contract
Quantity: therms. The Annual Contract Quantity will be
broken down into Monthly Contract Quantities as specified below:
January therms. July therms.
February therms. August therms.
March therms. September therms.
April therms. October therms.
May therms. November therms.
June therms. December therms.
Under no conditions will Monthly Contract Quantities be
deferred to later months. Core-Elect Monthly Contract quantities will
be considered the first gas through the Customer' s meter each month
after core volumes.
The Core-Elect rate will be equal to the core WACOG
specified on the appropriate rate schedule. This core commodity rate
is subject to change semi-annually. The term for Core-Elect purchases
shall be from to If Customer does not purchase
its entire Monthly Contract Quantity during any month or discontinues
or terminates core-elect procurement, Customer is liable for all
applicable Customer and Demand Charges plus Company's unavoidable
costs including any storage costs, but excluding any costs allocated
to transmission charges.
4 -
;a a
C. Non-core rated schedule(s) :
None-Core o of Estimated Annual
Rate Schedule Load Contract Ouantitv
GN-50N 100 582 ,783 Therms
The rate(s) hereunder will be equal to the non-core WACOG specified on
the appropriate rate schedule. These non-core rates are subject to
revision not more than twice monthly on five days notice to reflect
changes in Company' s non-core WACOG.
2 .2 Gas purchases under this Contract will begin on
5-1-88, or as soon after as the Utility is ready to commence service
to the Customer, but not before ten (10) working days after execution
of this Contract unless special circumstances exist.
2 . 3 Either the Utility or Customer may terminate the
non-core procurement provisions of this contract by providing thirty
(30) days prior written notice, however, customer and demand charges
will be paid as provided in the applicable rate schedule.
- 5 -
Article III
TRANSPORTATION SERVICE
(Applicable to Customers procuring gas
from sources other than the Utility)
3 . 1 In the event Customer is transporting Customer-owned
gas, all terms and conditions in Tariff Rule 30, "Transportation of
Customer Procured Gas" are incorporated as part of this Contract as if
fully set forth herein.
3 . 2 Transportation Service shall commence on N/A
and continue through N/A and month-to-month thereafter until
terminated by either party on fifteen (15) days written notice.
3 . 3 Customer will deliver gas into the utility system at
the Points of Receipt, and Utility will redeliver like quantities of
gas to Customer on a reasonably concurrent basis at the Points of
Delivery. Points of Receipt and Delivery are listed in Attachment B
which is attached hereto and incorporated herein. In the event
Customer is transporting gas under more than one contract, the order
of deliveries will be made to Points of Delivery and rate schedules in
the order listed on Attachment B.
3 . 4 For every therm of gas delivered to Utility for
redelivery to Customer, Customer agrees to pay the Volumetric Rate as
specified in Paragraph 1. 3 .
3 .5 Customer' s Maximum Daily Transportation Capacity is
therms.
3 . 6 In the event sufficient gas is not transported to meet
the Customer's gas requirements, Customer will be billed for such
volumes at the applicable sales rate schedule as specified in the
Billing Schedule in Paragraph 1.7 .
3 . 7 Customer will identify in Attachment C any pipelines,
shippers and/or brokers that will be involved on behalf of Customer in
transportation arrangements with Utility.
3 . 8 Changes in Gas nominations should be made during normal
business hours by contacting the Utility at (213) 689-2636. If
communication with the Utility at other times is necessary, call
(213) 689-7274 . Utility reserves the right to change these numbers at
any time upon notification to Customer.
- 6 -
r
Article IV
NOTICES
4 . 1 Any formal notice, request or demand concerning this
Contract shall be given in writing by Customer or Utility, and shall
be mailed by Registered or Certified mail or delivered in hand to the
other party as follows:
To Customer: City of Palm Springs
3200 E. Tahquitz-McCallum
Palm Springs, California 92263
To Utility: Southern California Gas Company
810 South Flower Street
Los Angeles, California 90017
Attention: Manager of Contract Sales
and Transportation
or to such other address as the parties may designate by written
notice. Routine communications may be mailed by first class U.S.
mail. Statements, invoices and billings shall be sent by Utility to
Customer by first class mail to:
City of Palm Springs
3200 E. Tahgitz-McCallum
Palm Springs, California 92263
4 . 2 Notices delivered by hand shall be deemed effective
when delivered. Notices delivered by first class mail shall be deemed
delivered forty-eight (48) hours (not including weekends and holidays)
after deposit, postage prepaid, in the U.S. mail, or if Certified or
Registered mail is used, as acknowledged by the receipt of the
Certified or Registered mailing.
- 7 -
Article V
MISCELLANEOUS
5. In the event Customer' s gas usage changes so that the
qualifications under the Customer' s selected rate schedules are not
met, the Customer will notify the Company in accordance with Tariff
Rule 9.
5.2 This Contract is not transferable by the Customer and
cannot be assigned without the prior written consent of the Utility
which will not be unreasonably withheld.
5.3 The Customer grants to the Utility for use as long as
this Contract continues in force and for a reasonable time thereafter,
such easements and rights-of-way in the land of the Customer, together
with such rights of ingress and egress as may be necessary or
convenient to enable the Utility to install, operate, inspect,
maintain, repair, change or remove meters, pipelines and all other
equipment which the Utility may install for the purpose of furnishing
gas service under this Contract.
5. 4 The Customer agrees to pay the Utility for all natural
gas sales and transmission service under this Contract at the rate and
under the conditions set forth in the then current applicable
schedule(s) , or revisions thereof authorized by the CPUC, including
but not limited to customer charges, commodity rates, demand charges,
volumetric rates, billing account surcharges and rate adjustments.
All monthly bills shall be paid at the office of the Utility within
nineteen (19) days after the date such bill is mailed. Late payments
will be subject to any late payment charges provided in the Tariff.
5. 5 The Utility shall not be obligated to deliver gas
except at times when, and at points where, the capacity of the
Utility's existing distribution system is sufficient to supply the
Customer without detriment to then-existing service to others.
5. 6 The Utility shall not be liable for failure to deliver
gas under this Contract when such failure in any way results from
breakage of its facilities, however caused, from acts of God, strikes,
interruptions in order to maintain or improve its system, or other
conditions beyond its reasonable control, as specified in Tariff
Rule No. 23 . The Customer shall not be liable for failure to accept
service under this Contract due to cessation of its operations caused
by acts of God, strikes, or of-her conditions beyond its reasonable
control. Customer's then current monthly Minimum Bill, for periods
during an event of force majeure, will be reduced proportionately to
such interruption of service pursuant to this paragraph.
- 8 -
5. 7 All natural gas delivered under this Contract shall be
measured in accordance with the standard of the Utility as set forth
in its Tariff Rule No. 2 . Any facilities necessary for service
hereunder will be provided by a separate facilities agreement. All
meters, gauges, pipelines, fittings, regulators and other equipment
installed on the premises of the Customer, the cost of which was borne
by, or advanced to, or donated to the Utility, shall be the Utility's
property, except as otherwise specifically provided in the then rules
of the Utility filed with the CPUC; such property may be changed or
removed by the Utility at any time.
5. 8 All natural gas delivered under this Contract shall be
supplied in accordance with the rules of the CPUC, and under such
rules as may be adopted by the Utility and approved by the CPUC. This
Contract shall be subject at all times to such changes or
modifications by the CPUC as it may from time to time direct in the
exercise of its jurisdiction.
5. 9 This Contract may be terminated at any time upon prior
written notice as provided in Articles 1. 6, 2 . 1, 2 . 3 and 3 .2 .
5. 10 A waiver by a party at any time of its rights with
respect to a default under this Contract, or with respect to any other
matter in connection with this Contract, shall not be deemed a waiver
with respect to any other or subsequent default or matter.
