HomeMy WebLinkAbout24899Resolution No.24899 Page 5
DESCRIPTION
COMPREHENSIVE FEE SCHEDULE
ENGINEERING DIVISION -WASTEWATER
FEE UNIT D
SEWER FACILITY FEE
EXCLUSIVE OF STREET MAIN CHARGES OR STREET LATERAL FEE
NEW CONSTRUCTION SHALL PAY THE SEWER FACILITY FEE IN EFFECT AT THE TIME A BUILDING PERMIT IS ISSUED BY
THE CITY, AND SAID FACILITY FEE SHALL BE PAID PRIOR TO THE GRANTING OF A BUILDING PERMIT. SAID FACILITY
FEES SHALL BE DEPOSITED IN THE SEWER FUND
A. RESIDENTIAL UNITS* ................................................................ $3,000 $1,006 /EDU {EQUIVALENT
DWELLING UNIT)
(INCLUDING SINGLE-FAMILY DWELLINGS, APARTMENTS, CO-OP APARTMENTS, CONDOMINIUMS, AND MOBILE HOME PARK SPACES)
1)IF THE COST OF ON-SITE SEWER CONSTRUCTION AND CONNECTION, EXCLUSIVE OF SEWER FACILITY FEE, SHALLEXCEED THE SUM OF $4,776 PER DWELLING UNIT, OR SUCH GREATER SUM AS SHALL HEREAFTER BE DETERMINEDBY RESOLUTION OF THE CITY COUNCIL, AMOUNTS SHALL BE ADJUSTED ANNUALLY IN ACCORDANCE WITH THEENGINEERING NEWS RECORD CONSTRUCTION COST INDEX.
2)IF THE COST OF SEWER MAIN CONSTRUCTION, IN THE EVENT NO SEWER MAIN EXISTS IN PROXIMITY TO SAIDPROPERTY SHALL EXCEED $7,960 PER DWELLING UNIT, OR SUCH GREATER SUM AS SHALL HEREAFTER BE
:�;!R:1:;�:i�:::���1�;so:E ��!�1:���R:���;:iis�����:.LL BE ADJUSTED ANNUALLY IN ACCORDANCE
O
B. COMMERCIAL AND INDUSTRIAL UNITS* ............................... $306 $100 FIXTURE UNIT
C.HOTEL ROOMS (AS DEFINED BY THE ZONING ORDINANCE)
WITHOUT KITCHENS* .............................................. $1,290 $343 UNIT
WITH KITCHENS * ...................................................... $1,500 $663 UNIT
D. RECREATIONAL VEHICLE SPACE*............................................ $2,340 $246
(FOR BUILDING PERMITS)
E.ASSESSMENT DISTRICTS
SPACE
THE SEWER FACILITY FEE TO BE PAID FOR PREMISES WITH SERVICE MADE AVAILABLE BY AN ASSESSMENT DISTRICT SHALLBE THE FEE IN EFFECT AT THE TIME A PETITION REPRESENTING 60% SUFFICIENCY IS FILED WITH THE CITY, PROVIDED SAIDCONNECTION OCCURS DURING THE COURSE OF CONSTRUCTION BUT IN NO EVENT LATER THAN 30 DAYS AFTER FILINGOF NOTICE OF COMPLETION OF THE ASSESSMENT DISTRICT. SHOULD A PERMIT NOT BE SECURED WITHIN THE TIMEFRAME SET FORTH HEREIN, THE FACILITY FEE TO BE PAID SHALL BE THAT FEE IN EFFECT AT THE TIME THE PERMIT FORCONNECTION IS SECURED.
PROPERTIES ADJACENT TO CITY*........................................... $6,000 $2,012 UNIT
PROPERTIES OUTSIDE OF THE CITY SHALL PAY A SEWER FACILITY FEE EQUAL TO TWICE THE RATE ESTABLISHED FOR PROPERTIES WITHIN
THE CITY LIMITS.
0
May 27, 2021
Page 2
Resolution No.24899
Page 6
Resolution No.24899 Page 7
Resolution No.24899 Page 8
Resolution No.24899 Page 9