AGREEMENT #2427
R16193, 5-6-87
SEWER CONSTRUCTION REFUND AGREEMENT BETWEEN
THE CITY OF PALM SPRINGS, CALIFORNIA, AND
ROBERT TARR
SEWER AGREEMENT NO.
THIS AGREEMENT made and entered into this day of
—, 1997, between the CITY OF PALM SPRINGS, CALIFORNIA, a municipal
corporation, hereinafter called the CITY, and ROBERT TARR
hereinafter called the developer.
WHEREAS, the DEVELOPER is, at the time of this agreement, the owner
of Parcel No. 513-363-002 as shown on Assessor' s Map, Section 27, Township
4 South, Range 4 East, San Bernardino Base and Meridian , delineated on
the plat "Sewer Construction Refund Agreement" attached hereto, marked
Exhibit "A" , and hereby made a part
WHEREAS, the CITY has established a policy for sewer refund agreements
and contributions for oversize sewer by City Council Resolution No. 13773
dated April 15, 1981 , which by reference is hereby made part of this
agreement; and
WHEREAS, said sanitary sewers have been dedicated to public use
by the DEVELOPER, and have been accepted by the CITY; and
WHEREAS, the DEVELOPER has submitted a financial statement of
construction costs for said sewers from:
HENDRICKSON CONSTRUCTION, INC. Dated February 23, 1987
copies of which are attached hereto, and marked "Exhibit B" , and made
part of this agreement; and
WHEREAS, the DEVELOPER, in accordance with the before mentioned
Council resolution has requested that the CITY AND THE DEVELOPER enter
into a Sewer Refund Agreement to reimburse the DEVELOPER for the cost
of off-site sewer which benefits other properties; and
WHEREAS, the CITY has determined that benefit from the construction
of off-site sewer will accrue to properties connecting to the off-site
sewer; and
WHEREAS, the CITY had determined that said benefit will be direct
y
proportion to the frontages of Parcels 513-361-016, 513-361-017,
513-363-008 and 513-363-002, as shown on Exhibit "A" .
NOW, THEREFORE, THIS AGREEMENT WITNESSETH that for and in
consideration of the mutual covenants indicated between the CITY and
the DEVELOPER, it is hereby agreed that developers , owners, or lessees
of lots shown on Exhibit "A" abutting said sewer shall pay to the CITY
the amount shown herein, plus sewer connection charges in effect at such
time prior to a permit being issued for connection to said sewer. Upon
receipt of such payment CITY shall pay to DEVELOPER the amount shown
herein.
The Assessment for Parcels is hereby established:
$49.2256 per front foot (not including laterals)
ASSESSORS NO. FRONTAGE ASSESSMENT COST
513-361-016 70 FT. $3,445.80
513-361-017 70.30 FT. $3,460. 57
513-363-008 173. 56 FT. $8,543.60
513-363-002 83.44 FT. $4,107.39
IN WITNESS WHEREOF, the CITY and the DEVELOPER have hereunto caused these
presents to be executed the day and year first above mentioned.
ATTEST: (NAME
By_ _ l
ATTEST: CITY OF PALM SPRINGS, CALIFORNIA
Bc' - _> '
City Clerk City Manager
Reviewed and Approved y
APpi2C)V iL, 6'd'Ystir,kCU1'`9'CC0lB4C1L
0
RESOLUTION NO. 16193
OF THE CITY COUNCIL OF THE CITY OF PALM SPRINGS,
CALIFORNIA, AUTHORIZING AND APPROVING SEWER CON-
STRUCTION REFUND AGREEMENT WITH ROBERT TARR.
WHEREAS, by Resolution No. 13773 of the City Council dated April 15, 1981, a
policy was established for the formation of Sewer Construction Refund Agree-
ment; and
WHEREAS Robert Tarr has caused to be constructed off-site sanitary sewers with
manholes and other appurtenances along Crestview Drive which will be connected
to the existing City sewer system; and
WHEREAS Agreement No. 2427 provides for collection by the City from persons
tapping into this off-site sanitary sewer and reimbursement from such amounts
to Robert Tarr.
NOW THEREFORE BE IT RESOLVED that the City Council of the City of Palm Springs
does hereby authorize and approve Agreement No. 2427 .
ADOPTED this 6th day of May 1987.