- 9 -
This Contract with the Attachments listed below constitutes
the entire agreement of the parties for natural gas sales service, and
all terms and other representations made are embodied in this written
Contract. This Contract shall not be modified or amended except by a
document in writing and duly executed by Utility and Customer.
1. Attachment A - Equipment
2 . Attachment B - Points of Receipt and Delivery
3 . Attachment C - 'Transportation Contract Contacts
CUSTOMER UTILITY
f
By, �i'Aa,..� � /emu..,» By:
NORMAN R. J{INS ail➢ �a� yid,
Title: � �, Poiri R Title: '." ptten � ao NrsR4Ars@ge.V
Date. Date:
✓ L; , %
APPROVED AS TO FORM
SS�Pl-
kiiy A�ttoarney
Date
10 —
REPORT DIS'TRTBUl ION SOUTHERN CALIFORNIA GAS COMPANY REPORT" NO. BEt$01
MARKET SERVICE'S ANALYSIS FOR END--USE PRIORITY FUEL REQUIREMENTS RUN DATE 63/15/6 '
ATTACHMENT A
PAGE NO. i
CUSTOMER NAME: *CTY OF F'S--MUNICIPAL STREET ADDRESS: 3200 E TAH MCCLI_M WY
ACCOUNT NUMBER. 19-Ei388-16`i--E01-i PALM S'PRGS CA 92262
PREMISES iD4: 190123434
f
S'Efi CPUC TYT'E MANUFACTURER CONNECTED AVERAGE HRS MCF DAY WKS MCF
NMBR PRTY UNIT DESCRIPTION USE CFH Cl-H /DA /DAY /WK /NO /MONK-1
10 CF'2A 2 PRIME MOVER CATERP TRACTOR CO. 161 000 43,2'50 24 1 ,036.0 7.0 4.3 31 ,244.0
GAS ENGINES POWER GENERATION CON
SUBI"OTAL_. 2 ____ .._____.__________..____________. 16,000 43,250 .___ i ,03F3.0 ____.___.._. 31 ,244.
TO"TAT_: 2 ---------------------------'- -------'----"----- 16,000 43,250 ___ i ,038.0 -------- 31 ,244.0
•
Q)
C`1
rn_
tv
i
lttac: tent 9
Pci.^.ts Of Maximum Daily ❑e_ive=-:
3ece-t- Ouantit7 P-=_ssu-e
1 .
2 .
Points of Maximum Daily Deli7rerr
Del_ve^r Ouantit•r P-essu-e
(up co)
1.
2 .
?cam No. 6412 - '-�
>t y hl ro n y n z W 'd n D' n z H r'( ',Y U
(p •1 �✓ rl ro n at r3 1.1 ro n DJ n z >t y t*1 d o 'y n z (D a 0 (r a .ti `� U r1 F' a D fr a '.1 U i-• a 0 7 N
)( O •[1 a ry U H a U '.7' I a U a t-A Ul (D U P' i'� a 0 a W N U lY i'� P• U w M UJ 1- U x i'� a U w a
rq i� a p rt a � U p ft r-• (D O rt a U U r1 U N ri p X� (1 ft a a ry (D rl fr
i• (1 a n a . • O ID (1 'P 'ti r1 ri a x• X fD a N N n x `(1 a W U
ari � 'Cryfia rybK � � mNna a n �
N 1- :1 a C \ (p W •• ;5' x u1 (D � N n n a
III
fi rA ft H• a G X •(7 a s w •• j 7. z ft N fi H (1 z '.i z ft N f1 O (U] ri
•,l N I•• 'U i•• p P t . a (ll N n N O n o a .. ..
O n O It
rt r H- N r.. ;7 1, (t N it a z '.3 z ft N :t O n O w •• .y ••
W rA N n ft O n O a •• •' N ry O n O a r•. , ft i'• • `C (t
rt .• fl rt '` N N .. .. w U N a10
tUi it• rA . ft U ~ N O H. • I. rd .. U rd •• ••
O [�• It i• (D 'd N ,rot 'y '7 It G O
p O ID O ff o ry 0 (D y O P O (1 U
(1 H r r a a
i' U a N a p a U
R r1 a a a O ri z z
m N U z I p
` it
N ID N N z O z ry
ry O i O N
r� a ft H. a f1 O i, N (D 3
O rt. U - a
IA (D
aop a N P. GP l
i"It a a tT ft
ilUGa I NA I (D I n
SrrG0 w n
N1i n H. ry � rA !a
for El a i' N h" ld
p ft
F' o N (i c l IDOx n 75" W
rt ~' in � o ID (A a on
1 Xti ft o 1- It r' ri (r N
;JU rtN N U >f HITJron �' nz a
i- It H. w' :r N ,j Ih ro n �' n z (afl * r� r•1 rd n Y n z U It td (Dp r• a u a w
rr wNp" I- HH aElWrapa oryfa-r ((DoriPP, 00 It Urirmortap (D tr1
1 (t Y a `./ 1-••d i-' a O (t aP H .. ry p a p p --C It ft a
N ry 1- 0 ki, a to it X �c1 a ,\ a W It fl � ryro x N a N ((0 n a X' X •r] a (/1 N n •, U n
r5 Ul N n G (D z ] 7. ft N f) N a o n O W N •) La
,•ni' it N o n o w N
ten' f I (A • X` nDry l o (D
O H. (D U ro
y
to ID
It
O111 w
O a P p
n H ryN � to ry � u
a adt o Y o I I 0
( N 0 o
I N p. ann
] wwa, UFiN N .rCP
N P z N C LA III •.7 •q f(D 0 as n
rt IQ a
P(oklGomY a ri
p
t7ari Url L1 P
I i-' :r i" (D I 0a, o :iww
on fai It
P.-
r i+ io o N. Pi 0
n i� a In
N 0 r
' V lsed CAL.P U.C.SHEET NO 18721-G
SOUTHERN CALIFORNIA GAS COMPANY
LOS ANGELES, CALIFORNIA CANCELING Revised CAL.P.U.C. SHEET NO 18638-G
(Sheet 1 of 4)
Schedule No. C3�i-50
NAVQK GAS SERVICE FOR COGENERATION
APPLICABILMY
Applicable to natural gas service for qualifying cogeneration facilities
classified in Rule 23 as Priority 3A. This schedule is also applicable to
solar electric generation projects. Customers eligible for service under this
schedule may elect transportation service under Schedule GT-50.
TERRTIYJRY
Applicable throughout the service territory.
RATES
Procurement Charge
The procurement charge is the weighted average cost of gas (WACOG) of the
Portfolio chosen either core or non-core.
GN-50C Core WACOG, per therm. . .. . . . . . . . . . . .. . . . . 21.094q
GN-50N Non-Core [aan, per therm. . . .. . . . .. . . . . . . 17.8190
The WACOG of the non-core procurement gas portfolio is subject to revision not
more than twice monthly 'upon five days' notice to reflect changes in the
non-core wACOG, including recorded billing lag adjustments,
Trancmiscion Charges-
Volumetric Charge, per therm . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8.8930
The unit volumetric charge shall be the weighted average of all the
transmission charges, including demand charges, of the Utility Electric
Generation customers for the preceding month, allowing for a 60 day lag
for true up.
The bill for cogeneration customers shall be calculated based on the
above, or the total customer rhame, demand charges and volumetric
transmission charge Of the otherwise applicable schedule, whichever is
less.
Minimum Charge
The minimum monthly charge shall consist of the monthly customer charge and
the monthly demand charges Of the Otherwise applicable schedule.
Rates may be adjusted to reflect any applicable taxes, franchise or other
fees, regulatory surcharges, and interstate Or intrastate pipeline charges
that may occur.
Rare number of therms to be billed shall be determined in accordance with
Rule 2.
