Loading...
HomeMy WebLinkAboutA8646 - Change Order #1 - Torres Sanitation Systems ConstructionCK WI tI'M,TO W.-NMARAETO1A 2 Originals: Contract Change Order No. 1 Contract Company Name: Torres Sanitation Systems Construction Company Contact: Alexandro Torres Summary of Services: CP 20-20, 2020 Sewer Collectio in Repairs Contract Price: $167,288.25 (including this CC for $2,860.2 Funding Source: 420-6800-57050 Contract Term: To be determined by the Notice to Proceed Contract Administration Lead Department: Contract Administrator: Development Services — Engineering Division Joel Montalvo/Donn Uyeno Contract Approvals Council Approval: December 10, 2020, Item 5.E. Contract Change Order # 1: TBD Agreement Number: A8646 Contract Compliance Exhibits: On file Signatures: Attached Insurance: On file Bonds: On file Contract Prepared By: Engineering Division Submitted on: 03/16/2021 By: Vonda Teed yVr� O� PAIM sA4'y A. - CITY OF PALM SPRINGS CONTRACT CHANGE ORDER C'�l /FORN�P To: Torres Sanitation Systems Construction Date: March 1, 2020 9617 Otis Street City Project No.: 20-20 South Gate, CA 90280 Project: 2020 Collection System Repairs Change Order No.: 1 (one) Purchase Order: 21-0699 Attn: Alexandro Torres Account No.: 420-6800-57050 This Contract Change Order No. 1 (CC01) provides for the cost of additional time, material and equipment due to an unmarked SCE utility line encased in concrete that was built over the existing sewer line. Change Order 1: Additional time, material and equipment due to an unmarked SCE utility line encased in concrete that was built over the existing sewer line at Cahuilla Rd and Tahquitz Canyon Way. Total Change Order Amount: Reasons for Changes: $2,860.25 Torres Sanitation has requested a change order due to the unforeseen conditions encountered in the field with a 2-ft concrete encasement around an unmarked SCE line that was built on top of the City's sewer line. The conflict was brought to the attention of the inspector, who reviewed and approved this additional work because this was the only way to get to the damaged sewer pipe that needed to be replaced. The Contractor spent considerable time chipping away at the 2-ft of concrete just to get down to the sewer pipe in need of repair. Changes to Contract Time: None. Source of Funds: Wastewater Fund (Fund 420). Construction contingencies for the project account no. 420-680-57050 is sufficient to the cover the cost of CCO1. Summary of Costs: Original Contract Amount: $164,428.00 Start Date: 02-01-21 Previous Change Order Amount: $0.00 Previous Days Added: 0 This Change Order Amount: $2,860.25 Days Added: 0 Revised Contract Amount: $167,288.25 Revised Completion: 06-08-21 CP 20-20 202 Collection System Repairs Contract Change Order No. 1 March 1, 2020 Page 2 I have received a copy of this Change Order and thg above AGREED PRICES are acceptable to Contractor Torres Sanitation Systems ✓��(!�/ � _ � _ 2 Construction -� Signature Date Alexander Torres, Owner City of Palm Sorinas Recommended By: Donn Uyeno, Project ager Date Recommended By: oe ntalvo, City Engineer Date Approved By: (A 0 2�? Aa . Ready, City Manager Date Attest By: � �� oLf 16, lzoz I Ant ny Mejia, City Clerk Date Approved as to Form: •- --, V., " 202 ffre Ballinge , City Attorney Date Distribution: Original Conformed Copy: Contractor (1) City Clerk (1) Conformed — File Co Engineering Pay File (1) City Project File (1) Purchasing (1) Finance (1) APPROVED BY MY COUNCIL AGREEMENT (CONSTRUCTION CONTRACT) THIS AGREEMENT made this day of *'-A 20_1-1, by and between the City of Palm Springs, a charter city, organized and exis ng in the County of Riverside, under and by virtue of the laws of the State of California, hereinafter designated as the City, and Torres Sanitation Systems Construction, hereinafter designated as the Contractor. The City and the Contractor, in consideration of the mutual covenants hereinafter set forth, agree as follows: ARTICLE 1 o THE WORK For and in consideration of the payments and agreements to be made and performed by City, Contractor agrees to furnish all materials and perform all work required to complete the Work as specified in the Contract Documents, and as generally indicated under the Bid Schedule(s) for the Project entitled: 2020 SEWER COLLECTION SYSTEM REPAIRS CITY PROJECT NO.20-20 The Work comprises of the rehabilitation by way of point repairs of twelve (12) sewer line segments of eight -inch (8") sewer main (manhole to manhole), for a total of seventeen (17) short length repairs using open cut methods as detailed within the contract documents. ARTICLE 2 — COMMENCEMENT AND COMPLETION The Work to be performed under this Contract shall commence on the date specified in the Notice to Proceed by the City, and the Work shall be fully completed within the time specified in the Notice to Proceed. The City and the Contractor recognize that time is of the essence of this Agreement, and that the City will suffer financial loss if the Work is not completed within the time specified in Article 2, herein, plus any extensions thereof allowed in accordance with applicable provisions of the Standard Specifications, as modified herein. They also recognize the delays, expense, and difficulties involved in proving in a legal proceeding the actual loss suffered by the City if the Work is not completed on time. Accordingly, instead of requiring any such proof, the City and the Contractor agree that as liquidated damages or delay (but not as a penalty), the Contractor shall pay the City the sum specified in Section 6-9 of the Special Provisions for each calendar day that expires after the time specified in Article 2, herein. In executing the Agreement, the Contractor acknowledges it has reviewed the provisions of the Standard Specifications, as modified herein, related to liquidated damages, and has made itself aware of the actual loss incurred by the City due to the inability to complete the Work within the time specified in the Notice to Proceed. 