AYES: Councilmembers Apfelbaum, Birer, Foster and Smith
NOES: None
ABSENT: Mayor Bogert
ATTEST: CITY OF PALM SPRINGS, CALIFORNIA
By _
tty er — City Manager
REVIEWED & APPROVED: G __
WP/RES
I _ '
24
O
J:3 W
1 U` 513-3GI-016
` c� 513-3GI-ol7
-1o.o�
lC` 17 513-3G3-008
o
28
C4 — J
•l
W
II
SEWEW C0N5TRUCTION REFUND AGREEMENT BETWEEN
NE CITY O+: PALM SPRINGS AND 'ROLiETI' TARR
5EWE9 AGREEMENT NO.
PCTED
F
EXHIBIT "A„
Aun cANVON '
AM V1rrA �¢ carve
o�`ELu"+e to SEWER REFUND AGREEMENT PLAT
r cRcsT��w UY� � t
SlT& } BEING A PORTION OF TUE N.E'. /d OF $EG,y7,L.4S,R.4E.,S.B.B.EM.
LA VK Wri wn IMCCT
WA I
VEClNfTY MAP '
N.T.V.
HAICKSON CONSTRUCTION, INC. INVOICE
General Engineering Contractor . Underground Specialists 5135
<#> Post Office Box U • Cathedral City, California 92234
Llc a256184,A (619) 328-1747
TO ROBERT TARR DATE 2-16-87 JOB NO. 2283
1777 RIDGE ROAD JOB NAME SAME
PALM SPRINGS, CALI1 . 92262 Joe LOCATION SAME
TERMS
DESCRIPTION PRICE AMOUNT
150 LF 8" SEWER , 3V E, t'13D 1 MANHOLE
i
TOTAL CONTRACT PRICE $17 , 130.00
i
EXTRA WORK l SEE A!'TACHED ) __2, 427.35
I
$19, 557.36
LH88 DDrN PAYMENT CHECK #101 7, 000.00
TOTAL AMOUNT NOW DUE THANK YOU! $12, 557.36
PLEASE PAY FROM THIS INVOICE
1 ti�
,l I
4�
i
I
'I
I
i
Ail bills due upon presentation.A finance charge of 1'A%,which is an 18%
annual rate,will be charged on that portion of your balance which is more
than 20 days past due.Any attorneys tees and costs which may be Incurred
In the collection of this Invoice will also be charged.
I
I
f
<*>
HENDRICKSON CONSTRUCTION, INC.
General Engineering Contractor • Underground Specialists
TARR: JOB 2283 EXTRA
CLEAN OUT AT END OF 4" LATERAL --------------- $ 116.58
4TH LATERAL----- --------------------------------- $ 354.62
BOBCAT EXCAVATOR FOR TRENCHING-2 HRS.@ $50.00 ---- $ 100.00
CONSTRUCTION PERMIT------------------------------- $ 355.00
CONSTRUCTION SURVEYING & STAKING ------------------- $ 750.00
DOWN TIME BECAUSE OF UTILITY CROSSINGS BEING
MISMARKED------------------------------------------ $ 7`-
2-3-87
CUT GAS SERVICE (2 hours delay) TOTAL EXTRA CHARGES $2427.36
TRAV----$32.66 PER HR. X 2=$65.32
BOB-----$32.52 PER HR. X 2=$65.04
DAN-----$29.47 PER HR. X 2=$58.94
CHUCK---$26.90 PER HR. X 2=$53.80
LUIS----$26.90 PER HR. X 2=$53.80
TOTAL--------------------------------------------- $ 296.90
2--4-87
8" WATER LINE OFF 6'-10' --TUNNELING ---2 HOUR DELAY
TRAV-----$32.66 PER HR. X 2=$65.32
BOB-----$32.52 PER HR. X 2=$65.04
DAN-----$29.47 PER HR. X 2=$58.94
CHUCK---$26.90 PER HR. X 2=$53.80
LUIS----$26.90 PER HR. X 2=$53.80
TOTAL-------------------------------------------- $ 296.90
$ 593.80
15% OVERHEAD $ 89.07
G82.87
10% PROFIT $ 68.29
T51-
Post Office Box U Cathedral City, CA 92234 • (619) 328-1747
License k256164-A
l
j
HENDRICKSON CONSTRUCTION, INC.