(continued)
(TO BE INSERTED BY UTILITY) ISSUED BY (TO BE INSERTED BY CAL. P,U.C.1
ADVICE LETTER NO. 1767-A ROY M. RAWLINGS DATE FILED
DECISION NO, 87-12-039 , et .. al . VICE PRESIDENT EFFECTIVE
RESOLUTION NO.
-J 3 CAL.P.UC.SHEETNO_1872G=_G_
SOUTHERN CALIFORNIA GAS COMPANY
LOS ANGELES. CALIFORNIA CANCELING Revised CAL.P.U.C. SHEET NO 18629-G
(Sheet 2 of 4)
Schedule No. QI-50
NATURAL GAS SERVICE FOR CUGENFRP.TION
(Continued)
SPECIAL CONDITIONS
1. Definitions of the principal terms used in this schedule are contained in
Rule No. 1.
2. Customers may receive service under this schedule (a) separately or (b)
in combination with another rate schedule(s) through a single meter
installation. Where: service is rendered under (b) , a separate monthly
customer charge may be applicable for service under each schedule.
3. As a condition precedent to service under this schedule, an executed
Contract for Gas Service (Form No. 6412) is required. By mutual
agreement, the contract may specify negotiated transmission charges, terms
or conditions of service different than those shown above. All rates and
conditions are subject to revision and modification as a result of
Commission order. Negotiated contracts must be filed with the public
Utilities Commission.
4. Ncni-core cogenerators may purchase gas from either the core (GU-50C) or
non-core (GU-50N) ga's portfolios. Non-core cogenerators electing service
under this schedule may choose elected core procurement under GN-50C for
all or a portion of -their gas requirements. Non-core cogenerators and
core cogenerators who have qualified for and elected non-core procurement
may choose core-elect procurement initially only when the WACOG of the
non-core portfolio is less than the WAOOG of the core portfolio.
Core-elect procurement customers may enter into a new core-elect contract
for the same or a lesser amount of gas upon expiration of their old
core-elect contract.
5. The Utility shall provide gas procurement service under Schedule GN-50N on
a best-efforts basis„ Either the Utility or the customer may terminate
the non-core procurement provisions of the service contract by providing a
30-day written notice of that intention.
6. The term of service for core-elect procurement under Schedule GN-50C shall
be a minimum of one year. Core-elect customers who do not use their full
contracted quantities on a monthly basis will be liable for unavoidable or
m;n;ee m, charges to reflect any costs which the Utility incurs as a result,
excluding costs allocated to transmission charges. The termination fees
shall be docwnented in the procurement contract.
7. Customers having long-term core-elect procurement contracts under GN-50C
may specify in their contract lower volumes of gas each year if they do
not expect their demands to be maintained at current levels.
(continued)
(TO BE INSERTED BY UTILITY) (TO BE INSERTED BY CAL P U CI
ISSUED BY
ADVICE LETTER NO. 1767-A ROY M. RAWLINGS -
DATE FILED
DECISION NG 87-12-039 , et a1 VICE PRESIDENT EFFECTIVE
REV.m.o RESOLUTION NO.
Revised CAL.P.U.C. SHEET NO 18723-G
SOUTHERN CALIFORNIA GAS COMPANY LOS ANGELES, CALIFORNIA CANCELING Revised CAL.P.U.C.SHEET NO. 18640-G
Schedule No. IN-50 (Sheet 3 of 4)
NATUl3AL GAS SERVICE FOR COGENERATION
(Continued)
SPECIAL CONDITIONS (Continued)
8. Core custOMexs must purchase gas from the core gas portfolio unless they
demonstrate to the Utility's satisfaction that they are capable of using
an alternate fuel on a sustained basis, have installed and use such
equipment and that such alternative fuel use is an econcnuc alternative to
core service, at which time they may be classified as non-core customers and
may purchase gas from the non-core portfolio.
9. A Cogeneration Contract Addendum (Form 5058) will be required as a
condition Of service under this schedule in those cases where additional
facilities are necessary to serve a customer who has requested service at
higher than standard delivery pressure.
10. This schedule is available for only the cogeneration portion of the
customer's gas purchases, which will be the lesser of:
a. Actual gas used by the cogenerator in the sequential production of
electrical energy and heat, steam, or useful work; or
b. The amount of gas the local electric utility would require to
generate and-transmit an equivalent amount of electricity, based on
the utility's average annual incremental heat rate and reasonable
transmission losses.
11. Customers will make available any existing meters and associated
measuring facilities required to measure the kilowatt-hours generated.
The Utility shall have the right to read, inspect and/or test the
measuring facilities during normal working hour;. Additional gas,
electric and/or steam, metering facilities required to separately determine
gas usage to which Schedule GN-50 is applicable will be installed, owned
and Operated by the Utility at its expense; however, the Utility may, at
its sole discretion, utilize estimated data to determine such gas usage.
12. Utility does not require standby equipment as a condition of service under
this schedule. It is the sole responsibility of the custcaner to provide
and maintain adequate standby equipment and fuel at all times for
immediate operation in the event that the supply of gas shall be
interrupted or curtailed in whole or in part.
(continued)
(TO BE INSERTED BY UTILITY) (TO BE INSERTED BY CAL. P.U.C.)
ISSUED BY
ADVICE LETTER NO. 1767-A ROY M. RAWLINGS
GATE FILED
DECISION NO 87-12-039 , et al VICE PRESIDENT EFFECTIVE
Revised CAL.P U C.SHEET NO 18724-r
SOUTHERN CALIFORNIA GAS COMPANY LOS ANGELES, CALIFORNIA CANCELINGR ViSed CAL.P.U.O.SHEET NO 18641-G
Schedule No. GN-50 (Sheet 4 of 4)
NATURAL GAS SERVICE FOR COGENERATION
(Continued)
SPECIAL CONDITIONS (Continued)
13. In the event of curtailment, customers under this schedule will be
curtailed in accordance with Rule 23, Priority of Service.
14. In the event customers make any material chainge, either in the amount or
character of gas appliances or equipment, written notice to the Utility
must be made in accordance with Rule 29, Change of Consumer'S Apparatus or
Equipment.
(TO BE INSERTED BY UTILITY) ISSUED BY (TO BE INSERTED BY CAL. P U.C.)
ADVICE LETTER NO. 1767-A ROY M. RAWLINGS
DATE FILED
DECISION NO. 87-12-039 , et all VICE PRESIDENT EFFECTIVE
• Re ed CAL P.U.C.SHEET NO. 18701-G
SOUTHERN CALIFORNIA GAS COMPANY Revised
LOS ANGELES, CALIFORNIA CANCELING CAL P.U.C.SHEET NO. 18618-G
Schedule No. GN-20 (Sheet 1 of 3)
NATfJ AL GAS CORE; SERVICE FOR LARGE COMMERCIAL AND INQJSTRIAL
AFP2SCABILSTY
Applicable to natural gas service for use classified in Rule 23 as Priority
1 and 2A at each Facility with usage exceeding 250,000 therms per year (or
20,800 therms per month during the season when gas is used) . Customers
eligible for service under this schedule may also elect transportation service
under Rate Schedule GT-20.
TERRI2URY
Applicable throughout the service territory.
RATES
Customer Charge, per month (P-1 Service) . . . . . . .. . . $10.00
Customer Charge, per month (P-2 Service) . .. . . . . . . . $50.00
If the customer charge is collected under Schedule CT-20, no duplicative
charge is collected hereunder.
Rate, per therm:
Sugner Winter
GN-20C, Core Service, per therm.
First 5,000 therms 46.500C 59.797(,-
Over 5,000 therms . ... ... .. . . . . . . . . ... . . .. . . . .. . . . 40.0000 44.000q
GN-20N, Non-Core Service, per therm.