2020 SEWER COLLECTION SYSTEM REPAIRS CITY PROJECT NO.20-20 AGREEMENT FORM OCTOBER 2020 AGREEMENT AND BONDS - PAGE 1 Termination Prior to Expiration of Term. City may terminate this Agreement for its convenience at any time, without cause, in whole or in part, upon giving Contractor written notice, pursuant to Section 6-8 of the Special Provisions. Where termination is due to the fault of Contractor and constitutes an immediate danger to health, safety, and general welfare, the period of notice shall be such shorter time as may be determined by the City. Upon such notice, City shall pay Contractor for Services performed through the date of termination in accordance with the Contract Documents. Upon receipt of such notice, Contractor shall immediately Cease all work under this Agreement, unless stated otherwise In the notice or by written authorization of the Contract Officer. After such notice, Contractor shall have no further claims against the City under this Agreement. Upon termination of the Agreement under this section, Contractor shall submit to the City an invoice for work and services performed prior to the date of termination. ARTICLE 3 — CONTRACT PRICE The City shall pay the Contractor for the completion of the Work, in accordance with the Contract Documents, in current funds the Contract Price(s) named in the Contractor's Bid Proposal and Bid Schedule(s), and any duly authorized Construction Contract Change Orders approved by the City. The amount of the initial contract award in accordance with the Contractor's Bid Proposal is $164,428.00. Contractor agrees to receive and accept the prices set forth herein, as full compensation for furnishing all materials, performing all work, and fulfilling all obligations hereunder. Said compensation shall cover all expenses, losses, damages, and consequences arising out of the nature of the Work during its progress or prior to its acceptance including those for well and faithfully completing the Work and the whole thereof in the manner and time specified in the Contract Documents; and, also including those arising from actions of the elements, unforeseen difficulties or obstructions encountered in the prosecution of the Work, suspension of discontinuance of the Work, and all other unknowns or risks of any description connected with the Work. ARTICLE 4 — THE CONTRACT DOCUMENTS The Contract Documents consist of the Notice Inviting Bids, Instructions to Bidders, the Prevailing rate of per diem wages as determined by the Director of the California Department of Industrial Relations, the accepted Bid and Bid Schedule(s), List of Subcontractors, Local Business Preference Program — Good Faith Efforts, Non - Discrimination Certification, Non -Collusion Declaration, Bidder's General Information, Bid Security or Bid Bond, this Agreement, Worker's Compensation Certificate, Performance Bond, Payment Bond, Standard Specifications, Special Provisions, the Drawings, Addenda issued during bidding (if any), and all Construction Contract Change Orders and Work Change Directives which may be delivered or issued after the Effective Date of the Agreement and are not attached hereto. 2020 SEWER COLLECTION SYSTEM REPAIRS CITY PROJECT NO 20-20 AGREEMENT FORM OCTOBER 2020 AGREEMENT AND BONDS - PAGE 2 ARTICLE 5 -- MUTUAL OBLIGATIONS For and in consideration of the payments and agreements to be made and performed by the City, the Contractor agrees to furnish all materials and perform all work required for the above stated project, and to fulfill all other obligations as set forth in the aforesaid Contract Documents. City hereby agrees to employ, and does hereby employ, Contractor to provide the materials, complete the Work, and fulfill the obligations according to the terms and conditions herein contained and referred to, for the Contract Price herein identified, and hereby contracts to pay the same at the time, in the manner, and upon the conditions set forth In the Contract Documents. Contractor specifically acknowledges and agrees to be bound by the Wage Rates and Labor Code requirements specified in the Contract Documents, including the requirement to fumish electronic certified payroll records directly to the Labor Commissioner (via the Division of Labor Standards Enforcement), and shall pay the general prevailing rate of per diem wages as determined by the Director of the Department of Industrial Relations of the State of California. ARTICLES —PAYMENT PROCEDURES The Contractor shall submit Applications for Payment in accordance with the Standard Specifications as amended by the Special Provisions. Applications for Payment will be processed by the City Engineer as provided in the Contract Documents. ARTICLE 7 -- NOTICES Whenever any provision of the Contract Documents requires the giving of a written Notice between the parties, it shall be deemed to have been validly given if delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended, or if delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the Notice. ARTICLE 8 — INDEMNIFICATION The Contractor agrees to indemnify and hold harmless the City, and all of its officers and agents from any claims, demands, or causes of action, including related expenses, attorney's fees, and costs, based on, arising out of, or in any way related to the Work undertaken by the Contractor hereunder. This Article 8 incorporates the provisions of Section 7-15 "Indemnification," of the Special Provisions, which are hereby referenced and made a part hereof. Prevailing Wages. Contractor agrees to fully comply with all applicable federal and state labor laws including, without limitation Califomia Labor Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 16000, et seq. ("Prevailing Wage Laws"). Contractor shall bear all risks of payment or non-payment of prevailing wages under California law, and Contractor hereby agrees to defend, 2020 SEWER COLLECTION SYSTEM REPAIRS CITY PROJECT NO.20.20 AGREEMENT FORM OCTOBER 2020 AGREEMENT AND BONDS PAGE 3 indemnify, and hold the City, its officials, officers, employees, agents and volunteers, free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. ARTICLE 9 -- NON-DISCRIMINATION In connection with its performance under this Agreement, Contractor shall not discriminate against any employee or applicant for employment because of actual or perceived race, religion, color, sex, age, marital status, ancestry, national origin (i.e., place of origin, immigration status, cultural or linguistic characteristics, or ethnicity), sexual orientation, gender identity, gender expression, physical or mental disability, or medical condition (each a "prohibited basis"). Contractor shall ensure that applicants are employed, and that employees are treated during their employment, without regard to any prohibited basis. As a condition precedent to City's lawful capacity to enter this Agreement, and in executing this Agreement, Contractor certifies that its actions and omissions hereunder shall not incorporate any discrimination arising from or related to any prohibited basis in any Contractor activity, Including but not limited to the following: employment, upgrading, demotion or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship; and further, that Contractor is in full compliance with the provisions of Palm Springs Municipal Code Section 7.09.040, including without limitation the provision of benefits, relating to non-discrimination in city contracting. ARTICLE 10 -- MISCELLANEOUS Terms used in this Agreement which are defined in the Standard Specifications and the Special Provisions will have the meanings indicated in said Standard Specifications and the Special Provisions. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically, but without limitation, monies that may become due and monies that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. The City and the Contractor each binds itself, its partners, successors, assigns, and legal representatives, to the other party hereto, its partners, successors, assigns, and legal representatives, In respect of all covenants, agreements, and obligations contained in the Contract Documents. SIGNATURES ON NEXT PAGE 2020 SEWER COLLECTION SYSTEM REPAIRS CITY PROJECT NO.20-20 AGREEMENT FORM OCTOBER 2020 AGREEMENT AND BONDS PAGE 4 IN WITNESS WHEREOF, the City and the Contractor have caused this Agreement to be executed the day and year first above written. CITY OF PALM SPRINGS, CALIFORNIA BY David H. Ready City Manager ATTEST: a APPROVED AS TO FORM: ere . 13a I I in g-'6r, City Attorney RECOMMENDED: By Joel Montalvo, P.E. City Engineer APPROVED BY THE CITY COUNCIL: Date 1 Z" i LZ O Agreement No. b� APPROVED BY MY COUNCIL i I2_121t0 2020 SEWER COLLECTION SYSTEM REPAIRS CITY PROJECT NO.20.20 AGREEMENT FORM OCTOBER 2020 AGREEMENT AND BONDS - PAGE 5 CONTRACTOR By: -T rYe. S S an l�nV on S �j s�cw1S C a15NcucA-ko h . T— Firm/Company Name By: _ L:S� Signature (notarized) Name: V-V�Y-Co v-o By: Signature (notarized) Name: Title: 0Q0 \^. Y Title: A notary public or other officer completing this certificate verifies only the Identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy or validity of that document. (This Agreement must be signed in the above space by one having authority to bind the Contractor to the terms of the Agreement) State of County, before me, SS If NMU rObli( personally appeared AlfwAl3cl rn n i who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signatures(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. (This Agreement must be signed in the above space by one having authority to bind the Contractor to the terms of the Agreement) State of 1 County of On before me, personally appeared who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/herttheir authorized capacity(ies), and that by his/her/their signatures(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing laws of the State of California that the foregoing paragraph is true and correct. paragraph is true and correct. WITNESS my hand and offi Ial seal. WITNESS my hand and official seal. i' IT y Notary Signature: Notary Signature: Notary Seal: TV Notary Seal: ronneininsmunnismom1 — I�OSq� •OO�IIMY� u/i/lu II/1/ ICLOMM �ItpIg11111 1 2020 SEWER COLLECTION SYSTEM REPAIRS CITY PROJECT NO.20-20 OCTOBER 2020 AGREEMENT FORM AGREEMENT AND BONDS - PAGE 6