General Engineering Contractor • Underground Specialists
WAGE COST SHEET
WAGES BENEFITS FICA UNEMP.INS. FUTA WORK-COMP HOURLY
OPERATORS
TRAMS CADWELL $19.74 7 .38 1.50 .74 . 17 3.13 32.66
BOB TAYLOR 19.63 7.38 1 .50 .73 . 17 3.11 32.52
LABORERS
LUIS SALAZAR 14.42 8.21 1.16 .57 .12 2.42 26.90
JOSE MERCADO 14.42 .8.21 1 .16 .57 .12 2.42 26.90
CHARLES MANTHEY 14.42 8.21 1.16 .57 .12 2.42 26.90
GREG SALAZAR 14.42 8.21 1. 16 .57 .12 2.42 26.90
TEAMSTERS
DAN CADWELL 16.56 8.04 1.32 .65 .15 2.75 29.47
Post Office Box U • Cathedral City, CA 92234 • (619) 328-1747
License M256161-A
y}
1i
1
A
M..
All Concrete Pouring As CITY OF PALM SPRINGS, CALIFORNIA Contractor Must Have This Permit at
Subsurface Structures Must Be Done anubom of Carolina y DW*Pment the Job Site or the Work WIII Not
In the Present of an Inspector. CU N S T R U CT I ON P E R-M I T Be Inspected.
For the 1Corrl:troctlen of Streets, Sewers, Storm Drains and any work within Public Streets or Right of Way
APPLICANT'S NAME(Print) t—`�N�17_.fLh`.: O h` i..—Ur • .'•T
ADDRESS —�✓ I S K)C L�1" L Ar T. �cj`Af` 'y imam,Fmn a C«Rw+lbnl PHONE NO.
SKETCH PHONE 323.8253 (Field Engineering)
REMARKS: 24 Hire.In advance of Inspection.
START DATE:
WORK DAYS:
COMPLETION DATE: •Z - Z8 -u
JOB FOREMAN'.
PFW*CONTRACTOR:
sUBCONT?ACTOR:
SUBCONTRACTOR:
SUBCONTRACTOR:
JOB PHONE.
TESTING LAB:
CITY INSPECTOR M P-,I+L-'oN ACiLG CITYPROJECTNO. BIDAMOUNTS
PURCHASE ORDER NO. ACCOUNT NO.
(Fuld Hm.)_ JOB LOCATION Street Address or Descrlplon of Location PERMIT NO.
09787
STREET ADDRESS All work detailed on this permit shall be
constructed In accordance with the provisions
CURB: L1N.F7.A7 PER F7. =$ of this permit 10 the satisfaction of the City
SIDEWALK: SO.FT.AT PER SO.FT. =$ Engineer. The Municipal Code of the City of
PAVEMENT: �=•`7 O 1' Palm Springs,this Construction Permit,and the
SO.FT.AT PER SO.FT. =$ following standard plans are hereby made a
CROSS GUTTER: PER EA: EA. =y part of this permit: -
RIBBON GUTTER: I IN.FT.AT PER LIN.FT. =€ STREET PLAN B
DRIVEWAY: PER EA. EA. =$ SEWER PLAN X
SEWER MAIN: LIN.FT.AT PER LIN.FT. =$
GRADING PLAN 1-1 Check
SEWER LATERALS' LIN.FT.AT PER LIN.FT. =$
WATER PLAN O Check
SEWER CONNECTIONS: PER EA. EA. =$
BUILDING PLAN O Check
SEWER MANHOLES: PER EA. EA. =$ The above referenced sketch, plans, profiles,
=5 standard plan, waivers, affidavit bonds,
=E insurance and the standard specifications of the
_ City of Palm Springs,are hereby Included and
SURVEY INSPECTION FEE Z 1" =S made a pa ILtlgis permit.
Contractor or Permltee Is Responsible for Testing. PERMIT FEE
(Except City Projects) TOTAL FEES =3 OP
DATE: )—�'j p - "� 1 have read the above and agree to comply with the THIS PERMIT MUST
provisions of this permh,including the rules printed JA I,!
IS UED BY 1 i I on Y
the reverse of this permit, and to pay for an " tl/
,:'�'��j; L( ;��•.f ,U,,,� additional replacement necessary as the result of
tms work. CITY TREASURER
APPLICANT'S COPY �% CITY OF PALM SPRINGS
SIGNATURE DF APPLICANT,OWNER OR AGENT CITY TREASURER'S VALIDATION
i
_5
4'