First 5,000 therms 43.2250 56.5224
Over 5,000 therms . . . .. ... . . . .. . . . . . . . . . . .. . . . . . . 36.7250 40.725G
Custcmers eligible for service under Schedule GN-20 may elect non-core gas
procurement. The rage for this service (IN-20N) is calculated based on
the weighted average cost of gas (WACCG) of the non-core gas portfolio
(sub3ect to revision not more than twice monthly upon five days notice)
plus the difference between the GN-20C procurement charge and the average
cost of the core gas portfolio. The average cost of the core gas
portfolio is 21.0940 per therm.
Under this schedule, the winter season shall be defined as November 1
through April 30.
(continued)
(TO 9E INSERTED BY UTILITY) (TO BE INSERTED SY CAL. P U C.)
1767-A ISSUED SY
ADVICE LETTER NO. ROY M. RAWLINGS DATE FILED
87-12-039, et al
DECISION NO. VICE PRESIDENT EFFECTIVE
^'° '•'° _ RESOLUTION NO.
Oritlea1 19789-C**
CAL.P ULC,SHEET NO
SOUTHERN CALIFORNIA GAS COMPANY Revised **
LOS ANGELES. CALIFORNIA CANCELING— CAL P.U.C.SHEET NO.
(Sheet 2 of 3)
Schedule No. G�I-20
NATURAL GAS CURE SERVICE FOR LARGE fCi-==C L AND =ST=
(Continued)
RATFS (Continued)
Minimum Charge
The minimum monthly charge shall consist of the Monthly Customer Charge.
The number of therms to be billed shall be determined in accordance with Rule
No. 2.
SPEC2AL CONDITIONS
1. Definitions of the principal terms used in this schedule are contained in
Rule No. 1.
2. Customers may receive: service under this schedule (a) separately, (b) in
combination of priorities under this schedule or (c) in combination with
another rate schedule(s) through a single meter installation. Where
service is rendered under (b) or (c) , a separate monthly customer charge
may be applicable for service under each schedule.
3. As a condition precedent to service under this schedule, an executed
Contract for Cos Service (Form No. 6412) is required, specifying the terns
of service.
4. Customers under this schedule may purchase gas under the core portfolio
(GN-20C) or the non-core portfolio (GN-20N) . Customers my enter into
core-elect procurement initially only when the WACCG of the non-core
portfolio is less than the WACOG of the core portfolio. Core-elect
procurement customers may enter into a new core-elect contract for only
the same or a lesser amount of gas upon expiration of their old core-elect
contract. Customers who leave core procurement service may return to ,core
procurement only under core-elect procurement service.
5. The Utility shall provide non-core gas procurement service on a
Lest-efforts basis. Either the Utility or the customer may terminate the
non-core procurement provisions of the Service Contract by providing a
30-day written notice: of that intention, with the exception that the
customer may nominate zero volume purchases for any given month following
a revision to the ncn-core procurement portfolio WACCG.
**18529-G, 18530-G, 18531--G, 18149-G, 18619-G
(continued)
1 ITO 9E INSERTED 9Y UTILITY, (TO 9E INSERTED BY CAL. P.U.C.]
1767-A 3rd Su 1. ISSUED DY
ADVICE LETTER NO. Fp ROY M. RAWLINGS GATE FILED ADr 29 , 1988
DECISION NO 87-12-039, et al VICE PRESIDENT EFFECTIVE Mav 01 , 1988
.[' I... RESOLUTION NO. G-2787 & G-2783
O final 18790-G*-
CAL.PUC SHEETNO ___
SOUTHERN CALIFORNIA GAS COMPANY
LOS ANGELES. CALIFORNIA CANCELING CAL P U.C. SHEET NO
(Sheet 3 of 3)
Schedule No. GAT-20
NATURAL CAS CCRE S=CE YCR LIR. ==ZI71AL AND INQS-=
(Continued)
SPE= CCNDITICNS (Continued)
6. The term of serria,. for core-elect procurement under Schedule 2T-20C
shall be a mini= of one year. Customers who do not use their full
contacted quantities on a yearly basis will be liable for unavoidable or
mina Tm charges to reflect any costs which the Utility incurs as a result,
excluding costs allocated to transmission charges. The termination fees
shall be documented in the procurement contract.
7. Customers having long term core-elect procurement contracts under Schedule
GN-20C may specify in their contracts lower volumes of gas each year if
they do not expect their downds to be maintained at current levels.
8. Customers under this schedule may be reclassified as non-core if they
demonstrate to the Utility's satisfaction that they meet the following
conditions: 1) clearly have the technological capability to use alternate
fuel; 2) would be able to use alternate fuel at a cost that is less than
the cost of core gas service; and 3) the customer is willing to accept the 1,
lower service priority of non-core service. Such classifications must be
submitted to the Commission for approval. Customers who qualify under
these conditions and choose to be classified as non-core will be served
under Rate Schedule GN-30. Customers who are classified as non-core must
requalify with the conditions above on an annual basis.
9. . In the event of curtailment, customers :der this schedule will be
curtailed in accordance with Dale 23, Priority of Service.
10. In the event customers rake any material change, either in the amount or
character of gas appliances or equipment, written notice to the Utility
must be made in accordance with Rule 29, Change of Consumer's Apparatus or
Equipment.
(TO HE INSERTED BY UTILITY) (TO BE INSERTED BY CAL. P.0 C 1
ISSUED BY
ADVICE LETTER NO. 1757-:� 3rd_Ssippl. ROY M. RAWLINGS DATE FILED Apr 29, 1988
DECISION NO. 87-12-039, eC a1 VICE PRESIDENT EFFECTIVE May 01 , 1988
e I... RESOLUTION NO. G-2787 & G-2783
So. Calif. Gas Co - COGEN Gas
Service - Sunrise Plaza Site
AGREEMENT #2558-B
MO 4158, 4-6-88
Contract for Gas Service
Prime Account Number 18-8388-179-802-1
This contract ("Contract") is made this 16th day of March,
1988 between Southern California Gas Company, a California corporation
("Utility") and City of Palm Springs, a
municipal corporation ("Customer") .
The Utility has filed with the Public Utilities Commission
of the State of California ("C:PUC") rate schedules and rules
applicable to service of natural gas which are open to public
inspection at the offices of the Utility. The Customer desires gas
service and the Utility is willing to furnish such service under the
applicable rate schedule(s) and rules specified below.
Now, therefore, it is mutually agreed as follows:
Customer' s gas service is primarily for use for:
Cogeneration at Customer's facilities located at: 403 So. Cerritos,
Palm Springs, California 9226-3 . Customer's equipment is described in
Attachment A which is attached hereto and incorporated herein.
Customer elects X sales and/or transportation
gas service (check one or both) as provided herein under the following
tariff rate schedules which are attached hereto and incorporated
herein as an integral part of this Contract: GN-50 , GN-20 .
customer agrees to the rates and conditions set forth in the then
current applicable rate schedule(s) and any revisions thereof
authorized by the CPUC.
Customer' s gas usage is classified at the priorities set
forth on the Billing Schedule in Paragraph 1.7 herein. The Utility
reserves the right to reassign the Customer's priority based on
changes in the Customer's equipment and/or operations.
- 1 -
Article I
GENERAL SERVICE
1. 1 Customer Charge: The Customer agrees to pay monthly
Customer Charges which are specified in Customer's applicable tariff
rate schedules.
1. 2 Demand Charge: The Customer shall also pay Demand
Charges based on the total gas throughput to Customer under Customer's
applicable sales and transportation rate schedules which provide for
demand charges. These quantities may change monthly according to the
applicable tariff rate schedules.
1. 3 Volumetric Charge: In addition, Customer shall pay a
per therm transmission Volumetric Charge as specified in Customer's
applicable tariff rate schedu].e(s) . This charge may change according
to the applicable tariff rate schedules.
1.4 The gas will be considered delivered for billing
purposes in the order established in the Billing Schedule, with core
volumes delivered first, followed by core-elect volumes.
1. 5 Minimum Charge: Customer's Monthly Minimum Charge
shall be the total of all Customer Charges plus all Demand Charges
applicable for that month.
1. 6 Termination: Customer must provide twelve (12) months
prior written notification to Utility of termination of Service under
rate schedules subject to demand charges hereunder. At the end of the
twelve (12) month period, if service is terminated, the D-1 and D-2
demand charges will no longer be due and payable.
- 2 -
1.7 The Billing Schedule below specifies the sequence in
which rates are applied to the Customer's usage. It will
identify fixed base volumes and percentages for volumes used in
excess of the base.
Billing Schedule
Prime Account Number: 18-8388-179-802-1
Contracted Otherwise
Billing Sequence Primary CPUC Applicable CPUC
Th/Mo Rate Priority 'Rate Priority
---------- -------- --- ------- --------- ----------- --------
1• 100 GN-50N 3A GN-20N 2A �-
2 .
3.
4 .
5.
6.
7.
8.
10.
Supplemental Account Numbers:
Note: Cogeneration transportation customers whose monthly
facility requirements exceed their transported quantities will
procure gas under either rate schedule or
Form No. 6412 - 3 -
Article II
GAS PROCUREMENT
(Applicable to Customers procuring gas from the Utility)
2 . 1 Customer elects to purchase gas from the following
portfolio(s) . Customer will pay the procurement rates currently
specified in the applicable rate schedules in addition to the Customer
Charges, Demand Charges and Volumetric rates specified in Article I.
a. Core Rate Schedule N/A. Percentage of
load: or Monthly Fixed Quantity: therms. Estimated
Annual Core Contract Quantity:, therms. This core rate will
be equal to the core rate specified on the appropriate rate schedule,
and is subject to change semi--annually. The first quantities of gas
delivered to the Customer each month will be these core volumes.
b. Core-Elect Rate Schedule(s) N/A. Annual Contract
Quantity: therms. The Annual Contract Quantity will be
broken down into Monthly Contract Quantities as specified below:
January therms. July therms.
February therms. August therms.
March therms. September therms.
April therms. October therms.
May therms. November therms.
June therms. December therms.
Under no conditions will Monthly Contract Quantities be
deferred to later months. Core-Elect Monthly Contract quantities will
be considered the first gas through the Customer' s meter each month
after core volumes.
The Core-Elect rate will be equal to the core WACOG
specified on the appropriate rate schedule. This core commodity rate
is subject to change semi-annually. The term for Core-Elect purchases
shall be from to If Customer does not purchase
its entire Monthly Contract Quantity during any month or discontinues
or terminates core-elect procurement, Customer is liable for all
applicable Customer and Demand Charges plus Company's unavoidable
costs including any storage costs, but excluding any costs allocated
to transmission charges.
4 -
C. Non-core rated schedule(s) :
None-Core o of Estimated Annual
Rate Schedule Load Contract Ouantity
GN-50N 100 426, 978 Therms
The rate(s) hereunder will be equal to the non-core WACOG specified on
the appropriate rate schedule„ These non-core rates are subject to
revision not more than twice monthly on five days notice to reflect
changes in Company' s non-core WACOG.
2 . 2 Gas purchases under this Contract will begin on
5-1-88, or as soon after as the Utility is ready to commence service
to the Customer, but not before ten (10) working days after execution
of this Contract unless special circumstances exist.
2 . 3 Either the Utility or Customer may terminate the
non-core procurement provisions of this contract by providing thirty
(30) days prior written notice, however, customer and demand charges
will be paid as provided in the applicable rate schedule.
- 5 -
Article III
TRANSPORTATION SERVICE
(Applicable to Customers procuring gas
from sources other than the Utility)
3 . 1 In the event Customer is transporting Customer-owned
gas, all terms and conditions in Tariff Rule 30, "Transportation of
Customer Procured Gas" are incorporated as part of this Contract as if
fully set forth herein.
3 . 2 Transportation Service shall commence on N/A
and continue through N/A and month-to-month thereafter until
terminated by either party on fifteen (15) days written notice.
3 .3 Customer will deliver gas into the utility system at
the Points of Receipt, and Utility will redeliver like quantities of
gas to Customer on a reasonably concurrent basis at the Points of
Delivery. Points of Receipt and Delivery are listed in Attachment B
which is attached hereto and :incorporated herein. In the event
Customer is transporting gas under more than one contract, the order
of deliveries will be made to Points of Delivery and rate schedules in
the order listed on Attachment B.
3 . 4 For every therm of gas delivered to Utility for
redelivery to Customer, Customer agrees to pay the Volumetric Rate as
specified in Paragraph 1. 3 .
3 .5 Customer' s Maximum Daily Transportation Capacity is
therms.
3 . 6 In the event sufficient gas is not transported to meet
the Customer' s gas requirements, Customer will be billed for such
volumes at the applicable sales rate schedule as specified in the
Billing Schedule in Paragraph 1.7.
3 . 7 Customer will :identify in Attachment C any pipelines,
shippers and/or brokers that will be involved on behalf of Customer in
transportation arrangements with Utility.
3 . 8 Changes in Gas nominations should be made during normal
business hours by contacting the Utility at (213) 689-2636. If
communication with the Utility at other times is necessary, call
(213) 689-7274. Utility reserves the right to change these numbers at
any time upon notification to Customer.
6 -
Article IV
NOTICES
4 . 1 Any formal notice, request or demand concerning this
Contract shall be given in writing by Customer or Utility, and shall
be mailed by Registered or Certified mail or delivered in hand to the
other party as follows:
To Customer: City of Palm Springs
403 So. Cerritos
Palm Springs, Ca. 92263
To Utility: Southern California Gas Company
810 South Flower Street
Los Angeles, California 90017
Attention: Manager of Contract Sales
and Transportation
or to such other address as the parties may designate by written
notice. Routine communications may be mailed by first class U.S.
mail . Statements, invoices and billings shall be sent by Utility to
Customer by first class mail to:
City of Palm Springs
403 So. Cerritos
Palm Springs, Ca 92263
4 . 2 Notices delivered by hand shall be deemed effective
when delivered. Notices delivered by first class mail shall be deemed
delivered forty-eight (48) hours (not including weekends and holidays)
after deposit, postage prepaid, in the U.S. mail, or if Certified or
Registered mail is used, as acknowledged by the receipt of the
Certified or Registered mailing.
7 -
Article V
14ISCELLANEOUS
5. 1 In the event Customer' s gas usage changes so that the
qualifications under the Customer's selected rate schedules are not
met, the Customer will notify the Company in accordance with Tariff
Rule 19.
5. 2 This Contract .is not transferable by the Customer and
cannot be assigned without the prior written consent of the Utility
which will not be unreasonably withheld.
5. 3 The Customer grants to the Utility for use as long as
this Contract continues in force and for a reasonable time thereafter,
such easements and rights-of-way in the land of the Customer, together
with such rights of ingress and egress as may be necessary or
convenient to enable the Utility to install, operate, inspect,
maintain, repair, change or remove meters, pipelines and all other
equipment which the Utility may install for the purpose of furnishing
gas service under this Contract.
5.4 The Customer agrees to pay the Utility for all natural
gas sales and transmission service under this Contract at the rate and
under the conditions set forth in the then current applicable
schedule(s) , or revisions thereof authorized by the CPUC, including
but not limited to customer charges, commodity rates, demand charges,
volumetric rates, billing account surcharges and rate adjustments.
All monthly bills shall be paid at the office of the Utility within
nineteen (19) days after the date such bill is mailed. Late payments
will be subject to any late payment charges provided in the Tariff.
5. 5 The Utility shall not be obligated to deliver gas
except at times when, and at points where, the capacity of the
Utility's existing distribution system is sufficient to supply the
Customer without detriment to then-existing service to others.
5. 6 The Utility shall not be liable for failure to deliver
gas under this Contract when .such failure in any way results from
breakage of its facilities, however caused, from acts of God, strikes,
interruptions in order to maintain or improve its system, or other
conditions beyond its reasonable control, as specified in Tariff
Rule No. 23 . The Customer shall not be liable for failure to accept
service under this Contract due to cessation of its operations caused
by acts of God, strikes, or other conditions beyond its reasonable
control . Customer' s then current monthly Minimum Bill, for periods
during an event of force majeure, will be reduced proportionately to
such interruption of service pursuant to this paragraph.
- 8 -
5. 7 All natural gas delivered under this Contract shall be
measured in accordance with the standard of the Utility as set forth
in its Tariff Rule No. 2 . Any facilities necessary for service
hereunder will be provided by a separate facilities agreement. All
meters, gauges, pipelines, fittings, regulators and other equipment
installed on the premises of the Customer, the cost of which was borne
by, or advanced to, or donated to the Utility, shall be the Utility's
property, except as otherwise specifically provided in the then rules
of the Utility filed with the CPUC; such property may be changed or
removed by the Utility at any time.
5. 8 All natural gas delivered under this Contract shall be
supplied in accordance with the rules of the CPUC, and under such
rules as may be adopted by the Utility and approved by the CPUC. This
Contract shall be subject at all times to such changes or
modifications by the CPUC as it may from time to time direct in the
exercise of its jurisdiction.
5.9 This Contract may be terminated at any time upon prior
written notice as provided in Articles 1. 6, 2 . 1, 2 . 3 and 3 . 2 .
5. 10 A waiver by a party at any time of its rights with
respect to a default under this Contract, or with respect to any other
matter in connection with this Contract, shall not be deemed a waiver
with respect to any other or :subsequent default or matter.
- 9 -
This Contract with the Attachments listed below constitutes
the entire agreement of the parties for natural gas sales service, and
all terms and other representations made are embodied in this written
Contract. This Contract shall not be modified or amended except by a
document in writing and duly executed by Utility and Customer.
1. Attachment A - Equipment
2 . Attachment B - Points of Receipt and Delivery
3 . Attachment C - Transportation Contract Contacts
CUSTOMER UTILITY
y: J� By. _. ice'(' ;?
NO✓ti MIAN i�. 1iij\EC ;i'2me"SfLi"iN'1a-iksi A "'mi.o m'; iQVb"ilfd eq
Title "ITT MA Title
�rf'JiTiML`u _
Date: - ,_ .?'), Date: 7` _'` ,)
APPROVED AS T.0 FORM
�yto�rney
'date � � ° �Ye)- O v
10 -
REPORT DISTRIBUTION SOUTHERN CALIFORNIA GAS COMPANY REPORT NO. BONG"!
MARKET SERVICES ANALYSIS FOR END-USE PRIORITY FUEL REQUIREMENTS RUN DATE 03/15./0
ATTACHMENT A
PAGE P10.
CUSTOMER NAME: CITY OF PALM SPRTNG.S ETNEET ADDRESS: 403 .S CERRITO.S DR
ACCOUNT NUMDER: 18-8388-179-802-1 PALM EPRGE CA 92262
PREMISES 1.14: 180120103
6�
SEN CPUC TYPE MANUFACTURER CONNECTED AVERAGE FIRS MCF DAY WKS MCF
NMBR PRTY UNIT DESCRIPTION USL CI=N CPIi /DA iDAI` /{JIC fi10 /MOPffN
f0 CI='?Fl i PRIME MOVER CATERP. TRACTOR CO. 81000 20,493 74 491 .0 7.0 4.3 14,804.0
GAS ENGINES PONEC< GENFRATION CON
SUDTOTA L i ________________ ___._ ___._ 8,000 20,493 __._ 491 .8
TOTAL_: i El 000 20,493 ___ . 491 .8 14,804.0
y�
�b
r
:a
Attactmen- 3
Pciats of Maximum Daily De.. :e
luanti't•r D-=_ss"-=
1 .
2 .
Points of Maximum Daily Deli�rery
Del ve^r Quantity Prassu-e
1.
2 .
Form No. 6412 - 12
10
� t1i V)
G .arro {10
x z ro m o m ruui 1
' N I tj V b la 4 r°.'
q clr, o
tp
N r4 (o p v
rUa F3G ^; ^ o
�' In .d 0) W 1) tP V 41 tP
ma) z m �l roro
'1
ra .°, ° aroti0ro
0 1 z o vIPNN
In z u r
u
m p N • m o ellu i1 0 -'i C G a)o yu m � N n. alroovNtr
id. .1; F1 •., N .. . -.V'1 O a' , Ut .� tj U N rt1
tj 'j •• rt1OU O11P y
N N O U O roA ro N H .1:
N •• N N a� ."� G •.� N 8 tj
U N VI z al "L N N N A m 0
G N VI 1ro1 z 0 z. 11 ',N1
u 0 U N U1 N N V .. ro N \ N U, Ni 11 •• ro m \ N tP k N A O r1 t1 N
ram \ N tPx .X N N u ;, G U N •-1 N N N d p, 0 u N P• wr1 tr 1 .
N V a ?+ q FI N O 14 1i 'd N O N �-1 d O ro 0 ro 1� O N r) P+.-I t: ro •L N
11 F1 " 'd +1 o N r1 u o N ro o v .,4 .0 F3 N In w ro ° ro .1 t3 aI 1 . 1 .r, ro r�
mi rood •+ � riNQIw p zu � uwwl+ Inzu � u01WP xro 1nar.
zu .cur1l0P4( m rnx .0 11� rl
r� m In
N u m -14i oO z :i VI
r� 1 a) rorN � ln N ,n
0
r1 •tt
N b, tP N N >+ • +� N
� w mr u .i ro m u -•1
1 i 'd S1 d .. N .. rdd O al
• E 1 •• .. N N 1 I O 9•d 1N va OI r7
O 0 1' y t! z 0 7 1n rim 1w1i -Y
y O N t0' N 1v at a) N F1 �
N .r, q.
d N •• 0 o EF1 i°t uoVom o
o ° yr' r, N P1 N -.1 t1 , 0 7
1, -[I '1'' N .. fU •. !L N f3 N .. .. F3 U w 44 fj -,I
n1 P1 q a1 .. .. VI N .. .. ..-1 ° N . .., O ro •r1 {1 1-I
, •• .. .. Rd OUO roOUO1{ N '1 NJ� z � 73 0 -'4 r{ NOU O
N 1• y U (dG Y {1 UI J 7. Z .7, 11 ;1 {1 V1 a� z N O N ii °m n, z m y w8 0 V) w N 7 r •.1 n. •.I la h,
I N \ N tP �. 8 y rd A N 114 I I
° NON i� x eu m N \ N tPX .k ro N \ N tea) a, ro
� u aXi m N u + G tI m y 11 N N 11 :' V tl m y N u u , � t1 a) -0 u OI N to 0 (1: •I VI
Inge a) -I q � 'da1 ° N .-lu ° � � Rialo 0) -1u gr, 'd �NONr4 -d0 gq 'da� oN '-1 wHmUm0y
f nx: r: N ron •d -'10F3 Imw rovd '1 > r3mm rooro .1xFiNv1w ron4j0r: t3N Hvt1mtroY•
* VrCuP10H zu unlwH
uuP, TOp zu uP1wE1V zV � VWwH z
+ • oised CAL.P.0 C. SHEET N0. 18721—G
SOUTHERN CALIFORNIA GAS COMPANY
LOS ANGELES. CALIFORNIA CANCELING Revised CAL.P.U.C. SHEET NO 18638-G
(Sheet 1 of 4)
Schedule No. GN-50
NATI7RAL GAS SERVICE FOR CCIGENERATION
APPLICABILITY
Applicable to natural gas service for qualifying cogeneration facilities
classified in Rule 23 as Priority 3A. This schedule is also applicable to
solar electric generation projects. Customers eligible for service under this
schedule may elect transportation service under Schedule GT-50.
TERRITC)RY
Applicable throughout the service territory.
RATES
Procurement Charge
The procurement charge is the weighted average cost of gas (FMCOG) of the
portfolio chosen either core or non-core.
GN-5OC Core WACOG, per therm. . . . . . . . . . . . . . .. . . . . 21.094d,
GN-5ON Non-Core MCOG, per therm.. ... . . . .. . . . . . . 17.819('
The UACOG of the non-core procurement gas portfolio is subject to revision not
more than twice monthly upon five days, notice to reflect changes in the
non-core FACOG, including recorded billing lag adjustments.
Transmission Charges-
Volumetric Charge, per therm . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8.8934
The unit volumetric charge shall be the weighted average of all the
transmission charges, including demand charges, of the Utility Electric
Generation customers for the preceding month, allowing for a 60 day lag
for true up.
The bill for cogeneration customers shall be calculated based on the
above, or the total customer charge, demand charges and volumetric
transmission charge of the otherwise applicable schedule, whichever is
less.
Minimum Charge
The minimum monthly charge shall consist of the monthly customer charge and
the monthly demand charges of the otherwise applicable schedule.
Rates may be adjusted to reflect any applicable taxes, franchise or other
fees, regulatory surcharges, and interstate or intrastate pipeline charges
that may occur.
The number of therms to be billed shall be determined in accordance with
Rule 2.
(continued)
(TO BE INSERTED BY UTILITY) (TO BE INSERTED BY CAL. P U C.)
ISSUED BY
ADVICE LETTER NO. 1767—A ROY M. RAWLINGS DATE FILED
DECISION NO. 87-12-039 . et . al . VICE PRESIDENT EFFECTIVE
ncv a..a
IT — l,•:'y, � C RESOLUTION NO.
• CAL.P.U.C.SHEET
SOUTHERN CALIFORNIA GAS COMPANY
LOS ANGELES, CALEFORNIA CANCELING Revised CAL. PU.C.SHEETNO 18629-G
(Sheet 2 of 4)
Schedule No. GN-50
NATURAL, GAS SERVICE FOR �GIIQERATION
(Continued)
SPECIAL CONDITIONS
1. Definitions of the principal terms used in this schedule are contained in
Rule No. 1.
2. Customers may receive service under this schedule (a) separately or (b)
in combination with another rate schedule(s) through a single meter
installation. where: service is rendered under (b) , a separate monthly
customer Charge may be applicable for service under each schedule.
3. As a condition precedent to service under this schedule, an executed
Contract for Gas Service (Form No. 6412) is required. By mutual
agreement, the contract may specify negotiated transmission chatges, terms
or conditions of service different than those shown above. All rates and
conditions are subject to revision and modification as a result of
Commission order. Negotiated contracts must be filed with the Public
Utilities Commission.
4. Non-core cogenerators may purchase gas from either the core (GU-50C) or
non-core (CH-50N) gas portfolios. Non-core cogenerators electing service
under this schedule may choose elected core procurement under 0-50C for
all or a portion of their gas requirements. Non-core cogenerators and
core cogenerators; who have qualified for and elected non-core procurement
may choose core-elect procurement initially only when the wACOG of the
non-core portfolio is less than the WACOG of the core portfolio.
Core-elect procurement customers may enter into a new core-elect contract
for the same or a lesser amount of gas upon expiration of their old
core-elect contract.
5. the Utility shall provide gas procurement service under Schedule GN-50N on
a best-efforts basis„ Either the Utility or the customer may terminate
the non-core procurement provisions of the service contract by providing a
30-day written notice: of that intention.
6. The term of service for core-elect procurement under Schedule GN-50C shall
be a minhmm of one year. Core-elect customers who do not use their full
contracted quantities on a monthly basis will be liable for unavoidable or
minimum charges to reflect any costs which the Utility incurs as a result,
excluding costs allocated to transmission charges. The termination fees
shall be documented in the procurement contract.
7. Customers having long-term core-elect procurement contracts under GN-50C
may specify in their contract lower volumes of gas each year if they do
not expect their demands to be maintained at current levels.
(continued)
(TO BE INSERTED BY UTILITY) (TO BE INSERTED BY CAL P U CI
ISSUED BY
ADVICE LETTER NO. 1767—A ROY M. RAWLINGS DATE FILED __
DECISION NO 67-12-039 , et a VICE PRESIDENT EFFECTIVE
nev a.o RESOLUTION NO.
Revised CAL.P U,C.SHEET NO 18723—G
SOUTHERN CALIFORNIA GAS COMPANY LOS ANGELES, CALIFORNIA CANCELING ReVlsed CAL. P.UC. SHEETNO. 18640-G
'(Sheet 3 of 4)
Schedule No. GN-50
NATURAL GAS SERVICE FOR COGENERATION
(Continued)
SPECIAL NNDITIONS (Continued)
8. Core customers must purchase gas from the core gas portfolio unless they
demonstrate to the Utility's satisfaction that they are capable of using
an alternate fuel on a sustained basis, have installed and use such
equipment and that such alternative fuel use is an economic alternative to
core service, at which time they may be classified as non-core customers and
may purchase gas from the non-core portfolio.
9. A Cogeneration Contract Addendum (Form 5058) will be required as a
condition of service under this schedule in those cases where additional
facilities are necessary to serve a customer who has requested service at
higher than standard delivery pressure.
10. This schedule is available for only the cogeneration portion of the
customer's gas purchases, which will be the lesser of:
a. Actual gas used by the cogenerator in the sequential production of
electrical energy and heat, steam, or useful work; or
b. The amount of gall the local electric utility would require to
generate and transmit an equivalent amount of electricity, based on
the utility's average annual incremental heat rate and reasonable
transmission losses.
11. Customers will make available any existing meters and associated
measuring facilities required to measure the kilowatt-hours generated.
The Utility shall have the right to read, inspect and/or test the
measuring facilities 'during normal working hours. Additional gas,
electric and/or steam metering facilities required to separately determine
gas usage to which Schedule GN-50 is applicable will be installed, owned
and operated by the Utility at its expense; however, the Utility may, at
its sole discretion, utilize estimated data to determine such gas usage.
12. Utility does not require standby equipment as a condition of service under
this schedule. it is the sole responsibility of the customer to provide
and maintain adequate standby equipment and fuel at all times for
immediate operation in the event that the supply of gas shall be
interrupted or curtailed in whole or in part.
(continued)
(TO BE INSERTED BY UTILITY) ITO BE INSERTED BY CAL. P U CI
ISSUED BY
ADVICE LETTER NO. 1767—A ROY M. RAWLINGS DATE FILED
DECISION NO. 87-12-039 , et al VICE PRESIDENT EFFECTIVE
nsv.s.w orenl rn.. . �
Rev
j Sed CAL.P.U C. SHEET NO,1872_ 4-C
SOUTHERN CALIFORNIA GAS COMPANY p
LOS ANgELES. CALIFORNIA CANCELINGRgYiSed CAL. P U.C.SHEET NO, 18641-G
Schedule No. GN-50 (Sheet 4 of 4)
NATURAL GAS SERVICE FOR COGENERATION
(Continued)
SPECIAL CONDITIONS (Contimed)
13. In the event of curtailm om
ent, custers under this schedule will be
curtailed in accordance with Rule 23, Priority of Service.
14. In the event customers make any material change, either in the amount or
character of gas appliances or equipment, written notice to the Utility
must be made in accordance with Rule 29, Change of Consumer's Apparatus or
Equipment.
(TO BE INSERTED BY UTILITY) ISSUED BY (TO BE INSERTED BY CAL, P U.C.)
ADVICE LETTER NO. 1767-A ROY M. RAWLINGS DATE FILED
DECISION NO. 87-12-039 . et al VICE PRESIDENT EFFECTIVE
• Re ed 18701-G
CAL.P.U.C.SHEET NO
SOUTHERN CALIFORNIA GAS COMPANY Revised
LO• ANGELES. CALIFORNIA CANCELING CAL P.U.C.SHEET NO. 18618-G
(Sheet 1 of 3)
Schedule No. (MI-20
NAZS7RAL GAS CURE: = = FOR LARGE CM1ERCLAL AND INNLUSPRIAL
APPLSCABTT,i'ry
Applicable to natural gas service for uses classified in Rule 23 as Priority
1 and 2A at each Facility with usage exceeding 250,000 therms per year (or
20,800 therms per month during the season when gas is used) . CLu^tomers
eligible for service under this schedule may also elect transportation service
under Rate Schedule GT-20.
TEI=RY
Applicable throughout the service territory.
RATES
Custmer Charge, per month (P-1 Service) ... .. . .. . . $10.00
Custanes Charge, per month (P-2 Service) .. . . . . . . . . $50.00
If the customer charge is collected under Schedule G1-20, no duplicative
charge is collected hereunder.
Rate, per therm:
Summer Winter
GN-20C, Core Service, per therm.
First 5,000 therms . . . . . . . . . . . .. .. . . . . . .. . . . . . . . . 46.5000 59.7970
Over 5,000 therms . . . . . . .. . . . ... . .. . . .. .. . . . .. . . . 40.0000 44.000C
GN-20N, Non-Core Service, per therm.
First 5,000 therms . .. . . . . . .. . ... . . . . . . . .. . . . . . . . 43.2250 56.5220
Over 5,000 therms .. . .. . . . . .. . . .. ... .. . . . . . . . . . . . 36.725C 40.725G
Custaners eligible i'or service under Schedule GN-20 may elect non-core gas
procurement. The rage for this service (GN-20N) is calculated based on
the weighted average cost of gas (WACOG) of the non-core gas portfolio
(subject to revision not more than twice monthly upon five days notice)
plus the difference between the GN-20C procurement charge and the average
cost of the core gas portfolio. The average cost of the core gas
portfolio is 21.094C: per therm.
Under this schedule, the winter season shall be defined as November 1
thrcugh April 30.
(continued)
(TO BE INSERTED BY UTILITY) (TO BE INSERTED BY CAL. P U.C.)
ISSUED BY
ADVICE LETTER NO. 1767-A DATE FILED
— ROY M. RAWLINGS
87-12-039 et al
�ECIBION NO. I - VICE PRESIDENT EFFECTIVE
RESOLUTION NO.
Ori*l 18789-G**
_- __ CAL.P U C.SHEET NO
SOUTHERN CALIFORNIA GAS COMPANY Revised *"
LOS ANGEE LES. CALIFORNIA CANCELING— CAL. P U C. SHEET NO.
(Sheet 2 of 3)
Schedule No. GN-20
NATURAL GAS CORE SERVICE FOR LARGE C TlERCIAL AND INLZTSTRIAL
(Continued)
RATFS (Continued)
Minim= Charge
The minin m monthly charge shall consist of the Monthly Customer Charge.
The number of therms to be billed shall be determined in accordance with Rule
No. 2.
SPECIAL CONDITIONS
1. Definitions of the principal terms used in this schedule are contained in
Rule No. 1.
2. Customers may receive service under this schedule (a) separately, (b) in
combination of priorities under this schedule or (c) in combination with
another rate schedule(s) through a single meter installation. Where
service is rendered under (b) or (c) , a separate monthly customer charge
may be applicable for service under each schedule.
3. As a condition precedent to service under this schedule, an executed
Contract for Cas Service (Form No. 6412) is required, specifying the terns
of service.
4. Customers under this schedule may purchase gas under the core portfolio
(GN-20C) or the non-core portfolio (GN-20N) . Customers may enter into
core-elect procurement initially only when the WACCG of the non-core
portfolio is less than the WACOG of the core portfolio. Core-elect
procurement customers may enter into a new core-elect contract for only
the same or a lesser amount of gas upon expiration of their old core-elect
contract. Customers who leave core procurement service may return to ,core
procurement only under core-elect procurement service.
5. The Utility shall provide non-core gas procurement service on a
best-efforts basis. Either the Utility or the customer may terminate the
non-core procurement provisions of the Service Contract by providing a
30-day written notice of that intention, with the exception that the
customer may nominate zero volume purchases for any given month following
a revision to the non-core procurement portfolio WACCG.
**18529-G, 18530-G, 18531.-3, 18149-G, 18619-G
i
(continued)
(TO BE INSERTED BY UTILITYI (TO BE INSERTED BY CAL. P.U.0 1
1767-A 3rd Su 1. ISSUED BY
ADVICE LETTER NO. p P ROY M. RAWLINGS DATE FILED Apr 29 • 1988
DECISION NO. 87-12-039, et al VICE PRESIDENT EFFECTIVE May 01, 1988
eov ,-. RESOLUTION NO. G-2787 & G-2783
Original 18790-G*-
CAL.P U C. SHEET NO
SOUTHERN CALIFORNIA GAS COMPANY
LOS ANGELES. CALIFORNIA CANCELING CAL.P.0 C. SHEET NO
(Sheet 3 of 3)
Schedule No. GN-20
NATURAL GAS CCRE SERVICE FOR LARGE =QCTAL AND =TSTRIAL
(Continued)
SPECIAL CONDITIONS (Continued)
6. The term of service for core-elect procurement under Schedule CN-20C
shall be a minimm= of one year. Customers who do not use their full
contracted quantities on a yearly basis will be liable for unavoidable or
minimim charges to reflect any costs which the Utility incurs as a result,
excluding costs allocated to transmission charges. The termination fees
shall be doclmlented, in the procurement contract.
7. Customers having long term core-elect procurement contracts under Schedule
chi-20C may specify in their contracts lower volumes of gas each year if
they do not expect their demands to be maintained at current levels.
8. Customers under this schedule may be reclassified as non-core if they i
demonstrate to the Utility's satisfaction that they meet the following
conditions: 1) clearly have the technological capability to use alternate
fuel; 2) would be able to use alternate fuel at a cost that is less than
the cost of core gas service; and 3) the customer is willing to accept the
lower service priority of non-core service. Such classifications must be
submitted to the Commission for approval. Customers who qualify under
these conditions and choose to be classified as non-core will be served
under Rate Schedule GN-30. Customers who are classified as non-core must
requalify with the conditions above on an annual basis. j
9. In the event of curtailment, customers ::.der this schedule will be
curtailed in accordance with Rule 23, Priority of Service.
i
10. In the event customers make any material change, either in the amount or
character of gas appliances or equipment, written notice to the Utility
must be made in accordance with lZule 29, Change of Consumer's Apparatus or
Equipment.
(TO BE INSERTED BY UTILITY) (TO BE INSERTED BY CAL. P.U.CI
ISSUED BY
ADVICE LETTER NO. 1767-A 3rd Su4p1. ROY M. RAWLINGS DATE FILED Apr 29, 1988
(DECISION NO. 87-12-039, et al VICE PRESIDENT EFFECTIVE May 01, 1988
acv '"O RESOLUTION NO. G-2787 & G-2783